WDT Introdution August 2016
Wireless Team Nguyen Quoc Thinh – Thinh – nWX367812
HUAWEI TECHNOLOGIES CO LTD
H
iC
fid
ti l
CONTENTS
GENERAL INTRODUTION WDTRP OPERATION WDT OPERATION DISCUSSION DOCUMENTATION
CONTENTS
GENERAL INTRODUTION WDTRP OPERATION WDT OPERATION DISCUSSION DOCUMENTATION
INTRODUTION
OPERATION
SITE DEPLOYMENT
DATAFILE
PRINCIPLES
PROCESS
STRUCTURE
Introdution 1. WDT – WDT – WIRELESS DEPLOYMENT TOOL (Version 7.6) - Developed Developed by Huawei, focuses on site deployment and acceptance acceptance - Application Application runs on Android 2.3 – 2.3 – 5.0. - Applies to SRAN7.0 to 11.1 micro base stations and SRAN8.0 to 11.1 micro base stations. - Provides Provides the following following functions functions
Site commissioning: Software and configuration loading, querry information ( board state, optical power, power, cell GPS, clock, query of transmission link setup progress, Ping & Tracert, antenna system, remote electrical tilt antenna (RET antenna), alarm query, base station management,
customization MML…)
Site acceptance: service test, ESN scanning, snapshot taking, and GPS data obtaining.
Data post processing: replay, encryption, and report generation.
2. WDTRP – WDTRP – WIRELESS DEPLOYMENT TERMINAL RESOURCE PLATFORM - A server provides the APP uniform access, site deployment data transmission, site deployment result send-back, terminal APP automatic updating, and terminal APP license management for the site deployment through smartphones. - Provides Provides the following following functions: functions:
Push Deployment data: Push site configuration files and software packages to a terminal.
Deployment log backhaul: Backhaul ESNs, GPS, site deployment logs, and fault photos to the WDTRP.
Terminal Management: Update APPs and manage license files.
- Link (Server (Server HongKong): HongKong): http://wdt-hk.huawei.com/
INTRODUTION
OPERATION
SITE DEPLOYMENT
DATAFILE
PRINCIPLES
PROCESS
STRUCTURE
OPERATION FLOW PRINCIPLES 5
3
Automatically updates WDT configfiles
Install App and Apply for a License
2
4 Obtaining the WDT
7
8 Deployment
Obtain site configuration files
Data preparation Device connection Download software
11
9 One-click Detection
6 WDT Config.txt
Auxiliary Detection
10
13 Service Verification
12
WDT
15 Acceptance
14
16
RETConfig.txt
Site Configuration File *.xml
ServiceTest.xml
Acceptance.xml
Generate Site Report
PingTable.xml
WDTRP Deployed nine servers : China, UK,
1 Choose data center to create project
Brazil, Mexico, Hong Kong, US, South Africa, Russia, Bahrain Data Centers.
Ping Table Create Tool
WDT Config Tool
Offline Tools:
WDT Assistant
WDT ATP Tool
WDT Service Test Tool
WDT Acceptance Tool Tool
WDT Service Test Tool
WDT Assistant
INTRODUTION
OPERATION
SITE DEPLOYMENT
DATAFILE
PRINCIPLES
PROCESS
STRUCTURE
SITE DEPLOYMENT PROCESS B. Upload the base station scripts to WDTRP server.
A. Create base station scripts on the OMC side.
C. View graphical log files on the OMC side, and instruct the onsite team to clear faults on the site (if having) After the fault is rectified, the OMC side ask the onsite team to leave the site.
Hardware installation personnel
Synchronize scripts
1. Onsite Team synchronize scripts in web disks or the server to the mobile phone memory
2. Connect the AP to a base station.
3. Use smartphone to load software and scripts and complete the base station deployment.
5. Ensure that no 4. Perform the project quality self-check, and upload quality-related problem all result to WDTRP Server exists on the site and then leave the site.
INTRODUTION
OPERATION
SITE DEPLOYMENT
DATAFILE
PRINCIPLES
PROCESS
STRUCTURE
DATAFILE STRUCTURE 02 methods: - Manual create folder tree and copy to smartphone. - Synchronization from WDTRP.
eNodeB
WDTConfig.txt
BTS3900 V100R008C00SPC210
NodeB
BTS3900 V100R008C00SPC220
NodeB
Software
HuaweiBTSInfo BTS3900
. . .
. . .
SMARTPHONE SDCARD Site A LIC
HuaweiSDTData
NodeBCfg.xml
CONTENTS
GENERAL INTRODUTION WDTRP OPERATION WDT OPERATION DISCUSSION DOCUMENTATION
PR OCES S
MA NA GE P ROJ ECT
M AN AG E U SE R
M AN AG E S IT ES
BASIC PROCESS
Choose Server, apply for permission
Responsible Persion:
Create a Project, audit permission for user
Project Manager
Create sites one-by-one or in batches by CME
OMC Team
Upload Site deployment files (software,XML, MML Querry , Site design picture…)
Onsite Team Install and activate WDT application (from provided QR codes)
Audit permission for terminal.
WDT Operation
Check the result and make report from upload files.
PR OCES S
MA NA GE P ROJ ECT
M AN AG E U SE R
M AN AG E S IT ES
MANAGE PROJECT
CREATE PROJECT: Project Management
Add
Fill in the information
Go to Site List Page
Download APP
For OnSite Team install and activate WDT Tool Register APP
PR OCES S
MA NA GE P ROJ ECT
MANAGE USER
USER AUDIT: System Management
Permission Auditing
Choose which one to audit
M AN AG E U SE R
M AN AG E S IT ES
PR OCES S
MA NA GE P ROJ ECT
M AN AG E U SE R
MANAGE USER
TERMINAL AUDIT: System Management
Terminal Querry
Choose which one to audit
M AN AG E S IT ES
PR OCES S
MANAGE SITES
ADD SITES:
Add/Import Manualy : Choose ADD
Import In Batches by CME: Choose CME Create Files
MA NA GE P ROJ ECT
M AN AG E U SE R
M AN AG E S IT ES
PR OCES S
MANAGE SITES
UPLOAD SITE DEPLOYMENT FILES:
in Dedicated Site Mode
in Site List Mode: Single Mode or Batch Mode
MA NA GE P ROJ ECT
M AN AG E U SE R
M AN AG E S IT ES
PR OCES S
MANAGE SITES
MANAGE UPLOAD FILES FROM WDT:
MA NA GE P ROJ ECT
M AN AG E U SE R
M AN AG E S IT ES
CONTENTS
GENERAL INTRODUTION WDTRP OPERATION WDT OPERATION DISCUSSION DOCUMENTATION
P RE PA RA TI ON
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
PROCESS start
Connect AP to xMPT board
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
Access Point Mode
P RE PA RA TI ON
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
PROCESS start
1.Obtain WDT
2.Active Software
- Config file, software - WDT Config file (Optional)
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
P RE PA RA TI ON
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
PROCESS start
1.Obtain WDT
Prepare
hardware
2.Active Software
installation topo
3. Download file
(can be exported by NEP-SD)
4. Commission
Upload to WDTRP
Download to WDT
5. Service Verification
6. Information Collection
7. Upload
End
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
PROCESS start
1.Obtain WDT
Prepare Ping Table File
2.Active Software
(WDT ATP Tool or
3. Download file
Template on WDTRP)
4. Commission
Upload to WDTRP
5. Service Verification
Download to WDT
6. Information Collection
7. Upload
End
P RE PA RA TI ON
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
PROCESS start
1.Obtain WDT
2.Active Software
Prepare MML File
3. Download file
(Notepad)
4. Commission
Upload to WDTRP
5. Service Verification
Download to WDT
6. Information Collection
7. Upload
End
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
C OM MI SS IO N
SERVICES
DATA PROCESSING
VERIFICATION
PROCESS start Prepare 1.Obtain WDT
Test
Scenario (Using
2.Active Software
Service
WDT
Services
Test Tool (XML File) or Online WDTRP Tool(XLS
3. Download file
File))
4. Commission
to WDTRP
5. Service Verification
6. Information Collection
7. Upload
End
OMC Team Upload
Onsite
Team
download to WDT
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
P RE PA RA TI ON
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
PROCESS start
Onsite Team upload all 1.Obtain WDT
2.Active Software
data, log files to WTRP OMC Engineer will use WDT Assistant to
3. Download file
make report 4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
P RE PA RA TI ON
PROCESS start
1.Obtain WDT
2.Active Software
3. Download file
4. Commission
5. Service Verification
6. Information Collection
7. Upload
End
C OM MI SS IO N
SERVICES VERIFICATION
DATA PROCESSING
CONTENTS
GENERAL INTRODUTION WDTRP OPERATION WDT OPERATION DISCUSSION DOCUMENTATION
DISCUSSION TOPICS
Site Comissioning Security:
Authentication.
Mistake during manual steps.
Advantage and Disavantage in comparision with current local deployment way:
Deployment steps, time spend
Troubleshoot scenario.
Building dedicated local WDTRP Server
CONTENTS
GENERAL INTRODUTION WDTRP OPERATION WDT OPERATION DISCUSSION DOCUMENTATION
DOCUMENTATION
Wireless Deployment Tool 7.6 User Guide
WDT Assistance Tool • http://support.huawei.com/carrier/navi#allProduct=true&col=product&path=PBI17851894/PBI1-7923444/PBI1-7275905/PBI1-7275986/PBI1-21149518&resTab=SW
WDT ATP Tool
http://3ms.huawei.com/hi/group/2028181/blog_1906145.html?mapId=2855393
WDT Servcies Test Tool
http://3ms.huawei.com/hi/group/2028181/blog_1724249.html?mapId=2476523&for_statistic _from=all_group_blog