NEW CONSTRUCTION CONSTRUCTION DESIGN PACKAGE USAID PRIMER
2
25m Ground Floor $7,751 $310/m2 25m2 Second Floor $5,307 2 $212/m
DESIGN BASIS FOR NEW CONSTRUCIONS
Building Codes
Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers, SEI/ASCE 7-05 , 2005 Code International de Construction, International Building Code (IBC), International Code Council, 2009 Wind Speed Maps for the Caribbean for Application with the Wind Load Provisions of ASCE 7, Pan American Health Organization (PAHO), 2008
Documentation for Initial Seismic Hazard Maps for Haiti, United States Geological Survey (USGS), 2010 Material Design Codes
Building Code Requirements for Structural Concrete (ACI 318-08), American Concrete Institute Building Code Requirements for Masonry Structures (ACI 530-08), American Concrete Institute, 2008 Wood Frame Construction Manual for One- and Two-Family Dwellings (WFCM-01), American Forest and Paper Association, 2001 Design Specification for Wood Construction with 2005 Supplement (NDS-05), American Forest and Paper Association National, 2005 Special Design Provisions for Wind and Seismic (ANSI/AF&PA SDPWS-08), American Forest and Paper Association, 2008 Steel Construction Manual, 13th Edition (AISC 13ed), American Institute of Steel Construction, 2005 Building Code Requirements for Masonry Structures (TMS 602-08), The Masonry Society, 2008
Loads
DESIGN BASIS FOR NEW CONSTRUCIONS
Building Codes
Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers, SEI/ASCE 7-05 , 2005 Code International de Construction, International Building Code (IBC), International Code Council, 2009 Wind Speed Maps for the Caribbean for Application with the Wind Load Provisions of ASCE 7, Pan American Health Organization (PAHO), 2008
Documentation for Initial Seismic Hazard Maps for Haiti, United States Geological Survey (USGS), 2010 Material Design Codes
Building Code Requirements for Structural Concrete (ACI 318-08), American Concrete Institute Building Code Requirements for Masonry Structures (ACI 530-08), American Concrete Institute, 2008 Wood Frame Construction Manual for One- and Two-Family Dwellings (WFCM-01), American Forest and Paper Association, 2001 Design Specification for Wood Construction with 2005 Supplement (NDS-05), American Forest and Paper Association National, 2005 Special Design Provisions for Wind and Seismic (ANSI/AF&PA SDPWS-08), American Forest and Paper Association, 2008 Steel Construction Manual, 13th Edition (AISC 13ed), American Institute of Steel Construction, 2005 Building Code Requirements for Masonry Structures (TMS 602-08), The Masonry Society, 2008
Loads
Devis Estimatif Build Change Post-Earthquake Technical Assistance Program, Haiti 20-Apr-12 Note: All data should be entered on this page and will automatically be populated on other sheets.
Date: 02-May-12
Proprietaire: Addresse: USAID Primer, Ground Floor
Ingenieur: B. Biddick
GPS:
Surface de la 2
maison (m ): 25.00
Telephone:
PHASE 0: Preparation du Site (Preparation of Site) A: Demolition (Demolition) Item
4
Lightweight roof removal Slab roof removal Demolition of walls and columns Floor slab removal
5
Foundation removal
1 2 3
No.
.
QTY
Unit
UNIT 2
surface du plan =
m
surface du plan =
m
surface des murs =
m
surface du plan =
m
longuer des murs =
m
2 2 2
B: Deblaiement du site (Site Clearing) 2
1
Demolition clearance
surface du plan =
m
2
Trash clearance
surface du site =
m
3
Removal of trees (keep if possible), shrubs, and grass
surface en herbe =
m
PHASE 1: Fondation + Chainage Inferieur (Foundation + Chainage Inferieur)
2 2
No.
Unit
A: Fondation (Foundation) 1
Strip footing
Longeur=
2
Isolated column footing Stone masonry foundation Mass concrete foundation walls
Nombre=
13
Longeur=
29
3 4
m
Longeur=
m m
B: Chainage Inferieur (Chainage Inferieur) 1
15cm x 20cm Plinth beam (1:2:4)
Longeur=
2
25cm x 20cm Plinth beam (1:2:4)
Longeur=
m
3
30cm x 20cm Plinth beam (1:2:4)
Longeur=
m
29
m
PHASE 2: Murs, Colonnes, Chainages (Walls, Columns, and Beams)
No.
Unit
A: Murs (Walls) 1
15cm blocks
surface des murs =
2
20 cm blocks
surface des murs =
m2 63
m2
B: Colonnes en Beton (Concrete Columns) 0
Number of columns
Nombre=
1
15cm x 15cm Columns (1:2:4)
Longeur=
2
20cm x 20cm Columns (1:2:4)
Longeur=
3
25cm x 25cm Columns (1:2:4)
Longeur=
13 m 2.7
m m
C: Chainage Intermediare (Intermediate Beam) 1
15cm x 10cm Intermediate beam (1:2:4)
Longeur=
2
20cm x 10cm Intermediate beam (1:2:4)
Longeur=
25.6
m m
D: Ouvertures (Openings) 1
2
Doors
Nombre=
3
Height (up to the ring beam)
Longeur=
2.5
Windows
Nombre=
4
Window heights
Longeur=
1.1
m m
E: Chainage Superieur (Ring Beam) 1
20cm x 15cm Ring beam (1:2:4)
Longeur=
2
20cm x 20cm Ring beam (1:2:4)
Longeur=
3
20cm x 25cm Ring beam (1:2:4)
Longeur=
PHASE 3: Toiture (Slabs and Roofs)
m 28
m m
No.
Unit
A: Toiture Lourde (Concrete Slab) 1
20cm Slab roof
surface du pl an =
25
m2
B: Toiture Legere (Lightweight Roof) 1
2
3
Gable Truss Roof dimension 1 (length of truss span)
m
Roof dimension 2 (length along ridge)
m
Monopitch Truss Roof dimension 1 (length of truss span)
m
Roof dimension 2 (length along ridge) Lightweight roof with rafters
m
Roof area
surface du plan =
m2
Length perpendicular to slope
m
PHASE 4: Crepissage, Plancher, et Finition (Plastering, Floor Slabs, and Painting)
No.
Unit
A: Crepissage (Plastering) 1
10mm Plaster (1:5)
sur fac e d es m urs =
2
15mm Plaster (1:5)
surface des murs =
m2
3
20mm Plaster (1:5)
surface des murs =
m2
1 50
m2
B: Dalle de Plancher (Floor Slab on Grade) 1
5cm Floor slab (1:3:6)
surface des murs =
m2
2
10cm Floor slab (1:3:6)
surface des murs =
m2
1
Paint
sur fac e d es m urs =
1
Windows
Nombre=
4
2
Iron window grilles
Nombre=
4
3
Venilation blocks 40cm x 20cm
Nombre=
4
Doors
Nombre=
C: Peinture (Paint) 1 50
3
m2
Cost Estimate -- New Construction in Confined Masonry Date: 2-May-2012
Address: USAID Primer, Ground Floor
Engineer: B. Biddick
TRANCHE 1 Preparation & Foundation No
Article
1
Cement
2
Price ($US)
# of Units
Unit
Total Price
TRANCHE 2 Construction up to the Roof # of Units
Total Price
TRANCHE 3 Roof & Finish # of Units
Total Price
$7.50
bag
36
$270.00
38
$285.00
27
$202.50
River Sand - washed
$25.00
m3
4
$100.00
3
$75.00
1
$25.00
3 4
River Sand White Sand
$19.00 $20.00
m3 m3
2
$40.00
5
Crushed gravel
$23.00
m3
3
$69.00
4
$92.00
2
$46.00
6
Pea gravel
$13.00
m3
7
River rock
$21.00
m3
5
$105.00
8 9
Limestone 30cm Block
$20.00 $1.13
m3 each
10
20cm Block
$0.80
each
11
15cm Block
$0.65
each
12
12cm Block
$0.45
each
13
10cm Block
$0.40
each
14 15
Cement brick (6x10x20) Ventilation Blocks
$32.00 $0.80
each each
16
#7 Bars
$6.50
m
17
#6 Bars
$5.25
m
18
#5 Bars
$3.30
m
19
#4 Bars
$1.11
m
32
$35.52
303
$336.33
20
#3 Bars
$0.77
m
140
$107.80
119
21 22
#2 Bars Binding Wire
$0.33 $1.40
m lb
116
$38.28
377
23
1x4 Lumber
$1.97
m
24
1x6 Lumber
$2.30
m
25
1x8 S4S Lumber
$2.95
m
26
1x8 RS Lumber
$2.62
m
27 28
1x12 Lumber 2x2 Lumber
$5.08 $2.07
m m
29
2x4 S4S Lumber
$3.44
m
30
2x4 S4S Lumber
$2.79
m
31
Plywood sheet (1/4")
$13.00
each
32
Plywood sheet (1/2")
$25.00
each
33 34
Plywood sheet (3/4") Hardboard
$36.00
each each
35
Wood Preservative
$20.00
gallon
36
Hurricane Straps
$1.65
m
37
Assorted Nails
$1.20
lb
38
Roofing Nails
$1.40
lb
39
CGI 3'x6'
40
CGI 3'x8'
$26.00
each
41
CGI 3'x10'
$28.00
each
42
CGI 3'x12'
$30.00
each
43
CGI squared 3'x12'
each
each
707
$565.60 209
$135.85
$91.63
360
$277.20
$124.41
30
$9.90
TRANCHE 3 Holdback / Add'l Req # of Units
Total Price
Total for all Tranches # of Units
Total Price
101 8
$757.50 $200.00
2 9
$40.00 $207.00
5
$105.00
707 209
$565.60 $135.85
335 619 523
$371.85 $476.63 $172.59
Devis Estimatif Build Change Post-Earthquake Technical Assistance Program, Haiti 20-Apr-12 Note: All data should be entered on this page and will automatically be populated on other sheets.
Date: 02-May-12
Proprietaire: Addresse: USAID Primer, Second Floor
Ingenieur: B. Biddick
GPS:
Surface de la 2
maison (m ): 25.00
Telephone:
PHASE 0: Preparation du Site (Preparation of Site) A: Demolition (Demolition) Item
4
Lightweight roof removal Slab roof removal Demolition of walls and columns Floor slab removal
5
Foundation removal
1 2 3
No.
.
QTY
Unit
UNIT 2
surface du plan =
m
surface du plan =
m
surface des murs =
m
surface du plan =
m
longuer des murs =
m
2 2 2
B: Deblaiement du site (Site Clearing) 2
1
Demolition clearance
surface du plan =
m
2
Trash clearance
surface du site =
m
3
Removal of trees (keep if possible), shrubs, and grass
surface en herbe =
m
PHASE 1: Fondation + Chainage Inferieur (Foundation + Chainage Inferieur)
2 2
No.
Unit
A: Fondation (Foundation) 1
Strip footing
Longeur=
2
Isolated column footing Stone masonry foundation Mass concrete foundation walls
Nombre=
3 4
m
Longeur=
m
Longeur=
m
B: Chainage Inferieur (Chainage Inferieur) 1
15cm x 20cm Plinth beam (1:2:4)
Longeur=
m
2
25cm x 20cm Plinth beam (1:2:4)
Longeur=
m
3
30cm x 20cm Plinth beam (1:2:4)
Longeur=
m
PHASE 2: Murs, Colonnes, Chainages (Walls, Columns, and Beams)
No.
Unit
A: Murs (Walls) 1
15cm blocks
surface des murs =
2
20 cm blocks
surface des murs =
60
m2 m2
B: Colonnes en Beton (Concrete Columns) 0
Number of columns
Nombre=
11
1
15cm x 15cm Columns (1:2:4)
Longeur=
2.7
2
20cm x 20cm Columns (1:2:4)
Longeur=
m
3
25cm x 25cm Columns (1:2:4)
Longeur=
m
m
C: Chainage Intermediare (Intermediate Beam) 1
15cm x 10cm Intermediate beam (1:2:4)
Longeur=
2
20cm x 10cm Intermediate beam (1:2:4)
Longeur=
25.6
m m
D: Ouvertures (Openings) 1
2
Doors
Nombre=
3
Height (up to the ring beam)
Longeur=
2.5
Windows
Nombre=
3
Window heights
Longeur=
1.1
m m
E: Chainage Superieur (Ring Beam) 1
20cm x 15cm Ring beam (1:2:4)
Longeur=
2
20cm x 20cm Ring beam (1:2:4)
Longeur=
3
20cm x 25cm Ring beam (1:2:4)
Longeur=
PHASE 3: Toiture (Slabs and Roofs)
m 30
m m
No.
Unit
A: Toiture Lourde (Concrete Slab) 1
20cm Slab roof
surface du plan =
m2
B: Toiture Legere (Lightweight Roof) 1
2
3
Gable Truss Roof dimension 1 (length of truss span)
m
Roof dimension 2 (length along ridge)
m
Monopitch Truss Roof dimension 1 (length of truss span)
m
Roof dimension 2 (length along ridge) Lightweight roof with rafters and Purlins
m
Roof area
surface du pl an =
Length perpendicular to slope
PHASE 4: Crepissage, Plancher, et Finition (Plastering, Floor Slabs, and Painting)
25
m2
5
m
No.
Unit
A: Crepissage (Plastering) 1
10mm Plaster (1:5)
sur fac e d es m urs =
2
15mm Plaster (1:5)
surface des murs =
m2
3
20mm Plaster (1:5)
surface des murs =
m2
1 50
m2
B: Dalle de Plancher (Floor Slab on Grade) 1
5cm Floor slab (1:3:6)
surface des murs =
m2
2
10cm Floor slab (1:3:6)
surface des murs =
m2
1
Paint
sur fac e d es m urs =
1
Windows
Nombre=
3
2
Iron window grilles
Nombre=
3
3
Venilation blocks 40cm x 20cm
Nombre=
4
Doors
Nombre=
C: Peinture (Paint) 1 50
3
m2
Cost Estimate -- New Construction in Confined Masonry Date: 2-May-2012
Address: USAID Primer, Second Floor
Engineer: B. Biddick
TRANCHE 1 Preparation & Foundation Price ($US)
# d'unités
Unit
Prix Total
TRANCHE 2 Construction up to the Roof
TRANCHE 3 Roof & Finish
# d'unités
# d'unités
Prix Total
Prix Total
1
Cement
$7.50
bag
28
$210.00
2
River Sand - washed
$25.00
m3
3
$75.00
3
River Sand
$19.00
m3
4
White Sand
$20.00
m3
5
Crushed gravel
$23.00
m3
3
$69.00
2 3
$40.00 $69.00
6
Pea gravel
$13.00
m3
7
River rock
$21.00
m3
8
Limestone
$20.00
m3
9
30cm Block
$1.13
each
10
20cm Block
$0.80
each
11
15cm Block
$0.65
each
673
$437.45
673
$437.45
12
12cm Block
$0.45
each
13
10cm Block
14
Cement brick (6x10x20)
15
287 114 306
$318.57 $87.78 $100.98
$0.40
each each
Ventilation Blocks
$0.80
each
16
#7 Bars
$6.50
m
17
#6 Bars
$5.25
m
18
#5 Bars
$3.30
m
19
#4 Bars
$1.11
m
287
$318.57
20
#3 Bars
$0.77
m
114
$87.78
21
#2 Bars
$0.33
m
306
$100.98
22
Binding Wire
$1.40
lb
23
1x4 Lumber
$1.97
m
24
1x6 Lumber
$2.30
m
25
1x8 S4S Lumber
$2.95
m
26
1x8 RS Lumber
$2.62
m
27
1x12 Lumber
$5.08
m
28
2x2 Lumber
$2.07
m
29
2x4 S4S Lumber
$3.44
m
30
2x4 S4S Lumber
$2.79
m
31
Plywood sheet (1/4")
$13.00
each
32
Plywood sheet (1/2")
$25.00
each
33
Plywood sheet (3/4")
$36.00
each
34
Hardboard
35
Wood Preservative
$20.00
gallon
36
Hurricane Straps
$1.65
37
Assorted Nails
$1.20
38
Roofing Nails
$1.40
lb
39
CGI 3'x6'
40
CGI 3'x8'
$26.00
each
41
CGI 3'x10'
$28.00
each
42
CGI 3'x12'
$30.00
each
43
CGI
$82.50
2
$40.00
Prix Total
# d'unité s 39 3
Article
11
# d'unités
Total for all Tranches
No
$32.00
Prix Total
TRANCHE 3 Holdback / Add'l Req
$292.50 $75.00
30
$59.04
30
$59.04
56
$156.13
56
$156.13
m
8
$13.20
lb
8
$9.60
3
$4.20
8 8 3
$13.20 $9.60 $4.20
10
$300.00
10
$300.00
each
each
d 3' 12'
h
Cost Estimate for Sanitation and Plumbing (2-story house w/ 2-baths)
Item Sink
Unit Price ($US)
Quantity
Total Price ($US)
$67.50
2
$135.00
$162.00
2
$324.00
Pipe 2''
$4.60
20
$92.00
Pipe 4''
$9.80
4
$39.20
Reducer (2'' en 4'')
$6.00
6
$36.00
Elbow joint 2''
$2.00
16
$32.00
Elbow joint 4''
$3.00
8
$24.00
Toilet
Sub Total
$682.20
Septic Tank
$700.00
Grand total
$1,382.20
Homeowner:___________________
ID No:_____________
BC Engineer:___________________
Address: _________________________
GPS: ________________
Homeowner Phone No:___________________
Boss: _________________________
House Type: _________ SITE and SOIL CONDITIONS
CHECKLIST Boss Phone No: _________________________
BUILD THE HOUSE ON A SAFE SITE 1 a b c 2 a b c d
DO NOT BUILD ON STEEP SLOPE
Less than 10% = OK Between 10% and 35% - Consult engineer More than 35% = Do not build SETBACKS from STEEP SLOPES At least 10m behind house to slope At least 10m in front of house to slope No loose debris, falling soil or rock within 10m of house No existing building within 10m of house upslope of site
Slope? < 10% 10 < 35% > 35% Planned? Yes/No Yes/No Yes/No Yes/No
3 IDENTIFY SEISMIC HAZARD
a b 4 a b c 5 a b c d e
Site is located in an area of medium or high seismicity (Yellow or Orange Zone) Site is located in an area of very high seismicity (Red Zone) S ETBACKS from RIVER and DRAINAGE At least 10 m from riverbed or drainage channel If flood zone, finished floor surface 80cm above ground If non flood zone, finished floor surface 30cm above ground IDENTIFY SOIL TYPE & SCREEN FOR HAZARDOUS SOILS Soil is Type A (Rock) Soil is Type B (Compact Gravels and Compact Sands) S oil is Type C (Non-consolidated Sand, Silt, Soft Clay) and… I f T yp e C So il , t he re ex is ts no ri sk of li qu ef ac ti on (a ss es wa te r t ab le lo ca ti on ) Soil is not expansive clay (use linear shrinkage test)
SDS
1.05g 1.67g Planned? Yes/No Yes/No Yes/No Soil? Yes/No Yes/No Yes/No Y es /N o Yes/No
6 S CREENING FOR OBSTACLES ON SITE
Planned?
a There are no large obstacles that need to be removed (trees, existing walls etc) b The site is not covered in fill material c If no, the fill is less than 30cm deep
Yes/No Yes/No Yes/No
7 a b c d e f
Planned? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
S ETBACKS FROM ROADS and BUILDINGS
Setback at least 2m from road or front boundary Setback at least 1m from side boundary Rainwater can flow into drainage Building constructed at least 4m behind the fence Septic tank more than 10m from active well Minimum distance between two buildings = 1.5m
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Date
Date
Photo #
Photo #
Photo #
Recommendation Made
Recommendation Made
Recommendation Made
Done? Yes/No Yes/No Yes/No Done? Yes/No Yes/No Yes/No Yes/No
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Done?
Date
Yes/No Yes/No Done? Yes/No Yes/No Yes/No Done? Yes/No Yes/No Yes/No
MTPTC 9 MTPTC 9 MTPTC 9 Build Change Photo #
Recommendation Implemented
Build Change Build Change Date
Photo #
Recommendation Implemented
MTPTC 13 MTPTC Design Criteria MTPTC Design Criteria Date
Photo #
Recommendation Implemented
Build Change Build Change Build Change Build Change Build Change
Yes/No Date
Date
Photo #
Photo #
Recommendation Made
Recommendation Made
Homeowner Signature:__________________________________
Date: __________
BC Engineer Sign atu re: ______________________________________
Date: __________
BC Team Leader Signatur e: ___________________________________
Date: __________
BC Manager Signature: ___________________________________
Date: __________
Done? Yes/No Yes/No Yes/No
Date
Done? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
Date
Photo #
Recommendation Implemented
Build Change Build Change Build Change Photo #
Recommendation Implemented
Overall Assessment: Meets Minimum Standard? Oui / No Comments:
SOURCE MTPTC 8 MTPTC 8 MTPTC 8
Build Change Build Change Build Change Build Change Build Change MTPTC 23
Homeowner:___________________
ID No:_____________
BC Engineer:___________________
Address: _________________________
GPS: ________________
Homeowner Phone No:___________________
Boss: _________________________
House Type: _________
CONFIGURATION CHECKLIST
Boss Phone No: _________________________
CONFIGURATION RULES FOR SINGLE and TWO STORY HOMES 1 a b c b
P LA N For single storey buildings with lightweight roof, length to width ratio equal to 3 or less For other types of building, length to width ratio equal to 2.5 or less Height to width ratio equal to 1.7 or less Separate irregular shaped buildings(L,U,E)
P la nn ed ? Yes/No Yes/No Yes/No Yes/No
D at e
2 a b c
E LE VA TI ON Building has not more than 2 storeys Maximum height of ground floor walls = 2.7m Maximum height of second floor walls = 2.5m
P la nn ed ? Yes/No Yes/No Yes/No
D at e
3 a 4 a b 5 a b c d e f
TYPE of FOUNDATION Do not use short columns (use continuous strip foundation) M INIMUM SHEAR WALL DENSITY Only include properly confined walls longer than 1m in shear wall density calculation Shear wall density complies with Build Change guidelines SHEAR WALL LOCATION At least two lines of shear walls in X direction At least two lines of shear wallls in Y direction Shear walls are symmetrically placed Shear walls are as far as possible from one another Shear walls are on exterior of buildin g Spacing or perpendicular or cross walls does not exceed Build Change guidelines
Planned? Yes/No Complies? Yes/No Yes/No Planned? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
6 a b c d
T IE C OL UM N L OC AT IO N Every corner (L) Every wall intersection (T) Every change in the direction of the wall At both ends of every wall longer than 30cm
P la nn ed ? Yes/No Yes/No Yes/No Yes/No
D at e
7 B ON D B EA M L OC AT IO N a At the foundation (plinth beam) b At the roof level (ring beam)
P la nn ed ? Yes/No Yes/No
D at e
c 8 a b c d 9 a b c d e
Yes/No Planned? Yes/No Yes/No Yes/No Yes/No P la nn ed ? Yes/No Yes/No Yes/No Yes/No Yes/No
Intermediate ring beam at sill level OPENING SIZE Maximum 1/2 length between to crosswalls Openings positioned directly under ring beam Doors reinforced on both sides with 8cm column Windows reinforced on both sides with 8cm column A CC ES S a nd V EN TI LA TI ON A t least two entrances/exits Entrances on different sides of building Opening/ventilation greater than 5% of floor area Opening position based on wind direction Gable not facing the wind
1 0 T WO S TO RY C ON FI GU RA TI ON R UL ES
a b c d e f g
Do not build buildings with open ground floor Do not build buildings with overhang Columns are continuous both floors Shear walls line up vertically Openings line up vertically Do not construct a second floor over a porch, or follow… S pecific connection detailing
P la nn ed ? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
Homeowner Signature:__________________________________
Date
Date
D at e
D at e
P ho to #
P ho to #
Photo #
P ho to #
P ho to #
Photo #
P ho to #
P ho to #
R ec om me nd at io n M ad e
R ec om me nd at io n M ad e
Recommendation Made
R ec om me nd at io n M ad e
R ec om me nd at io n M ad e
Recommendation Made
R ec om me nd at io n M ad e
R ec om me nd at io n M ad e
Date: __________
D on e? Yes/No Yes/No Yes/No Yes/No
D at e
D on e? Yes/No Yes/No Yes/No
D at e
Done? Yes/No Done? Yes/No Yes/No Done? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date: __________
BC Team Lea der Signat ure: ___________________________________
Date: __________
BC Manager Signature: ___________________________________
Date: __________
R ec om me nd at io n I mp le me nt ed
Build Change Build Change Build Change Date
Photo #
Recommendation Implemented
MTPTC 41 MTPTC 41 MTPTC 41 MTPTC 41 MTPTC 41 Build Change
D on e? Yes/No Yes/No
D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
MTPTC 41 MTPTC 41 Build Change Build Change P ho to #
R ec om me nd at io n I mp le me nt ed
MTPTC 39 MTPTC 39 MTPTC 79 Date
Photo #
Recommendation Implemented
MTPTC 43 Build Change MTPTC 81 MTPTC 81 D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
Build Change Build Change Build Change Build Change Build Change D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
Overall Assessment: Meets Minimum Standard? Oui / No
BC Engineer Signat ure: ______________________________________
P ho to #
Build Change GNA GNA
D at e
D on e? Oui / No Oui / No Oui / No Oui / No Oui / No Oui / No Oui / No
R ec om me nd at io n I mp le me nt ed
GNA GNA GNA MTPTC 22
D on e? Yes/No Yes/No Yes/No Yes/No
Yes/No Done? Yes/No Yes/No Yes/No Yes/No D on e? Yes/No Yes/No Yes/No Yes/No
P ho to #
Comments:
MTPTC 15 MTPTC 25 MTPTC 25 MTPTC 25, 42 MTPTC 25, 42 MTPTC 17 Build Change
Homeowner:___________________
ID No:_____________
BC Engineer:___________________
Address: _________________________
GPS: ________________
Homeowner Phone No:___________________
Boss: _________________________
House Type: _________
MATERIALS QUALITY CHECKLIST
USE GOOD QUALITY MATERIALS! 1 a b c
WATER, SAND and AGGREGATES Use clean water (not salty) Use clean river sand Use crushed/angular gravel for concrete
Planned? Yes/No Yes/No Yes/No
d 2 a b
Maximum gravel size 2cm for concrete CEMENT Use Type 1 for columns, beams and blocks Store off the ground and out of rain
Yes/No Planned? Yes/No Yes/No
Date
Photo #
Recommendation Made
Done?
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Yes/No Done? Yes/No Yes/No
Planned? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
g Use at least #2 bars for stirrups h Cut column steel long enough for overlap ≥ ø 50 i Store off the ground and out of rain 4 C ON CR ET E B LO CK S a C ompressive strength of blocks meets design requirements
Yes/No Yes/No
Yes/No Yes/No
Yes/No P la nn ed ? Yes/No
Yes/No D on e? Yes/No
b c d e f
Yes/No Yes/No Yes/No Yes/No Yes/No
Yes/No Yes/No Yes/No Yes/No Yes/No
TIMBER and CGI SHEET a Use dimensional lumber
Yes/No Yes/No Planned? Yes/No
Yes/No Yes/No Done? Yes/No
b Use Visually Graded Southern Pine #2 or equivalent c Timber used free of knots and splits
Yes/No Yes/No
Yes/No Yes/No
d D o not use green lumber or lumber with high moisture content e Do not use CCA pressure treated lumber (has green tint)
Yes/No Yes/No
Yes/No Yes/No
g Longitudinal block wall thickness minimum 3.0 cm
h Transverse block wall thickness minimum 2.5 cm
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Yes/No Yes/No
3 STEEL a Verify Grade 60 marking (minimum) on bars or… b G rade 40 for single story buildings with leightweight roofs c Use ribbed bars d Do not use rusty or recycled bars for longitudinal bars e Use at least #3 bars for plinth beam and ring beam f Use at least #4 bars for tie columns and door/window columns
Block width equal to, or greater than 15cm Use block 15 for concrete slab Blocks have been cured for at least seven days N o cracks or chips or partial blocks unless intact 1/3 of 2/3 Dimensionsdon not vary by more than 5mm
Date
D at e
Date
P ho to #
Photo #
R ec om me nd at io n M ad e
Recommendation Made
Homeowner Signature:__________________________________
Date: __________
BC Engineer Signature: ______________________________________
Date: __________
BC Team Leader Signature: ___________________________________
Date: __________
BC Manager Signature: ___________________________________
Date: __________
Done? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
MTPTC 48
MTPTC 60
MTPTC 65 D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
Build Change Build Change MTPTC 90 Build Change Build Change Build Change MTPTC 37 MTPTC 37 Date
Photo #
Recommendation Implemented
Overall Assessment: Meets Minimum Standard? Oui / No Comments:
________________
ID No:_____________
________________
Address: _________________________
GPS: ________________
H om eo wn er P ho ne N o: __ __ __ __ __ __ __ __ __ _
B os s: _ __ __ __ __ __ __ __ __ __ __ __ __
House Type: _________
FOUNDATION CHECKLIST
NG FOUNDATION 1
SITE LINE OUT and BATTERBOARD
a b
Excavation consistent with plan Batterboard completed c Excavation lines at right angles 2 F OU ND AT IO N E XC AV AT IO N D EP TH a Depth of foundation excavation (minimum 80 cm) b Depth of excavation in natural ground (min 50 cm) 3
F OU ND AT IO N M IN IM UM W ID TH
Check soil strength with 12mm rod. If penetration > 6cm, report to BC H ARD (Rock, Gravel) = 40 cm MEDIUM (Compacted sand, hard clay) = 50 cm SOFT (Loose sand, soft clay) = 70 cm F OU ND AT IO N E XC AV AT IO N Remove water from excavation Remove loose soil from excavation Remove any organic debris or tree trunks Bottom flat and level Last 5cm of soil excavated immediately prior to pouring blinding B LI ND IN G B AS E L AY ER U se 5 cm blinding base layer Mix 1:4:5 Use coarse river sand Use gravel max 3 cm Blinding is well compacted OPTION 1: Large Aggregate Concrete Strip Mix 1:5:5 with 30% stone by volume Use coarse river sand Use gravel max 3 cm Use stone max 25 cm Wet stones and excavation before pouring concrete Maximum depth of concrete poured in one go, less than 90 cm Place stones progressively, more than 30 cm from columns Scarify top for good contact Cure properly j Wait 7 days for footing to harden before pouring plinth beam 6-2 OPTION 2: Stone Masonry Strip Footing a Use cut, angular stones b Use mix 1:5 for mortar c Fill all gaps between stones with mortar d Use cross stones every 1 m e Scarify top for good contact f Cure properly g Backfill with compacted soil in 10 cm lifts 6-3 OPTION 3: BLOK 20 Strip Footing (2 story) a Mortar mix 1:3 b Concrete blocks are 200mm wide ("Bloc 20") c Mortar joints are 12.5mm d Stagger vertical joints by 1/3 block e Leave space for tie columns and tooth wall on each side by 1/3 block f Wet concrete block prior to use i Cure properly h Backfill with compacted soil in 10 cm lifts 7 TIE COLUMN ANCHORS a Use four #4 bars at each tie column location with #2 stirrup cage b Bend bottom of #4 bars in four directions to create self supporting rebar cage c Minimum 25 cm length foot d Use 3cm concrete spacers to achieve proper concrete cover below bars a b c 4 a b c d e 5 a b c d e 6-1 a b c d e f g h i
8
PIPING
a b
Do not put piping through reinforced concrete Put piping through strip footing
____________________________
Planned? Yes/No Yes/No Yes/No P la nn ed ? Yes/No Yes/No P la nn ed ?
Yes/No Yes/No Yes/No Yes/No P la nn ed ? Yes/No Yes/No Yes/No Yes/No Yes/No P la nn ed ? Yes/No Yes/No Yes/No Yes/No Yes/No Planned? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Planned? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Planned? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Planned? Yes/No Yes/No Yes/No Yes/No Planned?
Date
Photo #
Recommendation Made
D at e
P ho to #
R ec om me nd at io n M ad e
D at e
P ho to #
R ec om me nd at io n M ad e
D at e
D at e
Date
Date
Date
Date
Date
P ho to #
P ho to #
Photo #
Photo #
Photo #
Photo #
Photo #
R ec om me nd at io n M ad e
R ec om me nd at io n M ad e
Recommendation Made
Recommendation Made
Recommendation Made
Recommendation Made
Recommendation Made
Yes/No Yes/No
Done? Yes/No Yes/No Yes/No D on e? Yes/No Yes/No D on e?
Yes/No Yes/No Yes/No Yes/No D on e? Yes/No Yes/No Yes/No Yes/No Yes/No D on e? Yes/No Yes/No Yes/No Yes/No Yes/No Done? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Done? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Done? Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Done? Yes/No Yes/No Yes/No Yes/No Done?
Photo #
Recommendation Implemented
D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
MTPTC 54
MTPTC 56 MTPTC 56 says min 50 cm in natural ground
MTPTC 56 MTPTC 56 MTPTC 56 D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
MTPTC 59 MTPTC 59 MTPTC 59 Build Change D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
MTPTC 56, 59 MTPTC 48 MTPTC 48 MTPTC 48 Date
Photo #
Recommendation Implemented
MTPTC 48 - cyclopean MTPTC 48 - cyclopean MTPTC 48 MTPTC 48 MTPTC 64 MTPTC 64 MTPTC 64 Build Change
Date
Photo #
Recommendation Implemented
Build Change
Date
Photo #
Recommendation Implemented
GNA
Date
Photo #
Recommendation Implemented
MTPTC 57 MTPTC 61 Date
Photo #
Recommendation Implemented
Yes/No Yes/No
Date: __________
Overall Assessment: Meets Minimum Standard? Oui / No
______________________________
Date: __________
______________________________
Date: __________
_____________________________
Date
Date: __________
Comments:
MTPTC 63 MTPTC 63
Homeowner:___________________
ID No:_____________
BC Engineer:___________________
Address: _________________________
GPS: ________________
Homeowner Phone No:___________________
Boss: _________________________
House Type: _________
REINFORCED CONCRETE CHECKLIST
Boss Phone No: _________________________
GOOD QUALITY REINFORCED CONCRETE TIE COLUMNS and BOND BEAMS 1 a b 1 2 3 5 c 1 2 3 4 2 a 1 2 3 4
PLINTH BEAM and RING BEAM 20 cm wide, 15cm high Longitudinal Bars Four #3 (3/8") longitudinal bars Minimum Strength = Grade 60 or… Grade 40 for single story buildings with lightweight roofs Type of longitudinal bars RIBBED
Planned? Yes/ No
Date
Photo #
Recommendation Made
Done? Yes/ No
Yes/ No Yes/ No Yes/ No Yes/ No
Yes/ No
Yes/ No Yes/ No Yes/ No Yes/ No Planned? Yes/ No Yes/ No Yes/ No Yes/ No
Yes/ No Yes/ No Yes/ No Yes/ No Done? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No
Yes/ No Yes/ No Yes/ No Yes/ No
Yes/ No Yes/ No Yes/ No Yes/ No
Date
Photo #
Recommendation Implemented
MTPTC 65
Yes/ No
Stirrups
#2 closed stirrups Stirrup hooks bent at 135 degrees Hook length for stirrup minimum 4 cm Cover over steel minimum 2.5 cm TIE COLUMN
Date
Photo #
Recommendation Made
Longitudinal Bars
Minimum section 150mm by 150mm Tie columns used at locations per configuration Four #4 longitudinal bars Type of longitudinal bars RIBBED
Date
Photo #
Recommendation Implemented
Conflicts with MTPTC 60
b Column Ties
1 2 3 4
#2 closed ties Stirrup hooks bent at 135 degrees Hook length for stirrup minimum 4 cm Cover over steel minimum 2.5 cm
3 BAR ASSEMBLY
Planned?
Date
Photo #
Recommendation Made
Done?
Date
Photo #
Recommendation Implemented
a BEAM STIRRUPS and COLUMN TIES
1 Stirrup spacing maximum 20cm 2 Stirrups closely spaced (10cm) near all beam-column joints 3 Stirrup hooks rotated 4 Stirrups tied to longitundinal bars with binding wire b JOINT DETAILING 1 Minimum lap length = 50Ø (50cm for #3 bars, 60cm for #4 bars) 2 Apply one of overlap detailing options 3 U se extra L or T bars only if bars not cut properly 4 All bent bars at corners and T-junctions bent at 90 degrees 5 Laps tied with binding wire 4 F ORMWORK and CONCRETE SPACER a Formwork is good quality (not warped) b Use wood spacer to maintain distance between forms c Space between steel and formwork minimum 3 cm d U se concrete spacers every 3-4 stirrups or as req to maintain cover e Maximum size for concrete spacer is 3 cm x 3 cm x 3 cm f Use binding wire in concrete spacer g Check formwork for beams is level h Check formwork for columns is plumb 5 C ON CR ET E M IX IN G a Use Mix 1:2:4 b Use crushed, angular gravel c Use gravel with size less than 2 cm d Use clean, washed river sand e Use clean water (not salty or muddy) f Use Type 1 Cement g Mix a clean, concrete or asphalt surface, not on dirt h Using a mechanical mixer is best i Batch out gravel, then sand, then cement j Turn over 3 times or until color is uniform k Do not use too much water! Add water slowly l Use slump test or hand test for water content
Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Planned? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No P la nn ed ? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No
Date
Photo #
Recommendation Made
D at e
P ho to #
R ec om me nd at io n M ad e
Yes/ No Yes/ No Yes/ No Yes/ No
MTPTC 60 MTPTC 60 MTPTC 60
Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Done? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No D on e? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No
MTPTC 66 says 60 cm MTPTC 67
Date
Photo #
Recommendation Implemented
D at e
P ho to #
R ec om me nd at io n I mp le me nt ed
MTPTC 64
6 a b c d e f g h i j k l 7 a b c d e f g
CONCRETE POU RING and CURING
Wet formwork and steel before pouring concrete Use concrete within 90 minutes of mixing with water if from factory if manually use in less than 30 minutes E nsure toothed areas of columns completely filled with concrete Use rod to consolidate concrete around reinforcement Complete entire beam within one day If concrete pouring must stop, use a diagonal joint with stones Have plastic on standby, cover if it rains Scarify top for good contact Cure for minimum 3 days by sprinkling clean water, cure 5 times perday : MORNING, At, 8 , 10 AFTERNOON: 12, 14, 16, pour water slowly CONCRETE INS PECTION For slabs, remove formwork after 14 full days If steel showing, demolish and rebuild Remove the border of slab and/or beams after 48 hours Any cracks larger than 3 mm Many cracks in one location Diagonal or vertical cracks anywhere in the beam If any of the above exist, demolish concrete and repour
8 EMBEDDED STRAPS for RING BEAM - TRUSS CONNECTION
a
S traps are placed according to the plan b Length of straps above ring beam adequate c Straps are hooked below bottom of stirrups d Straps are tied to ring beam reinforcement with binding wire
Planned? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No
Date
Photo #
Planned? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No
Date
Photo #
Planned? Yes/ No Yes/ No Yes/ No Yes/ No
Date
Photo #
Recommendation Made
Done? Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Yes/ No Oui / No Oui / No Oui / No Oui / No Oui / No
Date
Recommendation Made
Done? Oui / No Oui / No Oui / No Oui / No Oui / No Oui / No Oui / No
Date
Photo #
Recommendation Implemented
Recommendation Made
Done? Oui / No Oui / No Oui / No Oui / No
Date
Photo #
Recommendation Implemented
Homeowner Signature:__________________________________
Date: __________
BC E ngineer S ign atu re: _ _____________________________________
Date: _ _________
B C T ea m L ea de r S ig na tu re : _ __ __ __ __ __ __ __ ___ __ __ __ __ __ __ __ __ _
D at e: _ __ __ __ __ _
BC Manager Signature: ___________________________________
Date: __________
Photo #
Recommendation Implemented
MTPTC 68 MTPTC 68
Overall Assessment: Meets Minimum Standard? Oui / No Comments:
Homeowner:___________________
ID No:_____________
BC Engineer:___________________
Address: _________________________
GPS: ________________
Homeowner Phone No:___________________
Boss: _________________________
House Type: _________
STRONG WALL CHECKLIST
Boss Phone No: _________________________
BUILD A STRONG MASONRY WALL 1 M OR T AR M I XI NG
P la nn ed ?
D at e
P ho to #
R ec o mm en da ti on M ad e
D on e?
a b c d e
Use mortar 1:3 mix Use clean, fine river sand Use clean water (not salty or muddy) Use Type 1 Cement Mix a clean, concrete or asphalt surface, not on dirt
Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No
f g h i
Using a mechanical mixer is best Batch out gravel, then sand, then cement Turn over 3 times or until color is uniform Do not use too much water! Add water slowly
Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No
2 W AL L M AS ON R Y
P la nn ed ?
D at e
P ho to #
R ec o mm en da ti on M ad e
D on e?
a Wet concrete blocks prior to use b Use a line and deadman
Yes / No Yes / No
Yes / No Yes / No
c d e f
Prop up column steel so it remains plumb U se 1/3 bonding, chase the bond before starting Vibrate block Tooth wall at tie columns and openings by 1/3 block
Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No
h i k j
Maintain minimum 2.5 cm between block and column tie Maximum bed joint thickness 12.5mm Minimum head joint thickness 12.5mm Maximum variation in mortar joint size 4mm
Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No
l m n o p q r
Prepare a reasonable amount of mortar to avoid wetting from time to time Pour the beam in one time Check the wall is plumb Maximum variation from plumb 2cm over 3m height Pour the column after completing min 1 m, max 1.2m heigh of wall Cure the wall 3 times per day for 3 days Check the top of the wall is level
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
3 I NTERMEDIATE RING BEAM
a b c d
D irectly below window level, 8cm high, 15cm wide Use two #3 (3/8") bars Use #2 (1/4") stirrups spaced at 20 cm Apply one of overlap detailling options
4 O PE NI N G R E IN FO RC EM E NT
Planned?
Date
Photo #
Recommendation Made
Yes / No Yes / No Yes / No Yes / No P la nn ed ?
Done?
D at e
P ho to #
R ec o mm en da ti on M ad e
D on e?
Yes / No Yes / No
Yes / No Yes / No
c d e f
Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No
g Use at least 40 cm overlap h Fill space above door opening with lightweight material, or… i Cast concrete lintel monolithic with ring beam
Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No
j Reinforce concrete lintel according to standard detail
Yes / No
5 E LE CT R IC AL a nd P LU MB I NG
a N ever break the wall to put electrical or plumbing b Leave free space for utility piping 6 P OU RI N G C OL UM N C ON CR E TE
P la nn ed ?
P ho to #
R ec o mm en da ti on M ad e
D on e?
D at e
P ho to #
R ec o mm en da ti on M ad e
D on e?
Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No
d Distance between formwork and steel bars 25mm minimum e E nsure toothed areas of columns completely filled with concrete
Yes / No Yes / No
Yes / No Yes / No
7 F IN IS H T HE W AL L W I TH P LA ST ER
P la nn ed ?
D at e
P ho to #
R ec o mm en da ti on I m pl em en te d
MTPTC 69 MTPTC 69 MTPTC 69
MTPTC 72 Date
Photo #
Recommendation Implemented
MTPTC 73 MTPTC 73 MTPTC 73 D at e
P ho to #
R ec o mm en da ti on I m pl em en te d
D at e
P ho to #
R ec o mm en da ti on I m pl em en te d
D at e
P ho to #
R ec o mm en da ti on I m pl em en te d
D at e
P ho to #
R ec o mm en da ti on I m pl em en te d
MTPTC 75
Yes / No Yes / No
a C lean out the bottom before placing formwork b Pour column in one day to the same height as wall c Pour columns after minimum 1m wall built
a 10mm plaster on both sides of walls b Use clean, fine river sand c Use clean water (not salty or muddy)
R ec o mm en da ti on I m pl em en te d
Yes / No D at e
Yes / No Yes / No P la nn ed ?
P ho to #
Yes / No Yes / No Yes / No Yes / No
a Form 8x15cm column either side of openings b Use 2 #4 (12mm) vertical bars Use #2 (1/4") stirrups at 15 cm spacing T ie reinforcement for doors into foundation beam Grout reinforcement for windows into blocks 50cm below sill beam Tie reinforcement into ring beam
D at e
D at e
P ho to #
R ec o mm en da ti on M ad e
Yes / No Yes / No Yes / No
D on e?
Yes / No Yes / No Yes / No
Homeowner Sig nature:__________________________________
Date: __________
BC Engineer Signature: ______________________________________
Date: __________
BC Team Leader Signature: ___________________________________
Date: __________
BC Manager S ignature: _ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __
Date: _ __ __ __ __ _
Overall Assess ment: Meets Minimum Standard? Yes / No
Comments: