REPUBLIC OF THE PHILIPPINES
TABLE OF CONTENTS
OFFICE OF THE CITY/MUNICIPAL ENGINEER/BUILDINGOFFICIAL
DISTRICT/CITY/MUNICIPALITY
ARCHITECTURAL A-1
LAND USE & ZONING
PERSPECTIVE VIEW & TABLE OF CONTENTS
A-2
GROUND FLOOR PLAN SECOND FLOOR PLAN
A-3
REFLECTED CEILING PLAN CROSS SECTION RIGHT SIDE ELEVATION
A-4
A-5
SCHED. OF DOORS & WINDOWS RAMP DETAILS, EAVES DETAIL, SUN BREAKER DETAIL DAMP PROOFING DETAIL, BALCONY RAILING DET. ROOF PLAN, LONGITUDINAL SECTION
A-6
FRONT ELEV., REAR ELEV.
A-7
STAIR & HANDRAIL DETAILS
A-8
TOILET DETAILS
LINE & GRADE
ARCHITECTURAL
STRUCTURAL S-1 S-2
PERSPECTIVE VIEW
FOUNDATION PLAN, 2ND FLOOR FRAMING PLAN ROOF DECK FRAMING PLAN SCHEDULE OF SLAB
S-3
DET. STAIR ON GRADE, RAMP & STAIR DET. OF FOOTING, TIE BEAM & COLUMN
S-4
TRUSS DIAGRAM, SCHEDULE OF BEAM DETAILS OF STEEL CONNECTION
STRUCTURAL
SANITARY ELECTRICAL E-1
GENERAL NOTES, LEGEND, LOAD SCHEDULE, RISER DIAGRAM, SINLE DIAGRAM
E-2
POWER LAYOUT (GROUND & SECOND FLOOR) LIGHTING LAYOUT (GROUND & SECOND FLOOR)
E-3
ELECTRICAL
SANITARY P-1
SEWER SYSTEM LAYOUT, LEGEND, DESIGN CRITERIA, NOTES
P-2
WATER & DRAINAGE SYSTEM LAYOUT, SEPTIC TANK, CATCH BASIN, DRAIN PIT, & LEACHING FIELD DETAILS
MECHANICAL
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING D IVISION
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-1 8
1
2
3
11
4
CONCRETE SUNBREAKER(SEE DETAIL) 1 A-3
A
WF1
W-1
LANDING
DN.
B
C SECOND FLOOR PLAN
3
2
1
4
11 200x200mm VITRIFIED UNGLAZEDFLOORTILES
SCHEDULE OF FINISH
W-3
A
SLOP SINK
D-4
UD
W-1
W-1
W-1
W-1
W-1
W-1
W-1
SHE
D-4
HE FL3 R E T N U O C K N I S
CLASSROOM
CLASSROOM
CLASSROOM
R E T N U O C K N I S
CLASSROOM
D-5 FL1 D-2
FL1
WF1
FL1
WF1
D-1
B
FL1 - PLAIN CEMENT FLOOR FINISH
SD
FL3 D-3
STO.
FLOORS :
D-4
W-1
W-2
W-2
D-1
W-2
W-2
D-1
WF1
D-1
W-2
W-2
D-1
FL1
FL1
- 200X200 VITRIFIED FLR TILES ( UNGLAZED )
D-2 D-1
W-2
W-2
WALLS : D-1
UP
C O R R I D O R
- PLAIN CEMENT FLOOR ROUGH WITH GROOVES
FL3
STO.
UP FL1
FL2 D-5
FL1
WF1
D-1
D-3
FL1
C O R R I D O R
- 150 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT) - 150mm THK. CHB w/200X200mm VITRIFIED WALL TILES ( GLAZED )
C RAMP UP
RAMP UP
- 100mm THK. CHB PLAIN CEMENT PLASTER w/50mmØ G.I. PIPE HANDRAIL PAINT FIN. - 100mm THK. CHB w/200X200mm VITRIFIED WALL TILES ( GLAZED )
GROUND FLOOR PLAN
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING D IVISION
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-2 8
1
2
3
4
5
6
7
8
9
10
11
A LIGHTING FIXTURE 6mmTHK. ORDPLYWOODCEILING w/6mmGROOVE ON50x50 mmCLEILING JOISTS (PAINT FIN.)
b
6mmTHK. MARINE PLYWOODCEILING w/GROOVE ON50x50mm CEILING JOISTS (PAINT FIN.) CEILING VENT. (SEE DETAIL)
c GA.26PLAING.I.GUTTERON 12x300mm THK. FIBER CEMENT FASCIA BOARD
SECOND FLOOR REFLECTED CEILING PLAN
A
B
C
C
B
A
A
B
C
TOP OF TRUSS APEX LINE OF TRUSS
APEX LINE OF TRUSS GA. 26CORR. G.I. SHEET ROOFING (PAINT FINISH)
GA. 26CORR. G.I. SHEET ROOFING (PAINT FINISH) SEE TRUSS DETAIL TOP OF ROOF BEAM GA. 26PL AING.I. SHEET GUTTERON12x300mm FIBERCEMENT FASCIA BOARD(PAINT FINISH)
TOP OF ROOF BEAM
W-1
W-2
CLASSROOM
SECONDFLOORLEVEL
3
GA. 26PL AING.I. SHEET GUTTERON12x300mm FIBERCEMENT FASCIA BOARD(PAINT FINISH)
3 A-3 150mmTHK. CHB PLAIN PLASTERPAINT FIN.
3 SECONDFLR. LVL.
A-3
TOP OF ROOF BEAM
150mmTHK. CHB PLAINPLASTER PAINT FIN.
SECONDFLR. LVL.
50mmGA#40 G.I. PIPE HANDRAIL W-1
GROUNDFLOORLEVEL FIN. GRD. LN. EXPOSE CEILING UNDERSLAB PAINT FINISH
32mmØ G.I. PIPE HANDRAILWITH32mmØ VERT. SUPPORT @300mm O.C. (PAINT FINISH)
W-2
CLASSROOM
1
32mmØ G.I. PIPE HANDRAILWITH32mmØ VERT. SUPPORT @300mm O.C. (PAINT FINISH)
150mmTHK. CHB WALL PLASTERPAINT FIN. GROUNDFLR. LVL. NAT. GRD. LN.
CROSS SECTION
GROUNDFLR. LVL. NAT. GRD. LN.
RIGHT SIDE ELEVATION
4 A-3
LEFT SIDE ELEVATION SCALE :
1: 100M
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-3 8
1
2
3
7 4
5
6
7
8
11
APEX LINE OF TRUSS GA. 26CORR. G.I. SHEET ROOFING (PAINT FINISH) GA.26PLAING.I. GUTTERON 12x300mmFIBER CEMENT FASCIA BD. (PAINT FINISH)
TOP OF ROOF BEAM
100MMTHK. CHB RAILING W/50mmØ G.I. PIPE RAILING
SECONDFLOORLEVEL
32mmØ G.I. PIPE HANDRAILWITH32mmØ VERT. SUPPORT @ 300mm O.C. (PAINT FINISH)
GROUNDFLOORLEVEL NAT. GRD. LN.
FRONT ELEVATION
10
9
8
7
6
5
4
3
2
1 APEX LINE OF TRUSS
TOP OF ROOF BEAM
SECONDFLOORLEVEL
GROUNDFLOORLEVEL NAT. GRD. LN.
REAR ELEVATION
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-4 8
1
3
2
4
5
7
6
8
10
9
11 GA. 26PL. G.I. SHT. GUTTER ON12x300mmFIBER CEMENT FASCIA BD. PAINT FIN.
GA. 26CORR. G.I. SHEET ROOFING PAINT FIN.
A
GA. 26PL. G.I. SHT. FLASHING ON12x300mm FIBERCEMENT FASCIA BOARDPAINT FIN. GA. 26PL. G.I. SHT. RIDGE ROLLPAINT FIN.
B
C
LN. OF STRUCTURE
ROOF PLAN
1
3
2
5
4
9000 4500
6
7
9000 4500
4500
W-1
W-1
8
9
9000 4500
4500
W-1
W-1
10
11
9000 4500
4500
W-1
W-1
4500
APEX OF TRUSS
THIRDFLOORLEVEL
W-1
SECONDFLOORLEVEL
W-1
CLASSROOM 5
CLASSROOM 6
CLASSROOM 7
CLASSROOM 8
W-1
LANDING W-3
SHE
GROUNDFLOORLEVEL
W-1
CLASSROOM 1
W-1
W-1
CLASSROOM 2
W-1
W-1
CLASSROOM 3
W-1
W-1
CLASSROOM 4
W-1
NAT. GRD. LN. EXPOSEDUNDER SLAB CEILING PAINT FINISH
LONGITUDINAL SECTION
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION MERALCOAVENUE, PASIGCITY
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-5 8
STAINLESS STEEL KICKING PLATE
FFL
CLASSROOM
D-1
TOILET
TANGUILE PANEL DOOR ON 50X150 MM THK. YACAL/GUIJO JAMB W/ FIXED CLEAR GLASS TRANSOM COMPLETE WITH HARDWARES AND ACCESSORIES
D-2
HOLLOW CORE FLUSH TYPE SWING DOOR W/ MARINE PLYWOOD FACING INSIDE AND ORDINARY OUTSIDE COMPLETE W/ HARDWARES AND ACCESSORIES
TOILET (DISABLED)
D-3
TOILET (CUBICLE)
LOUVER TYPE DOUBLE SWING DOOR COMPLETE W/ HARDWARES AND ACCESSORIES PROVIDE KICK PLATE
D-5
STO.
SWING DOOR ON 50X100 YACAL/GUIJO DOOR JAMB COMPLETEWITHHARDWARES ACCESSORIES
HOLLOW CORE FLUSH TYPE SWING DOOR ORDINARY COMPLETE W/ HARDWARES AND ACCESSORIES
JALOUSIE WINDOWS WITH CLEAR GLASS BLADES ON STANDARD ALUMINUM CASING AND FIXED CLEARGLASS TRANSOM ON 50X150 YACAL/GUIJO JAMB COMPLETE WITH HARDWARES AND ACCESSORIES
W-1
W-2
JALOUSIE WINDOWS WITH CLEAR GLASS BLADES ON STANDARD ALUMINUM CASING AND FIXED CLEAR GLASS TRANSOM ON 50X150 YACAL/GUIJO JAMB COMPLETE WITH HARDWARES AND ACCESSORIES
JALOUSIE WINDOWS WITH CLEAR GLASS BLADES ON STANDARD ALUMINUM CASING ON 50X150 YACAL/GUIJO JAMB COMPLETE WITH HARDWARES AND ACCESSORIES
DOORS & WINDOWS SCHEDULE GA#26 CORR. G.I. ROOFING SHT. PAINT FIN.
CONCRETE HOLLOW BLOCKS CONCRETE SLAB POLYETHYLENE SHEET DAMP PROOFING
6mm THK. MARINEPLYWOOD CEILINGON 50x50mm CEILING JOIST @600mm BW
TOP CHORDSEE STRUCTURALDETAIL
GRAVELBEDDING 38mmØ TEKSCREW
38mmØTEKSCREW
C-PURLIN(SEE STRUC'LDETAIL)
2-32mmØ G.I. PIPE HANDRAIL w/32mmØ VERT. SUPPORT @300mmOC (PAINT FIN.)
GA#26 GI STRAP COPPERRIVET
SAG RODSEE STRUCTURALDETAIL
12x300mm FIBERCEMENT FASCIA BOARDFIX W/METALSCREW ONSTL. FRAMEPAINT FINISH
6mmTHK. MARINE PLYWOODCEILING ON 50x50mmCEILING JOIST @600mmBW
DAMP PROOFING DET.
GA#26 GI GUTTERPAINT FIN. GA#26GI STRAP
6mmTHK. ORD. PLYWOODCEILING W/ 6mmGROOVE ON 50x50mm CEILING JOIST @600mmBW (PAINT FIN.)
12mMØ STEELDOWEL EMBEDDINCONC.
2 A-4
NON-SKIDPLAIN CEMENT FLOORFIN. w/ GROOVE LINES
2-32mmØ G.I. PIPEHANDRAIL w/32mmØ VERT. SUPPORT @300mm O.C.(PAINTFIN.)
ROOF BEAM
20x20X2mm ANGULARBAR FOR FASCIABOARD FRAMECOATED WITHPRIMER
GA#26G.I.GUTTERON12x300mmFIBER CEMENT FASCIA BOARDPAINT FIN.
BASKETSTRAINER BASKET STRAINER
NON-SKIDPLAIN CEMENT FLOORFINISH w/GROOVELINES
75mmØ PVCDOWNSPOUT PAINT FINISH 75mmØ PVC DOWNSPOUTPAINT FINISH
CEILING VENT (SEE DETAIL)
DETAIL SECTION
SECTION DETAIL (EAVES)
SPOT DETAIL (EAVES)
SEE TRUSS DET.
5
100X100CONCRETE SKIRTING
6
6mmTHK. ORD. PLYWD. CEILING (PAINT)ON 50x50mm CLG. JST. @600mmOCBW
32mm Ø G.I PIPE VERTICAL SUPPORT @300mmONCENTER PROVIDE 12mmØ STEELDOWELS (PAINT FIN.)
B
FR. QUARTER-C MOULDING CEILING CONTACT TO CONC. WALL
SPOT DETAIL CO RRI DO R
6mmTHK. MARINE PLYWD. CEILING (PAINT)ON50x50mm CLG. JST. @600mmOC BW
10mmØ @250mmON CENTER
SPOT DETAIL (CORNER CLG.) 12x12mmGROOVE
C
25x25mmWOODVENT. PROVIDE INSECT SCREEN
FR. 25x75mmWOOD FRAMEPAINT FIN.
BEAMREBARS SEE STRUCTURALDETAIL
CONCRETE SUNBREAKER DET. NON-SKIDPLAIN CEMENT FLOOR FINISHw/GROOVE LINES
TOTALRUNOFRAMP
32mmØ G.I. PIPE HANDRAIL w/32mmØ VERT. SUPPORT @300mmO.C. (PAINT FIN.)
DET. PLAN OF RAMP
25x25mmWOODVENT PROVIDE INSECT SCREEN
DETAIL PLAN (VENT.)
FR.25x75mm VENT FRAME (PAINT FIN.)
6mmTHK PLYWOODCEILING ON50x50mm CEILING JOIST @600mmOC. BW (PAINT FIN.)
SECTION DEATIL (VENT.)
REPUBLIC OFTHE PHILIPPINES
DEPARTMEN T
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEER ING DIVISION
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-6 8
5
6
5 A-7
50mmØ G.I. PIPE SCH. 40 PAINT FIN.
A
50mmØ G.I. PIPE SCH. 40PAINT FIN.
W-1
50mm%%G.I. PIPE SCH. 40PAINT FIN. 50mmØ G.I. PIPE SCHEDULE 40 (PAINT FINISH)
19mmSQUARE BAR WELDEDTO G.I. PIPE HANDRAIL@146mm O.C.
19mmSQUAREBARWELD TO G.I. PIPE HANDRAIL @146mmO.C. PLAINCEMENT STEEL TROWELLFIN.
LANDING
6
18
17
19
16
13
m m 2 7 6 4 = H C A E m m 2 9 2 @ S D A E R T 6 1
.
[email protected]. STAIR
50mmØ G.I. PIPE SCH. 40 w/19mmSQ.BAR@146mm ONCENTERPAINTFIN.
14
19mmSQUARE BAR WELDTO G.I. PIPE HANDRAIL@146mm O.C.
L L A W
[email protected]. STAIR
LANDING
15
DN
HANDRAIL DETAIL
SECONDF.F.L.
L A A-7 C I P Y T
19mmSQUARE BAR WELDEDTO G.I. PIPE HANDRAIL@146mm O.C.
L A C I P Y T
TREAD
25x25x2mmANGULARBAR NOSING
SPOT DETAIL
CRASH RAILING
12 TYPICAL
11
SECTION DETAIL
10
2x25x25mm ANGULAR BARNOSING @STEP
12x12x2mmFL AT BAR STRAP @600mmO.C.
50mmØ SCH. 40G.I. PIPE PAINT FIN.
NOSING DETAIL
50mmØ G.I. PIPE SCHEDULE 40 (PAINT FINISH)
19mmSQ. BARANCHORED TO THE WALL(PAINT FIN.)
B (SECOND FLOOR TO GROUND FLOOR)
DETAIL PLAN OF STAIR SCALE :
5
6
A
B
SPOT DETAIL
C
D A E R T M O R F m m 0 0 9
19mm SQUARE BAR ANCHORTO THE WALL(PAINT FIN.)
ROOF LINE
SPOT DETAIL
A W-1
TOILET
10 A-7
50mmØ SCH. 40G.I. PIPE HANDRAIL w/
[email protected]
W-1
5 A-7 50mmG.I.PIPE SCH. 40 HANDRAILw/25mmSQ. BRACKECT @600mmO.C. PAINT FIN.
17 18
16
19
15
SECOND FLOOR LINE
LANDING
17
14
16 15
EXPOSED UNDERSLAB CEILING PAINT FIN.
13 12
m m 2 7 6 4 = H C A E m m 2 9 2 @ S D A E R T 6 1
CORRIDOR
19 18
14 W-3
11 10
50mmØ G.I. PIPE SCH. 40 w/19mmSQ.BAR@146mm ONCENTERPAINTFIN.
9 8
13
5mmTHK. FACIAL MIRROR 38mmØ STAINLESS STEELGRAB BAR
100mmTHK CHB RAILING PLASTERAND PAINT FIN.
12 11 10
SECONDFLOORLEVEL 9 8 7
200x200mmVITRIFIED GLAZEDWALLTILES
6
ELEV.
5 4
7 WC
6
9 A-7
5 4
GROUND FLOOR LINE
HE
LAV
SCALE: 1:50m
3
WC
1
HCR
DETAIL SCALE: 1:20m
2
CORRIDOR
BALCONY RAILING DET.
NATURAL GRADE LINE
3 2
B
16TREADS @292= 4672
1 UP
(GRD FLOOR TO SECOND FLOOR)
DETAILED PLAN OF STAIR
7 A-7
DETAIL SECTION OF STAIR
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING D IVISION MERALCOAVENUE, PASIGCITY
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-7 8
1
2
10
11
DET. PLAN T
DET. ELEVATION
DET. SECTION OF FEMALE TOILET
1
DET. SECTION OF MALE TOILET
2 10
LOW PARTITION w/ 200x200mm VITRIFIED GLAZED WALL TILES
11
W-3 W-3
A
SLOP D-5
D-5
SINK
200x200mm VITRIFIED FLOOR TILES (UNGLAZED)
D-5
L A N I R U FL3
D-2
HCR
200x200mm VITRIFIED FLOOR TILES (UNGLAZED)
DET. SECTION
SD
SHE FL3
D-3
HCR
STO.
R E T N U O C K N I S
PLAINCEM. PLASTERED PAINT FIN.
HE
D-4
3mmTHK.SOLIDWOOD FASCIALMIRRORONAL. FRAMING
STO. 200x200mm VITRIFIEDWALL TILES (GLAZED)
D-4
D-3 D-2
B UP
FEMALE TOILET DETAIL
UP
MALE TOILET DETAIL DET. OF COUNTER SINK
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
A-8 8
1
2
3
4
5
6
7
8
9
10
11
7
8
9
10
11
A
B
C
FOUNDATION PLAN
1
2
3
4
5
6
A
B
C
2ND FLOOR FRAMING PLAN
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
PHYSICAL FACILITIES AND SCHOOLS ENGINEERING D IVISION MERALCOAVENUE, PASIGCITY
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
S-1 4
1
2
3
4
5
6
7
8
9
10
11
A
B
C
ROOF DECK FRAMING PLAN
TYPICAL SLAB ELEVATION
S C H E D U L E OF S L A B S
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
S-2 4
C O L UM N S C H ED U L E 10
DETAIL OF TIE BEAM
DETAIL OF STAIR ON GRADE
11
DETAIL OF RAMP
TYPICAL BEAM ELEVATION
TYP. FOOTING DETAIL
S C HE D U L E O F F O OT I N G
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
S-3 4
5
6
A A
DETAIL OF T-1
SCHEDULE OF TRUSS MEMBERS
B STAIR FRAMING PLAN (TYP.)
CONNECTION DETAIL
STAIR SECTION DETAIL
TYPICAL TRUSS ANCHORAGE DETAIL CONNECTION DETAIL
SECTION OF STAIR SLAB SPOT DETAIL
CONNECTION DETAIL
PURLIN CONNECTION DETAIL
SAG ROD CONNECTION DETAIL
HALF TRUSS CONNECTION DETAIL
SPOT DETAIL
SPOT DETAIL
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
S-4 4
GENERAL NOTES 1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. THE APPLICABLE
SYMBOL - CEILINGLIGH T OUT LET
PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF
- 2 x 40 W ATTSFLUORESCENTLAMP
THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. THE ELECTRICAL WORKS SHALL BE DONE UNDER THE IMMEDIATE SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.
F
- CEILINGFANOUT LET
S/S S
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 230 V AC, 60 Hz.
S S
WIRING METHOD SHALL BE AS FOLLOWS : a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT SCH. 40 BRANCH CKT., & AUXILIARY
² AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL
BE 15mmØ TRADE/NOMINAL SIZE. I
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
E-1 3
1
2
3
4
5
6
7
4
5
6
7
8
9
10
11
A
B
C
SECOND FLOOR LIGHTING LAYOUT
1
2
3
8
9
A
B
C
GROUND FLOOR LIGHTING LAYOUT
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N MERALCOAVENUE, PASIGCITY
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
E-2 3
1
2
3
4
5
6
7
8
9
10
11
4
5
6
7
8
9
10
11
A
B
C
SECOND FLOOR POWER LAYOUT
1
2
3
A
B
C
GROUND FLOOR POWER LAYOUT
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
E-3 3
1
3
2
4
5
7
6
8
9
10
11
A
B ROOF DRAIN LAYOUT
C
1
100mmĐPVCSP
CO
P S C V P m m 0 5
5
100mmĐPVCSP
6
11
SEPTICTANK
WC
P S C V P Ø m m 0 0 1
50mmØPVCVTW
WC
LAV FD
L W C I G Ø m m 2 1
P W C V P m m 0 5
FD CO
OUTLET
100mmĐPVCSP
100mm� PVCSP CO 150mmØCDP
75mmØ PVCDS
50mmØ PVCVR RISER
4
P S C V P m m 0 5
CB
A
3
2
CB
CB
150mmØ CDP DS
75mmĐ PVCDS
SS
CO CS
WC
12mmØGICWL
CO
P S C V P Đ m m 100CO 0 0 1
WC
UD
L W C I G Ø m m 2 1
P W C V P Đ m m 0 5
FD LAV WC
2 m m Đ G I C W L
CO
P D C Ø m m 0 5 1
50mmPVCVSTRRISER
CO 1
FD
CLASSROOM CS
12mmØGICWL
L W C I G Ø m m 0 2
50mmØPVCVTW P S C V P Đ m m 0 0 1
12mmĐGICWL CV
2 0 m m Đ G I C W L
B FD
FD
C CB D 1 R 5 A 0 m I N m A Ø G E C S D Y P S T T O E M M A I N
CB
150mmØCDP D 1 R 5 A 0 m I N m A G Ø E C D S P Y S T T O E M M A I N
PLUMBING RO-IN LAYOUT
W 3 A 8 m T m E Ø R S G Y I S C T W E L M T O M A I N
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N MERALCOAVENUE, PASIGCITY
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
P-1 3
1 1 0 1 B C
C W
9
V A L D F
P
D C O Ø C
C W
D F
m 0 B 1 m 0 0 C 5 1
Ø m S m D 5 C 7 V P
8
D U
D F O C
B C
S C
S D
7
B C D F
P D C Ø m m 0 5 1
M O O R S S A L C
6
P D C Ø m m 0 5 1
B C
S D
5
B C P D C Ø m m 0 5 1
D F
M O O R S S A L C
4
P D C Ø m m 0 5 1
B C
S D
3
B C D F
P D C Ø m m 0 5 1
M O O R S S A L C
2
P D C Ø m m 0 5 1
B C
1
S D
B C
P D C Ø m m 0 Ø 5 1 m
M O O R S S A L C
m D S 5 C 7 V P S S
D F
P D C Ø m m 0 5 1
L W C I G Ø m m 2 1
D F B C
C W C W
L W Ø C m I m G 2 1
S O C C
Ø m L m 2 W C 1 I G
D F V A L
B C
D F
C W
A PLUMBING RO-IN LAYOUT
B
B C
C
REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
P-2 3
LEGEND: CB
100mm THK.+FIN. SLAB w/10mmØ REBARS @200mm OCBENTUP2 OUT OF 3 ATL/4 FROM FACESUPPORTBOTHWAYS
100mm THK. +FIN. SLAB w/100mmØ BENTUP2 OUT OF 3 @L/4 FROM FACE SUPPORTBW
150x300mmRCBEAMw/2-16mmØTOPAND BOT.REBARS&10mmØ STIRRUPS1@50, 3@100, REST@300mm OC AIR SPACE
NGL
CATCHBASIN
CDP CONCRETE DRAINPIPE CO CLEANOUT AIR SPACE CV
CHECK VALVE
HB
HOSE BIBB
NGL MH
MH
INLET
AIR SPACE
FD FLOORDRAIN GICWLGALVANIZEDIRONCOLDWATERLINE(SCH.40) GICWR GALVANIZEDIRONCOLDWATERRISER(SCH.40)
WATER LEVEL INLETS
LEACHING CHAMBER DIGESTIVECHAMBER
GRAVELBED
1% SLOPE
PLASTEREDw/WATERPROOFING COMPOUNDOR APPLY ONEFACE BITUMENTAR
PLASTEREDw/WATERPROOFING COMPOUNDOR APPLY ONEFACE BITUMENTAR
WALLREINFORCEMENT10mmØ VERT. & HOR. BAR @200mm OC BW
WALLREINFORCEMENT10mmØ VERT. & HOR. BAR @200mm OC BW
GV
GATE VALVE
MH
MANHOLE
PVCDS POLYVINYLCHLORIDE DOWNSPOUT PVCDP POLYVINYLCHLORIDE DRAINPIPE PVCDS POLYVINYLCHLORIDE DOWNSPOUT
100mm THK. SLAB w/10mmØ REBARS @300mm BOTHWAYS
100mm THK. SLAB w/10mmØ REBARS @300mm BOTHWAYS
PVCSP POLYVINYLCHLORIDE SOILPIPE PVCVACPOLYVINYL CHLORIDE VENT. ACROSS CEILING PVCVP POLYVINYLCHLORIDE VENT. PIPE PVCVS POLYVINYLCHLORIDE VENT STACK
SECTION DETAIL
PVCVTR/W POLYVINYLCHLORIDE VENT TROUGHROOF/WALL
SECTION DETAIL
PVCWP POLYVINYLCHLORIDE WASTE PIPE PVCWS POLYVINYLCHLORIDE WASTE STACK RD
ROOF DRAIN
UD
URINALDRAIN
WC WATERCLOSET
DRAINAGEPIPE
INLET
LAV
LAVATORY
CS
COUNTERSINK
OUTLET
PLUMBING NOTES: GRADES OF HORIZONTALPIPINGS RUNALL HORIZONTALPIPINGS INPERPECT ALIGNMENT ANDAT A FORMGRADE NOT LESS THANTWO PERCENT (2%)
DETAIL PLAN
PROHIBITEDFITTINGS NO DOUBLEHUB ORTEE BRANCHSHALL BEUSED ONHORIZONTAL SOILAND WASTELINES, THE DRILLINGSANDTAPPING OFHOUSEDRAIN, WASTEORVENTPIPESANDUSEDOF SADDLEHUBANDBENDARE PROHIBITED.
S-1a 100mm THK. +FIN. SLAB w/ 100mmØ REBARS @300mm OC BENTUP 2 OUTOF 3 @L/4 FROM FACESUPPORTBOTHWAYS
OUTLET
PIPECLEAN-OUTS CLEAN-OUTS AREREQUIREDUNDERTHEF0LLOWINGCONDITIONS: a) EVERYCHANGEOF HORIZONTALDIRECTIONEXCEEDINGTWENTYTWOANDONE-HALFDEGREES (22 1/2°). b) ONEANDONE-HALF METERS (1.50m.) INSIDETHEPROPERTYLINES BEFORETHEHOUSEDRAINAGECONNECTION. c) EVERYFIFTEENMETERS (15.00m) INHORIZONTALRUNOF PIPES. d) AT THEEND OFANY HORIZONTALPIPELINES.
2-100mmØEXTRABARSTOP/BOT.ON TWO PARALLELSIDE MH
S-1a
MH
S-1a
CHANGEINDIRECTIONALLCHANGEIN DIRECTIONSHALLBEMADEBYAPPROPRIATEUSEOF FORTY-FIVEDEGREES(45°) WYES, LONGSWEEP QUARTERBEND, SIXTH-EIIGHTORSIXTEENTH BEND. WHENTHECHANGE OFFLOW IS FROM HORIZONTALTO VERTICALA SINGLE1/8 BENDCOMBINATIONMAYBE USEDON VERTICALSTACKS ANDSHORT QUARTER BENDS MAYBEUSED ONWASTE LINE, TEEANDCROSSES MAYBEUSEDIN BENT PIPES.
INLET CDP
THEDIGESTIONCHAMBEROF SEPTIC VAULT MUST BEWATERPROOFED.
S2 100mm THK. +FIN. SLAB w/ 10mmØREBARS@300mmOCBENTUP 2/3 OUT@L/4 FACESUPPORTAND SHORTSPAN10mmØ TEMP. BARS @300mm EW
2% SLOPE
NOT LESS THAN0.30 METEROFAIR SPACEMUST BELEFT BETWEENTHE TOP OFTHE SEWAGEAND THEUNDER PART OF VAULT ROOFSLAB.
CDP
INLET
2% SLOPE
150mm THK. CHB w/100mmØ REBARS HOR. @2-LAYER VERT. @600mm OC.
OUTLET
NO SEPTIC VAULT SHALLBE CONSTRUCTEDUNDER THEBUILDING. ALLPLUMBING WORKS SHALLBE UNDERTHE SUPRVISIONOF ALICENSED MASTERPLUMBERAND ALICENCED PLUMBING CONTRACTOR.
10mmØ BAR HANDLE 3-10mmØ(E.W.)
SEPTIC TANK DETAIL
MANHOLE COVER DET.
DETAIL SECTION
CATCH BASIN DETAIL SECTION
DESIGN CRITERIA i. LIVE LOAD_________________ 1000Pa ii ALLOWABLE STRESSES 1. CONCRETE a. FOR FOOTING, BEAMS AND SLABS fc'' = 20 MPa 2. CONCRETE MASONRY UNITS (LOAD BEARING CHB) fm' =6.90 MPa, fm = 2.41 MPa 3. REINFORCING STEEL BARS FOR BARS SMALLER THAN 16mmØ fy = 230 MPa 4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa
NOTE: WATER TABLE IS 1500 BELOW GROUND LEVEL. REPUBLIC OFTHE PHILIPPINES
DEPARTMENT
OFEDUCATION
P H Y S I C A L F A C I L I T I E S A N D S C H O O L S E N G I N E E R I N G D I V I S IO N
TWO STOREY EIGHT (8) CLASSROOM G.I. ROOF SCHOOL BUILDING
P-3 3