JASMIG CONSTRUCTION SUPPLY
COMPANY PROFILE
JASMIG CONSTRUCTION SUPPLY JASMIG CONSTRUCTION SUPPLY is a Filipino – owned company duly registered by the Department of Trade and Industry and with the Philippine Contractors Accreditation Board. A company built to accommodate the increasing demand of our country to a competent and expert professionals all quite respected in their own fields and have proven attributes of professionalism, experience and expertise.
JASMIG CONSTRUCTION SUPPLY has the capability to undertake any project phase, from initial planning, design, estimates, documentation, project management, construction for any infrastructure project. Hence, the company does not only engage with construction but as well as supply of permanent construction materials, rentals of heavy equipment and all matters regarding construction.
JASMIG CONSTRUCTION SUPPLY
CERTIFICATE OF REGISTRATION
JASMIG CONSTRUCTION SUPPLY
CONTRACTOR’S LICENSE
JASMIG CONSTRUCTION SUPPLY
MAYOR’S PERMIT
JASMIG CONSTRUCTION SUPPLY
ORGANIZATIONAL CHART (Engineering & Construction Division)
JASMIG CONSTRUCTION SUPPLY
RESUMES
PERSONAL DATA JANE CASAS BERBERABE Entrepreneur, Licensed Pharmacist HOME ADDRESS
:
9007 BK National Highway, Brgy. Alangilan, Batangas City, Philippines
OFFICE ADDRESS
:
9007 BK National Highway, Brgy. Alangilan, Batangas City, Philippines
TELEPHONE NUMBER
:
(+6343) 722-0416 +63925-387-6348
E-MAIL ADDRESS
:
[email protected]
CIVIL STATUS
:
Divorced
NATIONALITY
:
Filipino
BIRTH DAY
:
August 27, 1967
SEX
:
Female
EDUCATION: Tertiary
:
University of Sto. Tomas, Manila Bachelor of Science in Pharmacy March 1988
Secondary
:
Saint Bridget College March 1984
Primary
:
Saint Bridget College March 1980
PRESENT WORK
:
Proprietress Jasmig Construction Supply / Jasmig Construction Corporation from 1998 to present
PROJECTS UNDERGONE
:
Refer to Contractor’s Registration Certificate (CRC)
AFFILIATION
:
Member Provincial Unified Builders of Batangas
RESUME PERSONAL DATA: Name:
Frando L. Pulmano
Home Address:
San Isidro, Batangas City
Position:
Purchasing Engineer Supervisor / Project Engineer
Date of Birth:
October 05, 1963
Place of Birth:
Quezon City
Civil Status:
Married
Sex:
Male
Nationality:
Filipino
Dialect Spoken:
English / Filipino
Religion:
Catholic
Weight:
120 lb s
Height:
5’6”
Father’s Name:
Lucas A. Pulmano
Mother’s Name:
Leonor L. Pulmano
EDUCATIONAL BACKGROUND College:
BS Civil Engineering Graduated, March 1985 Cebu Institute of Technology Cebu City
LICENSURE EXAMINATION: Civil Engineering Board Examination November 1985, FEU Girls High License No.: 0047964
SPECIAL SKILLS AND INTEREST Computer literate, knowledge to operate softwares such as MSexcels, MSWord, Powerpoint (for all windows)
WORK EXPERIENCES:
Period
Craft
Name of Project
Jasmig Construction Supply EEI Corporation Construction Division
Purchasing Supervisor / Project Engineer Purchasing Supervisor Engineer
Government Projects
Aug 1997 - Sept 1998
EEI Corporation Construction Division
Purchasing Supervisor Engineer
Jun 1996 – Jul 1997
EEI Corporation Construction Division
Buyer II
Feb 1994 – Apr 1996
EEI Corporation Construction Division EEI Corporation Construction Division
Buyer II
Jan 1999 - Present
Oct 1998 – Jan 1999
Oct 1993 – Feb 1994
Company
Buyer I
JG Summit Petrochemical Plant, Electro-Mech, Simlong, Batangas City GOTO-Semi Conductor Plant, Electro- Mech Carmelray, Canlubang, Laguna Philips SemiConductor Mechanical Piping Lispi, Cabuyao, Laguna Assigned at Main Office Pilipinas Shell Refinery (Star Project) ElectoMech & Instrucmentation, Tabangao, Batangas City
WORK DESCRIPTION: o Review bill of materials (permanent materials) including consumable materials such as cutting disc, welding rod in accordance to specification for the preparation of purchase order after sourcing from three of more suppliers regarding the availability and amount of the said materials. o Approved quotation with the lowest price from three suppliers and award purchased order to the supplier which has the lowest prices. o Review work scheduling (PERT-CPM) in order to procure in advance the material needed for the said work activity. o Prepare RFI (request for Information) for the submittal of material sample, brochure and technical specification to customer for approval. o Prepare three quotations for the approved material thru inquiry from three suppliers. o Prepare evaluation of material to be purchased for approval by project manager. o Encoding of all information including description of materials quantity, unit price and total amount of the said approved purchase order and fed to computer. o After inquiry and find out that the material needed was nowhere to be founding the Philippine Market, we prepare formal inquiry from supplier abroad with complete drawing & specification and sent thru fax or to courier. o Give instruction to buyers if the supplier with the lowest prices has the complete quantity requirements, if not proceed to second supplier with available material. o Signing of purchase order to be awarded to supplier with lowest price and with available material. o Coordination to warehouse personnel if the material needed is available to their office. If not make inquiry to three suppliers for the availability of the said material. o Arrange meeting with warehouse supervisor, material control supervisor and field supervisor pertaining to imported and local materials that will going to use as permanent materials for the said project and discuss exactly the time of arrival at site and availability of the said material to avoid delays resulting to poor progress. I do hereby certify that the above information is true and correct in the best of my knowledge and belief.
SGD. FRANDO L. PULMANO Applicant
RESUME PERSONAL DATA: Name:
Rodolfo H. Dimaandal
Home Address:
Sta. Teresita, Batangas
Position:
General Foreman
Date of Birth:
September 19, 1960
Place of Birth:
Batangas City
Civil Status:
Married
Sex:
Male
Nationality:
Filipino
Dialect Spoken:
English / Filipino
Experience Name of Company: Jasmig Construction Supply Year:
1998 up to Present
Project Title
Refer to Company’s Experience
IRMINA B. DE VILLA REGISTERED CIVIL ENGINEER License No. 0100643 Libra St., Madonna Homes, Alangilan, Batangas City Mobile No.: +639164280239 / E-mail Address:
[email protected] OBJECTIVE To work in a company that will further enhance and develop my knowledge, ability and skills in the field of engineering and construction. QUALIFICATIONS Computer literate [AutoCAD; Microsoft applications (Word, Excel, Power Point)] Have excellent communication skills (oral and written) Highly trainable, fast learner and have ability to stand pressure BWC-DOLE Certified Safety Officer (Certificate No. 40-01-0655-06) EXAMINATION TAKEN AND PASSED Registered Civil Engineer Licensure Examination Manila November 2004 MEMBERSHIP / PROFESSIONAL AFFILIATION Philippine Institute of Civil Engineers, Inc. Batangas Chapter WORK EXPERIENCE Project Engineer Jasmig Construction Supply Kumintang Ibaba, Batangas City October 2008 – up to Present Duties and Responsibilities: • Coordinates and checks of engineering deliverables • Monthly project status reports and change orders Responsible for planning, scheduling, conducting and coordinating the technical and management aspects of projects • Accountable for the successful completion of engineering projects • Requires extensive regular contact with assigned project Clients • Assist in the preparation of engineering project proposals • Budget monitoring and trend tracking • Participating in Client/contractor meetings and resolving Client/engineering and management project issues Review and approve project Client invoices • Ensure effective engineering and Client communications
Ensuring a project is fit-for-purpose and adheres to the project budget and schedule Ensuring all relevant safety objectives and legal requirements are observed
Accounting for engineering tasks to ensure they meet contract requirements
Developing project-specific procedures for the work to be carried out
Interpreting clients' requirements, identifying and addressing design parameters and engineering problems and ensuring solutions are implemented
Ensuring all justifications for contractual variations during projects are maintained to support subsequent commercial claims
Evaluating, organizing and prioritizing work within the overall project schedule
Liaising and managing third party contractors to ensure all equipment is fit for purpose
Taking responsibility for a team of engineers and training/mentoring junior engineers
Keeps good communication with other Engineers
Piping Engineer Atlantic, Gulf & Pacific Company of Manila - New Caledonia (Inco Goro Nickel Mining Plant Project) August 2008 – October 2008 Duties and Responsibilities: Prepares and keeps records of test packages Checks completeness of pipelines on P&IDs under each subsystems before turnover to clients HSE Engineer Atlantic, Gulf &Pacific Company of Manila - New Caledonia (Inco Goro Nickel Mining Plant Project) July 2007 – August 2008 Duties and Responsibilities: Orients newly mobilized manpower on the safety, health and environmental rules of the project Conducts daily prestart safety meeting and weekly toolbox meeting with the workers and superiors Conducts daily safety inspection of working area, workers’ situations and job descriptions and randomly reminds workers on the safety precautions that must be done before or as they do their respective work
Gives alternative solutions on how to do their work safely Conducts safety audits on the working area Conducts routinely inspection of tools and equipment Coordinates with clients and other constructors’ safety engineers and workers to have a harmonious work place Prepares daily safety reports and minutes of the Weekly Safety coordination meeting and monthly Company Safety meeting Office & Site Engineer Jasmig Construction Supply Kumintang Ibaba, Batangas City June 2005 – July 2007 Duties and Responsibilities: In charge in the preparation and submission of bid documents - Prepares the Technical Documents / Eligibility documents to bid - Prepares the Financial Documents such as detailed estimates and bar charts for bidding Supervises the implementation / construction of the awarded government & non-government projects Conducts daily site inspection and prepares progress report Checks if the activity meets the standard, time and cost as per plan which includes materials, labor and equipment
Safety Engineer Jasmig Construction Supply Kumintang Ibaba, Batangas City June 2005 – July 2007 Duties and Responsibilities: Responsible for the safety and welfare of the workers Conducts toolbox meetings Prepares daily safety records and monthly safety reports Conducts safety site inspection Inspects the tools and equipment to be used in the project TRAINING EXPERIENCE Assistant Engineer City Engineer’s Office Batangas City November 2004-May 2005 Duties and Responsibilities: Assist the engineer-in-charge in surveying and inspection for the construction / repair of projects to be bidded Assist the engineer-in-charge in the preparations of program of works, bill of materials, cost estimates and specification of the proposed infrastructure projects
Drafts plans of the proposed vertical / horizontal infrastructure projects
Trainee Mar Castillo Contractor and Construction Supply San Juan, Mabini, Batangas June 2003-October 2003 Duties and Responsibilities: Estimate and design of simple structures: o Residential building, roads, breakwater Supervise field works Issue receipts for the orders of construction materials Checking of available construction materials EDUCATIONAL BACKGROUND Short Courses: Auto-Cad Operator Course (109 Hours) University of Batangas Hilltop, Batangas City August 30, 2013 Primavera 6.0 CIMS Technology Makati 2009 College:
Bachelor of Science in Civil Engineering Batangas State University Alangilan, Batangas City March 31, 2004
Secondary: Batangas National High School Rizal Avenue, Batangas City March 26, 1999 Primary:
Banaba East Elementary School Banaba East Batangas City March 24, 1995
SEMINARS ATTENDED Consultation CUM Organizational Meeting of Safety Practitioners Bureau of Working Conditions, Department of Labor and Employment WODP Training Center, Batangas City March 23, 2007 Basic Occupational Safety and Health Bureau of Working Conditions, Department of Labor and Employment WODP Training Center, Batangas City
July 28, 2006 Strengthening the Competitiveness of CALABARZON’s PS Licensees to Ensure Consumer Safety & Protection PhilSAAC First General Membership Forum CEAT-EE Auditorium, UPLB, Los Baños, Laguna, October 20, 2005 Future Civil Engineers Facing the Challenges of the 21st Century 3rd REGIONAL STUDENTS’ CONFERENCE Amphitheater, CEAFA Building, Batangas State University, Alangilan, Batangas City October 16 to 17, 2003 Theory and Practice of Pre-stressed Concrete Multi-Media Center, University of Batangas Hilltop, Batangas City October 10, 2003 Strengthening Knowledge in the Civil Engineering Discipline towards Global Competitiveness 2002 PICE REGION IV STUDENTS’ CONFERENCE Divine Word College of Calapan Calapan City, Orriental, Mindoro October 18 to 19, 2002 Civil Engineering and Its Varied Profession Amphitheater, CEAFA Building, Batangas State University, Alangilan, Batangas City September 27, 2002 PERSONAL DATA Date of Birth Place of Birth Sex Status Religion Height Weight
: : : : : : :
October 07, 1982 Banaba East, Batangas City Female Married Roman Catholic 5' 1" 68 kgs.
PERSON TO CONTACT IN CASE OF EMERGENCY: MR. NESTOR A. DE VILLA Libra St., Madonna Homes, Alangilan, Batangas City +639268466413
CHARACTER REFERENCES Jane C. Berberabe Owner / President Jasmig Construction Supply Kumintang Ibaba, Batangas City (043) 722 0416 Sonia D. Paglicauan OIC- Construction Section Department of Public Works and Highways Batangas Second District Engineering Office Batangas City (043) 723 9791 Victoria G. Caibigan Engineer II DPWH – Batangas Second District Engineering Office Batangas City, Philippines (+6343) 4025900
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
SGD. IRMINA B. DE VILLA
JASMIG CONSTRUCTION SUPPLY
LIST OF COMPLETED PROJECTS
LIST OF CONSTRUCTION PROJECTS COMPLETED Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
One storey Residential Building P 850,000.00 1995 Pulo, San Carlos, Rosario, Batangas Mr. & Mrs. Monico Panganiban
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Two Storey Residential Building P 900,000.00 1996 Matabungkay, Lian, Batangas Mr. & Mrs. Robert Schalamon
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
One Storey Residential Building P 600,000.00 1997 Baybayin, Rosario, Batangas Mr. & Mrs. Cesar Agbay
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Const. of Multi-Purpose Gym P 7,000,000.00 1995 Capitol Site, Batangas City PEO-Batangas
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
PBMIT Gymnasium Repair (Sub-Con) P 3,474,900.00 1996 Rizal Avenue, Extension, Batangas City PBMIT-Batangas City
Project Title/Description Project Cost Year Fionished Project Location Name & Address of the Owner
Calaca, Gymnasium (Sub-Con) P 2,0000,000.00 1997 Calaca, Batangas Municipality of Calaca
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Two Storey Building P 2,500,000.00 1997 BNHS Batangas City DPWH-1st Engineering Batangas City
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Paraiso-Luya Road P 1,500,000.00 1999 Calatagan, Batangas DPWH-Batangas 1st Engineering
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Lucsuhin-Biga Road P 500,000.00 1999 Calatagan Batangas DPWH-Batangas 1st Engineering
Project Title/Description Project Cost Year Finished Poject Location Name & Address of the Owner
Concreting of Sta. Ana-Bagong Silang Road P 1,000,000.00 1999 Calatagan Batangas DPWH-Batangas 1st Engineering
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Two Classroom P 645,000.00 2000 Bolbok Elementary School DPWH-Batangas 1st Engineering
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of CHB Lined Canal P 2,000,000.00 2000 Along Talisay-Agoncillo Road @ Tanauan Batangas DPWH- Tanauan Batangas
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement of Old Sangguniang Building P 1,105,000.00 2000 Batangas City City Engineer’s Office
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Open Canal
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Lined Canal P 500,000.00 2000 Publacion 1, San Luis Batangas DPWH-Batangas Sub District
P 300,000.00 2000 Danglayan, San Pascual Batangas DPWH- Batangas Sub-District
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Brgy Road P 1,000,000.00 2000 Brgy Bulihan, Rosario Batangas PEO-Batangas
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction Of Tritran Terminal (Sub-Con) P 3,000,000.00 2000 Calicanto Batangas Geroleo Balmes / Batangas City
Project Title/Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Extension of Line Canal P 350,000.00 2001 Brgy Aplaya, Bauan Batangas PEO-Batangas
Project Title/Description
Project Cost Year Finished Project Location Name and Address Of the Owner
Package: a) Proposed Widening of Poblacion 6 Road, Cuenca; b) Concreting of Road @ Sitio Kanluran , Brgy. Mahabang Dahilig, Batangas City P 204, 495.00 2001 A) Cuenca, Batangas B) Mahabang Dahilig, Batangas City PEO – Batangas
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Brgy. Road @ Boot P 323,000.00 2001 Tanauan City, Batangas PEO - Batangas
Project Title/.Description
Construction of Open Classroom Building @ Santor Elementary School P 490,000.00 2001 Tanauan City, Batangas PEO - Batangas
Project Cost Year Finished Project Location Name N& Address of the Owner Project Title/Description Project Cost Year Finished Project Location Name and Address Of the Owner
Repair/Maintenance of Open Canal & Cross Drain @ Batangas-Lobo Road, San Jose Sico Section P 300,000.00 2001 San Jose – Sico, Batangas City DPWH – Sub-District
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Prenza Lateral Canal P 247,000.00 2001 Lian, Batangas DPWH – 1st District
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Manila – Batangas Pier Road P 760,000.00 2001 Batangas City DPWH –Sub District
Project Title/Description Project Cost Year Finished Project Location Name and Address Of the Owner Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Two Storey (4 CL) Bldg. @ San Pascual NH/S, San Pascual, Batangas 1,850,000.00 2002 San Pascual, Batangas Provincial Engineer’s Office
Construction of Rehabilitation Center, Kumintang Ibaba, Batangas City 994,000.00 2002 Batangas City Provincial Engineer’s Office
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Road @ Brgy. Mataywanak 500,000.00 2002 Tuy, Batangas
Project Title/Description Project Cost Year Finished Project Location Name and Address Of the Owner
Concreting of Brgy. Road @ Acke-Tuyon-Tuyon 100,000.00 2002 Tuy, Batangas DPWH – 1st District
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Road @ Brgy. Dao 400,000.00 2002 Tuy, Batangas DPWH – 1st District
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Open Line Canal @ Brgy. Caysasay 300,000.00 2002 Taal, Batangas
DPWH – 1st District
DPWH – 1st District
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Concreting of Brgy. Road @ Humayingan 500,000.00 2002 Lian, Batangas
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Rehabilitation of Alupay E/S 380,000.00 2002 Rosario, Batangas
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of One Classroom Building @ Kaingin E/S P 440,000.00 June 2003 San Pascual, Batangas
Project Title/.Description Project Cost Year Finished Project Location Name & Address of the Owner
Construction of Flood Control @ Matinggain I 300,000.00 August 2003 Lemery, Batangas
Project Title /.Description
Construction of Canopy for Ground Floor @ Multi-Purpose Covered Court, Provincial Sports Complex 2,800,000.00 August 2003 Bolbok, Batangas City
Project Cost Year Finished Project Location Name & Address of the Owner Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
DPWH – 1st District
PEO - Batangas City
Municipality of San Pascual
DPWH – Bats. 1st Eng’g District
Provincial Engineer’s Office, Batangas City
Improvement of Road @ Brgy. Bukal P 400,000.00 September 2003 Padre Garcia, Batangas DPWH – Bats. Sub Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB @ Tanauan School of Fisheries P 500,000.00 December 2003 Ambulong, Tanauan City DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPH @ Bulihan P 300,000.00 October 2003 Nasugbu, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Finished Project Location Project Title/Description
Construction of Flood Control @ Wawa Ibaba P 200,000.00 October 2003 Lemery, Batangas Construction of Flood Control @ Wawa Ibaba
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPH @ Niugan P 200,000.00 October 2003 Taal, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of Multi-Purpose Structure/Bldg. @ Dacanlao P 500,000.00 November 2003 Calaca, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Completed Project Location Name & Address of the Owner
Construction of Hanging Bridge @ Libato P 800,000.00 October 2003 San Juan, Batangas Provincial Engineer’s Office, Batangas City
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of Road @ Wawa P 500,000.00 December 2003 Batangas City Provincial Engineer’s Office, Batangas City
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of FMR @ Apacay P 500,000.00 September 2003 Taal, Batangas DPWH – Batangas 1st Engineering District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of FMR @ Zone 14 P 500,000.00 December 2003 Taal, Batangas DPWH – Batangas 1st Engineering District
Concreting of Road @ the Municipality of Cuenca P 500,000.00 February 2004 Cuenca, Batangas DPWH – Batangas 3rd Engineering District
Project Title/Description
Construction of Open Canal @ Manuel Quezon St., Poblacion 2 Project Cost P 500,000.00 Date Finished February 2004 Project Location Laurel, Batangas Name & Address of the DPWH – Batangas 3rd Engineering District Owner Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of Various Barangay Roads P 2,000,000.00 May 2004 Municipality of San Luis DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB (League of Municipalities of Batangas Hall) P 5,000,000.00 August 2004 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Started Project Location Name & Address of the Owner
Concreting of Road @ Brgy. Sta. Monica to Brgy. Balagtasin P 1,000,000.00 August 2004 San Luis, Batangas DPWH-Bats 2nd Engineering District
Project Title/Description Project Cost Date Started Project Location Name & Address of the Owner
Concreting of Road @ Brgy. Alagao to Brgy. San Vicente P 1,000,000.00 August 2004 Bauan, Batangas DPWH-Bats 2nd Engineering District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB, Brgy. Sinisian P 500,000.00 October 2004 Calaca, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of FMR, Brgy. Cogonan P 500,000.00 October 2004 Nasugbu, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MP Building / Structure at Aga P 500,000.00 November 2004 Nasugbu, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB, Brgy. Gonzales P 4,000,000.00 July 18, 2007 Tanauan City, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner Project Title/Description
Rehabilitation of Canal @ Brgy. Banay Banay 1st P 1, 000,000.00 August, 2007 San Jose, Batangas DPWH – Bats. 4th Eng’g District
Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of FMR, Brgy. Pansipit, Pook, Pamiga, San Jacinto P 1,000,000.00 December 14, 2006 Agoncillo, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of Open Canal @ Brgy Bago P 1,000,000.00 June 20, 2007 Ibaan, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of Open Canal @ Brgy Coliat P 1,000,000.00 July 20, 2007 Ibaan, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of Line Canal at Brgy. Pag-olingin Bata P 500,000.00 April 30, 2007 Lipa City, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction /Concreting of Farm to Market Road at Brgy. Anilao P 500,000.00 June 20, 2007 Lipa City, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of Line Canal at Brgy. Pag-olingin West P 500,000.00 June 8,, 2007 Lipa City, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Repair / Rehab of FMR at Brgy. Bukal-Maugat Road P 1,000,000.00 October 16, 2006 Padre Garcia, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Improvement of MPB at Brgy 3 P 300,000.00 June 1, 2005 Talisay, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Concreting of FMR, Brgy. Banay Banay P 1, 000,000.00 April 7, 2006 Padre Garcia, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB at Poblacion 5 P 500,000.00 April 17, 2007 Laurel, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of Four (4) Classrooms P 2,000,000.00 December 18, 2007 Tanauan City, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB P 4,000,000.00 December 18, 2007 Pagaspas, Tanauan, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB P 4,000,000.00 April 7, 2007 Gonzales, Tanauan, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Construction of MPB P 3,000,000.00 May 22, 2008 Brgy. Sampaloc, Talisay, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Repair/Impvt of Balele E/S, Balele, Tanauan City, Batangas P 1,349,728.00 June 25, 2008 Brgy. Balele, Tanauan City, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description
Const. of 4 CL Bldg., Natatas NHS, Natatas, Tanauan City, Bats P 2,892,997.00 Sept. 6, 2008 Brgy. Natatas, Tanauan City, Bats DPWH – Bats. 3rd Eng’g District
Project Cost Date Finished Project Location Name & Address of the Owner Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Completion of MPB, Sampaloc, Talisay, Batangas P 1,445,900.00 Feb. 10, 2009 Brgy. Sampaloc, Talisay, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Completion of MPB, Balas, Talisay, Batangas P 1,928,300.00 Feb. 10, 2009 Brgy. Balas, Talisay, Batangas DPWH – Bats. 3rd Eng’g District
Project Title/Description
Conc. of Road ( Dayap to Butucan) & ( Bulihan to Looc), Nasugbu P 4,774,623.00 July 21, 2008 Nasugbu, Batangas DPWH – Bats. 1st Eng’g District
Project Cost Date Finished Project Location Name & Address of the Owner
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Const.of MPBldg, Brgy. Mahacot West, Bats. City P 3,858,990.20 Sept. 15, 2008 Dec. 17, 2008 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Impvt./Rehab. of Road , Manila-Batangas Road, Bats. City P 9,647,900.00 Sept. 15, 2008 Jan. 9, 2009 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Impvt./Rehab. of Road, Paharang West Road, Bats. City P 9,647,900.00 Sept. 15, 2008 Jan. 7, 2009 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Impvt./Rehab. of Road, Gulod Itaas Road, Bats. City P 9,647,900.00 Sept. 15, 2008 Jan. 8, 2009 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Const.of MPBldg, Balete Relocation Site, Bats. City P 4,823,900.00 Feb. 18, 2009 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Conc. of Road, Brgy. Gulod, Lemery, Bats. P 3,820,200.00 Jan. 5, 2009 Lemery, Batangas DPWH – Bats. 1st Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Repair/Maintenance of Creek, San Carlos, Lipa City, Bats. P 1,969,160.00 Aug. 13, 2008 Lipa City, Batangas DPWH – Bats. 4th Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Impvt./Rehab. of Road, Gulod Itaas Road, Bats. City P 4,824,078.00 Sept. 15, 2008 Jan. 8, 2009 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description Project Cost Date Finished Project Location Name & Address of the Owner
Const. of Gulod Labac to Gulod Itaas, Batangas City P 4,823,992.00 Sept. 15, 2008 Nov. 12, 2008 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title/Description
Repair/Rehab. of Revetment, Mabalanoy River, San Juan, Bats. P 1,499,176.00 Jun. 26, 2008 San Juan, Batangas DPWH – Bats. 4th Eng’g District
Project Cost Date Finished Project Location Name & Address of the Owner Project Title/Description
Const.of MPBldg, Brgy. Catandala, Bats. City
Project Cost Date Finished Project Location Name & Address of the Owner
P 4,823,900.00 Mar. 18, 2009 Batangas City DPWH – Bats. 2nd Eng’g District
Project Title /.Description
Const. of Road at Anus, San Jose; Dayapan, Ibaan; Laklakin, Balagtasin, San Jose & Sampal, Natunuan 2,122,347.00 Spetember 25, 2008 Batangas
Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
DPWH – Bats. 4th Eng’g District
Improvement of Farm to Market Road at San Pedro And Mahacot East 9,648,847.00 June 22, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Rehabilitation/Reconstruction/Improvement of BatangasTabangao-LoboRoad (Intermittent Section),PinamucanSimlong Section (Phase I), Batangas City 9,647,900.00 April 20, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Improvement /Upgrading of Brgy. Pantay, Brgy. Makina FMR, Calaca, Bats. 4,775,500.00 Aug. 20, 2009 Batangas DPWH – Bats. 1st Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement/Rehab of Nasugbu-Ternate Road, Batangas 19,297,800.00 Sept. 22, 2009 Batangas
Project Title /.Description
Improvement/Rehab of Nasugbu-Lian-Calatagan Road Section, Phase I, Batangas 19,297,800.00 Sept. 22, 2009 Batangas
Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
DPWH – Bats. 1st Eng’g District
DPWH – Bats. 1st Eng’g District
Improvement/Rehab of Nasugbu-Lian-Calatagan Road Section, Phase I, Batangas 19,297,800.00 Sept. 22, 2009 Batangas DPWH – Bats. 1st Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement/Rehab of Nasugbu-Lian-Calatagan Road Section, Phase II, Batangas 19,297,800.00 Sept. 22, 2009 Batangas DPWH – Bats. 1st Eng’g District
Improvement/Rehab. of Palico-Balayan-Batangas Road, Phase I, Batangas 19,297,800.00 Sept. 22, 2009 Batangas DPWH – Bats. 1st Eng’g District
Improvement/Rehab. of Palico-Balayan-Batangas Road, Phase II, Batangas 19,297,800.00 Sept. 22, 2009 Batangas DPWH – Bats. 1st Eng’g District
Repair and Rehabilitation of Nasugbu-Lian-Calatagan Road, Batangas @ Km. 123+646 to Km. 124+764 9,997,200.00 Oct. 10, 2009 Batangas DPWH – Bats. 1st Eng’g District
Asphalt Overlay/Improvement/Rehab. of Manila-Batangas Road, Batangas City 18,092,479.88 Jul. 23, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Asphalt Overlay/Improvement/Rehab. of DumantayPaharang West Road, Batangas City 18,092,412.84 Jul. 23, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Asphalt Overlay/Improvement of Gulod Labac-Gulod Itaas Road, Bats. City 18,092,062.50 Aug. 20, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Asphalt Overlay/Improvement of Mahacot East-Mahacot West Road, Bats. City 18,092,062.50 Aug. 20, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Asphalt Overlay/Improvement of Soro-soro Ilaya Road, Bats. City 18,092,062.50 Aug. 20, 2009 Batangas DPWH – Bats. 2nd Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement/Rehab of Palico-Balayan Road, Bats. City 18,090,187.50 Aug. 20, 2009 Batangas
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement/Rehab of San Pedro Road, Bauan, Bats. 9,647,998.00 Oct. 22, 2009 Batangas
Project Title /.Description
Repair/Rehab/Impv't of Manila-Batangas-Pier Road, Batangas City 9,647,998.00 Oct. 9, 2009 Batangas
Project Cost Year Finished Project Location Name & Address of the Owner
DPWH – Bats. 2nd Eng’g District
DPWH – Bats. 2nd Eng’g District
DPWH – Bats. 2nd Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement/Rehab of Pitogo Road, Bauan, Bats. 9,647,998.00 Oct. 22, 2009 Batangas
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
Improvement/Rehab of Colvo Road, Bauan, Bats. 9,647,998.00 Oct. 22, 2009 Batangas
Project Title /.Description
Improvement/Rehab of Sto. Nino - Bagong Silang Road, Bauan, Bats. 9,647,998.00 Oct. 22, 2009 Batangas
Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner
DPWH – Bats. 2nd Eng’g District
DPWH – Bats. 2nd Eng’g District
DPWH – Bats. 2nd Eng’g District
Asphalt Overlay/Rehab./Impvt of Nasugbu-Lian-Calatagan Phase I, Km 101+500 - Km 102+500 19,298,200.00 Feb. 20, 2010 Batangas DPWH – Bats. 1st Eng’g District
Asphalt Overlay/Rehab./Impvt of Nasugbu-Lian-Calatagan Phase II, Km 101+500 - Km 102+500 19,298,200.00 Feb. 20, 2010 Batangas DPWH – Bats. 1st Eng’g District
Construction/Rehabilitation of 2 Storey Building At Batangas National High School, Batangas City 24,123,500.00 June 21, 2010 Batangas DPWH – Bats. 2nd Eng’g District
Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description Project Cost Year Finished Project Location Name & Address of the Owner Project Title /.Description
Project Cost Year Finished Project Location Name & Address of the Owner
Construction/Improvement of School Building Facilities at Batangas Calicanto, Batangas City 14,471,999.00 Mar. 23, 2010 Batangas DPWH – Bats. 2nd Eng’g District
Improvement of Drainage and Other Related Structure at Manila-Batangas City Road, Batangas City 46,376,365.00 June 24, 2010 Batangas DPWH – Bats. 2nd Eng’g District Construction of Ospital ng Lipa (Phase II), Brgy. Marawoy, Lipa City 99,648,156.00 November 28, 2012 Brgy. Marawoy, Lipa City, Batangas City Engineer’s Office-Lipa City Concreting of Batangas-Tabangao-LoboRoad, Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies Traffic Benchmark for Upgrading to Paved Road Standard (HDM-Project Analysis) (MFO-2) KO137+006.00 – KO144+408.00 (Intermittent Sections), Batangas City, Batangas Province 99,325,912.60 November 26, 2012 Batangas DPWH –Region IV-A, EDSA QC
Title:
Construction of Ospital ng Lipa (Phase II),
Location:
Brgy. Marawoy, Lipa City
Amount:
99,648,156.00
Date Started:
January 10, 2012
Date Completed: November 28, 2012
Title:
Concreting of Batangas – Tabangao – Lobo Road, Road Upgrading (Gravel to Paved) based on Gravel Road Strategies Traffic Benchmark for upgrading Gravel to Paved Road Standard (HDM-Project Analysis) (MFO-2) KO137+006.00 – KO144+408.00 (Intermittent Sections)
Location:
Batangas City, Batangas Province
Amount:
99,325912.60
Date Started:
March 29, 2012
Date Completed: November 26, 2012
Title:
08DC0013 Repair/Improvement of Balele Elementary School
Location:
Brgy. Balele, Tanauan City, Batangas
Amount:
1,400,000.00
Date Started:
April 21, 2008
Date Completed: June 25, 2008
Title:
BRH-001 Rehabilitation of Perimeter Fence
Location:
Batangas Regional Hospital, Batangas City
Amount:
3,189,311.79
Date Started:
December 2007
Date Completed: June 2008
Title:
08DE-0116 Construction of Multi-Purpose Building
Location:
Mahacot West, Batangas City
Amount:
3,858,990.20
Date Started:
October 22, 2008
Date Completed: Dececember 17, 2008
Title:
08DE-0059 Improvement/Rehabilitation of Road, Catandala & Dumantay-Mahacot, Batangas City
Location:
Batangas City
Amount:
9,648,156.00
Date Started:
August 22, 2008
Date Completed: September 15, 2008
Title:
08DB0127 Concreting of Farm to Market Road
Location:
Brgy. Gulod, Lemery, Batangas
Amount:
3,820,200.00
Date Started:
November 27, 2008
Date Completed: January 5, 2009
Title:
08DE-0276 Improvement/Rehabilitation of Gulod Itaas Road
Location:
Brgy. Gulod, Itaas, Batangas City
Amount:
9,647,900.00
Date Started:
December 15, 2008
Date Completed: January 8, 2009
Title:
08DE-0115 Construction of Gulod Labac to Gulod Itaas Road
Location:
Batangas City
Amount:
4,823,992.00
Date Started:
October 17, 2008
Date Completed: November 12, 2008
Title:
08DE-0279 Construction of Multi-Purpose Building
Location:
Balete Relocation Site, Batangas City
Amount:
4,823,900.2
Date Started:
January 2, 2009
Date Completed: February 18, 2009
Title:
Rehabilitation/Reconstruction/Improvement of Batangas – Tabangao – Lobo Road (Intermittent Section) Pinamucan Simlong Section, (Phase I)
Location:
Batangas City
Amount:
9,647,900.00
Date Started:
March 8, 2009
Date Completed: April 20, 2009
Title:
Construction of Two-Storey 6 Cl RGR Type SB
Location:
Banilad E/S, Nasugbu, Batangas
Amount:
8,547,065.75
Date Started:
July 14, 2006
Date Completed: February 20, 2007
Title:
08DD-0041 Repair/Maintenance of Revetment at Lawaye Bridge Malabanoy River
Location:
San Juan, Batangas
Amount:
1,499,176.00
Date Started:
May 23, 2008
Title:
07DC-0361 Construction of Multi-Purpose Building at Brgy. Pagaspas, Tanauan, Batangas
Location:
Tanauan, Batangas
Amount:
3,855,825.00
Date Started:
September 4, 2007
Date Completed: December 10, 2007
Title:
08DE-0274 Improvement/Rehabilitation of Manila – Batangas Road, Batangas City
Location:
Batangas City
Amount:
9,647,900.00
Date Started:
December 15, 2008
Date Completed: January 9, 2008
Title:
08DE-0278 Construction of Multi-Purpose Building at Brgy. Catandala, Batangas City
Location:
Batangas City
Amount:
4,823,900.00
Date Started:
December 26, 2008
Date Completed: March 18, 2009
Title:
08DD-0099 Construction of Multi-Purpose Building at Brgy. Gonzales, Tanauan City
Location:
Tanauan City, Batangas
Amount:
3,855,825.00
Date Started:
April 9, 2007
Date Completed: July 18, 2007
Title:
08DD-0094 Construction of Multi-Purpose Building at Brgy. Tampoy, San Jose, Batangas
Location:
San Jose, Batangas
Amount:
1,109,115.00
Date Started:
October 27, 2008
Date Completed: November 10, 2008
Title:
08DD-0093 Construction of Multi-Purpose Building at Brgy. Tugtog, San Jose, Batangas
Location:
San Jose, Batangas
Amount:
1,109,115.00
Date Started:
October 27, 2008
Date Completed: November 10, 2008
Title:
08DC-0253 Completion of Multi-Purpose Building at Brgy. Balas, Talisay, Batangas
Location:
Talisay, Batangas
Amount:
1,928,300.00
Date Started:
December 22, 2008
Date Completed: February 10, 2009
Title:
09DE0048 – Improvement of Farm to Market Road at San Pedro & Mahacot East Road
Location:
Batangas City
Amount:
9,648,847.00
Date Started:
June 06, 2009
Date Completed: June 22, 2009
Title:
09DE0067 – Improvement/Rehabilitation of Batangas – Lobo Road Km.105-469 to Km 113+360
Location:
Batangas City
Amount:
18,090,187.50
Date Started:
August 7, 2009
Date Completed: August 20, 2009
Title:
10DE0103 Construction/Rehabilitation of 2 Storey
Building At Batangas National High School, Batangas City Location:
Batangas National High School, Batangas City
Amount:
24,123,500.00
Date Started:
March 9, 2010
Date Completed: June 21, 2010
Title:
10DE-0209: Construction/Improvement of School
Building Facilities At Batangas Calicanto, Batangas City Location:
Calicanto Elementary School, Batangas City
Amount:
14,471,999.80
Date Started:
February 03, 2010
Date Completed: March 23, 2010
Title:
10DE-0104: Improvement of Drainage and Other
Related Structure at Manila-Batangas City Road, Batangas City Location:
Batangas City
Amount:
46,376,365.00
Date Started:
March 25, 2010
Date Completed: June 24, 2010
JASMIG CONSTRUCTION SUPPLY
LIST OF EQUIPMENT OWNED
LIST OF EQUIPMENT UNIT 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 1 unit 2 units 4 units 7 units 4 units 4 units 4 units 2 units 1 Lot 1 Lot
TYPE/DESCRIPTION Hyundai Excavator – ROBEX-220LC9S CAT Excavator – 320D KOMATSU Road Grader – GD405-A KOMATSU Road Grader – GD405-2 CATERPILLAR Vibratory Compactor – CS-533E(10tons) SAKAI Vibratory Compactor – TW-40(4tons) SAKAI Vibratory Compactor – SG-41(4tons) YANMAR Mini Excavator – B37 ISUZU Dump Truck – PC-10 (Plate No. URS-260) FUSO Boom Truck – Fighter (Plate No. RGL-880) IZUSU Mini Dump Truck – Forward (Plate NO. RVK-156) IZUSU Mini Dump Truck – Giga (Plate NO. RKC-365) IZUSU Elf Truck – Dropside (Plate NO. DTR -340) IZUSU Elf Truck – Dropside (Plate NO. XAS -519) Hydraulic Breaker - OKADA HYUNDAI Excavator – ROBEX-2200LC-7S CAT Bulldozer – D6-C SAKAI Vibratory Compactor- SG-25(2.5tons) Air Compressor – 175 CFM Welding Machine – MILLER 500A Welding Machine – YAMATO 300A Speed Cutter BOSCH Concrete Vibrator Concrete Cutter 1 Bagger Concrete Mixer Water Pump Bar Cutter Concrete Screeder Electric Jackhammer Carpentry Tools Steel Scaffolding
CONDITION Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running Good Running
Specifications Brand Name:
Hyundai
Model Number:
Robex 220LC-9S
Condition:
Good Running Condition
Bucket capacity:
1.44m3
Machine Weight:
22,515 lbs
Moving Type:
Crawler Excavator
Maximum Digging Height:
9,780 lbs
Max Digging Radius:
20' 11"
Operating Weight:
22,515 lbs
Maximum Digging Depth:
21' 6"
Cummins B5.9 - C water cooled, 4 cycle Diesel, 6-cylinders in line, direct injection, turbocharged, charger air cooled. Hydraulic system -
Variable displacement tandem axis piston pumps.
Two speed axial piston motor with brake valve and parking brake Drives & brakes - Fully hydrostatic type Swing System - Fixed displacement axial piston motor Fuel tank 400 liter X-leg type
Specifications Make: CATERPILLAR Model: 320D Year: 2011 Category : Track Mounted Bucket Capacity: 1 m3 Bucket Width: 1,150 mm Dig Depth: 6,640mm Reach at Ground Level: 9,780mm Dump Height: 6,570mm Bucket Breakout: 13,358kgf Engine Make-Model: Cat C6.4 ACERT Net Engine Power SAE Rated: 103kW Engine Displacement: 6.4lt Number of Cylinders: 6 Pump Types : Variable displacement axial piston pump Relief Valve Pressure Main Pumps: 350bar Operating Weight: 21.5MT DimensionsTransport Length: 9,440mm Transport Height: 3,440mm Width: 3,180 mm Track Length: 3,650mm Speed: 5.5kph Gradeability: 70%
Specifications Engine Make: Komatsu Model: 6D105 Net Power Gear 5-6: 110 hp; 82 kw Max Power: 110 hp; 82 kw Net Torque Gears 5-6: 282 lb ft; 382.3 Nm Displacement: 396 cu in; 6.5 L Operational Std Operation Weight - Front Axle: 5621.8 lb; 2550 kg Std Operation Weight - Rear Axle: 13955.3 lb; 6330 kg Std Operation Weight – Total: 19577.1 lb; 8880 kg Tire Size front 9.00-20-10PR, rear 11.00-20-10PR Transmission Type: hydroshift Number of Gears – Forward 6 Number of Gears – Reverse 6 Max Speed – Forward: 26.1 mph; 42 km/h Max Speed – Reverse: 28 mph; 45 km/h Steering Articulation L/R: 27 degrees Turning Radius: 18.4 ft in; 5.6 m Front Axle Wheel Lean: 22 degrees Oscillation – Total: 26 degrees Ground Clearance: 1.4 ft in; 435 mm Moldboard Width: 10.2 ft in; 3100 mm Moldboard Height: 24.6 in; 625 mm Moldboard Thickness: 0.75 in; 19 mm Max Depth of Cut: 17.3 in; 440 mm Circle Max Reach Outside Tires – Left: 53.9 in; 1370 mm Max Reach Outside Tires – Right: 55.9 in; 1420 mm Max Lift Above Ground: 14.2 in; 360 mm Dimensions: Height to Top of Cab: 10.9 ft in; 3315 mm Overall Length: 23 ft in; 7025 mm Width Over Tires: 7.1 ft in; 2165 mm Wheelbase: 16.1 ft in; 4900 mm Blade Base: 6.9 ft in; 2100 mm Tandem Axle Wheelbase: 4.3 ft in; 1305 mm Rear Ground Clearance: 0.98 ft in; 300 mm Front Ground Clearance: 1.4 ft in; 435 mm
Specifications Title:
1997 KOMATSU GD405-2
Make:
KOMATSU
Category:
Articulated
Net Engine Power:
115KW
Operating Weight:
10,250Kg
Specifications Engine Model:
Caterpillar 3054C
Gross Power:
130 hp (97 kW)
Net Power (ISO 9249):
125 hp (93 kW)
Net Power (SAE J1349):
124 hp (92 kW)
Net Power (EEC 80/1269):
125 hp (93 kW)
Bore:
4.13 inches (105 mm)
Stroke:
5 inches (127 mm)
Dimensions Overall Length:
217 inches (5510 mm)
Overall Width:
90 inches (2290 mm)
Specifications YEAR :
1986/87,
WEIGHT:
3.5 TON,
ENGINE:
ISUZU ENGINE
Specifications SAKAI COMPACTION ROLLER MADE IN 1990 MADE IN Japan
Specifications
The B37 Mini Excavator comes with a three-cylinder, 27 horsepower (approximate) Yanmar diesel engine. It has a two-speed transmission and weighs roughly 7,500 pounds. Different models come with either 15inch rubber or steel tracks. Yanmar B37 Mini Excavators come with a 60-inch backfill blade and an adjustable 40/90 boom swing with a 21-tooth bucket. It has an approximate digging depth of 10 to 13 feet. Pilot and Controls
The Yanmar B37 comes with canopy or cab; cabs can be heated. The pilot operates the mini excavator with joystick controls.
Specifications
Brand Name: Isuzu Elf Dropside Type: Trucks Year: 1996 Made In: Japan
Imported from Japan, rebuilt and reconditioned in the Philippines. Isuzu Elf Drop Side (4 wheeler 10 ft.)
Specifications
Brand Name:
Isuzu Elf Dropside
Type:
Trucks
Year:
1996
Made In:
Japan
Imported from Japan, rebuilt and reconditioned in the Philippines. Isuzu Elf Drop Side (4 wheeler 10 ft.)
Specification
Gross Power:
26 kW
Max Speed:
7.5 mph
Weight:
2579 kg
Wheelbase:
1737 mm
Working Width:
1199 mm
Specification
Isuzu Forward Dump Truck 6-Wheeler Brand:
Isuzu
Model:
Forward
Year:
2000
Body Type:
Dump Truck
Transmission:
Manual
Specification
ENGINE The 6M60-3AT1 and 3AT2 features intercooler turbo, common rail fuel injection, cooled EGR and oxidation catalyst, superior fuel economy, enhanced torque, reduced engine noise and exceeds EPA04 emission standards. BRAKING POWER Most of the new Fighter series comes equipped with full air brakes. Antilock brakes (ABS) are standard on all models. EASY SHIFTING The Fighter comes with a 6-speed manual transmission or a 9-speed manual transmission that deliver better performance while realising fuel savings. AIR SUSPENSION All 6X2 and selected 4X2 and 6X4 Fighters feature air suspension on the rear axle.
Specification
CAT Bulldozer D6-C The Caterpillar D6 uses a six-cylinder engine. The required fuel is diesel. The piston displacement measures 638 cubic inches, and the engine has a rated rpm of 1,800. Earlier models had an engine drawbar rating of 63 horsepower and a belt rating of 78 horsepower; the total drawbar pull originally was 16,674 lbs. By 1955, the drawbar power had been increased to 73 horsepower and the belt to 93 horsepower; the drawbar pull also increased to 17,486. Dimensions Caterpillar's D6 has a length of 184 inches, a width of 96 inches and a height of 105 inches. The gross weight of the machine measures 33,000 lbs. The company equipped the D6 with front and rear tracks that measure either 60 or 74 inches. The fuel tank has a maximum capacity of 65 gallons.
Specification
HYUNDAI EXCAVATOR MODEL :
ROBEX 2200LC-7S
BUCKETCAPACITY:
0.92M3
WEIGHT :
21.5 TON
ENGINE :
CUMMINS-B5.9-C (145PS / 1950RPM)
LENGTH :
9520
WIDTH :
2990
HEIGHT :
2990
MANUFACTURED : 2008 BREAKER LIND QUICK CLAMP INSTALLED
Yamato Welding Machine 300A
Miller Welding Machine 500A
Air Compressor 175CFM
Specification
Isuzu Dump Truck 10-Wheeler PC-10 Brand:
Isuzu
Year:
2010
Fuel:
Diesel
Body Type:
Dump Truck
Transmission:
Manual
Specification Brand:
Isuzu
Model:
Giga
Year:
1996
Fuel:
Diesel
Body Type:
Mini Dump Truck
Transmission:
Manual
4UNITS- CONCRETE CUTTERS
7-UNITS – 1 BAGGER CONCRETE MIXER
Specification OKADA HYDRAULIC BREAKER WORKING PRESSURE:
14-18 MPa
OIL FLOW CONSUMPTION:
120-160L/MIN
FREQUENCY:
465-625 BPM
OPERATING WEIGHT (STANDARD/SILENT):
1640/1505 KG
OVERALL LENGTH W/O BRAKET:
2205 MM
WORKING STEEL DIAMETER:
125 MM
CARRIER MACHINE WEIGHT RANGE: WEIGHT:
14-26 TON
RATE FLOW:
140-230L/MIN
BOSCH SPEED CUTTER
4 – UNITS CONCRETE SCREEDER
2 - UNITS CONCRETE VIBRATOR 4-UNITS WATER PUMPS 4 – UNITS BAR CUTTER 2 UNITS ELECTRIC JACKHAMMER 1-LOT CARPENTRY TOOLS 1-LOT STEEL SCAFFOLDING
JASMIG CONSTRUCTION SUPPLY
BUSINESS OFFICE
JASMIG CONSTRUCTION SUPPLY
FINANCIAL STATEMENT
JASMIG CONSTRUCTION SUPPLY
VALUE ADDED TAX REGISTRATION and TAX CLEARANCE
JASMIG CONSTRUCTION SUPPLY
GOVERNMENT AFFILIATION DOLE PhilGEPS SAFETY CERTIFICATES
IRMINA C. BLANCO
JASMIG CONSTRUCTION SUPPLY
OFFICE MAP