book of ericson telcordia nad its advantages, structure
TermodinamikaDeskripsi lengkap
imbuhan dalam bahasa kadazanduhun, imbuhan hurufFull description
Descripción: uiihlihuigyuhg
Full description
Full description
computer engineer
Integration RNC EricssonFull description
LTE Integration
Salesforce.com Integration Using SAP PI%3a a Case StudyFull description
modul 19 corelFull description
For more FREE Calculus study material join GLOBAL EDUCATION COMMUNITY at www.examville.com
bansalFull description
Integrando BASEBAND 5212
thinkiit lecture notes iitjee mathematics
integrationFull description
SAP FI HR IntegrationFull description
Description : ZDDS - Nokia ZDDS Integration
ATG-Endeca-Integration is a quick guide to enable searching in ATG commerce application running on ATG11. This guide talks about all integration points with Oracle Endeca along with Java classes ov...
Sap Hybris integration document
Build Quality with Engineering Ethics
Study Integration Ericsson RBS6601 -3G Dtac Project
1
GSM RAN External Management System
Core Network Radio Access Network
Mun
A
A-ter OSS-RC
BSC
Mun
TRC/BSC Abis Um
TEMS
Network Management Environment
RBS RBS
Mobile Station
RBS
Mobile Station
WCDMA RaN
LTE RAN External Management System
Core Network
Radio Access Network
Mun
S1
OSS-RC Mun Mul X2 Uu
TEMS
Network Management Environment
RBS RBS
User Equipment
RBS
User Equipment
RBS 6601 – main remote Solution
Main unit - duw IP Transmission
SCU-External Alarm
TNB: Optical, TNA: Electrical
6xSFP module RRU connection
4xE1
Local O&M via serial Local O&M via Ethernet LAN
Tools list • As attached file
• Thin client with – Windows (2000, XP or Vista) – Java Runtime Environment - JRE 1.5 – Hyper Terminal or similar function for serial connection – Element Manager (EMAS) Software
DTAC
3 G RAN Process ( 1 /4 )
D T A CN S P- N S C
Site integration process
NB Update in NSN 2 G Network
check the existing alarm NSN before integration
D T A CE N G/ F O
Y
Approve by ENG ?
Y
ENG Submit NB info to NSP - NSC
FO inform SOC -FE
E c t- D T
E C T- I N T
N
Detailed RND and ATND completed
Data Transcript (DT ) Production
Submit to DT ECT -INT and DTAC - ENG for approval
Submit DT to ECT INT (RNC )
D U r a ti o n
A S P- I N t ( N O D E B)
E c t- i n t ( R N C)
Data trascripts
check the existing alarm E /// before integration
Load Data Scripts in RNC
2
Record the external alarm
1
NSN
Start
Site Acceptance completed
Inform FO b efore performing Activity
NSN or E /// Network
E /// Inform ECT - INT
8
DTAC 3G RAN Pr o c es s
DUr a t io n
ASP-INt (NODE B)
Ec t -in t (RNC) DTAC- TRS DTAC-FO
Sit e in t eg r a t io n pr o c es s (2/4 ) Activate cells acknowledgem ent
Confirm TRS commissioning cmpleted
Trouble Shooting (Max 2 HRS)
TRS Working?
N
Inform ASPINT to cancel the integration activities
Y
2
NB Update In E/// 2G & 3G Network at OSS
Perform Activate Cells & Test from RNC
Inform DTACTRS for TRS issues
Inform PM for integration cancellation
Trouble Shooting (Max 2 Hrs)
N
N
1
Power On E/// RBS and Verify Voltage
Load Data Scripts into Node B
TRS Test is Working Properly?
Y
Connect TRS to E/// RBS
Check and Clear Critical Hardware Alarms
Internal Alarm Passed?
Y
Inform E/// RNC and FO To Activate Cells
3
9
DTAC 3G RAN Pr o c es s
DTAC-FO
DTAC NSPNSC
Sit e in t eg r a t io n pr o c es s (3/4 )
d u r a t io n
ASP-INt (NODE B)
ECT-INT (RNC)
Check alarm status
Trouble Shooting
Update OSS
Perform Test Call (Support)
N
3
Record FingerPrint & Emergency Licence Keys
Perform Test Calls
Test Calls Pass?
Y
External alarm test (3G)
Site integration completed
Check alarm status with FO Before leaving site
Inform ECTINT to lock sectors
4
Fin g er pr in t v a l id o n l y 30 days
10
DTAC 3G RAN Pr o c es s
d u r a t io n
ASP-INt (NODE B)
ECT-INT (RNC)
DTAC NSPNSC
DTAC-FO
Sit e in t eg r a t io n pr o c es s (4 /4 )
Generate Full Licence Key For Node B From FingerPrint
Perform lock sectors
4
Site cleaning
Load Node B Full Licence Key In OSS
End
Inform FO Before Leaving Site
11
Dtac integration workflow 1. Inform SOC-FE before doing activity 2. Completion the Installation 3. Add Module for Rectifier 3.1 Plug in additional Module 3.2 Commissioning 4. Verify voltage & Power on Ericsson RBS 4. Load Data Scripts into Node B - LEOBARD 5. Load Data Scripts in RNC -ERICSSON 6. Check and clear critical hardware alarms 7. Internal alarm pass? 7.1 Pass ( go to step 8) 7.2 Not Pass : 7.2.1 Check and clear critical hardware alarms ( go to step 7) 8. Inform E/// BSC and FO to activate Cells 9. Activate Cells (Site Integrated) 10. Test calls 11. Test call OK (go to step 11) 16.2 Test call Not OK 16.2.1 Trouble shooting ( go to step 10) 11. Site integration completed& then Lock the site 12. inform ECT INT 21. Inform SOC-FE before leaving site 22. upload test result to SH & submit to FO and ENG.
12
Configuration data IP and router configuration Design documents prepare by design team (RND & ATND) Scripts for on-site loading include: OAM Access Configuration Site Equipment Configuration IUB script