OJO Project Quality Standards
HUAWEI TECHNOLOGIES CO., LTD.
Contents:•
Cabinets installation:
BTS 3900A cabinet installation& fixation Power cabinet installation& fixation (TP48200A)_1 Power cabinet installation& fixation of stacked cabinets_2 The equipment layout in BTS3900A cabinet The equipment layout and cables inside BTS3900A cabinet The equipment layout and cables inside TP48200A cabinet_1 The equipment layout and cables inside stacked cabinets_2 The MCB distribution for DCDU Sensor installation Cabinet labeling system
• RF Installation:
Antennas and RRU installation Antenna ports Antenna Mechanical Tilt Install AISG cable from ANT to 3G RRU RRU power cable grounding Antennas and RRU ports sealing Feeders installation
• Batteries installation
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 2
Cabinet Installation
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 3
BTS3900A cabinet installation& fixation
APM30
over the RFC cabinet, should be fixed and tightened by 4 bolts
RFC cabinet fixed on the basement, four bolts should be tightened well
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 4
Base is fixed using 4 bolts on concrete foundation GF sites or metal grillage for RF sites
Leave 80 cm from the base frame to the end of the concrete foundation is desirable ( if available )
BTS cabinet base frame fixed on the basement, four bolts should be tightened well
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
BTS base frame must be leveled
Page 5
Base frame is fixed and leveled using 4 bolts on concrete foundation
Power cabinet installation& fixation (TP48200A)_1 TP48 fixation bolts and washers
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 6
Power cabinet installation& fixation of stacked cabinets_2
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 7
-
-
BTS and TP48 cabinets should be leveled together while doors are closed Spacing between the 2 cabinets should be 5 cm
TP48 cabinet should be fixed with 4 bolts
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 8
The equipment layout in BTS3900A cabinet
DCDU-12A for MRFU power
DCDU-12A for BBU and Fan BBU3910 DCDU-12B for 3G and 4G RRU In case more than 6 RRUs, add another DCDU-12B here.
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
M R F U d
Page 9
The equipment layout and cables inside BTS3900A cabinet
RRU power cables and signal cables should be routed from the right entry port DCDU power cables and fiber cables and BTS ground cable to be from the left entry port
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page Page10 10
The equipment layout and cables inside TP48200A cabinet_1
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 11
The equipment layout and cables inside stacked cabinets_2 AC, Ground and IF cable to be installed from the left entry port Make sure to keep at least 5cm between AC and IF
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Battery, RRU dc cables and alarm and signal cables to be installed from the right entry port
Page 12
The MCB distribution for DCDU
LLVD
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
BLVD
BAT
Page 13
Sensor installation
Temperaturehumidity index sensor
Lamp in TP
smoke sensor
Water proof sensor
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 14
Cabinet labeling system
Rectifier
AC power cables connected in PDP should be labeled, terminated and fixed
Labels
for all power cables inside the rectifier, all cables should be terminated
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
All Signal, Power and Ground cables inside the cabinet should have label
Page 15
RF Installation
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 16
Antennas and RRU installation
- Stainless steel bolts, double nuts - Double nuts needed for Antenna fixation - Use the old antenna grounding cable for the new antenna after swap
- Stainless steel bolts, Spring washer and nut.
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
If there is available space on the Tower , the 2 RRU should be of different types ( 3G & 4G ) for each sector .. 4G on the left and 3G on the right
If there is no available space to install 2 RRU for each sector , we can install 3 RRU’s together but they should be of the same type 3G or 4G Page 17
Antenna ports 4G1800M
AISG Male
Left is 1800M, 4G
3G-2100M
900M
AISG Female
Right is 2100M, 3G Page
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 18
18
Antenna Mechanical Tilt The HW Tri-band antenna length is 2.6 meters, should set mechanical tilt according to the marker of L=2.6
This small triangle using to define mechanical down tilt
Record and call OMC to confirm the M-tilt value of all the sectors HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 19
Install AISG cable from ANT to 3G RRU AISG
cable will be installed from 3G RRU 3839 to antenna
AISG
cable input on the antenna AISG
cable input inside the RRU
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page Page20 20
RRU power cable grounding
From BTS When RRU power cable through into BTS cabinet, must use 6 in 1 grounding clamp for shield layer grounding of RRU power cable !
From RRU side The shielding layer of RRU power cable need to grounding using clip in RRU
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
6 in 1 grounding clamp, 1clamp can fix 6pcs RRU power cable.
Page 21
Antennas and RRU ports sealing
Wrap
3 layers of waterproof tape
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Wrap
3 layers of insulation 3M tape
Top
and bottom black ties
Page 22
Use out door labels for upper jumpers ( fixed with black cable ties)
-
Use out door labels for Fiber, Power and ground cables
Use the Antenna port cover for the unused ports. Upper jumpers connectors should be sealed as mentioned before Using joint bar connect each RRU
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 23
Feeders installation
Wrap 3
layers of waterproof tape
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Wrap 3
layers of insulation 3M tape
Top and
bottom black tie wraps
Page 24
Cable tray Sharp Edges should be covered by rubber
Subcontractor must make the VSWR for all the RF system before the swap and provide Snap shots inside the As built document
Outdoor Labels should be installed before and after the connectors Earth Reading should be taken before and after the Swap , reading should be less than 5 ohms
Feeders and fiber and power cables arranged inside the cable try in the mentioned order and all cables should be flat over the cable tray
Old cable should be shifted Without affecting their service
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Feeder Grounding Kits to be installed and connected to the nearest grounding bar Feeder Grounding Kits to be isolated in the same way as the antenna connecter
Page 25
After swap , the cable tray covers must be Fixed by Steal ties
Outdoor label system Antenna 3G
Tx
Rx
RRU Power
Fiber
BBU Ground
Fiber
Sec1 ANT_0A
ANT_0B
MBTS PWR RRU 0 CPRI 0 MBTS PGND 0 CPRI 0
Sec2 ANT_1A
ANT_1B
MBTS PWR RRU 1 CPRI 1 MBTS PGND 1 CPRI 1
Sec3 ANT_2A
ANT_2B
MBTS PWR RRU 2 CPRI 2 MBTS PGND 2 CPRI 2
4G
Tx
Rx
Power
Fiber
Ground
Fiber
Sec1 ANT_3A
ANT_3B
MBTS PWR RRU 3 CPRI 3 MBTS PGND 3 CPRI 3
Sec2 ANT_4A
ANT_4B
MBTS PWR RRU 4 CPRI 4 MBTS PGND 4 CPRI 4
Sec3 ANT_5A
ANT_5B
MBTS PWR RRU 5 CPRI 5 MBTS PGND 5 CPRI 5
2G
Tx
Rx
Sec1 ANT_0C ANT_0D Sec2 ANT_1C ANT_1D Sec3 ANT_2C ANT_2D
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page 26
Batteries installation
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page Page27 27
2 4 1
3
HUAWEI CO., LTD. HISILICONTECHNOLOGIES SEMICONDUCTOR
Page Page28 28
Thank you www.huawei.com