COSTO DE MATERIALES: CEMENTO PRECIO x TON:
ARENA PRECIO x CAMIÓN
GRAVA PRECIO x CAMIÓN
AGUA PRECIO x PIPA
20 Bultos de 50 Kg.
DE 7M3
DE 7M3
DE 4000 LTS
$2,200.00
$2,450.00
$2,450.00
$18.00
DE 50 KG
PRECIO x M3:
PRECIO x M3:
PRECIO x M3:
$110.00
$350.00
$350.00
$4.50
DESPERDICIO:
DESPERDICIO:
DESPERDICIO:
DESPERDICIO:
3% 1.03
8% 1.08
8% 1.08
30% 1.30
COSTO CON DESP.
COSTO CON DESP.
COSTO CON DESP.
COSTO CON DESP.
$2,266.00
$378.00
$378.00
$5.85
NOTAS: 1 ESTA TABLA ES ÚTIL PARA OBRAS PEQUEÑAS DONDE HAY QUE ELABORAR EL CONCRETO EN OBRA 2 LLENAR SÓLO LOS CAMPOS EN COLOR AMARILLO 3 LOS COSTOS OBTENIDOS SON SÓLO DE MATERIALES 4 CADA QUIEN DEBERÁ AGREGAR SUS COSTOS DE OPERACIÓN E INDIRECTOS
PRECIO x BULTO:
5 ESTA TABLA DE COSTOS PUEDE USARSE PARA FINES DE PLANEACIÓN DE COMPRA DE MATERIALES Y ANÁLISIS
CLASIFICACIÓN
6 LAS PROPORCIONES DE LA TABLA FUERON TOMADAS DE: "COSTO Y TIEMPO EN EDIFICACIÓN" CARLOS SUÁREZ SALAZAR LIMUSA - NORIEGA EDITORES MÉXICO 1997 TERCERA EDICIÓN
AGREGADO
CEMENTO
BULTOS
ARENA
GRAVA
AGUA
$$$ x M3 CON
M3 CONCRETO
COSTO AL
CANTIDAD DE
CANTIDAD DE CEM
CANTIDAD DE
CANTIDAD DE
CANTIDAD DE
COSTO AL
F´C=
REVENIMIENTO
MÁXIMO
TONELADA
DE 50 KG
M3
M3
M3
DESPERDICIO
REQUERIDOS:
CONSTRUCTOR
CEMENTO TON.
BULTOS DE 50 KG
ARENA EN M3
GRAVA EN M3
AGUA EN M3
CLIENTE
100 kg/cm2
8 A 10 CM
FIRMES Y PLANTILLAS
12 A 15 CM
3/4" 1 1/2" 3/4" 1 1/2"
0.260 0.254 0.286 0.280
5.20 5.08 5.72 5.60
0.500 0.470 0.500 0.470
0.680 0.700 0.680 0.700
0.195 0.190 0.215 0.210
$1,036.34 $1,018.94 $1,095.37 $1,077.97
0.00 0.00 0.00 0.00
$0.00 $0.00 $0.00 $0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
$0.00 $0.00 $0.00 $0.00
3/4" 1 1/2" 3/4"
0.323 0.308 0.354
6.46 6.16 7.08
0.480 0.450 0.480
0.670 0.700 0.670
0.210 0.200 0.230
1 1/2"
0.338
6.76
0.450
0.700
0.220
$1,167.85 $1,133.80 $1,238.21 $1,201.90
0.00 0.00 0.00 0.00
$0.00 $0.00 $0.00 $0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
$0.00 $0.00 $0.00 $0.00
3/4" 1 1/2" 3/4" 1 1/2"
0.355 0.337 0.391 0.373
7.10 6.74 7.82 7.46
0.470 0.440 0.470 0.440
0.650 0.680 0.650 0.680
0.195 0.185 0.215 0.205
$1,228.93 $1,188.08 $1,310.62 $1,269.78
1.00 0.00 0.00 0.00
$1,228.93 $0.00 $0.00 $0.00
0.36 0.00 0.00 0.00
7.10 0.00 0.00 0.00
0.47 0.00 0.00 0.00
0.65 0.00 0.00 0.00
0.20 0.00 0.00 0.00
$1,474.72 $0.00 $0.00 $0.00
3/4" 1 1/2" 3/4" 1 1/2"
0.423 0.400 0.467 0.445
8.46 8.00 9.34 8.90
0.465 0.435 0.465 0.435
0.640 0.670 0.640 0.670
0.190 0.180 0.210 0.200
$1,377.32 $1,325.14 $1,477.14 $1,427.23
0.00 0.00 0.00 0.00
$0.00 $0.00 $0.00 $0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
$0.00 $0.00 $0.00 $0.00
150 kg/cm2
8 A 10 CM
FIRMES, DALAS
12 A 15 CM
Y CASTILLOS 200 kg/cm2
8 A 10 CM
LOSAS DE ENTREPISO
12 A 15 CM
250 kg/cm2
8 A 10 CM
PISOS ESTRUCTURALES, COLUMNAS, DADOS, ZAPATAS Y TRABES
12 A 15 CM