References for Liquefied Natural Gas Storage & Terminals
This document is the sole property of TGE. It must not be copied or used without written consent of TGE. Last update on 12.01.2016
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
Page 2 of 24
• • • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Xiadong Village, Dapeng District, Shenzhen, P.R.China Shenzhen Gas Corporation Ltd. TGE/ YPDI (Consortium) March, 2017 05421
- Unloading/Loading System: LNG Unloading/ Loading Arms (2) and Vapour Return Arm (1) - LNG Storage Tank (1) of 80,000 m 3 Storage Capacity (net) - LP LNG Pumps (3) - BOG Handling System: Desuperheater, BOG Suction Drum, and BOG Compressors (2)
-
-
-
Overall Project Management/ EPC Consortium Leader Basic Engineering (Process & Utility Systems, Basic Safety -, Instrumentation & Control Systems Detail Engineering
-
Procurement & Supply (Process Equipment, LNG Tank materials, Process Piping Systems, Cryogenic Valves, Instruments & Control Systems, Electrical Equipment
-
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
-
HP LNG Pumps (3) Submerged Combustion Vaporisers (2) LNG Truck Loading Arms (5) MP and HP Gas Metering Systems Ground Flare (1)
Construction of LNG Tank & Overall Construction Management Operator Training, Commissioning & Start-up
LNG Storage Tank Supervision of Consortium partner YPDI’s work All Process Equipment, LNG Tank materials, all Process Piping Systems including supports, all Cryogenic Valves, all Instruments and Control Systems, main Electrical Equipment
Page 3 of 24
• • • • •
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Zhoushan, China ENN (Zhoushan) LNG Co., Ltd TGE/YPDI 2017 05389
EPC Contract for Two (2) x 160,000 cum LNG Gas storage tanks
-
Basic and detailed Engineering Fabrication and Delivery Commissioning
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Procurement Construction
Page 4 of 24
• • •
• •
•
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Shenzhen, Guangdong, P.R. China CNOOC Shenzhen Gas Co. Ltd. Consortium TGE Gas Engineering GmbH (TGE) and Sinopec Ningbo Engineering Co., Ltd. (SNEC) 2015 05290
Consortium under the lead of TGE Gas Engineering GmbH is contracted to build four full containment LNG storage tanks, each with a capacity of 160,000 m 3. The primary standard of LNG Tanks shall be EN 14620-2006 for design, manufacturing, inspection and testing, purging and cool down. Local codes and standards to be considered and applied where applicable. Engineering is executed within several engineering entities of TGE and SNEC.
-
Engineering of complete Tank expansion facility Procurement of construction materials and equipments Construction of complete facility
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Pre- / Commissioning of expansion facility
Page 5 of 24
• • •
• •
•
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Dapeng bay, Guangdong, P.R. China Guangdong Dapeng LNG Co. Ltd. Consortium TGE Gas Engineering GmbH (TGE) and Sinopec Ningbo Engineering Co., Ltd. (SNEC) 2015 05093
Consortium under the lead of TGE Gas Engineering GmbH is contracted to build the 4th Tank and interconnecting piping to the existing operation unit with connections for EPC future expansions. Engineering is executed within several engineering entities of TGE and SNEC.
-
Engineering of complete Tank expansion facility Procurement of construction materials and equipment Construction of complete facility
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Pre- / Commissioning of expansion facility
Page 6 of 24
Location: Owner: Contractor: Year of Completion: TGE Project Number:
• • •
China Inner Mongolia Huineng Coal Chemical Co., Ltd. TGE 2014 05170
30,000 m3 LNG storage tank single containment (steel / steel) Two submerged LNG in-tank pumps (320 m 3/h; 130 mLC) Eight truck loading facilities
-
Basic design Procurement / delivery of main equipment Supervision of Construction, PreCommissioning, Commissioning and Performance tests
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Detail design of LNG storage tank Operator training
Page 7 of 24
Location: Owner: Contractor: Year of Completion: TGE Project Number:
• • • •
Zhongwei, China Ningxia Zhongwei Guanghui Energy Development Co., Ltd. TGE 2014 05292
50,000 m3 LNG storage tank single containment (steel / steel) Two submerged LNG in-tank pumps (320 m 3/h; 130 mLC) Seven (7) LNG truck unloading 7 loading stations One (1) LNG container unloading / loading station
-
Basic design Procurement / delivery of main equipment Supervision of Construction, PreCommissioning, Commissioning and Performance tests
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Detail design of LNG storage tank Operator training
Page 8 of 24
• • •
• •
• • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Qinshui County, Shanxi Province, China Jincheng Huagang Natural Gas Co. Ltd Consortium TGE Gas Engineering GmbH (TGE) and Linde AG (Linde) 2014 05344
Natural Gas Liquefaction, Storage and Distribution plant Execution as consortium partner of Linde engineering Natural Gas Liquefaction Unit (Linde Part) LNG Storage and distribution system (TGE Part) full containment
-
Basic and Detail Design for 29,000 m³ Full Containment LNG Storage Tank Procurement Delivery of Special Material for Tank, Mechanical Equipment for Tank (Pumps and Hoist) as well as Tank Instrumentation and Tank Safety Valves Basic Design for LNG Send-Out and Distribution System (Truck Loading) Site Supervision for Construction and Commissioning Support
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
Page 9 of 24
•
• • • •
• • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Xinghe County, Ulanqab City, Inner Mongolia, China Inner Mongolia Xingjie Gas Co. Ltd Consortium TGE/ Linde AG 2014 05375
Natural Gas Liquefaction, Storage and Distribution plant Execution as consortium partner of Linde engineering Natural Gas Liquefaction Unit (Linde Part) LNG Storage and distribution system (TGE Part) full containment
-
Basic and Detail Design for 29,000 m³ Full Containment LNG Storage Tank Procurement Delivery of Special Material for Tank, Basic Design for LNG Send-Out and Distribution System (Truck Loading)
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Mechanical Equipment for Tank (Pumps and Hoist) as well as Tank Instrumentation and Tank Safety Valves
-
Site Supervision for Construction and Commissioning Support
Page 10 of 24
• • • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
•
-
Shenzhen, Dapeng Bay, China CNOOC Shenzhen Gas Co. Ltd. TGE 2013 05374
LNG Receiving Terminal consisting of: - 4 tanks net. volume of 160.000 m3 LNG storage capacity each - Compressor station - Vaporizer - Sea Water Intake - Send out system/ truck loading system - Jetty
Piping Stress Analysis whole Terminal Define Critical Line List out of the Overall Line List Carry out Static Analysis and Dynamic Analysis and issuing Reports accordingly
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Water Hammer Analysis Report Water Hammer Thrust Data Report Flange Leakage Analysis Report Safety Valve Discharge Analysis Report
Page 11 of 24
• • • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Shenzhen, Dapeng Bay, China CNOOC Shenzhen Gas Co. Ltd. TGE 2013 05338
Piping layout for a tunnel between Process area and Jetty (Basic- and Detail Engineering)
-
Piping layout (3D Model) Stress calculation HAZOP
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Stainless Steel Inliner Structure Steel Design Safety Equipment
Page 12 of 24
• • •
• •
•
Location: Owner: Contractor:
Year of Completion: TGE Project Number:
Yuedong, China CNOOC Shandong Chemical Engineering Co., Ltd. TGE Gas Engineering GmbH for SDCEC Shangdong Design Chemical Engineering Company 2012 05308
Engineering Review Service Contract for Yuedong LNG Terminal Basic and Detail Engineering developed by SDCEC
-
Review of process, equipment, instrumentation Basic Design Documents Consultancy service
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Review of process, equipment, instrumentation Detail Engineering Documents
Page 13 of 24
• • • • •
Beilun, Ningbo, Zhejiang Province China CNOOC Ningbo LNG Co., Ltd. TGE/CHENGDA CONSORTIUM 2012 05059
Location: Owner: Contractor: Year of Completion: TGE Project Number: :
•
LNG Storage Tank:
The scope of work defines three 160,000m 3 full containment LNG storage tanks. The primary standard of LNG Tanks shall be EN14620-2006 for design, manufacture, inspection and testing, drying, purging and cool down.
EPC turn-key contractor: - Authority Engineering - Basic Engineering - Procurement Off Shore - Detail Engineering - Construction - Installation
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Mechanical Completion Commissioning Start-up Performance Guarantee Testing Technical support during run test
Page 14 of 24
• • • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Sines, Portugal REN Atlântico Projesines: Joint Venture Somague /TGE 2012 05063
EPC contract for the extension of the existing receiving, storage and regasification facilities increasing storage and send out capacity by 50%. Built o EN 1473 (facilities) and EN 14620 (Tank) Provision of 1x150,000m 3 (net) LNG (pre-stressed Concrete Outer wall) Full Containment Storage Tank A new Sea Water System (Intake & Outfall) inclusive two (5000 m3/hr) SW Pumps An additional send-out train consisting - 4 Low Pressure LNG (500 m 3/hr) In-Tank Pumps - 1 LNG Boil of Gas Recondenser - 2x High Pressure LNG Pumps - 2x Open Rack Vaporizers (ORV’s) - Electrical Substation - Fiscal metering train (450000 Nm 3/hr) with tie-ins to existing metering facilities.
•
• • •
Full EPC in Joint Venture with Local Civil Partner Somague -
Basic Engineering Detail engineering HAZOP and QRA Procurement/delivery of main equipment Supervision of construction, precommissioning, commissioning
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Performance test Storage Tank Detail Design Operator Training
Page 15 of 24
• •
• • •
• • • • •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Ji Munai, China Xinjiang Ji Munai Guanghui LNG Development Ltd. Co. TGE 2012 05118
30,000 m3 LNG Storage Tank (single containment)according API 620 LNG filling system from NG liquefaction plant Submerged in-tank pumps (each 320 m 3/h; 130 mLC) LNG send-out system to truck loading stations Truck loading facilities
-
Basic Engineering Procurement/delivery of main equipment Supervision of detail engineering, construction, pre-commissioning, commissioning, performance tests
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Storage Tank Detail Design Operator Training
Page 16 of 24
• • • • •
•
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Naomaohu, Yiwu, Xinjiang, P. R. China Xinjiang Guanghui New Energy Co. Ltd. TGE 2011 02197
1.2Mil t/a Methanol and 0.8Mil DME Plant - Coal gasification - Methane removal - Methane liquefaction - Methanol plant - DME plant LNG Storage and Distribution Plant 30,000 m3 LNG StorageTank, single containment Two submerged intank pumps (320 m 3/h; 120 mLC) Ten truck loading facilities − − −
-
Basic design of LNG storage tank Farm Procurement/ delivery of main equipment Commissioning
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Detail design of LNG storage tanks and DCS/ESD system Supervision of construction
Page 17 of 24
•
• • • • •
•
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
North Pars, Iran CNOOC North Pars LNG TGE/Linde/Snamprogetti 2008 2011
Concept Design (Pre-FEED) study for an LNG Production and Export Facility with capacity of 20mmtpa in Phase I, up to 30mmtpa for Phase II. Inclusive Gas Treatment, Liquefaction Process, LNG Storage & Transfer facilities, Power Generation and Utilities. Inclusive Process Optimisation, Value Engineering Studies and execution Turn-key cost estimate.
-
Consortium Leader Concept Design Storage & Loading
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
HAZID Assessment Turn-key Cost Estimate
Page 18 of 24
• • • • •
•
• •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
LNG -
Mugardos (La Coruna), Spain Reganosa TGE 2007 01548
Receiving Terminal (EN 1473) 2 x 150,000 m³ LNG Storage Tanks (BS 7777) Full Containment 3 x LNG ship loading arms, 1 x vapour return arm 2 x submerged LP pumps per storage tank 4 x HP send out pumps 1 x submerged combustion vaporizer 2 x open rack vaporizers NG distribution system to the local grid at 80 bar g Truck loading system Re-liquefaction system
EPC turn-key -Contractor Main EPC Activities: - Basic Engineering - Construction - Procurement
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Authority Engineering Detail Engineering Commissioning
Page 19 of 24
• • • • •
•
• •
• •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Melkøya Island Hammerfest, Norway Snøhvit License Group, Norway Consortium TGE – Entrepose – Fabricom 2006 01567
The project involves the design, engineering, supply, pre-fabrication, installation/ construction and commissioning/ start-up of Storage and Loading Package for LNG, LPG and Condensate (Export Terminal). The LNG export capacity is designed for 5,6 billion m³ / year. The project includes 2 LNG storage tanks full-containment type of each 125,000 m³ net capacity, 1 LPG storage tank of 45,000 m³ net capacity and 1 condensate storage tank of 75,000 m³ plus loading facilities for vessels of up to 160,000 m³.
Consortium leader for the EPC turn-key Contract Main EPC Activities:
-
Basic Engineering Construction Procurement
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Authority Engineering Detail Engineering Commissioning
Page 20 of 24
•
• • • •
• •
• •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Port Lavaca – Point Comfort Calhoun County, Texas, USA Calhoun LNG, LP TGE 2006 01977
2 x 160,000 m 3 LNG storage tanks Marine docking facilities with single berth capable of mooring and unloading LNG carriers in the class 75,000 m³ to 220,000 m³ NGL fractionation facilities Send-out-capacity of 7.2 mtpa
-
Front End and Engineering Design Services (FEED)
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Provide lump sum Turn-key cost estimate
Page 21 of 24
• • • • •
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
LNG -
-
Kitimat (Province Alberta), Canada KITIMAT LNG Inc. TGE 2005 01924
Receiving Terminal: 3 x 160,000 m³ LNG Storage Tanks Marine docking facilities with single berth Capable of mooring and unloading LNG Carriers in the class 75,000 m 3 to 200,000 m³ Send-out capacity of 6 mtpa
Site selection Front-end engineering and design services (FEED)
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Preliminary Risk Assessment Provide lump sum Turn-key cost estimate
Page 22 of 24
• •
• • •
•
•
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Shan Shan, Xinjiang, P. R. China Xinjiang Guanghui Industry and Commerce Group Co. Ltd. TGE 2004 01454
Natural Gas Treatment and Liquefaction Plant for 1,500,000 Nm 3/d - Feed Gas Compression (8,5 MW) - CO2 Wash Unit - Dryer Station - Feed Gas Liquefaction - Refrigerant System - Refrigerant Storage and Make-up - Gas Turbine (20 MW) as driver for cycle compressor - Fuel Gas System LNG Storage and Distribution Plant 30,000 m³ LNG Storage Single Containment Tank according API 620 Two submerged in-tank pumps (320 m 3/h; 120 mLC) Four truck loading facilities Six container loading facilities for railway transportation − − − −
-
Front end / Basic design Detail design of LNG storage tanks and DCS/ ES system Supervision of construction and commissioning
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Detailed engineering supervision Procurement and detail design of main equipment
Page 23 of 24
• • • • •
•
•
•
•
•
• •
• •
• •
Location: Owner: Contractor: Year of Completion: TGE Project Number:
Sines, Portugal Transgâs Atlântico, Portugal TGE / Entrepose /Somague Consortium 2003 01431
The terminal is designed for a turn-over of 5,2 10 9 Nm³ of natural gas per year equivalent to 600,000 Nm³/h at a pipeline pressure of 77 to 80 barg at a high availability level. Two full containment LNG storage tanks with a net capacity of 120,000 m³ designed according to BS 7777 and EN1473. The NG send-out system is designed for a peak send-out of 900,000 Nm³/h. The send-out system consists of submerged in-tank pumps, high-pressure booster pump station, five open rack vaporizers each with a capacity of 180 tons/h and a metering station. LNG vaporization system incl. sea water intake equipped with sea water filtering runs, sea water pumps and electro chlorination system. LNG unloading facilities including jetty head, unloading berth, LNG ship unloading arms and a ship gangway allowing to receive LNG carriers between 35,000 m³ up to 165,000 m³. LNG ship unloading line designed for a max. ship unloading rate of 10,000 m³/h. Truck loading facilities equipped with 2 bays designed to load 3,000 trucks per year. Extension to 6,000 trucks per year is foreseen. General facilities including main service building, warehouse and utility station. Design and construction in compliance with European Regulations, European Directives (PED) and applicable HSE regulations.
Consortium leader for the EPC turn-key Contract Main EPC Activities: - Authority Engineering - Detail Engineering - Commissioning
TGE Gas Engineering GmbH · Mildred-Scheel-Str. 1 · 53175 Bonn, Germany Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0 www.tge-gas.com /
[email protected]
-
Construction Procurement
Page 24 of 24