SERVICEMAN HANDBOOK
YR05-05301~ YX 03-01601~
Book code No.S7YO00207ZE01 No.S7YO 00207ZE01
2002.08 (K.E) J 2005.03 (K.E) E
Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E SK130UR-1E -1E
CONTENTS 1. DIMENSIONS IN TRANSPORTA TRANSPORTATION ····································· ·················· ······································ ······································· ······················ 1 2. MACHINE SPECIFICATIONS ······································ ··················· ······································· ········································ ································· ············· 2 3. COMPONENT COMPONE NT SPECIFICATIONS ······································ ··················· ······································· ········································ ·························· ······ 3 3-1 ENGINE SPECIFICATIONS ······································· ···················· ······································· ········································ ··························· ······· 3 3-2 HYDRAULIC COMPONENTS ······································ ·················· ········································ ········································ ························· ····· 6 3-3 CONTROL CURVE OF PUMP ··············································· ··························· ········································ ··································· ··············· 8 3-4 HYDRAULIC CYLINDER ······································ ·················· ······································· ······································· ········································ ························· ····· 11 4. PERFORMANCE PERFORMANCE ················· ························· ················· ················· ················· ·················· ················· ················· ················· ················· ·················· ············· ···· 13 4-1 PERFORMANCE LIST ······································· ···················· ······································· ········································ ································· ············· 13 4-2 NOISE LEVEL ······································· ··················· ······································· ······································· ········································ ··························· ······· 13 5. WEIGHT OF COMPONENTS COMPONENTS ················· ························· ················· ················· ················· ················· ················· ················· ················· ············· ···· 15 6. SPECIFIED SPECIFIED OIL, GREASE AND FILTER FILTER ELEMENT········ ELEMENT ················· ················· ················· ·················· ················· ··········· ··· 17 6-1 LUBRICANT LIST ······································ ·················· ········································· ········································· ········································ ······················ 17 6-2 FILTER FILTER ELEMENTS LIST ····································· ·················· ······································· ········································ ······························· ··········· 18 7. CAB, CANOPY INTERFERENCE PREVENTION SYSTEM ·········································· ······························· ··········· 20 7-1 OUTLINE OF MECHATRO MECHATRO SYSTEM ······································· ··················· ········································ ······························· ··········· 20 7-2 OUTLINE AND SWITCHES ········································ ···················· ······································· ······································· ·························· ······ 24 7-3 INSTALLATION INSTALLATION AND CONSTRUCTION OF ANGLE SENSOR ······························ ·························· ···· 29 7-4 PROCEDURE TO RELEASE CAB INTERFERENCE PREVENTION FUNCTION ···· 36 7-5 INDICATOR INDICATOR ADJUSTMENT PROCEDURE ·········································· ······················ ······································ ·················· 37 7-6 INSPECTION OF ELECTRIC PARTS PARTS ···················································· ································ ····································· ················· 38 8. PRESSURE AND PERFORMANCE STANDARD STANDARD ················································ ···························· ······························ ·········· 40 8-1 STANDARD STANDARD FOR HYDRAULIC OIL PRESSURE MEASUREMENT ······················ 40 8-2 ENGINE SPEED MEASUREMENT ······································ ·················· ········································ ··································· ··············· 46 8-3 TEST PROCEDURES ········································ ···················· ········································ ······································· ································· ·············· 47 9. PERFORMANCE STANDARD STANDARD TABLE ·············································· ·························· ······································· ····························· ·········· 55 10. HYDRAULIC HYDRAULIC CIRCUIT DIAGRAM ················ ························ ················· ················· ················· ················· ················ ················· ················ ······· 60 11. ELECTRIC CIRCUIT DIAGRAM ········································ ·················· ··········································· ·········································· ························ ··· 64 12. MECHATRO MECHATRO CONTROL SYSTEM ··············································· ··························· ········································ ·································· ·············· 74 13. DIMENSION OF ATT TTACHMENT ACHMENT ······································· ···················· ······································· ········································ ·························· ······ 84 Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E SK130UR-1E
14. MAINTENANCE STANDARD ························································································· 93 14-1 CLEARANCE BETWEEN PIN AND BUSHING ····················································· 93 14-2 CLEARANCE IN THRUST DIRECTION ································································ 96 14-3 TYPE AND DIMENSION OF PIN ··········································································· 98 14-4 TYPE AND DIMENSION OF BUSHING ······························································ 102 14-5 UNDERCARRIAGE ····························································································· 105 15. WORKING RANGE ······································································································· 112 16. LIFTING CAPACITIES ·································································································· 115 17. TOOLS & JIGS ············································································································· 117 18. SOME CONVERSION UNITS ······················································································ 128
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
1. DIMENSIONS IN TRANSPORTATION
Q U
P
N
V O
R
S
T
W
M B
* H , H
I
F
K
G
E
J
C D
L
A
Unit : mm Code A B C D E Model SK75UR-3E 6,180 4,300 2,250 2,870 1,880 SK130UR-1E 7,440 5,130 2,900 3,570 2,310
F
G
470
770 2,600 2,550
2,270 2,320
450
570
910 2,730
2,550 2,490
500
Code Model SK75UR-3E SK130UR-1E
Q
R
L
M
N
O
P
H*
S
I
T
J
K
U
V
L
W
400 2,170
145 1,045 1,330
690
115 R1160 R1160
2,320 5,460
455 2,410
200 1,165 1,180
590
170 R1360 R1385 R1375 2,490 6,515
Note) * marks show the canopy specification.
– 1 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
2. MACHINE SPECIFICATIONS Model
SK75UR-3E
SK130UR-1E
0.28
0.45
km/h (low/high)
3.2/5.8
3.8/6.4
km/h (low/high)
3.1/5.5
3.5/6.0
min-1 {rpm}
12.5 {12.5}
11.7 {11.7}
% (degree)
70 (35)
70 (35)
kN {kgf}
52.9 {5,400}
87.3 {8,900}
kN {kgf}
39.2 {4,000}
61.9 {6,310}
1,760
2,200
Item Heaped capacity of bucket
e Travel speed
Rubber crawler
Iron crawler c n a Slewing speed m r o Gradeability f r e Bucket P Digging force Arm
Arm length
mm
Rubber crawler
Machine weight
Iron crawler Rubber crawler
Upper structure
Iron crawler
t h g i e WUnder
Rubber crawler
carriage Iron crawler Attachment Canopy ground pressure Cab ground pressure Model
m3
Canopy
kg
7,550
-
Cab
kg
7,640
13,400
Canopy
kg
7,600
-
Cab
kg
7,690
13,400
Canopy
kg
3,250
-
Cab
kg
3,340
5,970
Canopy
kg
3,250
-
Cab
kg
3,340
5,970
Canopy
kg
2,780
-
Cab
kg
2,780
4,950
Canopy
kg
2,830
-
Cab
kg
2,830
4,950
kg
1,520
2,480
Rubber crawler
kPa {kgf/cm2}
34.3 {0.35}
Iron crawler
kPa {kgf/cm 2}
34.3 {0.35}
-
Rubber crawler
kPa {kgf/cm2}
34.3 {0.35}
41 {0.42}
Iron crawler
kPa {kgf/cm 2}
34.3 {0.35}
42 {0.43}
ISUZU CC-4JG1
ISUZU BB-4BG1T
40.5/2,100 {55/2,100}
62.9/2,050 {85.5/2,050}
188/1,800 {19.2/1,800}
312.6/1,600 {31.9/1,600}
3.059
4.329
4-95.4 X 107
4-105 X 125
226 {116}
234 {172}
85
160
Output rating
kW/min-1 {PS/rpm} N.m/min-1 {kgf .m/rpm}
e Maximum torque n i g Total displacement n E Number of cylinders-Bore X Stroke Fuel consumption rate
L
mm g/kW.h {g/PS.h}
Fuel tank capacity
? t Hydraulic pump n e n Setting pressure MPa {kgf/cm2} o p Slewing motor m o Travel motor c . d Control valve y H Hydraulic tank capacity/systm capacity
L
Variable displacement axial Variable displacement axial piston + gear pump piston + 2 gear pumps 29.4 {300}
34.3 {350}
Axial piston
2-speed variable axial piston 7-spool (Multiple) L
55/70
94/140
– 2 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
3. COMPONENT SPECIFICATIONS 3-1 ENGINE SPECIFICATIONS
Model Applicable machine Engine model
SK75UR -3E
SK130UR-1E
YR05-05301~
YX03-01601~
ISUZU CC-4JG1 ISUZU BB-4BG1T Vertical, 4-cycle Vertical, 4-cycle water-cooled water-cooled diesel engine, diesel engine, in line, direct in line, direct injection injection, with turbocharger mm X mm 4 X 95.4 X 107 4 X 105 X 125
Type No. of cylinders-Bore X Stroke Total displacement
cc
3,059
4,329
18.2
18.0
kW/min -1 {PS/rpm} N.m/min -1 {kgf .m/rpm}
40.5/2,100 {55.0/2,100}
62.0/2,050 {85.5/2,050}
187/1,800 {19.2/1,800}
312.6/1,600 {31.9/1,600}
Low idling
min-1 {rpm}
1,000 ± 20 {1,000 ± 20}
High idling
2,320 ± 25 {2,320 ± 25}
2,350 ± 20 {2,350 ± 20}
Fuel consumption rate
min-1 {rpm} g/kW.h {g/PS.h}
226 {166}
234 {172}
Allowable tilting angles
degree
Compression ratio Rated output Maximum torque
Back and forth, left and right 35 Counterclockwise as seen from fly wheel side
Rotating direction Firing order
1-3-4-2
Fuel injection timing
b.T.D.C : degree MPa {kgf/cm2}
Fuel injection pressure
17 ± 1
9.0 ± 1
18.1 {185}
18.14 {185}
Open Valve action
Valve clearance Thermostat action
degree
Close
Open
Close
Intake valve
b.T.D.C. 24.5 a.B.D.C. 55.5 b.T.D.C. 19
a.B.D.C. 47
Exhaust valve
b.B.D.C. 54.0 a.T.D.C. 26.0 b.B.D.C. 57
a.T.D.C. 15
0.4 at cool
mm Intake valve Exhaust valve ˚C
0.4 at cool 82/95
Compression pressure MPa {kgf/cm2} at min-1 {rpm}
2.94 {30} at 200
3.04 {31} at 200
Lubrication oil pressure MPa {kgf/cm2} at min-1 {rpm}
-
-
760 X 620 X 710
900 X 690 X 865
240
368
Dimensions L X W X H
mm
Dry weight
kg
Governor
Bosch type
Fuel filtration
Paper elment type
Lubrication system
Forced lubrication system
Lubricant filtration
Full-flow paper element type
Cooling system Starter capacity Generator capacity
Fan size
ø450 suction type, 7-blades ø550 suction type, 8-blades
Rotation ratio
V-belt drive, rotation ratio 1.12 V-belt drive, rotation ratio 0.89
V X kW
24 X 3.2
24 X 4.5
VXA
24 X 30
24 X 50
-
-
Starting aid Cooling water capacity : Engine
L
5.0
8.5
Engine oil volume : Max/Effective
L
9.6/7.6
13.2/11
– 3 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
Engine performance curves (ISUZU CC-4JG1) Accessories : Fan, Generator, without Air cleaner and Muffler N.m 200
kgf .m 20
Shaft Torque 19 180
18 17
PS kW
160
50
e u q r o T t f a h S
16
60 40
Power output
50 t u p t u O r e 40 w o P
30
30 g/kW.h
20
g/PS.h e 200 t
260 20
Fuel Consumption Rate 10
240
180
220
160
200
10
2320 ± 25rpm
1200
1400
1600
1800
2000
2200
140
a R n o i t p m u s n o C l e u F
2400
Engine speed rpm
F:Fuel consumption rate (g/PS .h) P: Shaft output (PS) : Standard load factor (0.65 ~ 0.75) : Specific gravity Fuel consumption in normal operation : 7.1~8.2 L/h {load factor : (0.65~0.75)}
F XPX X 1000 166 = X 55 X 0.835 X 1000 = 10.9 .L/h
Fuel consumption =
– 4 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
Engine performance curves (ISUZU BB-4BG1T) Accessories : Fan, Generator, without Air cleaner and Muffler 340 Shaft Torque
320 300 280
312.6±20Nm/about1600min-1 (31.9±2.0kgf .m/about1600rpm)
34 32 30 28
e u q r o T t f a h S
26 N.m kgf .m
PS kW 80 100
80 t u p t u O 60 r e w o P
Power output
60
40
280
40
260 20
Fuel Consumption Rate
240
210 190 170 150
e t a R n o i t p m u s n o C l e u F
220 g/kW.h g/PS.h
20
1000
1500
2000
2500
Engine speed rpm
F : Fuel consumption rate (g/PS .h) P: Shaft output (PS) : Standard load factor (0.65 ~ 0.75) : Specific gravity Fuel consumption in normal operation : 11.4~13.2 L/h {load factor : (0.65~0.75)}
F XPX X 1000 172 = X 85.5 X 0.835 X 1000 = 17.6 .L/h
Fuel consumption =
– 5 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
3-2 HYDRAULIC COMPONENTS
Model
Item Type Main Pump
Displacement Working pressure Delivery flow Use Displacement Working pressure Delivery flow
p m u Gear p c Pump i l u a r d Rated revolution y H
Weight Oil quantity in pump
cc/rev MPa {kgf/cm2} L/min cc/rev MPa {kgf/cm2} L/min min-1 {rpm} kg L
Function of regulator Type Main relief valve setting pressure l o e r MPa {kgf/cm2} t v (Attachment, Travel) n l o a v Over load relief valve setting pressure C (ORV-A2,A3,A5,B2,B3,B5,C3,D3) MPa {kgf/cm2} Pilot pressure (MAX) MPa{kgf/cm2} Type e v r l MPa{kgf/cm2} a e Working pressure v z MPa{kgf/cm2} l o Max. pressure o r D Rated flow L/min t r n o 2 o f Allowable back pressure (Service) MPa{kgf/cm } C Weight kg Slewing unit Type Hydraulic motor Reduction unit r Working pressure MPa{kgf/cm2} o t o Reduction ratio m Output torque N.m {kgf .m} g n Braking torque N.m {kgf .m} i w Brake releasing pressure MPa{kgf/cm2} e l S Rotation direction(Seeing from shaft end) Weight (with reduction unit) kg Lubricant of reduction unit L Grease cc Type Displacement per stroke (high/low) cc/rev Rotating speed (high/low) min-1 {rpm} Hydraulic Working pressure MPa {kgf/cm2} r motor High speed switching pressure MPa {kgf/cm 2} o t o Oil volume L/min m l Output torque N .m{kgf .m} e v Reduction Rotating speed min-1 {rpm} a r Reduction ratio T unit Lubricant volume L . . N m{kgf m} Parking Regulating torque brake Brake releasing pressure MPa {kgf/cm2} Total weight kg
SK75UR -3E K3P36B-101R-2001 31.4 X 2 29.4 {300} 66 X 2 for Pilot (Pf) for Dozer (P3) 9.5 23.1 3.4 {35} 19.6 {200} 20 48.5 2100 (Clockwise rotation as seen from shaft), Hi idle : 2310 44 1 Total power shift, Air-con power shift, Third pump power shift control BCV75-A3-1 29.4{300} at 28L/min 32.9{355} at 20L/min 3.9{40} KVS-65-1 19.6{200} at 50L/min 24.5{250} 52 0.3 {3.5} 5 SG025E-126 MFB40-330 RG025S-155-52 24.5 {250} 1: 15.54 2,320{236} at 250kgf/cm 2 185 {18.9} 2.0 {20}, Allowable pressure3.9 {40} A port in: CW, B port in: CCW 67 Nippon Oil Co., Gearlub SP90 : 1.5 Shell Albania EP2 : 150 GM09VN-B-19/34-1 34.4/19.1 1,877/3,312 29.4 {300} 3.4 {35} 65 8,532/4,629 {870/472} 30.5 {53.8} 1: 61.6 SAE#90 GL-4 : 1.3 97{9.9} 0.5{4.8} 81
– 6 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
Item
Model
Item Type Displacement cc/rev p -1 Rated revolution min {rpm} m u Working pressure MPa {kgf/cm2} p L/min c Max. flow i l u Max. input power kw {PS} a r Max. input torque N .m {kgf .m} d y Type H Regulator Function of regulation Others Relief valve setting pressure MPa {kgf/cm2} Type l o L/min r e Max. flow t v Max. pressure MPa {kgf/cm2} n l o a v Main releif valve setting pressure MPa {kgf/cm2} C Over load relief valve setting pressure MPa {kgf/cm2} Type e MPa {kgf/cm2} v r Main relief valve pressure l a e Over load releif valve pressure (A1, B1 port) MPa {kgf/cm2} v z l o MPa {kgf/cm2} o D Working pressure r t r Rated flow L/min n o o f Allowable back presure (Service) MPa {kgf/cm2} C Weight kg Type Displacement per stroke cc/rev Working pressure MPa {kgf/cm2} Braking torque N.m {kgf.m} Hydraulic Brake releasing pressure (Stroke end)MPa {kgf/cm2} Relief setting pressure MPa {kgf/cm2} r motor o t Weight kg o Type m g Reduction ratio n Reduction i w unit Lubricant e l S
Lubricant volume L Grease Grease amount cm 3 Weight kg Capacity (Displacement X Reduction ratio) cm3 Total weight kg Type Displacement per stroke (high/low)cc/rev Hydraulic Rotating speed (high/low) min -1 {rpm} motor Working pressure MPa {kgf/cm 2}
r o t High speed switching pressure MPa {kgf/cm2} o Rotating speed min -1 {rpm} m l e Reduction Reduction ratio v a Lubricant r unit T Lubricant volume L
N .m{kgf .m} Parking Regulating torque brake Brake releasing pressure MPa {kgf/cm2} Total weight kg
SK130UR-1E Main pump
Pilot gear pump Dozer gear pump K3V63DTP101R-0E02 ZX10LPRZ2-06D SGP1A25 51.2 X 2 (in running: 57.6) 10 24.9 2,050 (Clockwise rotation as seen from shaft) 34.3 {350} 4.9 {50} 20.6 {210} 105 X 2 (in running: 118) 20.5 52.3 62.5 {85} (including gear pump 3.2 {4.3}) 291.3 {29.7} (including gear pump 14.7 {1.5}) KR36-0E02 Positive electrical flow control With electro-magnetic proportional reducing 34.3 {350} 5.0 {51} 20.6 {210} KMX13YC/B33031-10 118 X 2 37.8 {385} 34.3 {350} (60 L/min) 37.8 {385} (30 L/min) KVS-65-1 20.6 {210} at 50 L/min 27.5 {280} at 30 L/min 24.5 {250} 52 0.3 {3.5} 5 M2X63CHB-13A-07/285-60 60 28.0 {285} 314 {32} 2.3 {23} ~ 4.9 {50} 28.0 {285} at 105 L/min 34 RG06D19G3 1 : 19.2 SAE#90~#140, API service GL3 or 4 (At shipping : Shell 90EP) 1.7 EP type grease (Shell Albania EP2) 500 75 1,152 109 GM18VL2-K-33/56-10 32.7/55.8 2072/3464 34.32 {350} 1.96~6.86 {20~70} 31.4/52.5 1 : 66 Gear oil SAE #90 GL4 2.5 178 {18.2} 0.78 {8} 144
– 7 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
3-3 CONTROL CURVE OF PUMP 1) SK75UR-3E
Models SK60SR -1E Standard specification (Spec. 1) A/C power cut pressure Pf = 0k (0 psi) ) r a e g f o e u q r o t n ) i o t m p . f m g u k ( s n n o i T c e e h u t e q r d o u t l t c n u i p t ' n n I s e o d e u q r o t s i h T (
n i m / L e t a r w o l f y r e v i l e D
Delivery pressure
Pd1+Pd2 kgf/cm2 2 Models SK75UR -3E (Spec. 2) SK60SR -1E Dozer spec. A/C power cut pressure Dozer pump pressure
a
Pf=0K
P3=20K
b
Pf=35K
P3=20K
c
Pf=0K
P3=200K
d
Pf=35K
P3=200K ) m . f g k ( n i T e u q r o t t u p n I
n i m / L e t a r w o l f y r e v i l e D
Delivery pressure
Pd1+Pd2 kgf/cm2 2
– 8 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
2) SK130UR-1E (1) At H mode
( T ra v el)
I n d e p e n d e n t l o a H d i n g I n d m o ( P e p d e 2 = 5 e n d e k , n t Q m l o a i n ) H d i n g m o ( P d e 2 = 5 k , Q m i n ) T r av e l s i m u l t an A T e o T s u s i mu l o a d l t a n i n g e o u s l o a d i n g
( AT T)
100
) n i m / L ( Q e t a r50 w o l f 40 y r e v i l30 e D
Min f low H mode
20 10 0
50
100
(2) At S mode
150 200 Delivery pressure Pd (kgf/cm 2)
250
300
350
( T ra v el) ( AT T )
100
) n i m / L ( Q e t a r50 w o l f 40 y r e v i l30 e D
Min f low S mode
T r a v e l o r A T T i n d e p e n d e n t l o a T r a d i n v e g S l o r A m o T T d e s i m u l t a n e o u s l o a d i n g S m o d e
20 10 0
50
100
150 200 Delivery pressure Pd (kgf/cm 2)
250
300
– 9 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
350
SK130UR-1E
(3) At FC mode
100
(Travel)
( AT T)
) n i m / L ( Q e t a r50 w o l f 40 y r e v i l30 e D
Min f low FC mode
20
T r av e l o r A T T i n d e p e n d e n t l o a d i n g F T r a C m v e l o d o r A e T T s im u l ta n e o u s l o a d i n g F C m o d e
10 0
50
100
150 200 Delivery pressure Pd (kgf/cm2)
250
300
– 10 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
350
SK75UR-3E SK130UR-1E
3-4 HYDRAULIC CYLINDER Boom, Bucket, Off-set and Dozer cylinder
A
B
R 2
E C
1 F
2 F
R 1
d2
d1
G
H
Arm cylinder
A' A
B
1 F 2 E C F
R 1 d2 d1
G
– 11 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
Unit : mm Model
SK75UR-3E
Applicable cylinder
Parts No.
A
A'
B
Boom
YR01V00017F1
1,417
-
941
115
70
142
131
95
Arm
YR01V00018F1
710
105
70
-
126
95
Bucket
YT01V00019F2
1,120
735
80
55
102
93
85
85
Off-set
YR01V00019F1
954
564
100
60
124
114
95
95
Dozer
YT01V00020F1
690
-
150
120
70
-
144
80
80
1,525
-
1,025
105
70
155
123
80
90
965
115
80 193.5
139
100
Boom
SK130UR-1E
SK75UR-3E
YX01V00003F1
ØF1
ØF2
G
H 95
-
YX01V00004F1
Bucket
YX01V00005F3
1,365
885
95
65
145
111
90
90
Off-set
YX01V00008F1
1,050
510
105
70
155
123
100
100
220
110
65 152.4
126
90
90
R.H. YX01V00006F1 L.H.
Applicable cylinder
YX01V00007F1
Parts No.
370 1,432
660
R1
Boom
YR01V00017F1
72
Arm
YR01V00018F1
65
Bucket
YT01V00019F2
50
Off-set
YR01V00019F1
Dozer
YT01V00020F1
Boom
SK130UR-1E
L.H.
ØE
Arm
Dozer
Model
R.H. YX01V00002F1
300 1,124
ØC
R.H. YX01V00002F1 L.H.
YX01V00003F1
-
R2 65
Ød1
Ød2
Weight Cushion mechanism Remarks kg Rod side Head side
75
75
97
65
70
93
43
50
50
48
55
47
55
55
53
62
65
70
70
55
75
72.5
80
80
109
-
75
75
144
-
Arm
YX01V00004F1
70
Bucket
YX01V00005F3
55
55
60
60
81
Off-set
YX01V00008F1
65
65
70
70
81
60
60
57
Dozer
R.H. YX01V00006F1 L.H.
YX01V00007F1
60
-
-
Note : Rod and head side of Boom & Arm cylinders equip electronic cushions. And rod side of Off-set cylinder equips electronic cushion.
– 12 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
4. PERFORMANCE 4-1 PERFORMANCE LIST
Item
Earth : Soft soil Dump truck loading by 90˚ slewing (Start to dig from ground level) Attachment digging force
Slewing speed min-1 {rpm}
Travel speed High/Low km/h
SK75UR-3E
12.5 {12.5}
5.3/3.1
SK130UR-1E
11.7 Rubber crawler: 6.4/3.8 {11.7} Iron crawler: 6.0/3.5
Machine
Item
Fuel consumption g/kW.h
Workload m3/h
Traction Gradeability Arm kN % (Arm length) {ton} {deg} m kN {kgf}
Bucket kN {kgf}
52.0 {5.3}
70 {35}
39.2 {4,000} (1.76m)
52.9 {5,400}
100.0 {10.2}
70 {35}
61.9 {6,310} (2.2m)
87.3 {8,900}
Cycle time 90˚ slewing sec
Machine
S
H
S
H
S
H
SK75UR-3E
-
7.2
-
59
-
17.0
SK130UR-1E
-
13.0
-
162
-
13.1
Remarks
Note : Standard type SK130UR-1E equips the iron crawler.
– 13 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
4-2 NOISE LEVEL
Y
Microphone (2)
(1), (2) (5) (5) r
1.5m
m 1 0
r X
Z
(6) (6) (4)
(3)
(3), (4)
Measuring range Noise level Item Model SK75UR-3E SK130UR-1E
Ambient noise value (Dynamic) Sound power level 98 99
Evaluated value Machine operation Ground condition
Machine
Back hoe
Measuring position (positon of microphone) Unit : dB Close to operator's ear (High idling at no load) Cab door closed 75 74
New standard Calculated sound power level by measured noise level from six directions Simulation (Digging) On concrete
Rated output (kW)
New standard Noise level 99dB 104 106 106
Measurement condition
Simulation (Digging)
– 14 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
5. WEIGHT OF COMPONENTS SK75UR-3E
Unit : kg Model Specif icati on Item Complete Machine 1. Upper Structure (Assy of followings) 1.1 Upper frame 1.2 Counterweight Counterweight (Add-on type) 1.3 Canopy/Cab 1.4 Engine 1.5 Hydraulic tank 1.6 Fuel tank 1.7 Slewing motor (with reduction) 1.8 Control valve 1.9 Boom cylinder 1.10 Pin (for Boom installation 2pcs.) 1.11 Hydraulic pump 1.12 Radiator 2. Undercarriage (Assy of followings) 2.1 Lower frame 2.2 Slewing bearing 2.3 Travel motor (with reduction) 2.4 Upper roller 2.5 Lower roller 2.6 Front idler 2.7 Idler adjuster 2.8 Sprocket 2.9 Swivel joint 2.10 Dozer blade 2.11 Dozer cylinder 2.12 450mm Rubber shoe 2.13 450mm Track link with shoes 600mm Track link with shoes 2.13.1 Track link assy 3. Attachment (Assy of followings) 3.1 Boom assy (Assy of followings) Rear boom + front boom + upper boom 3.1.1 3.1.2 Arm cylinder 3.1.3 Off-set cylinder 3.2 Arm assy (Assy of followings) 3.2.1 Arm 3.2.2 Bucket cylinder 3.2.3 Idler link 3.2.4 Bucket link 3.3 0.28m3 Bucket assy 4. Fluid, Water (Assy of following) 4.1 Hydraulic oil 4.2 Engine oil 4.3 Fuel 4.4 Water (coolant)
SK75UR-3E Cab Rubber crawler Iron crawler 7,640 7,690 3,340 770 1,100 400 185 240* 64* 46* 67 50 97* 10 48 43
Canopy (Option) Rubber crawler Iron crawler 7,550 7,600 3,250
95
2,780 800 115 90 X 2 4X2 15 X 10 44 X 2 28 27 21 280 55* 410 X 2
2,830
2,780
2,830
-
420 X 2 530 X 2 160 X 2
-
420 X 2 530 X 2 160 X 2
1,520 1,060 800 96* 53* 260 160 44* 6X2 8X2 200 200 47 3 70 5
Note : * show a dry weight.
– 15 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
SK130UR -1E
Unit : kg Item Complete Machine
Model Specif icati on
SK130UR-1E Iron crawler 13,400
1. Upper Structure (Assy of followings) 1.1 Upper frame 1.2 Counterweight 1.3 Cab 1.4 Engine 1.5 Hydraulic tank 1.6 Fuel tank 1.7 Slewing motor (with reduction) 1.8 Control valve 1.9 Boom cylinder 1.10 Pin (for Boom installation) 1.11 Hydraulic pump 1.12 Radiator
5,970 1,300 2,180 185 368* 91* 53* 110 120 122* X 2 23 94 77
2. Undercarriage (Assy of followings) 2.1 Lower frame 2.2 Slewing bearing 2.3 Travel motor (with reduction) 2.4 Upper roller 2.5 Lower roller 2.6 Front idler 2.7 Idler adjuster 2.8 Sprocket 2.9 Swivel joint 2.10 Dozer blade 2.11 Dozer cylinder 2.12 500mm Rubber shoe 2.13 500mm Track link with shoes 2.13.1 Track link assy
4,950 1,560 149 144 X 2 8X2 27 X 12 70 X 2 57 X 2 36 X 2 63 460 57* X 2
3. Attachment (Assy of followings) 3.1 Boom assy (Assy of followings) Rear boom + front boom + upper boom 3.1.1 3.1.2 Arm cylinder 3.1.3 Off-set cylinder 3.2 Arm assy (Assy of followings) 3.2.1 Arm 3.2.2 Bucket cylinder 3.2.3 Idler link 3.2.4 Bucket link 3.3 0.45m3 Bucket assy
2,480 1,620 1,180 *154 *81 496 285 *92 12 X 2 43 340
4. Fluid, Water (Assy of following) 4.1 Hydraulic oil 4.2 Engine oil 4.3 Fuel 4.4 Water (coolant)
-
730 X 2 290 X 2
Rubber crawler
760 X 2
-
300 138 11 133 18
Note : * show a dry weight.
– 16 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
6. SPECIFIED OIL, GREASE AND FILTER ELEMENT 6-1 LUBRICANT LIST
Select the suitable lubricant for ambient temperature of your site. Components
Type of lubricant
Capacities SK75UR-3E Tank :
Tank :
55 L Total system : 78 L
94 L Total system : 160 L
Hydraulic tank
Hydraulic oil
Engine oil pan
Engine oil
H : 9.6 L L : 7.6 L
H : 13 L L : 11 L
Fuel tank
Diesel fuel
85L
160 L
Radiator : Radiator (Reservoir)
Coolant (LLC)
SK75UR-3E : Nippon oil co., Gearlub SP90 SK130UR-1E : Travel motor SAE #90 GL-4 Slewing motor
Upper roller Lower roller
Specified lubricant
SK130UR-1E
KW68 KW46 KOBELCO genuine parts KW32S A.P.I. classification for "service CD"
Radiator :
3.9 L Total volume : 10 L
KOBELCO antifreeze (If commercial 8.5 L is used, the mixing rate of the LLC Total volume : should conform with the specified.) 18 L
1.5 L
1.7 L
1.3 L x 2
2.5 L X 2
20 cc Engine oil
Idler Attachment and Dozer blade Slewing bearing Idler adjuster Grease
90 cc
150 cc
150~160 cc
200cc
25 points 4 points
6 points
1 point 2 points
Operating lever
As required
Slewing gear
5 kg
6.4 kg
A.P.I. classification for "service CD"
Extreme pressure Multipurpose grease N.L.G.I. No.2 Lithium base grease EP type Cartridge : 2421Z183 Pail can : 2421Z213 N.L.G.I. No.2 Lithium base with MoS2 grease
Note : Machines are shipped from factory with ISO VG46 for hydraulic oil and with SAE 10W-30 for engine oil.
Note : USE OF BIO-DEGRADABLE OILS When you use Bio-degradable Oil (BIO OIL), refer to the following information. 1. There are two types of BIO OIL available; vegetable-based and synthetic-based. You are recommended to use the synthetic-based type, because the vegetable-based oil has a maximum usage temperature of 80˚C {176˚F}. Because of this, the degradation of vegetable-based oil occurs more rapidly, and causes reduced service life. 2. Do not mix either type of BIO OIL with the original factory-filled mineral oil, in the case that you do use BIO OIL, it is required to flush the hydraulic system that was filled with BIO OIL three times. 3. If you use BIO OIL, slewing and propel parking brake performance will be reduced, because of the lower friction factor of BIO OIL compared to that of mineral oil. 4. For further information about recommended Bio-degradable oil, please contact our distributor.
– 17 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
6-2 FILTER ELEMENTS LIST SK75UR-3E
11
2
4
1
3
6
12
10 9 7
8 (R.H)
5
8 (L.H)
8
Filter elements, Side cutters, Teeth, Pins and O-ring
No. Device 1 2 Hydraulic oil filter 3 4 5 Air cleaner 6
Engine oil filter
7
Fuel filter
8
9
10 11 12
Parts No. YR50V00004P1 ZD11G15500 YT50V00001F1 ZD11G15500 LE11P00002S002 894430-9831
894414-7963 YR20M00013S024 YR20M00013S025 Air conditioner YR20M00013S023 Side cutter (R.H) 2412N279D1 Side cutter (L.H) 2412N279D2 (Capscrew) ZS13C20045 (Nut) ZN13C20016 Tooth (Center) B12P0015E1 Tooth (Right and left) 2412U111S1 B12P0015E2 (Locking pin) (Rubber lock) B12P0015E3 Pin YT12B01113P1 O-ring 2445Z912
Qty Parts Name Replacement Interval Return filter (STD) 1 After 50 hours (initial change) (O-ring) 1 Every 500 hours (from 2nd. change) Suction strainer 1 Every 2000 hours (O-ring) 1 Element 1 After cleaning of 6th time or an elapse of 1 year After 50 hours (initial change) Cartridge 1 Every 500 hours (from 2nd. change) Cartridge 1 Every 500 hours Filter (R.H) 1 After cleaning of 10th time or heavy Filter (Center) 1 clogging Filter (L.H) 1 1 1 Heavy worn 6 6 2 2 Hole or crack is appeared 4 4 2 Exceeding the limit of clearance 4 Deformed or worn
Note : Items enclosed in parenthesis ( ) are the pars to be changed at the same time
– 18 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
SK130UR-1E
4
2
3
1 Full flow
Bypass
11
6
12
9
10 7
8 (R.H)
5
8 (L.H)
8
Filter elements, Side cutters, Teeth, Pins and O-ring
No. Device 1 2 Hydraulic oil filter 3 4 5 Air cleaner 6 7 8
9
10 11 12
Parts No. YR50V00004P1 ZD11G15500 YW50V00004F5 ZD11G20000 LP11P00004S002 897026-1342 Engine oil filter 894160-9641 Fuel filter 897172-5490 YR20M00013S024 Air conditioner YR20M00013S025 YR20M00013S023 Side cutter (R.H) 2412N278D11 Side cutter (L.H) 2412N278D21 (Capscrew) ZS13C20050 (Nut) ZN13C20016 Tooth (Center) 2412U16S1 Tooth (Right and left) 2412U112S1 (Locking pin) B12P0015E2 (Rubber lock) B12P0015E3 Pin YY12B01242P1 O-ring 2445Z912
Parts Name Return filter (STD) (O-ring) Suction strainer (O-ring) Element Cartridge (bypass) Cartridge (full flow) Cartridge Filter (R.H) Filter (Center) Filter (L.H)
Qty 1 1 1 1 1
Replacement Interval After 50 hours (initial change) Every 500 hours (from 2nd. change) Every 2000 hours
After cleaning of 6th time or an elapse of 1 year After 50 hours (initial change) 1 Every 500 hours (from 2nd. change) 1 Every 500 hours 1 After cleaning of 10th time or heavy 1 clogging 1 1 1 Heavy worn 8 8 2 2 Hole or crack is appeared 4 4 2 Exceeding the limit of clearance 4 Deformed or worn
Note : Items enclosed in parenthesis ( ) are the pars to be changed at the same time
– 19 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
7. CAB, CANOPY INTERFERENCE PREVENTION SYSTEM 7-1 OUTLINE OF MECHATRO SYSTEM SK75UR-3E Pilot valve for Attachment
t u e c v l 2 a P v e v l a v x m u l f o o n o B c
m r A
g n i w e l S
l e v a r t t f e L
l e v a r t t h g i R
e v l a v t h g i a r t s
l e v a r T
P1
Low pressure sensor
(SE7)
P1 Arm in propo. A1 valve (PSV-1)
(SE3)
P3 Boom up propo. A3 valve (PSV-3)
(SE11)
P5 Off-set left propo. A5 valve (PSV-5)
e v l a v x u l f n & t o u c c 1 m r P A
t e s f f O
P2
Pump
(PSV-B) P2 cut propo. valve
Off-set pilot valve
m o o B
t e k c u B
(PSV-D) P1 cut & Arm conflux valve
Potentio meter (SE19) Pilot signal processing Pilot signal processing Pilot signal processing Pilot signal processing (SE18)
(SE17)
Cab interference prevention
Arm in
Boom up Mechatro controller (C-1)
Pi
Pilot signal processing
d n a m m o c d e e p s T T A
Far Near Distance from ATT and Cab
– 20 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
CAB INTERFERENCE PREVENTION SYSTEM (SK75UR -3E) Note : The contents in para. 1), 2) and 3), are in common to the concerned sections (Boom up, Arm in, Off-set left).
1) The potentiometer output voltages for boom, arm and off-set operations are input to mechatro controller. 2) The mechatro controller detects that any of boom, arm and off-set are entered in interference area with each potentiometer output voltage. 3) And simultaneously detects the ATT position and speed, and outputs command to proportional valves for boom up, arm in and off-set left to gradually stop the movement in the interference area, according to respective command. (1) Boom up
4) The boom up proportional valve controls the proportional valve secondary pressure according to command output by mechatro controller; consequently the conflux valve of boom main spool and boom on the control valve starts returning. 5) Simultaneously changes value of command to P2 cut proportional valve according to the controlled boom up pilot secondary pressure. 6) And P2 cut proportional valve controls the proportional valve secondary pressure to the pressure corresponding to the command output by mechatro controller. 7) The boom main spool and boom conflux valve, and P2 cut proportional valve are switched by mechatro pressure command, consequently cylinder supply flow rate is gradually reduced during boom up operation in the range of boom up interference area, and ATT smoothly stops. (2) Arm in
4) The arm in proportional valve controls proportional valve secondary pressure according to command output by mechatro controller, consequently the arm main spool on the control valve starts returning. 5) Simultaneously changes values of command to P1 cut valve & Arm conflux valve and P2 cut proportional valve according to the controlled arm in pilot secondary pressure. 6) And P1 cut valve & Arm conflux valve and P2 cut proportional valve control the proportional valve secondary pressure to the pressure corresponding to the command output by mechatro controller. 7) The arm main spool and P1 cut & Am conflux valve and P2 cut proportional valve are switched by mechatro pressure command, consequently cylinder supply flow rate is gradually reduced during arm in operation in the range of arm in interference area, and ATT smoothly stops. (3) Off-set left
4) The off-set left proportional valve controls proportional valve secondary pressure according to command output by mechatro controller; consequently the off-set main spool on the control valve starts returning. 5) The off-set main spool is switched by mechatro pressure command, consequently cylinder supply flow rate is gradually reduced during off-set left operation in the range of off-set left interference area, and ATT smoothly stops.
– 21 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
SK130UR -1E
Pilot valve for Attachment
R.H
L.H
t u e c v l 1 a P v e v l a v
t e m k o c o u B B
t h g i r l e v a r T
e v l a v t l h e i g v a a r r t T s
t f e l l e v a r T
g n i w e l S
e l n b o i t a i a r l a u v c e r i l v m c r a e A r v
e v l a v x u l m f o n o o B c
t u e c v l 2 a P v
m r A
t e s f f O
x u l
f m r n o A c
Low pressure sensor
(SE7)
(SE3)
Off-set pilot (SE11) valve
P1
Arm in propo. valve (PSV-1)
A5
P3
Boom up propo. valve (PSV-3)
A3
P1
Off-set left propo. valve (PSV-5)
A1
P5
P2
Pump
P2 cut propo. valve (PSV-B)
Potentio meter (SE19) (SE18)
(SE17)
P1 pump P2 pump propo. valve propo. valve (PSV-P1) (PSV-P2)
Pilot signal processing Pilot signal processing Pilot signal processing Pilot signal processing Pilot signal processing Pilot signal processing
Cab interference prevention
Arm in
Off-set left
Boom up
P1 pump
P2 pump
Mechatro controller (C-1)
mA
Regarding P1, P2 pump and cut valve processing, these are omitted because they are common to other control.
Pilot signal processing
, k e t c v o l n l e a b v r r e . u v o c l d a p n v o a . r p o m h p c o m r a o P e c e c n t e r n e i e c o f r n p e r e t g n f e n i i t a r r n e e t a o r n t N a I s
Interference area Distance from ATT to Cab
m u m i n i M
– 22 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
CAB INTERFERENCE PREVENTION SYSTEM (SK130UR -1E) Note : The contents in para. 1), 2) and 3), are in common to the concerned sections (Boom up, Arm in, Off-set left).
1) The potentiometer output voltages for boom, arm and off-set operations are input to mechatro controller. 2) The mechatro controller detects that any of boom, arm and off-set are entered in interference area with each potentiometer output voltage. 3) And simultaneously detects the ATT position and speed, and outputs command to proportional valves for boom up, arm in and off-set left to gradually stop the movement in the interference area, according to respective command. (1) Boom up
4) The boom up proportional valve controls the proportional valve secondary pressure according to command output by mechatro controller; consequently the conflux valve of boom main spool and boom on the control valve starts returning. 5) Simultaneously changes values of command to P1 and P2 pumps, and P2 cut proportional valve according to the controlled boom up pilot secondary pressure. 6) And P1 and P2 pumps, and P2 cut proportional valve control the proportional valve secondary pressure to the pressure corresponding to the command output by mechatro controller, and reduce the deliveries of P1 and P2 pumps. 7) The boom main spool and boom conflux valve, and P2 cut proportional valve are switched by mechatro pressure command and changes the deliveries of P1 and P2 pumps, consequently cylinder supply flow rate is gradually reduced during boom up operation in the range of boom up interference area, and ATT smoothly stops. (2) Arm in
4) The arm in proportional valve controls proportional valve secondary pressure according to command output by mechatro controller, consequently the arm main spool on the control valve starts returning. 5) Simultaneously changes values of command to P2 pump and P2 cut proportional valve according to the controlled arm in pilot secondary pressure. 6) And P2 pump and P2 cut proportional valve control the proportional valve secondary pressure to the pressure corresponding to the command output by mechatro controller, and reduce the delivery of P2 pump. 7) The arm main spool and P2 cut spool are switched by mechatro pressure command and change P2 pump delivery, consequently cylinder supply flow rate is gradually reduced during arm in operation in the range of arm in interference area, and ATT smoothly stops. (3) Off-set left
4) The off-set left proportional valve controls proportional valve secondary pressure according to command output by mechatro controller; consequently the off-set main spool on the control valve starts returning. 5) The off-set main spool is switched by mechatro pressure command, consequently cylinder supply flow rate is gradually reduced during off-set left operation in the range of off-set left interference area, and ATT smoothly stops.
– 23 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
7-2 OUTLINE AND SWITCHES 1. Functions 1) Cab/canopy interference prevention function 2) Height/depth display function 3) Height limitation function 4) Depth limitation function 5) Off-set L/H limitation function
When attachment is closing to cab/canopy, it will be stopped automatically. In order to operate the interference prevention system in safety, keep the following caution.
•If the machine is started operating without warming up in cold weather, the auto stop position of the cab interference preventive equipment may shift. So don’t fail to warm up after starting the engine. •When checking the function of the cab interference preventive equipment, operate the lever slowly.
Sensor (Off-set) •Never remove and attach and disassemble to repair the sensor. It may cause the malfunction of the interference preventive equipment. Would you please contact KOBELCO distributor. •When the sensor is struck and external flaw is found, check the auto stop operating condition. When failure is detected, would you please contact KOBELCO distributor for checking and repair.
Sensor (Arm)
Sensor (Boom)
• Never immerse the sensor in water during work. Should the sensor be immersed, check the auto stop operating condition. If failure is found, contact KOBELCO distributor. 22
2. Cab interference prevention system (1) Operation When the engine key is turned to ON or START position, the right display appears. And this display indicates the live function of cab interference prevention system. This function is activated every time you turn on the engine key.
CAB
NO MEDDL'G PREVENT Display
INTERFERENCE PREVENTION AREA (SIDE)
A
B 500mm
3. Movement of “A”, “B” areas
(1) Movement of “B” area When attachment is closing to cab, and bucket teeth enter warning area “B”, operator will be noted by intermitted warning buzzer and machine speed will be reduce.
200mm
Cab (Canopy)
(2) Movement of “A” area. When bucket teeth is closing to stop area “A”, operator will be noted by continuous warning buzzer, and machine is automatically stopped. Warning buzzer will be stopped after 5 seconds.
B A
NOTE
• Travel/slewing/dozer blade/off-set (R.H) are not automatically stopped. Off-set (L.H) will be automatically stopped +400 mm. When bucket is closing to 300 mm, arm in and boom up will be automatically stopped. • All figures are calculated based on arm top pin position. Therefore it is changed the bucket position.
INTERFERENCE PREVENTION AREA (FRONT)
Safety area 300mm 800mm
– 24 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(3) Release of automatic stop function
1) When operator want to close attachment to cab, push the release switch “R” on the right control lever. Then operator can move the attachment even though stop area “A”. While pushing this switch, monitor displays
2) When operate toward safety side, it is not necessary to push release switch “R”. Move the attachment till warning buzzer disappears.
3. Height/depth limitation device
(1) The multidisplay of the gauge cluster on the right front of the operator’s seat indicates the depth, height and left off-set distance, and the depth, height
8
and off-set left limit functions and those conditions. Read the depth, height and off-set left limit setting and releasing method carefully.
MULTI DISPLAY (LCD)
7
2
(2) Switches
1) Multi display (LCD)
1
2) Setting switch
8
3) Height limitation set switch
5
4) Depth limitation set switch 5) Depth limitation set change switch (Down/up) 6) Off-set left limitation set switch 7) Reset switch
3
4
6
8) LED (Red) (Light Emitting Diode)
– 25 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
1) Screen change switch After starting engine, the display changes as follows by every pressing of screen change switch.
DEPTH + 0.0m
ARM TOP PIN
2) Base level setting switch This switch is used to set the present height of the arm top to “0”. The height of the arm top pin when SET this switch was pressed is the base level.
BOOM FOOT PIN
a DISPLAYED VALUE
Display DEPTH
0.0m
3) Height limitation setting switch This switch is used to set the height limitation. The highest position when this HEIGHT switch was pressed is the limit height.
BOOM FOOT PIN DISPLAY
Display 23
HEIGHT
3.5 m
NOTE When LED is on, the height limit functions. Press the switch once more time and the height limit is released.
When the attachment comes close to the preset height, the operation stops automatically. This system enables work to be done near houses and electric wires safely and smoothly. Height and depth display
a) When new machine is delivered and the “RESET” switch is pressed, the boom foot pin is considered as a base level. b) Move the arm top pin position to the position where the depth display is required to set to “0” (Base level). c) Press “SET” switch, and the value 0.0m is displayed on the multidisplay. d) Turn on the attachment function, and the depth from the arm top pin when the “SET” switch was pressed is displayed. e) When it is necessary to change the base position, adjust the arm top position to the base position required to change to and press the “SET” switch again.
– 26 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
4) Depth limitation setting switch This switch is used to set the depth limitation. The arm top pin position when this switch was pressed is the DEPTH limit depth.
BOOM FOOT PIN
DISPLAY
Display 24
DEPTH
-2.0 m
NOTE When LED is on, the depth limit is in function. Press the switch one more again, and the depth limit is released.
DEPTH LIMITATION
When the bucket comes close to the preset depth, the operation stops automatically. By making sure of the places where the underground materials are in advance, this system enables work to be done close to gas pipes and water pipes in safety and smoothly. Example of operation When it is necessary to display the digging depth, place the bucket on the flat ground and press the “SET” switch. When machine is “A” position, the digging depth can be recognized by setting the arm top pin position to “0” and reading the indicated value (in “B” position). However, if the bucket is not on the same condition (a=b) as the preset base level, it may be impossible to read the accurate depth. 5) Depth limitation variable setting switch This switch is used to change the value of the “DEPTH” limit, and the limit depth becomes larger at 0.2m intervals by every pressing of the “UP” switch, and becomes smaller at 0.2m intervals by every pressing of the “DOWN” switch.
6) Off-set L/H limitation set switch This switch is used to set the offset left limit. The arm top pin position when this switch was pressed OFF-SET is limit off-set toward the left s ide. LEFT When the bucket comes close to the preset off-set distance, the operation stops automatically. This system enables you to position it to the same position securely in the off-set operation. Display 25
OFFSET LEFT
1.0 m
– 27 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
7) Reset switch
This switch is used to reset the base
RESET
level, height limit, depth limit and off-set left limit. Press the reset switch, and the base level is initialized.
8) LED (Light Emitting Diode)
This LED goes on when the setting functions of height limit, depth limit
HEIGHT
and off-set left limit are on.
SUPPLEMENTARY EXPLANATION
•The preset level is not released even if the starter switch is “OFF”. • When the operation stops due to the height limit, only the boom up and arm out operations stop.
A PIN
(3) Boom off-set pedal
Pedal B (Depress heel side) A (Depress toe side) Off-set leftwards
Off-set rightwards
(4) Matchmark sticking on the attachment
Match matchmarks, and the cab interference prevention does not function and the attachment can
BOOM OFF-SET PEDAL
B LOCK POSITION RELEASE POSITION
be operated in the minimum swing radius. This matchmark does not show the interference prevention functioning point. SUPPLEMENTARY EXPLANATION
• When being off-set on the right side of the matchmark point, the slewing in the minimum radius is possible. • When being off-set on the left side of the matchmark point, the slewing in the minimum radius is impossible because the cab and canopy interference prevention equipment functions.
– 28 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
7-3 INSTALLATION AND CONSTRUCTION OF ANGLE SENSOR 1. Installation of boom angle sensor SK75UR-3E T=Tightening torque : N .m {kgf .m}
6, 8 T=22.5±1.96 {2.3±0.2}
2
I Direct curve to cab side
6, 8 T=22.5±1.96 {2.3±0.2}
Note the direction of mark
3
A
A
View I
NOTE
1. Item 1 (sensor) should be installed with placing T=4.9±0.5 {0.5±0.05} 4, 7, 9
1
harness inside range of (*) LA. 2. Mark of item 1 (sensor) which is located on item 3 (lever) should be installed (*) in LB side.
No. 1 2 3 4 5 6 7 8 9
5, 7, 9 T=13.7±1.5 {1.4±0.15}
Section AA
Description Angle Sensor Rod Assy Lever Capscrew (M6 X 16) Capscrew (M6 X 25) Nut Lock Washer Lock Washer Washer
– 29 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 2 4 2 6 2 6
SK130UR-1E
SK130UR-1E
T=Tightening torque : N.m {kgf .m}
T=22.5±1.96 6, 8 {2.3±0.2}
2 I
3
6, 8 T=22.5±1.96 {2.3±0.2} A
A
View I
Note the direction of mark
NOTE
1. Item 1 (sensor) should be installed with placing T=4.9±0.49 {0.5±0.05} 4, 7, 9
harness inside range of (*) LA.
1
2. Mark of item 1 (sensor) which is located on item 3 (lever) should be installed (*) in LB side.
No. 1 2 3 4 5 6 7 8 9
T=13.7±1.5 {1.4±0.15} 5, 7, 9 Section AA
Description Angle Sensor Rod Assy Lever Capscrew (M6 X 16) Capscrew (M6 X 25) Nut Lock Washer Lock Washer Washer
– 30 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 2 4 2 6 2 6
SK75UR-3E
2. Installation of Arm angle sensor SK75UR-3E
T=Tightening torque : N .m {kgf .m} T=22.5±1.96 {2.3 ±0.2} 7, 9
3 A
7, 9 T=22.5±1.96 {2.3 ±0.2}
4 A 9, 11, 12 T=65.7±6.9 {6.7 ±0.7}
1 5, 8, 10 T=4.9±0.5 {0.5 ±0.05}
B T=13.7 ±1.5 {1.4 ±0.15} 6, 8, 10 Section BB
B Note the direction of mark Section AA
NOTE
1. Item 1 (sensor) should be installed with placing harness inside range of (*) LA. 2. Mark of item 1 (sensor) which is located on item 3 (lever) should be installed (*) in LB side.
No. 1 2 3 4 5 6 7 8 9 10 11 12
Description Angle Sensor Lever Rod Assy Cover Capscrew (M6 X 16) Capscrew (M6 X 25) Nut Lock Washer Lock Washer Washer Capscrew (M10 X 20) Washer
– 31 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 1 2 4 2 6 5 6 3 3
SK130UR-1E
SK130UR-1E
T=Tightening torque : N .m {kgf .m} 3 T=22.5±1.96 {2.3 ±0.2} 7, 9
A 4
7, 9 T=22.5±1.96 {2.3 ±0.2}
2 A 9, 11, 12 1 5, 8, 10 T=4.9 ±0.49 {0.5 ±0.05}
B
T=13.7±1.5 {1.4 ±0.15} 6, 8, 10 Section BB B
Note the direction of mark
Section AA
NOTE
1. Item 1 (sensor) should be installed with placing harness inside range of (*) LA. 2. Mark of item 1 (sensor) which is located on item 3 (lever) should be installed (*) in LB side.
No. 1 2 3 4 5 6 7 8 9 10 11 12
Description Angle Sensor Lever Rod Assy Cover Capscrew (M6 X 16) Capscrew (M6 X 25) Nut Lock Washer Lock Washer Washer Capscrew (M10 X 20) Washer
– 32 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 1 2 4 2 6 4 6 2 2
SK75UR-3E
3. Installation of Off-set angle sensor SK75UR-3E
NOTE T=Tightening torque : N .m {kgf .m}
1. Item 1 (sensor) should be installed with placing harness inside range of (*) LA. 2. Mark of item 1 (sensor) which is located on item 3 (lever) should be installed (*) in LB side.
T=115.0±12 {11.7±1.2} 3, 6
2
I
A
Note the direction of mark
5
±
0 1
A View I
T=4.9±0.5 {0.5±0.05}
1
4, 7, 8
5, 7, 8 T=13.7±1.5 {1.4±0.15}
Section AA
No. 1 2 3 4 5 6 7 8
Description Angle Sensor Lever Capscrew (M12 X 50) Capscrew (M6 X 16) Capscrew (M6 X 25) Nut Lockwasher Washer
– 33 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 2 4 1 6 6
SK130UR-1E
SK130UR-1E
NOTE T=Tightening torque : N.m {kgf .m}
1. Item 1 (sensor) should be installed with placing harness inside range of (*) LA. 2. Mark of item 1 (sensor) which is located on item 3 (lever) should be installed (*) in LB side.
3, 6
2
A I
5
±
8 1
Note the direction of mark
A
View I
T=4.9±0.49 1 {0.5±0.05} 4, 7, 8
5, 7, 8 T=13.7±1.5 {1.4±0.15}
Section AA
No. 1 2 3 4 5 6 7 8
Description Angle Sensor Lever Capscrew (M12 X 60) Capscrew (M6 X 16) Capscrew (M6 X 25) Nut Lockwasher Washer
– 34 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 2 4 1 6 6
SK75UR-3E SK130UR-1E
4. Construction of angle sensor
4-Ø7
LOT No. stamp
Connector : Housing : Terminal : Plug : Retainer : Lead wire : Tube :
2-M6
Wiring diagram Red (1)
Black (3) White (2)
Angle (˚)
3MA-JMII+AMP 174359 171661-2 (Gold plating) 172746-1 1-174360-1 AVX 0.5f Iwase CSA PVC105C (Black) 6D White
Black
Output characteristic Red
NOTE
12 20 10 11 9 5 14 13 8 7 6
15 2 3 18 16 1
4
19 17
1. Manufacture Model : JCC-065-9 2. Specification 1) Effective electric angle : 180˚ ± 5˚ 2) Mechanical angle
: 360˚ continue
3) Resistance
: DC500V 1000M Ω and over
No. 1 2 3 4 5 6 7 8 9 10
Description Housing Roter Shaft Plate Corrector Terminal Wiper Holder Wiper Chip Wiper CP Ring
Q'ty 1 1 1 1 1 2 1 1 2 1
No.
Description
11 Resistance 12 Rubber Bushing 13 Nut 14 Washer 15 Snap Ring 16 Bearing 17 Bearing 18 Oil Seal 19 O-ring 20 Adhesive (Epoxy)
– 35 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Q'ty 1 1 1 1 1 1 1 1 3
-
SK75UR-3E SK130UR-1E
7-4 PROCEDURE TO RELEASE CAB INTERFERENCE PREVENTION FUNCTION
Do not release cab interference prevention switch unless emergency purpose is evident.
Don't fail to place the safety lock lever to "LOCKED POSITION" to bring down the operator seat, or the operator seat is not unlocked. Stop the engine first, then bring the operator's seat down forward and release the interference prevention release switch.
SAFETY LOCK LEVER
(1) Stop the engine with safety lock lever is "LOCKED"
LOCKED POSITION
position. (2) Recline the seat forward. (3) Cab interference prevention release switch (1) is located inside of control box. (4) Loosen lock bracket of cab interference prevention release switch (1), and turn bracket 45˚. (5) Place the cab interference prevention release switch (1) to release position. 1
Then set the bracket and tighten the sems-bolt. (6) Return the operator seat to original position, and
BRACKET
start engine. After, moving machine in safety area, repair cab interference prevention function.
SEMS-BOLT
(7) When the machine escaped to a safety area, check the cause of trouble immediately, and repair the malfunction. Return the interference prevention switch (1) to the side of interference prevention without fail NOTE
Normally, cab interference prevention switch should be held on interference prevention position.
– 36 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
7-5 INDICATOR ADJUSTMENT PROCEDURE
Adjustment is necessary in the following cases. (In this case, indicator means monitor) 1. Replacement of attachment 2. Replacement of angle sensor 3. Replacement of mechatro controller Remove the grommet of mechatro controller and change the internal adjusting switch from "RUN" to "TEST" to store the angle sensor value at the respective stroke end of the boom up, arm in and out, and off-set left and right operations in the mechatro controller. NOTE
In case of this adjustment, make sure the position of engine key is OFF.
14)Press "OFF-SET LEFT" switch which LED is lighted
1) Start the engine.
on, and monitor displays LONG or SHORT.
2) Press the "SET" and "RESET" switch together 5 to
Then select one of them
10 seconds.
LONG : 2.5 m Arm
3) Monitor displays "OPT STEP 1 START".
SHORT : 2.2 m Arm 4) Buzzer sound 0.5 second and stop 1.0 second by 15) Press "SET" switch, then buzzer sounds will be
turnes.
stopped. This completes the adjustment. 5) LED of "HEIGHT", "DEPTH" are lighted on. 16) Finally press "RESET" switch. 6) Operate following cylinders to stroke end.
(This initialize standard set position.)
* Boom raise, off-set right and arm in.
17) Stop the engine, change the mechatro controller
7) Press "HEIGHT", "DEPTH" switch which LED are
internal adjusting switch from "TEST" to "RUN", and
lighted on together once.
check that the interference prevention equipment function normally through test.
8) Monitor displays "OPT STEP 2 START"
18) When it functions normally, return the grommet to
9) Monitor displays "OFF-SET LEFT"
the former position and finish the adjustment.
10) LED of "HEIGHT", "DEPTH" are disappeared. 11) Operate following cylinder to stroke end. * Off-set left and arm out. * Boom position is not related.
12) Press "OFF-SET LEFT" switch which LED is lighted on. 13) "OPT SELECT ARM LONG" or "OPT SELECT ARM SHORT" is displayed.
– 37 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E -1E
7-6 INSPECTION OF ELECTRIC PARTS (3) Inspection of proportional solenoid valve valve (PSV)
(1) Inspection Inspection of angle sensor sensor of depth display display
You can confirm the input signal of each angle sen-
for stop
sor if you operate each attachment and check the
Check it with SERVICE DIAGNOSIS.
display.
PSV Boom Up Boom Down Arm Out Arm In Off-Set (L)
1) No display display changed even though though arm top pin height is moved over 0.1 m when operating boom raise and boom down. Or display is changed over 0.2 m even though
Symbol PSV 3 PSV 4 PSV 2 PSV 1 PSV 5
Screen No. 26 27 28 29 31
actual movement is approx. 0.1 m. 1) In the stop area, area, command feed feed back current current is 680
Boom angle sensor failure
mA for SK75UR-3E and 800mA for SK130UR -1E.
Boom angle sensor installation mistake 2) No display changed changed even though though arm top pin
2) No comman command d
height is moved over 0.1 m when operating arm
Potentio failure causes no arm top pin height
in or arm out operation.
can be fed back.
Or display is changed over 0.2 m even though
Angle sensor set mistake
actual movement is approx. 0.1 m.
3) Command Command is OK but but no fed back
Arm angle sensor failure
Disconnection of wire harness
Arm angle sensor installation mistake
PSV failure
3) No display changed changed even though though arm top pin
4) Both command command and and feed back back are OK
height is moved over 0.1 m when operating off-
PSV failure (stuck PSV spool, etc.)
set left and off-set right operation.
Hydraulic components failure
Or display is changed over 0.2 m even though actual movement is approx. 0.1 m. Off-set angle sensor failure Off-set angle sensor installation mistake (2) Inspection Inspection of angle sensor sensor voltage voltage signal
Check with SERVICE DIAGNOSIS. Boom : Servi Servi ce Diagnosis Screen Screen No.34
Boom Up Boom Down SK75UR-3E SK130UR -1E SK75UR-3E SK130UR -1E Voltage Angle
0.8 V
1.0 V
3.1 V
3.3 V
28˚
32˚
160˚
162˚
Ar m : Ser vi ce Di agnos agn os is Scr een No .34
Arm Out Arm In SK75UR-3E SK130UR -1E SK75UR-3E SK130UR -1E Voltage Angle
0.8 V
1.2 V
3.9 V
4.1 V
26˚
40˚
143˚
155˚
Off-set : Service Diagnosis Screen No.35
Off-set Left Off-set Right SK75UR-3E SK130UR -1E SK75UR-3E SK130UR -1E Voltage Angle
1.2 V 49˚
1.3 V
3.9 V
3.5 V
147˚
130˚
– 38 – Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E SK130UR-1E -1E
(4) Display Display with failure failure code code No. 3) Inadequate Inadequate data data at adjustment adjustment
1) Input signal signal failure failure from angle sensor sensor
When disconnected wiring or short circuit, it will
When adjusting, the angle sensor input data at
cause of input signal failure from angle sensor.
respective stroke end of the boom up, arm out
In this case following code will be displayed.
and in, and off-set right and left is stored in the
Also stop signals signals will be output output and and caution caution buzzer
controller. When respective input data differs 20
continuously sound.
degree or more from the theoretical value, the data
Boom Angle Sensor Fail
POT
BOOM POTENTIO
POT
ARM POTENTIO
does not input in the controller because the position may not be on the adjustment or the angle input sensor input value may be failed.
Arm Angle Sensor Fail
POT
Off-set Left Sensor Fail
Boom Up Data Fail
POT
SET ERROR BOOM RAISE
Arm In Data Fail
POT
SET ERROR ARM IN
Arm Out Data Fail
POT
SET ERROR ARM OUT
Off-set Right Data Fail
POT
SET ERROR OFF-SET (R)
Off-set Left Data Fail
POT
SET ERROR OFF-SET (L)
OFF-SET POTENTIO
In the case of plural number of s ensor failure, all items will be displays alternately. alternately. REMEDY: Check harness and angle sensors.
When the upper display is appeared, the boom, arm and off-set left operation stop.
When the operation of the machine is unavoidable, place the release switch under the operator seat to the release side, and it is operable.
Contact Service shop. 2) Proportiona Proportionall valve failure failure
PSV
BOOM RAISE PROPO- VALV
PSV
BOOM LOWE L OWER R PROPO- VALV
PSV
ARM IN PROPO- VALV
PSV
ARM OUT PROPO- VALV
PSV
When the left display is appeared, it may not stop at the specified position. (Operable)
Contact Service shop.
OFF-SET (L) PROPO- VALV
– 39 – Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E SK130UR-1E -1E
8. PRESSURE AND PERFORMANCE STANDARD 8-1 STANDARD STANDARD FOR HYDRAULIC OIL PRESSURE PRESSURE MEASUREMENT MEASUREMENT (1) Hydraulic Hydraulic instruments instruments
(3) Place to to install pressur pressure e gauge
70 kgf/cm2 (1000 (1000 psi) psi) pressur pressure e gauge gauge ...... ...... 1 set
1) Main Main circui circuitt
500 kgf/cm2 (7100 psi) pressur pressure e gauge gauge .... 3 sets sets
After relea sing air in the hydraulic hydr aulic tnak, tnak , replace repla ce
Surface Surface Thermometer Thermometer ........... ................ .......... ........... .......... .... 1 set
plugs PF PF 1/4 of main main pump gauge ports ports a1 , a2
Pressure Measuring Kit and
with plugs for pressure measurement, and attach
Oil Analyzing Analyzing Equipment Equipment ........... ................ .......... ..... 1 set (2) Measuring Measuring cleanlines cleanliness s of hydraulic oil
pressure gauge 500 kgf/cm 2 (7100 psi). 2) Dozer Dozer circui circuitt
• After releasing releasing air in the hydraulic hydraulic oil tank, tank, open the
Replace dozer pump gauge plug PF 1/4 a3 with
cover and sample oil in the hydraulic tank, and mea-
plug for pressure measurement, and attach pres-
sure with the instrument for analysis. If the measured value is over the standard value, replace the return filter and/or change the hydraulic oil.
sure gauge 500 kgf/cm 2 (7100 psi). 3) Pilot Pilot circuit circuit Replace pilot gauge plug a4 with plug PF1/4 for pressure measurement, and attach pressure gauge 70 kgf/cm2 (1000 psi).
SK75UR -3E
SK130UR -1E
a2
a1 A3
Main pump, gauge port
a2(a1) Main pump, gauge port
a3
a4
Pump
Plug for pilot pressure measurement Pump
Dozer pump, plug for gauge
a2 Main pump a1
a4
Plug for pressure measurement a3
Pump
Dozer control valve
Pilot, plug for pressure measurement
Pump
Plug for dozer circuit pressure measurement
– 40 – Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E SK130UR-1E
PRESSURE ADJUSTMENT POSITION (1) Main control valve SK75UR -3E
Arm out OR8-D3
Off-set left OR11-A5
Bucket digging OR1-A3
Boom up OR3-A2
Main relief MR1
Off-set right OR12-B5
Bucket dump OR2-B3
Boom down OR4-B2 View from front side of machine
Arm in OR7-C3 View from rear side of machine
Rear of machine
SK130UR -1E
Off-set left OR11 Main relief MR1
Bucket dump OR2
Boom up OR3
Rear of machine View from top of machine
Arm out OR8
Boom down OR4 Bucket digging OR1 Arm in OR7
Off-set right OR12
View from bottom of machine
– 41 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(2) Control valve for dozer (Dozer specification only) SK75UR -3E
Dozer up OR10
Main relief MR3
Dozer down OR9
SK130UR -1E
Main relief MR3
Dozer up OR10
Dozer down OR9
– 42 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(3) Pilot relief valve
Pilot relief valve PR1 is built in main pump. SK75UR -3E
SK130UR -1E
PR1 Pilot relief
PR1 Pilot relief Pilot relief valve position
(4) Slewing overload relief
The slewing motor is equipped with plugs for pressure measurement, but the measurement is carried out using gauge ports a1 and a2 . SK75UR -3E
Slewing left Over load relief valve OR5-B port
SK130UR -1E
Dr
2 plugs PT 1/4 for pressure measurement
2 plugs PT 1/4 for pressure measurement
A
B Port PF3/8 (Plug) Air release port Slewing right Over load relief valve OR6
Slewing right Over load relief valve OR6
Slewing left Over load relief valve OR5
Slewing over load relief position
– 43 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
PROCEDURE FOR ADJUSTING RELIEF VALVE SK75UR -3E (1) Pilot relief valve PR1
660
Loosen nut (661) and adjust it with adjust screw (660). : 24 mm : 6 mm
No. of turns of adjust screw 1/2 turn
Pressure change kgf/cm2 (psi) Approx. 62 (880)
Pilot relief valve
661 T=3.0 kgf·m (22 lbf·ft)
7 T=2 kgf·m (14 lbf·ft)
(2) Main relief valve (Travel section, ATT common section) MR1
Loosen lock nut (7) and adjust it with adjust screw
6
(6). : 19 mm : 4 mm
No. of turns of adjust screw 1/2 turn
Pressure change kgf/cm2 (psi) Approx. 62 (880)
Main relief valve (Travel section , ATT common section)
8 T=2 kgf·m (14 lbf·ft)
(3) Port relief valve (Boom, bucket, arm off-set sections) Loosen lock nut (8) and adjust it with adjust screw
(7). : 19 mm
7
: 4 mm
No. of turns of adjust screw 1/2 turn
Over load relief valve (Boom, bucket, arm, off-set sections)
Pressure change kgf/cm2 (psi) Approx. 62 (880)
71
(4) Slewing over load relief valve OR-5, OR-6 When the adjusted pressure is 10 kgf/cm2 (142 psi)
T=4 kgf·m (29 lbf·ft)
or less, loosen nut (71) and adjust it with cap (90). : 24, 27 mm : 5 mm When the pressure adjusted value is over 10 kgf/ cm2 (142 psi), replace the relief valve assy.
90 Slewing over load relief valve
– 44 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
SK130UR -1E (1) Pilot relief valve PR-1
Adjust it with adjust screw (611). : 6 mm
611 No. of turns of adjust screw 1 turn
Pressure change kgf/cm2 (psi) Approx. 21 (300)
Pilot relief valve
7
(2) Main relief valve (Travel section, ATT common section) MR-1
6
Loosen lock nut (7) and adjust it with adjust screw (6).
Main relief valve (Travel section, ATT common section)
: 19 mm : 4 mm
No. of turns of adjust screw 1 turn
Pressure change kgf/cm2 (psi) Approx. 180 (2600) 8
(3) Over load relief valve OR-1 to 4, OR-7 to 12
7
(Boom, bucket, arm, off-set sections)
Loosen lock nut (8) and adjust it with adjust screw (7). : 19 mm
Over load relief valve (Boom, bucket, arm, off-set sections)
: 4 mm
No. of turns of adjust screw 1 turn
Pressure change kgf/cm2 (psi) Approx. 180 (2600) 71
(4) Slewing over load relief valve When the adjusted pressure is 10 kgf/cm2 (142 psi)
or less, loosen nut (71) and adjust it with cap (90). : 41 mm
90
: 22 mm
Slewing over load relief valve
When the pressure adjusted value is over 10 kgf/cm2 (142 psi), replace the relief valve assy. (5) Travel surge cut valve Adjustment is done by manufacturer, so don’t replace parts other than O ring.
Loosen cap (204) and adjust it with shim (205). : 10 mm
204 205 Travel surge cut valve
– 45 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
Pickup
8-2 ENGINE SPEED MEASUREMENT (1) Warming up of engine Start engine to raise the coolant temEngine coolant temperature gauge perature of engine to 40 to 80˚C. (104˚ Red to 176˚F) White The E/G coolant temperature gauge Blue is used to measure. The range in white color shows the temperature of approx. 40 to 100˚C (104˚ to 212˚F), so confirm that the measured value indicates the temperature within the range of white color.
Speed meter
Measurement of E/G speed
(2) Measuring with diesel engine speed meter
1) Install diesel engine speed meter pickup on and of injection pipes on which the pickup can be easily installed.
Buzzer Stop Switch (Returns)
Screen Change SW (Advances)
2) Check E/G idling speed. (3) Engine speed measured value through service diagnosis
Work Mode Select SW
1) Turn "ON" the starter switch with the buzzer stop switch pressed. 2) A program No. and an actual engine revolution are displayed as the No.2 Item.
Gauge Cluster
3) At the "H" mode, if work mode select switch is pressed after pressing buzzer stop switch and returning a display screen, the engine speed in "H" mode is displayed. 4) Press a work mode select switch in "S" and "FC" mode, select each mode, and the engine speed in each mode is displayed.
2
5) The screen advances like No.2, No.3....each time the screen change switch is pushed.
No.2 E/G SET MEAS E/G PRS. KPSS SW
2205 2201 LIVE H
No load set rpm Actual rpm LIVE/DEAD indication H/S/FC indication
6) The screen returns like No.40, No.39....each time the buzzer stop switch is pressed. 7) The display does not disappear unless the starter switch is turned to "OFF". (4) Actual measurement of engine revolution by the screen change switch After the engine starts, the following items are displayed in that order each time the screen change switch is pressed.
• Engine speed (At this time, each mode is chosen and engine speed is measured.)
DEPTH +0.0m
2250RPM
256Hr AFT E/G OIL CH Example of screen change
• Hours after the engine oil was replaced
– 46 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
8-3 TEST PROCEDURES (1) Travel speed
1) Purposes Measure the track link revolution and confirm the performances between the hydraulic pump and the travel motor of the travel drive system. 2) Conditions
One side lifted position
Operating oil temperature : 45~55˚C (113 ~ 131˚F) Crawler on the right and left sides are tensioned evenly. 3) Preparation Stick the packing tape to the travel motor cover.
Packing tape
Swing the slewing frame through 90 as shown in °
Fig. right and make the crawler on one side take off the ground, using the attachment. 4) Measurement Engine speed ................. Hi idle 2-speed travel switch ..... 1st and 2nd speed Measuring points ........... Right and left Method........................... Using stopwatch, measure
Sticking position of mark
the revolutions per minute visually
Track Link Revolutions Item Item
RH and LH
Unit : rpm Standard value
Repairable level
Service limit
Model
SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E
H1
19.2 ~ 21.2
22.1 ~ 24.4
23.9 ~ 26.5
27.6 ~ 30.6
29.6~
34.1~
H2
12.3 ~ 13.6
13.4 ~ 14.8
15.1 ~ 16.8
16.5 ~ 18.3
18.7~
20.4~
S2
13.1 ~ 14.5
13.6 ~ 14.8
16.1 ~ 17.9
16.8 ~ 18.3
20.0~
20.6~
FC2
15.2 ~ 16.8
17.3 ~ 19.1
18.8 ~ 20.9
21.5 ~ 23.8
23.3~
26.6~
– 47 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(2) Deviation of travel
1) Purposes Measure the amount of deviation at 20 m (66 ft) travel and confirm the right and left balance from the hydraulic pump to the travel motor of the travel drive system.
30~40cm (1 ft)
2) Condition Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F)
Travel position
RH and LH crawler are tensioned evenly. Plain, level and solid ground Engine speed : Hi idle 3) Preparation
A
a. Straight course more than 30 m (33 yard)
20m (22 yard)
b. Travel position in which the bottom of the bucket is lifted by about 30 cm (1 ft).
Measuring method
4) Measurement a. Measure the max. deviation distance of the circular arc in the 20 m (22 yard) length, excluding the preliminary run of 3~5 m (10~16 ft). b. Operate the travel lever at the same time.
Travel deviation Unit : mm/20m Measurement Standard Repairable Service item value level limit 240 (9'45") or less 480 (18'9") 720 (28.3") A
(3) Performances of parking brake
1) Purposes Confirm that the parking brake holds a stopped con-
30cm (1 ft)
dition of the machine in a no-load travel position and on a 1/4 gradient slope. 2) Condition
1/4 gradient Approx. 15 deg.
A slope with 1/4 (Approx. 15 deg) gradient and a
Parking brake operating position
stopped condition in a no-load travel position. 3) Preparation Place an angle meter on the shoe plate and confirm that it makes an angle more than 15˚. Hang a perpendicular in parallel with the guide frame rib on the track frame and put a mark (matching mark) on the shoe plate. 4) Measurement
Angle meter
Method of measurement
Five minutes after the engine stops, measure the movement distance of the matching mark.
C
Guide frame
Parking brake Measurement position C
Standard value 0
Unit : mm/5min Repairable Service level limit 1 (0.04 in) 2 (0.08 in)
– 48 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(4) Drain rate of travel motor
Forward
1) Purposes To measure the drain rate of the travel motor and to confirm the performances of the travel motor.
Rib "A"
2) Conditions Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F) Engine speed : Hi idle 3) Preparation
Stopper "B"
a. Apply stopper pins for both travel sprockets of left and right.
Rotary direction
b. Stop the engine, and release air in the hydraulic
Location of stopper applied to travel sprocket
oil tank c. Loosen nut and disconnect drain tube, and plug the end of this tube.
90
d. Connect a hose to the drain port of travel motor,
Ø10
Ø22 pipe
and receive the drained oil in a container
40
4) Measurement ; at Travel Lock Unless you observe the rotary force direction at
L
Stopper "B"
travel lock, rib “A” may be broken by stopper “B” in some cases. a. Start the engine and relieve pressure at the full
ØD
stroke of the travel lever.
Stopper
b. Measure the drain rate for 30 seconds of relieving. Take three measurements in the forward motion on each side at one time and make the mean value the measured value.
Unit : mm Model SK75UR-3E
Item
SK130UR-1E
ØD
L
60
100
70
130
Plug Hose
Unit : L/30sec Drain of travel motor
Item
Standard value
Repairable level
Service limit
SK75UR-3E
3.4
6.8
10
SK130UR-1E
5
13
15
Model
– 49 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(5) Slewing speed
1) Purposes Measure the slewing time and confirm the performances between the hydraulic pump and the swing motor of the slewing drive system.
Max. reach
2) Conditions Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F) Hard and level ground Engine speed : Hi idle
Standard slewing speed measuring position (at the max. reach)
3) Preparation The height of 1.5 m (5 ft) at which the bottom of the bucket matches the tip of the tooth on condition that the bucket is empty, the arm cylinder is most retracted and the bucket is used for digging. 4) Measurement Slewing the machine by bringing the slewing lever to its full stroke. Measure the time required to make two turns after one turn of preliminary turn and calculate the time required for one turn.
Variable slewing speed measuring position (at the min. reach)
Slewing Speed
Unit : sec/rev Item Model
Item
Standard value
Repairable level
Service limit
SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E
Standard slewing
4.6 ~ 5.2
4.9 ~ 5.7
6.0 ~ 6.6
6.3 ~ 7.3
7.4 ~
8.0 ~
Variable slewing
7.6 ~ 10.6
10.1 ~ 14.1
10.7 ~ 13.6
12.9 ~ 18.0
15.9 ~
18.2 ~
(6) Drain rate of slewing motor
1) Purposes Measure the drain rate of the slewing motor and confirm the performances of the slewing motor 2) Conditions Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F) Engine speed : Hi idle 3) Preparation a. Release air from inside the hydraulic oil tank. b. Stop the engine. c. Disconnect the slewing motor drain hose from its end returning to the hydraulic oil tank and take oil in a container d. Put a plug to the tank side. 4) Measurement ; at Slewing Lock a. Start the engine and put the side faces against the inside of the right or left shoe plate. b. Relieve the slewing motor at full stroke of the slewing motion. c. Receive in a container the amount of drain accumulated in 30 seconds of relieving.
Drain rate of slewing motor Unit : L/30sec Standard Repairable Service Item Model value level limit SK75UR-3E
5.0
7.5
10
SK130UR-1E
5.0
8.0
11
– 50 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(7) Performance of slewing brake
1) Purposes Confirm the braking torque performances by the slewing relief valve.
1.5m (5ft)
2) Conditions Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F) Hard and level ground, Bucket is empty Engine speed : Hi idle
Slewing brake performance measuring position
3) Preparation a. A height of 1.5 m (5 ft) at which the bottom of the bucket matches the tip of the tooth on condition that the bucket is empty, the arm cylinder is most retracted and the bucket is used for digging.
Measuring the length of the arc over the outer circumference of slewing race Matching marks on slewing race
B
b. Put a mark (matching mark) on the outer circumference of the slewing bearing of the upper frame side and of the track frame side. Erect two poles (flags) at the front and back of the extended line of the matching mark.
Matching marks on track frame
4) Measurement a. When operating in regular slewing speed, by shifting lever to neutral position at pole position the slewing operation stops. b. Calculate the slewing drift angle by the following equation, after the upper slewing body stops, using the amount of deflection (m) of the matching marks on the slewing race and the length (m) of the circumference of the slewing race:
Slewing drift angle (˚) =
Amount of deflection of matching marks [m] Circumferential length of slewing race [m]
Measuring position of slewing brake performances Slewing brake performance Unit : degree Standard Repairable Service Item Model value level limit SK75UR-3E
55
SK130UR-1E 55~75 or less
61
66
80
90
X 360˚
(8) Performance of slewing parking brake
15˚
1) Purposes To confirm the mechanical performances of the slewing parking brake that is fitted to the inside of the slewing motor. 2) Conditions On a slope with 1/4 (Approx. 15 deg.) gradient stop the machine at right angles with the slope at the height of 1.5 m (5 ft) at which the bottom of the bucket matches the tip of the tooth on condition that the bucket is empty, the arm cylinder is most retracted and the bucket is operated for digging.
Slewing parking brake measuring position Measuring the length of the arc over the outer circumference of slewing race Matching marks on slewing race
3) Preparation Put the angle meter on the shoe plate and make sure that the angle is more than 15˚. Put a matching mark over the outer circumference of the slewing bearing on the upper frame side and on the track frame side. 4) Measurement When five minutes has passed after the engine stops, measure the length of the movement of the matching marks.
C
Matching marks on track frame Measuring position of slewing brake performances
Measurement position C
Standard value 0
Unit : mm/5min Repairable Service level limit 1 2
– 51 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(9) Operating time of cylinders
1) Purposes Measure the operating time of the boom, arm, dozer and off-set and confirm the performances between the hydraulic pump and the cylinder of the attach-
(1)
(2)
ment drive system. 2) Conditions
30cm (1 ft)
Measuring position for bucket digging and dump
Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F) Engine speed : Hi idle Operating time excluding the cushion stroke 3) Preparation Hard and level ground with the bucket empty 4) Measurement 1 ; Boom up and down
(3)
With the boom operating lever at full stroke, measure the required operating time of the bucket be-
(4)
tween the ground surface and its highest position.
Measuring position for boom up and down motions
When lowering the boom, allow the bucket onto a soft ground or cushioning such as rubber tires; never put the bucket against concrete or other solid material. Measurement 2 ; Arm in and out, bucket digging and dump In a position in which the tooth of the bucket rises
(6)
to a level of about 30 cm (1 ft) above ground, mea-
(5) 30cm (1 ft)
sure the full stroke operating time required with the
Measuring position for arm in and out motions
arm and bucket operating levers at full stroke. Measurement 3 ; Dozer Using attachment like a stick, lift the machine body’s dozer side. Measure the required time for the operating of dozer up and down at full stroke.
(8)
Measurement 4 ; Off-set
(7)
Keep the off-set cylinder horizontal and position the arm vertical and close the bucket fully. and place
Dozer blade up and down
the dozer blade to ground. Measure the required time for the operating of boom swing from left/right to right/left at full s troke.
(10)
(9) Off-set motion from end to end
– 52 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(10) Cylinder operating time
Slewing Speed
Unit : mm/min Item
Measuring position
Model
Standard value
Repairable level
Service limit
SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E
1
3.3 ~ 3.9
3.4 ~ 4.0
4.2 ~ 5.0
4.4 ~ 5.1
5.4 ~
5.6 ~
2
1.8 ~ 2.4
2.0 ~ 2.6
2.3 ~ 3.3
2.6 ~ 3.3
3.2 ~
3.5 ~
3
2.5 ~ 3.1
2.8 ~ 3.4
3.2 ~ 4.0
3.6 ~ 4.4
4.2 ~
4.7 ~
4
3.8 ~ 4.4
5
2.6 ~ 3.2
2.7 ~ 3.3
3.3 ~ 4.1
3.5 ~ 4.2
4.4 ~
6
2.2 ~ 2.8
2.2 ~ 2.8
2.8 ~ 3.6
2.8 ~ 3.6
3.8 ~
7
1.9 ~ 2.5
3.2 ~ 4.2
2.4 ~ 3.2
4.1 ~ 5.4
3.3 ~
5.6 ~
8
1.4 ~ 2.0
3.0 ~ 3.6
1.8 ~ 2.6
3.8 ~ 4.6
2.6 ~
5.0 ~
9
3.2 ~ 3.8
5.3 ~ 6.7
4.1 ~ 4.9
6.8 ~ 8.6
5.3 ~
9.0 ~
10
3.8 ~ 4.4
5.4 ~ 6.8
4.9 ~ 5.6
6.9 ~ 8.7
6.2 ~
9.2 ~
4.9 ~ 5.6
6.2 ~ 4.5 ~
(11) Oil tightness of cylinders
1) Purposes Confirm that the cylinder oil tight by checking the
B
moving length of the cylinder rods.
C
2) Conditions
A
Hydraulic oil temperature : 45 ~ 55˚C (113 ~ 131˚F) Level and solid ground
D 1.5m (5 ft)
When cylinders are replaced, bleed off air from the cylinders, before checking for oil tightness. The arm cylinder has moved 30 mm (1.2 in) from the stroke end. (Off the cushioning range) 3) Preparation Keep the tip of the bucket at 1.5 m (5ft) height, with the bucket empty and the arm cylinder is most retracted. [Provided the arm cylinder is extended by 30 mm (1.2 in).] 4) Measurement Measure the distance of drift five minutes after the engine is tuned off.
Oil tightness of cylinder Item Measurement
Model
position
Unit : mm/5min Standard value
Repairable level
Service limit
SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E SK75UR-3E SK130UR-1E
A
3
3
4.5
4
6
5
B
3
4
4.5
5
6
7
C
3
-
6
-
9
-
D
51 or less
90
76 or more
110
102 or more
150
– 53 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E
(12) Slewing bearing
Location of bearing mounting bolts
1) Purposes Measure the gap between the lower frame and the bottom face of the swing bearing and estimate the level of wear of the swing bearing.
Slewing bearing A
2) Conditions Hard and level ground
Dial indicator
The slewing bearing mounting bolts are not loosened. The slewing bearing is lubricated well, not making
How to measure the axial play of slewing bearing
abnormal sound during slewing. 3) Preparation a. Install a dial indicator to the magnetic base and fix it to the lower frame.
90˚~110˚
b. Direct the upper slewing body and the lower frame toward the travel direction, bring the probe of the dial indicator in contact with the bottom surface of
30cm (1 ft) Measuring position I
the outer race on the slewing body side and set the reading at zero. 4) Measurement 1 (Measuring position I and II) a. Measure the travel of the outer race in the axial direction in position I [The arm at 90˚ ~ 110˚ and the crawler front lifted about 30 cm (1 ft)] and in
1.5m (5 ft)
position II, using a dial indicator. b. Measure three times, and take a simple average.
Measuring position II
Axial play of slewing bearing Standard Repairable Position value level A 1.2 ~ 2.8 3.6 ~ 4.2
Unit : mm Service limit 4.5 or more
5) Measurement 2 (Measuring position III) With the arm cylinder most retracted and the bucket dump, lift the tip of the tooth of the bucket about 10 mm (0.4 in) and swing the tip of the bucket to right
B
10mm
and left by man power.
Measuring position III
But in this case, the gap of the attachment is included.
Unit : mm Measuring position B
Item
Standard value
Repairable level
Service limit
SK75UR-3E
40
80
120 or more
SK130UR-1E
25 ~ 55
60 ~ 110
120 or more
Model
– 54 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
9. PERFORMANCE STANDARD TABLE SK75UR -3E
Note) The mode is already S mode when power is thrown. Unless otherwise specified, measure it on H mode. Measuring Position Standard Tolerance Adjusting Measuring Inspection Item Unit Point condition Position Size Port value Hi Lo +1 -1 Class Sampling g Cleanliness of hydraulic oil Hydraulic oil in tank NAS 8 n i Ambient temp. r Hydraulic oil temperature Tank surface 50(122) +5(41) -5(23) ˚C u 50˚C~-10˚C s nCoolant temperature Radiator surface 75(167) +15(59) -15(5) (˚F) (122˚F~14˚F) a o e i t Lo idle 1020 +30 -30 LOW throttle i Display change m d e 2250 +30 -30 d Adjustment FULL throttle (H mode) dHi idle switch on the r n o n e a c i Perform all eS mode not gauge cluster 2100 +30 -30 rpm d g n n p s FC mode screen required measurement with 1800 +30 -30 a E t the air-conditioner (Injection pipe) S Decel 1050 +30 -30 "OFF". Pilot primary pressure circuit G pump a4 3.4{35} +0.2{+2} -0.1{-1} PR1 Hi idle e RH and LH P1 a1 f r uTravel simultaneous +0.5{+5} 0{0} MR1 29.4{300} e i l s P2 a2 operation s e r e r P1 a1 29.4{300} +0.5{+5} 0{0} n p ATT i MR1 Boom up e a v P2 a2 29.4{300} +0.5{+5} 0{0} l M a P3 a3 19.6{200} +0.5{+5} 0{0} v Dozer H OR3 Boom up 32.8{335} 0{0} -3.4{-35} a1 Boom R OR4 Boom down 32.8{335} 0{0} -3.4{-35} t i u H OR1 Bucket digging 32.8{335} 0{0} -3.4{-35} e c a1 r r Bucket i R OR2 Bucket dump 32.8{335} 0{0} -3.4{-35} c u s s e Forward Simultaneous r e RH Main PF1/4 a1 u r s p Reverse operation of travel s e Travel pump e RH and LH v Forward r l p a LH a2 (No over load relief) Reverse v h f g i i e LH OR5 Swing LH 24.5{250}+2.5{+25}+0.5{+5} H l Swing a2 e r RH OR6 Swing RH 24.5{250}+2.5{+25}+0.5{+5} d H OR7 Arm in 32.8{335} 0{0} -3.4{-35} a o Arm a2 l R OR8 Arm out 32.8{335} 0{0} -3.4{-35} r e LH OR11 Off set LH v 32.8{335} 0{0} -3.4{-35} a1 O Off set RH OR12 Off set RH 32.8{335} 0{0} -3.4{-35} H OR9 Dozer down 27.5{280} 0{0} -7.8{-80} Dozer a3 MPa R 27.5{280} 0{0} -7.8{-80} OR10 Dozer up {kgf/cm2} proportional k Indicated Performs calculation from actual B 21 c P2 cut valve current readings on o No. current display l Values which are calcu1.0 +0.15 -0.05 b Travel straight lated by C 22 value pressureconverting e valve values in the {10} {+1.5} {-0.5} v figure to current l (mA) left values are shown. a P1 cut valve D E/G hi, lever on neutral 20 v 314 position l
-
-
-
t i u c r i c e r u s s e r p t o l i p y r a d n o c e S
a n o i t r o p o r P
P2 cut valve
B
Travel straight valve
C
P1 cut valve
D
k c Arm o l b e v Boom l a v l a Off set n o i t r o Arm p o r p e Boom s r e v n Off set I
In Out Down Up
A1 A2 A3 A4
- -
Left In Out Down Up
A5 A1 A2 A3 A4
- -
Left
A5
y a l p s i d i t l u m r e t s u l c e g u a G 2 C
. o N n e e r c s s i s o n g a i d e c i v r e S
-
-
-
21 22
2.5 {25}
+0.2 {+2}
-0.15 {-1.5}
3.4 {35}
+0.2 {+2}
-0.1 {-1}
715
E/G Hi The max. value is displayed as the full lever strokes.
200
E/G Hi lever on neutrul position
680
E/G Hi Cab interference prevention area Height limitation area Depth limitation area
20 29 28 27 26
-
-
31 29 28 27 26
0 {0}
-
31
+0.05 {+0.5}
0 {0}
– 55 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E
Inspection Item Track link revolution (RH, LH)
Standard Value 1-speed
19.2 ~ 21.2
2-speed
12.3 ~ 13.6
S mode
2-speed
13.1 ~ 14.5
FC mode
2-speed
15.2 ~ 16.8
Up
2.5 ~ 3.1
Down
3.8 ~ 4.4
In
2.6 ~ 3.2
Out
2.2 ~ 2.8
Digging
3.3 ~ 3.9
Dump
1.8 ~ 2.4
Down
1.9 ~ 2.5
Up
1.4 ~ 2.0
Right
3.8 ~ 4.4
Left
3.2 ~ 3.8
Variable speed
7.6 ~ 10.6
STD speed
4.6 ~ 5.2
H mode
Boom Arm d e Operating time e p S of cylinder g (At no load) n i t a r e p O
Bucket Dozer Off set
Slewing speed
1-speed Travel speed 2-speed
Rubber
22.3 ~ 23.7
Iron
23.0 ~ 24.4
Rubber
11.9 ~ 13.9
Iron
12.6 ~ 14.6
Unit
sec/3 revs.
sec
sec/1 rev
sec/20m
Amount of travel deviation
High speed
0 ~ 240
mm/20m
Parking brake drift
15˚ gradient
0
mm/5min
Neutral position after 180˚ full speed swing
45 ~ 65
degree
15˚ gradient
0
mm
Tip of bucket tooth
85
Boom cylinder
5
Arm cylinder
5
Dozer cylinder
5
Performance of slewing brake
e c n a Performance of m r o f r e P
slewing parking brake
ATT amount of drift
Amount horizontal play at the bucket tooth
30 ~ 45
mm/5min
(At no load)
mm
– 56 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
SK130UR -1E
Note) The mode is already S mode when power is thrown. Unless otherwise specified, measure it on H mode. Measuring Position Standard Tolerance Measuring Adjusting Inspection Item Unit condition Point Position Size Port value Hi Lo +1 -1 Class Sampling g Cleanliness of hydraulic oil Hydraulic oil in tank NAS 8 n i Ambient temp. r Hydraulic oil temperature Tank surface 50(122) +5(41) -5(23) ˚C u 50˚C~-10˚C s nCoolant temperature Radiator surface 75(167) +15(59) -15(5) (˚F) (122˚F~14˚F) a o e i t Lo idle 1000 +25 -25 LOW throttle i Display change m d e 2310 +30 -30 d Adjustment FULL throttle (H mode) dHi idle switch on the r n o n e a c i Perform all eS mode gauge cluster 2200 +30 -30 rpm not d g n n p s screen required measurement with 1700 +30 -30 a E FC mode t the air-conditioner (Injection pipe) S Decel 1050 +30 -30 "OFF". Pilot primary pressure circuit G pump a4 5.0{51} +0.5{+5} -0.1{-1} PR1 Hi idle e RH and LH P1 a1 f r u Travel simultaneous 0{0} MR1 34.3{350} +0.5{+5} e i l s P2 a2 Main operation s e r e r a1 34.3{350} +0.5{+5} 0{0} P1 pump p n i ATT MR1 Boom up e a v P2 a2 34.3{350} +0.5{+5} 0{0} l M a P3 G pump a3 20.6{210} +0.5{+5} 0{0} v Dozer H OR3 Boom up 37.7{385} 0{0} -3.4{-35} Boom a1 R OR4 Boom down 37.7{385} 0{0} -3.4{-35} t i u H OR1 Bucket digging 37.7{385} 0{0} -3.4{-35} e c a1 r r Bucket i OR2 Bucket dump 37.7{385} 0{0} -3.4{-35} R c u s s e Forward Simultaneous r e RH PF1/4 a1 34.3{350} +1.0{+10} 0{0} u r s p Reverse operation of travel s e Travel e RH and LH v Forward Main r l p a LH a2 34.3{350} +1.0{+10} 0{0} (No over load relief) Reverse pump v h f g e i LH OR5 Swing LH 27.9{285} +3.4{+35} +0.5{+5} l Swing H i a2 e r RH OR6 Swing RH 27.9{285} +3.4{+35} +0.5{+5} d H OR7 Arm in 37.7{385} 0{0} -3.4{-35} a o Arm a2 l R OR8 Arm out 37.7{385} 0{0} -3.4{-35} r e LH v OR11 Off set LH 37.7{385} 0{0} -4.4{-45} a1 O Off set RH OR12 Off set RH 37.7{385} 0{0} -4.4{-45} H OR9 Dozer down 27.5{280} 0{0} -6.8{-70} Dozer G pump a3 R OR10 Dozer up 27.5{280} 0{0} -6.8{-70} proportional MPa Indicated Performs B P2 cut valve 21 calculation from actual readings on {kgf/cm2} current current 1.0 display No. k Travel straight C 22 value c valve Values which are calcu+0.15 -0.05 {10} o lated by converting l (mA) b {+1.5} {-0.5} D P1 cut valve 20 344~354 pressure values in the
-
-
-
-
t i u c r i c e r u s s e r p t o l i p y r a d n o c e S
e v l a Arm variable v l recirculation a n P2 cut valve o i t r Travel straight o valve p o r P P1 cut valve
Arm variable recirculation In k c Arm o Out l b Down e v Boom l Up a v l a Off set n o i t r o Arm p o r p e Boom s r e v n Off set I
A B C D A A1 A2 A3 A4
- -
Left In Out Down Up
A5 A1 A2 A3 A4
- -
Left
A5
y a l p s i d i t l u m r e t s u l c e g u a G 2 C
. o N n e e r c s s i s o n g a i d e c i v r e S
23 2.45{25}
670
21 2.65{27}
707
22 1.67{17} +0.2 20 2.65{27} {+2}
-0.15 {-1.5}
E/G Hi The max. value 535 is displayed as the full lever 707 strokes differ with types of 321~670 operations.
-0.05 {-0.5}
E/G Hi Min.200 lever on neutrul position
-0.15 {-1.5}
E/G Hi Cab interference prevention area Max.800 Height limitation area Depth limitation area
23 1.27~2.45{13~25} 29 28 27 3.43~0.59 +0.05 26 {35~6} {+0.5}
left figure to current values are shown. E/G hi, lever on neutral position
-
31 29 28 27 26
0.21~0 +0.15 {2.1~0} {+1.5}
-
31
– 57 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
Inspection Item Track link revolution (RH, LH)
Standard Value 1-speed
22.1 ~ 24.4
2-speed
13.4 ~ 14.8
S mode
2-speed
13.6 ~ 14.8
FC mode
2-speed
17.3 ~ 19.1
Up
2.8 ~ 3.4
Down
3.8 ~ 4.4
In
2.7 ~ 3.3
Out
2.2 ~ 2.8
Digging
3.4 ~ 4.0
Dump
2.0 ~ 2.6
Down
3.2 ~ 4.2
Up
3.0 ~ 3.6
Right
5.3 ~ 6.7
Left
5.4 ~ 6.8
H mode
Boom Arm d e Operating time e p S of cylinder g (At no load) n i t a r e p O
Bucket Dozer Off set
Slewing speed
Variable speed
10.1 ~ 14.1
STD speed
4.9 ~ 5.7
1-speed Travel speed 2-speed
Rubber
18.4 ~ 20.4
Iron
20.1 ~ 22.1
Rubber
11.1 ~ 12.5
Iron
11.8 ~ 13.2
Unit
sec/3 revs.
sec
sec/1 rev
sec/20m
Amount of travel deviation
High speed
0 ~ 240
mm/20m
Parking brake drift
15˚ gradient
0
mm/5min
Neutral position after 180˚ full speed swing
55 ~ 75
degree
15˚ gradient
0
mm
Tip of bucket tooth
90
Boom cylinder
3
Arm cylinder
4
Dozer cylinder
3
Performance of slewing brake
e c n a Performance of m r o f r e P
slewing parking brake
ATT amount of drift
Amount horizontal play at the bucket tooth
25 ~ 55
mm/5min
(At no load)
mm
– 58 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
[MEMO]
– 59 – Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
10. HYDRAULIC CIRCUIT DIAGRAM SK75UR-3E
Applicable machine : YR05-05301-
-60-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Relief valve set pressure Unit Valves
Main relief valve Over load relief valve
Slewing relief valve Pilot relief valve
-61-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
Applicable machine : YX03-01601-
-62-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-63-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
11. ELECTRIC CIRCUIT DIAGRAM SK75UR-3E
-64-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-65-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-66-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-67Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
-68Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-69Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-70Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-71Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-72Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
-73Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
12. MECHATRO CONTROL SYSTEM SK75UR-3E MECHATRO CONTROL SYSTEM IN GENERAL ELECTRIC
CONTROLLER INPUT OR OUTPUT SIGNAL HYDRAULIC PILOT SECONDARY PRESSURE
FRONT SE-12 A
SOLENOID VALVE SECONDARY PRESSURE
SOLENOID INVERSE PROPORTIONAL VALVE SECONDARY PRESSURE PILOT PRIMARY PRESSURE MAIN CIRCUIT LH
RH
REAR B SE-11 INVERSE PROPORTIONAL SOLENOID VALVE
OFF-SET PILOT VALVE 7 LH
RH
PILOT VALVE FOR ATT
8 PLOT VALVE FOR TRAVEL
3 4
P1 ARM IN PSV-1 P2 ARM OUT PSV-2 P3 BOOM UP PSV-3 P4 BOOM DOWN PSV-4
SE-9
P5 OFF-SET LEFT PSV-5
SE-10 ROTARY MULTI CONTROL VALVE
GAUGE CLUSTER DISPLAY H/S/FC SELECT
SE-4 SE-3 SE-2 SE-1
SWITCH PANEL
E G A T L O V T U P T U O
SE-8 SE-7 SE-6
H/S/FC SELECTION N O I T A C I ACCEL DIAL N U SE-16 M M O L C A L N A I O I R T E E R G S O A R T O L R O P V
SE-5
T N E R R U C D N A M M O C L A N O I T R O P O R P
E G A T L O V
MECHATRO CONTROLLER
A1 A2 A3 A4 A5
SE-19 OFF-SET
SE-18 ARM
SE-17 BOOM E G A T L O V T U P T U O
ENGINE GOVERNOR MOTOR
COMMAND CURRENT
MAIN PUMP
GEAR PUMP
PILOT PUMP
SPEED SENSOR
: ENGINE SPEED SENSOR : GOVERNOR MOTER : LOW PRESSURE SENSOR PROPORTIONAL COMMAND CURRENT
: ACCEL DIAL POTENTIOMETER
VOLTAGE 24V
-74Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
BOOM CYLINDER BOOM UP CONFLUX
C/V UPPER SIDE 8
S E S V 2 A T L P P U Y C A B V X U E M L O F V L O N A B O V C
5
G N I W E L S
M R A
7
Fr
6
T F E L L E V A R T
Fr T H G I A L R E T V S A R T
Re
3
T H G I R L E V A R T
M O O B
Re
4
1
T E K C U B
T E S F F O
ARM CYLINDER ARM OUT CONFLUX ARM IN CONFLUX
E V L A V S T S U A C P Y B
OFF-SET CYLINDER
2
SLEWING MOTOR PARKING BRAKE RELEASE
TRAVEL MOTOR 1,2-SPEED SELECT
INVERSE PROPO. SOLENOID VALVE PORT OPERATION MODE
A1
A2
A3
A4
A5
PSV-C
PSV-B
BOOM LOW SPEED ARM LOW SPEED OFF-SET LOW SPEED OFF-SET LEFT LIMIT CAB INTERFERENCE PREVENTION HEIGHT LIMITATION DEPTH LIMITATION E E E V V V L L L A A A V V V . . . O T O O P H P P T O I G T O U R A O U R C P R R P C P S T S S S S A L A P E P Y V Y B A B 2 R 1 P T P
E K A R B G N I K R A P G N I W E L S
T F I H S R E W O P C / A
D E E P S 2 , 1 L E V A R T
K C O L R E V E L
K / C O E L V B L A D I V O O N P E L O R O P S
PSV-B P SV-C PSV-D SV-1 SV-2 SV-3 SV-4
LEVER LOCK SW-11
PORT OPERATION MODE
PSV-D
P1 TRAVEL P2 BYPASS CUT STRAIGHT BYPASS CUT
BOOM UP CONFLUX ARM SLEWING TRAVEL RIGHT & BOOM , BUCKET AND OFF-SET TRAVEL LEFT & SLEWING AND ARM TRAVEL RIGHT AND LEFT , BOOM OR BUCKET OR SLEWING OR ARM
-75Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E MECHATRO CONTROL SYSTEM IN GENERAL ELECTRIC
CONTROLLER INPUT OR OUTPUT SIGNAL HYDRAULIC PILOT SECONDARY PRESSURE SOLENOID VALVE SECONDARY PRESSURE
SOLENOID INVERSE PROPORTIONAL VALVE SECONDARY PRESSURE PILOT PRIMARY PRESSURE MAIN CIRCUIT
FRONT SE-12 A
REAR B SE-11
OFF-SET PILOT VALVE 7 LH
RH
LH
RH
PILOT VALVE FOR ATT
8 3
PLOT VALVE FOR TRAVEL SE-9
4
P5 P4 P3 P2 P1
SE-10
GAUGE CLUSTER DISPLAY H/S/FC SELECT
SWITCH PANEL
H/S/FC SELECTION N O I T A C I ACCE L DIA L N U SE-16 M L M A O N C O L I T E A I R G R O A E R T S O L R O P V
E G A T L O V
E V L A V L O R T N O C I T L U M Y R A T O R T U O H T I W
L A N D T O N I N T A E M R R R O M P O U O C C R P
LOW PRESSURE SENSOR SE-4 4 SE-3
3
SE-2
SE-7
T E S F F O
SE-19 OFF-SET
8
E N L O I B T A E I A V R L L A U A V C R V I M C R A E R
SE-18 ARM
7
5
SE-17 BOOM
E G A T L O V T U P T U O
OUTPUT VOLTAGE
HIGH PRESSURE SENSOR
A3
SE-22
C-1
A2 SE-23
A1
MECHATRO CONTROLLER
ENGINE GOVERNOR MOTOR
M-2
SPEED SENSOR
SE-13
PSV-P1 P1 PUMP PROPO.VALVE
: ENGINE SPEED SENSOR
PSV-P2 P2 PUMP PROPO.VALVE
: GOVERNOR MOTER
E E N V V L L O I A T T A V H A T V . G . L I E O O L U U P A P C C B O R O R A S T I I S R S R C A P P R L E A P V R Y E V M B A R 2 R A P T PSV-A PSV-B PSV-C P
: HIGH PRESSURE SENSOR : LOW PRESSURE SENSOR
S i P
1
6 SE-5
T F E L
2
SE-1 SE-8
INVERSE PROPORTIONAL SOLENOID VALVE ARM IN A5 PSV-1 ARM OUT A4 PSV-2 BOOM UP A3 PSV-3 BOOM DOWN A2 PSV-4 OFF-SET LEFT A1 PSV-5
PROPORTIONAL COMMAND CURRENT VOLTAGE 24V
: ACCEL DIAL POTENTIOMETER
-76Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
BOOM CYLINDER BOOM UP CONFLUX C/V UPPER SIDE S i P
1 B P
7
E N L O I B T A E I A V R L L A U A V C R V I M C R A E R
M R A
8
X U E L V M L R F A A N O V C S E S V A L P A Y V B T 2 U P C
a C R
E S R E V E R
5
T F E L L E V A R T
G N I W E L S
6
E S R E V E R
T H G I A L R E T V S A R T
D R A W R O F
T H G I R L E V A R T
D R A b W T R P O F
2
T E K C U B
1
b
c 3 R
M O O B
ARM C YLIND ER ARM O UT CO NFLU X ARM I N CO NFLUX
S E S V A L P A Y V B T 1 U P C X U E L V M L R F A A N O V C
4
OFF-SET CYLINDER
1 A P
SLEWING MOTOR PARKING BRAKE RELEASE
TRAVEL MOTOR 1,2-SPEED SELECT System summary P1, P2 pump is controlled by
Furtures 1
proportional valve. 2 Part of the control valve is controlled
3
by the proportional
4
valve. The main spool is E E E V V K L L A A A R V V B . T . O U O G P C P N I O S O K R S R R P A P G A P N P I Y B W 1 E P L S
5
controlled D E E P S 2 , 1 L E V A R T
K C O L R E V E L
K / C O E L V B L A D I V O O N P E L O R O P S
hydraulically.
6
7
8
V-C P SV-D S V-1 SV -3 S V-4
9
LEVER LOCK SW-11
P1 pump is controlled by proportional valve. P2 pump is controlled by proportional valve. The travel straight valve is controlled by proportional valve. The bypass cut valve is controlled by proportional valve. The arm variable recirculation valve is controlled by proportional valve. The swing action is controlled by P2 bypass cut valve(=proportional valve.) The arm action is controlled by P2 bypas cut valve (=proportional valve). Make the controllability of arm and slewing combined operation soft. The open and close actions of the swing P/B are controlled by solenoid valve. Electric cushioning for cylinder. Make the shock at stroke end weak.
Cab interference prevention 10 Make the shock at stop motion soft in interference area.
Purpose A) The po wer cu rve sha ll be an ideal curve. B) Supply an optimum flow for each operation. • Make the changeover soft.
• Make the changeover soft. • Control the arm speed as you desire. • Make the controllability soft.
• Make the shock at stroke end weak. • Make the shock at stop motion soft in interference area.
-77Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SUMMARY OF MECHATRO CONTROLLER ELECTRO-HYDRAULIC CONVERSION INFORMATION IS DISPLAYED ON THE MULTI DISPLAY OF THE GAUGE CLUSTER.
MACHINE FRONT CAB INTERFERENCE PREVENTION RELEASE SWITCH
UNDER OPERATOR SEAT MECHATRO CONTROLER
RIGHT HAND OPERATOR CONTROL LEVER KPSS WORK MODE RELEASE SWITCH SWING PARKING BRAKE RELEASE SWITCH CAB INTERFERENCE PREVENTION RELEASE SWITCH AUTO ACCEL RELEASE SWITCH
GAUGE CLUSTER
SWITCH PANEL DOZER BLADE CONTROL LEVER
ACCEL DIAL
STARTER SWITCH (ENGINE KEY) GAUGE CLUSTER
SWITCH PANEL
The work mode selector switch contains the following function
(1) Work mode "H" (2) Display item roll forwarded when in service diagnosis operation (3) Display item roll forwarded in trouble history operation (4) Time display roll forwarded when correcting E/G oil supply cumulative time. Buzzer stop switch contains the following functions. (1) Stops the warning sounding. (2) Display item rollbacked in service diagnosis operation.
MULTI DISPLAY
(3) Display item rollbacked in trouble history operation. (4) Time display rollbacked when correcting E/G oil supply cumulative time.
HEIGHT, DEPTH, LEFT OFF-SET SWITCH PANEL FOR CAB INTERFERENCE PREVENTION SCREEN CHANGE SWITCH
-78Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
The functions displayed on the multidisplay are classified roughly into the following 8 types * 1. CPU error display ........................... Display the error of the mechatro controller, etc. * 2. Self-diagnosis display .................... Displays the failure of the I/O system of the mechatro controller such as the low and high pressure sensors, governor motor, proportional valve, angle sensor solenoid valve, etc (43 items) ............... 3. Service diagnosis display Displays the information output by the mechatro controller such as the pressure sensor detection, proportional valve, solenoid valve, etc. (30 items) .................... 4. Trouble history display Stores and displays the contents of the troubles detected though the mechatro self diagnosis. 5. Mechatro "A" adjustment display .... Displays it by procedure during the mechatro "A" adjustment. 6. E/G oil supply cumulative (integrated) time .... Displays the E/G oil supply cumulative time and E/G speed (rpm) list. * 7. Cab interference prevention system ..... When attachment is closing to cab, it will be stopped automatically. In this time, the failure of adjustment and fail of angle sensor are displayed on the self-diagnosis. This cab interference prevention has the following five functions. (1) Cab interference prevention function. (2) Height/Depth display function. (3) Height limitation function. (4) Depth limitation function. (5) Off-set left limitation function. ................. * 8. Electric cushion function The cylinder speeds in the motions of boom up, arm in/out and off-set left are reduced at near the stroke end of cylinder. In this time, the failure of boom & arm angle sensors and solenoid valves errors are displayed in the self-diagnosis. ............................. 9. Warning displays When the machine is normal after self-diagnosis but the actual operation fails. For these displays, refer to the next page. Marks * are displayed in each time of occurrence.
SELF DIAGNOSIS DISPLAY FUNCTION (1) Summary It performs self diagnosis of control inputs and outputs of pressure sensors and proportional valves while the machine is in ioeration. Wire numbers and colors may be confirmed on the electric diagram or on the harnesses. (2) I/O configuration INPUT
SERIAL COMMUNICATION
Pressure sensor
Gauge cluster
Proportional valve Selector valve (SOL) Potentiometer
l o r t n o C
(Buzzer alarm)
Governor motor Battery relay
-79Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
SELF-DIAGNOSIS INDICATION ITEM No.
Contents
Display of monitor 1.
MECHATRO CONT. FAIL
A-1
ROM DATA FAILURE
A-2
MECHATRO SET ERROR
1
Mechatro controller fail
2
ROM data fail
3
Mechatro set error
4
Boom raising pressure sensor fail
B-1
5
Boom lowering pressure sensor fail
B-2
6
Arm in pressure sensor fail
B-3
7
Arm out pressure sensor fail
B-4
8
Bucket digging pressure sensor fail
B-5
9
Bucket dump pressure sensor fail
B-6
10
Swing right pressure sensor fail
B-7
11
Swing left pressure sensor fail
B-8
12
Travel right pressure sensor fail
B-9
13
Travel left pressure sensor fail
B-10
14
Off set left pressure sensor fail
B-14
15
Off set right pressure sensor fail
B-13
16
P1 pump pressure sensor fail
C-1
17
P2 pump pressure sensor fail
C-2
18
P1 bypass cut propo valve fail
D-1 PSV
P1 BYPASS CUT PROPO-VALVE
19
P2 bypass cut propo valve fail
D-2 PSV
P2 BYPASS CUT PROPO-VALVE
20
Travel priority propo valve fail
D-3 PSV
TRAVEL PROPO-VALVE
21
Boom up stop proportional valve fail
D-4 PSV
BOOM RAISE PROPO-VALVE
22
Boom down stop proportional valve fail
D-5 PSV
BOOM LOWER PROPO-VALVE
SE
BOOM RAISE SENSOR
SE
BOOM LOWER SENSOR
SE
ARM IN SENSOR
SE
ARM OUT SENSOR
SE
BUCKET DIG SENSOR
SE
BUCKET DUMP SENSOR
SE
SWING (R) SENSOR
SE
SWING (L) SENSOR
SE
TRAVEL (R) SENSOR
SE
TRAVEL (L) SENSOR
SE
OFFSET (L) SENSOR
SE
OFFSET (R) SENSOR
SE
PUMP P1 SENSOR
SE
PUMP P2 SENSOR
-80Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
No.
Contents
Display of monitor
23
Arm variable recirculation proportional valve fail
D-6
24
Arm out proportional valve fail
D-7
25
Arm in proportional valve fail
D-8
26
Off-set left proportional valve fail
D-10
27
P1 pump pressure sensor fail
E-1
28
P2 pump pressure sensor fail
E-2
29
Travel two-speed solenoid valve fail
F-3
30
Swing parking solenoid valve fail
F-2
PSV
RECIRCULAT PROPO-VALVE
PSV
ARM OUT PROPO-VALVE
PSV
ARM IN PROPO-VALVE
PSV
OFFSET (L) PROPO-VALVE
PSV
PUMP P1 SENSOR
PSV
PUMP P2 SENSOR
SV
TWO-SPEED SOLENOID
SV
SWINGBRAKE SOLENOID
G-1 M
STEP MOTOR CURRENT-NG
M
STEP MOTOR S/PT. ERROR
POT
SET ERROR BOOM RAISE
31
Governor motor current fail
32
Governor motor starting point indexing fail
G-2
33
Interference prevention boom up setting error
A-4
34
Interference prevention arm in setting error A-5
POT
SET ERROR ARM IN
35
Interference prevention arm out setting error
A-6
POT
SET ERROR ARM OUT
36
Interference prevention off-set right setting error
A-7
POT
SET ERROR OFFSET (R)
37
Interference prevention off-set left setting error
A-8
POT
SET ERROR OFFSET (L)
38
Boom potentiometer fail
POT
BOOM POTENTIO
39
Arm potentiometer fail
POT
ARM POTENTIO
40
Off-set potentiometer fail
POT
OFFSET POTENTIO
41
Accel potentiometer fail
42
Gauge cluster Mechatro controller communication failure
43
Battery relay fail
H-2 H-3 H-4 H-1
→
POT
ACCELERATR POTENTIO
I-1
RECEIVE ERROR
I-2
BAT. RELAY
-81Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E TROUBLE HISTORY DIAGNOSIS
4) To scroll the page, use the work mode selector switch and the buzzer stop switch.
The error item detected by the self-diagnosis is stored in the mechatro controller as a history and is displayed on the multidisplay.
. Press the work mode selector switch (H), page up.
. Press the buzzer stop switch, page down.
(1) How to display 1) Turn the engine key on. 2) Press the buzzer stop switch 5 times in sequence for 10 seconds. (Example) CONTENTS
DISPLAY
No errors
Note : All the error items are stored by hour meter, when the hour is differed, press the work mode selector switch (H) or the buzzer stop switch, and displays all items and make sure that they are right.
NO ERROR 00025H
Error detected in the past
5) Turn the engine key off, and the display is disappeared.
B-1 BOOM RAISE D-1 P1 BYPASS F-3
TWO-SPEED
(2) How to cancel the contents of the trouble history 1) Display the trouble history mode.
3) Transmits the error data (one or many) and hour meter to the gauge cluster.
2) Press the work mode selector switch (H) and the buzzer stop switch for 10 seconds or more simultaneously.
. Hour meter and 3 error data are displayed on the screen.
3) When the deletion is completed, the is displayed.
. If three error data or more exist, display the data three by three in order for every 5 seconds.
4) Turn the engine key off.
Note : All the stored items are erased. It is impossible to erase data partially.
-82Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
(3) CONTENTS OF THE TROUBLE HISTORY Symbol
A
B
C
Display A–1 ROM DATA Controller relation A–2 MEC. SET A–4 BOOM RAISE A–5 ARM OUT Interference A–6 ARM IN prevention A–7 OFF-SET (R) A–8 OFF-SET (L) B–1 BOOM RAISE B–2 BOOM LOWER B–3 ARM OUT B–4 ARM IN B–5 BUCKET DIG Low pressure B–6 BUCKET DUMP sensor B–7 SWING (R) B–8 SWING (L) B–9 TRAVEL (R) B–10 TRAVEL (L) B–13 OFFSET (R) B–14 OFFSET (L) High pressure C–1 PUMP P1 sensor (Hydraulic pump) C–2 PUMP P2
Symbol
D
E F G
H I
Display D–1 P1 BYPASS D–2 P2 BYPASS D–3 S-TRAVEL D–4 BOOM RAISE Proportional valve D–5 BOOM LOWER (Control valve) D–6 RECIRCULAT D–7 ARM OUT D–8 ARM IN D–10 OFF-SET (L) Proportional valve E–1 PUMP P1 (Hydraulic pump) E–2 PUMP P2 F–2 SWING BRAKE Solenoid valve F–3 TWO-SPEED G–1 CURRENT-NG E/G Accessory G–2 S/PT.ERROR G–3 E/G REV. H–1 ACCEL Potentio relation H–2 BOOM H–3 ARM H–4 OFF-SET I–1 MONITOR I–2 BAT. RELAY MONITOR SYSTEM OK
SK75UR-3E SK130UR-1E .
HOW TO CORRECT Procedure
A
B
Operating procedure
Display on multidisplay (Example) (Normal)
Turn the starter switch “ON”.
DEPTH 1.0m
E/G speed is displayed
Press the gauge cluster screen change switch once,
DEPTH 1.0m
and the E/G speed (rpm) is displayed.
is displayed. Press once
E/G speed is displayed Press once more 2250RPM
2250RPM
C
Press once more, and the engine oil supply cumulative time screen is displayed.
D
Press the screen change switch for 5 to 10 seconds and release the hand, it returns to the correction mode.
100Hr AFT E/G OIL CH
E
Press the work mode selector switch (H), and the cumulative time increases. (once 1Hr)
100Hr AFT E/G OIL CH
Cumulative time increases
101Hr AFT E/G OIL CH
Press the buzzer stop switch, the cumulative time
100Hr AFT E/G OIL CH
Cumulative time decreases
99Hr AFT E/G OIL CH
F
G
decreases. (once 1Hr)
Press the gauge cluster screen change switch once the correcting time is stored, and exits from the correction mode and “Depth” is displayed to complete the correction.
DEPTH 1.0m
100Hr AFT E/G OIL CH
100Hr AFT E/G OIL CH
(Normal) 99Hr AFT E/G OIL CH
Complete the correction
DEPTH 1.0m
Note : Press the screen change switch once after the procedure D, and the condition is stored and the correction is completed.
-83Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
13. DIMENSIONS OF ATTACHMENT SK75UR-3E SK130UR-1E .
BOOM
SK130UR
VIEW I Front boom left
I
Front boom right
A : Boom length B : Distance between boom foot pin and rear boom bracket pin C : Width of boom foot D : Distance between boom foot pin and boom cyli nder rod pin bracket E : Radius from boom foot pin to pin of boom cylinder rod pin F : Inner width (SK75UR-3E), Outer width (SK130 UR-1E) G : Inner width of boss H : Distance between pins I : Distance between pins J : Inner width of boss K : Inner width of bracket L : Distance between pins
M : Distance between pins N : Inner width of boss O : Outer width of boss P : Distance between pins Q : Inner width of boss R : Inner width of bracket S : Distance between pins T : Distance between pins U : Distance between pins V : Outer width of boss W : Outer width of boss X : Distance between pins
Y : Distance between pins Z : Inner width of boss d1 : Pin dia. d2 : Pin dia. d3 : Pin dia. d4 : Pin dia. d5 : Pin dia. d6 : Pin dia. d7 : Pin dia. d8 : Pin dia.
-84Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
BOOM SK75UR-3E A B C D E F G H I J K L M N O P Q R S T U V W X Y Z d1 d2 d3 d4 d5 d6 d7 d8
3,870 1,478 360 1,212 R1,900 100 354 60 370 304 332 378 R658 273 362 370 215 253 350 60 1,590 353 303 181 R203 100 60 75 60 55 55 55 55 70
SK130UR-1E 4,370 1,696 574 1,178 R2,050 400 465 80 400 336 346 535.5 R890 305 421 400 232 253 440 80 1,800 464 335 231.5 R248 108 70 80 70 70 70 70 70 90
-85Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
ARM Y C Z
E D X
X
B
G
F
Z
A Y P
d5 Q M N d4 SECTION Z-Z D1 d1
H J
D2 d2
K
d3
D3 L
SECTION X-X
SECTION Y-Y
A : Arm length B : Distance between pins of boss and bracket C : Distance between pins of boss and bracket D : Distance between pins of boss and boss D1 : I.D of boss D2 : I.D of boss D3 : I.D of boss E : Height between pins of boss and bracket F : Height between pins of boss and bracket G : Height between pins of boss and center H : Arm top end (with bushing) J : Boss width K : Boss width of arm link
L : Boss width M : Bracket inner width N : Bracket inner width P : Link dimension Q : Link dimension d1 : Pin dia. d2 : Pin dia. d3 : Pin dia. d4 : Pin dia. d5 : Pin dia.
-86Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
ARM
A B C D E F G H J K L M N D1 D2 D3 d1 d2 d3 d4 d5
SK75UR-3E
SK130UR-1E
1,760 R420 R1,511.5 R240 450 280 15 180 162 180 210 90 102 65 60 75 50 50 60 50 65
2,200 R572.5 R1,831 R355 514.5 300 10 250 232 210 226 100 106 80 75 85 65 60 70 60 75
-87Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
BUCKET
G
E
d2 A
I
I0 H F
I
d1
B
D C
A : Distance between pin and bracket B : Distance between bracket pin and tooth end C : Inner width of bracket top end D : Inner width of lug E : Inner width of bracket F : Outer width of side cutter G : Inner width of bucket bottom H : Tooth outer distance I : Pitch between teeth I0 : Pitch between teeth d1 : Pin dia. d2 : Pin dia.
-88Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
m )
m :
0 n
0
2 0
9 1
7.
6.
ti
,1
2
2
i 6
5
c
5
,1 9
1
yt
6 5
8
0(
U
. 0 1
a . yt p i a c c a k p
) 7 0(
9
5.
2
0
0
0
5. 6
0
2 0(
8
0 6
0
0
e n
ht s
o
7
9
w
5.
5.
h
9
9
et s ) a
0
3 ci d
1
(
1 in *
ni kr
e
s
2
0
9
2
8
8
0(
7
9
6
7
2
2
7
1
4
7
ul a
0 *
K
d
s a
3
3 1
4.
1
2
t
8
s
4. 3
0
0,
)
0
2
1
9 0
4.
U
1
1
8
ur dr
8 0,
1
5 5.
5
5.
3 1,
)
R
0
5.
c
at
0
E 1 -
0 9
c a
2
a
2 M
V : et o
S N ) 8
3 2
0
9
0
1
1
0(
6
8
5
7
1
1
3.
3. 0
6
)
0
1
9
9
2
0
9
0
7
7
0(
5
7
4
6
2
2
.2 6
0 e
0
7 .3
t
3
0
3
0
3
3
k c u B
5
) 4
0 0(
3
2.
2
2 2
4
2
3
3
0
7
7
1
4
3
2
5
3
5
1
1
2,
2. 0
7
6 R
2
) 8
0
0I
1
2
0
8
0(
5
1
1
8
6
9
0
0
2
6
6
0
0(
4
6
5
4
1
1
5
)
5
8
6
6
0
0
2
6
3
3
0(
3
5
4
3
1
1
1. 5
5
8
6
5
6 1.
8
8
0 0
K
5
6 6
2.
0
4
2
2.
7
5
8
7
5
)
5
0
8
0
2
8
0
5
5
*
U
8
0 2.
0
R
9
5 2.
E 3 -
5
6
8
8
S 7 ) 4
0
3
7
1
2
4
4
2
1. 0
8
0( ) 0 0(
2
0
0 1. 0
9
yt d a
3
i e c o a
p
5.
5. 4
4
8
1
8
9 1
1
8
8
2
0
0
2
6
6
3
2
1
4
4
2
1
1
9
1.
l
5
R
1
M
1 0,
1.
t n e m p i u q E
3 3
1
3
9 R
8
0
0
9
4
6
5
m(
) A
B C
D
E
F G
H
I
d
d
C
-89Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
DIMENSION OF LUG SECTION
SECTION BB BOSS I 2418P26830(75UR) 2418P26832(130UR)
PLATE
BOSS II 2418P27140(75UR) YY61B01005P1(130UR)
SECTION AA
PLATE
X
Shim(t=1.0) SHIM (t=1.0)
ITEM
DETAIL X
Pin hole Lug plate Bush thickness length dia
Unit : mm
Hole dia.
Spring pin dia.
Boss outer dia.
Screw dia.
Boss width
Boss outer dia.
Boss width
Screw hole P.C.D
E
F
G
H
J
M
N
MODEL
A
B
C
D
SK75UR-3E
50
19
53
65
8
110
M12
19
110
28
91
SK130UR-1E
65
22
64
80
10
146
M14
22
138
36
115
-90Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E SK130UR-1E .
DIMENSION OF BOSS X
H
G
5 I
A
C
B
D
15 DETAIL X E F
Unit : mm ITEM
A
B
C
D
E
F
G
H
I
SK75UR-3E
82.6
54
75.5±0.2
80.5
23 (19)
38 (34)
13
10
2.5
SK130UR-1E
101.6
69
94.5±0.2
99.5
19 (15)
34 (30)
15
13
2.5
MODEL
Note : Values in ( ) show the dimension for boss II.
-91Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
DIMENSION OF DOZER SK75UR-3E
SK130UR-1E
E
E G A
d1
d2
G
D
D G
d2
E
E d2
d1
d1
F F B
B C
C
UNIT : mm CODE
MODEL
ITEM
A B C D E
Blade width Blade height Distance from dozer attaching pin center to cutting edge end Inner width of dozer attaching bracket Width of dozer attaching bracket Distance from dozer attaching pin center to attaching pin on F dozer cylinder head side G Attaching bracket inner width on dozer cylinder head side d1 Dozer attaching pin dia. d2 Attaching pin dia. on dozer cylinder head side
SK75UR -3E
SK130UR -1E
2,320 470 R1,375 653 60
2,490 590 R1,633 672 128
R933
R881
82 50 70
92 60 60
-92Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
14. MAINTENANCE STANDARD 14-1 CLEARANCE OF PIN AND BUSHING SK75UR-3E . SK130UR-1E (L) Off-set cylinder rod side pin
(M) Off-set cylinder head side pin
(J) Front boom attaching pin
(I) Upper boom attaching pin
(N) Boom cylinder rod side pin
(K) Boom foot pin
(J) Front boom attaching pin
(G) Arm cylinder attaching pin (I) Upper boom attaching pin (H) Upper boom top pin
(O) Boom cylinder head side pin
(F) Arm cylinder rod side pin (E) Bucket cylinder head side pin
(B) Bucket drive pin
(C) Idler link pin (A) Arm point pin
(D, *D) Bucket cylinder rod side pin
(Q) Dozer cylinder rod side pin
(P) Dozer cylinder head side pin
(R) Dozer foot pin DOZER BLADE
-93Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
CLEARANCE OF PIN AND BUSHING SK75UR-3E
Unit : mm Standard value
Symbol
Item
A
Arm point
B
Bucket link (Bucket link connection)
C
Idler link (Arm connection)
Pin dia.
Pin dia. Bushing i.d. Standard Repairable Service Remedy tolerance tolerance value level limit
+0.11 +0.21
-0.06 -0.09 +0.12 +0.05
+0.11 +0.24
50 D *D
Bucket cylinder (Rod side) Bucket link (Idler link connection)
-0.06 -0.12
E
Bucket cylinder (Head side)
F
Arm cylinder (Rod side)
65
G
Arm cylinder (Head side)
70
H
Arm foot
60
I
Upper boom 55
J
Front boom
K
Rear boom
L
Off-set cylinder (Rod side)
-0.06 -0.09
60
55 M
Off-set cylinder (Head side)
N
Boom cylinder (Rod side)
O
Boom cylinder (Head side)
P
Dozer foot
Q
Dozer cylinder (Head side)
-0.06 -0.12 75
R
Dozer cylinder (Rod side)
Clearance
+0.25 +0.05 +0.20 +0.00
+0.11 +0.37 +0.06 +0.32
+0.25 +0.05
+0.11 +0.37
+0.20 +0.08
+0.14 +0.29
+0.12 +0.06
+0.12 +0.21
+1.00 +0.03
+0.09 +0.19
+0.25 +0.05
+0.11 +0.37
+0.06 +0.32 +0.12 +0.28 +0.11 +0.37
50
-0.06 -0.09
+0.20 +0.00 +0.19 +0.06
70
-0.06 -0.12
+0.25 +0.05
More than 1.2
2.0
Replace bushing or pin
-94Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
Unit : mm Standard value
Symbol A
Item Arm point
B
Bucket link (Bucket link connection)
C
Idler link (Arm connection)
D
Bucket cylinder (Rod side)
* D
Pin dia.
Bucket link (Idler link connection)
E
Bucket cylinder (Head side)
F
Arm cylinder (Rod side)
65
60
G
Arm cylinder (Head side)
H
Arm foot
I
Upper boom
J
Front boom
K
Rear boom
L
Off-set cylinder (Rod side)
M
Off-set cylinder (Head side)
N
Boom cylinder (Rod side)
Pin dia. Bushing i.d. Standard Repairable Service Remedy tolerance tolerance value level limit
-0.020 -0.060
0 -0.060
+0.233 +0.176 +0.236 +0.179 +0.252 +0.196 +0.243 +0.189 +0.180 +0.100
75
+0.030 -
70
70
+0.256 +0.069
+0.231 +0.160
+0.261 +0.130
0 -0.030
+0.230 +0.164
+0.260 +0.164
0 -0.060
+0.233 +0.164
+0.293 +0.164
+0.030 -
+0.180 +0.100
+0.210 +0.070 +0.247 +0.082 +0.255 +0.068 +0.440 +0.280 +0.320 +0.060
O
Boom cylinder (Head side)
+0.030 -
P
Dozer foot
-0.150 -0.210
Q
Dozer cylinder (Head side)
R
Dozer cylinder (Rod side)
-0.060 -0.120
+0.200 0
60
+0.313 +0.196 +0.316 +0.199 +0.312 +0.196 +0.303 +0.189 +0.240 +0.100 +0.210 +0.070
+0.226 +0.099
+0.187 +0.082 +0.225 +0.098 +0.230 +0.130
80
Clearance
0 -0.060
More than 1.2
2.0
-95Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Replace bushing or pin
14-2 CLEARANCE IN THRUST DIRECITON SK75UR-3E Unit : mm
A B C D D' E F G H I J K L M N O P Q R
Standard Repairable value level
Item
Basic size
Arm Bucket Link side Bucket link Bucket Arm Idler link (Arm connection) Link side Rod side Bucket link (Idler link connection) Link side Rod side Bucket link (Rod side) Bucket link Head side Bucket cylinder Arm (Head side) Rod side Arm cylinder Arm (Rod side) Head side Arm cylinder Bracket (Head side) Arm Arm foot Boom Front Boom Front boom (Front side) Bracket Front Boom Front boom Rear Boom (Rear side) Rear Boom Boom foot Upper frame Rod side Off-set cylinder Front Boom (LH) (Rod side) Head side Off-set cylinder (Head side) Front boom (RH) Rod side Boom cylinder (Rod side) Rear Boom Head side Boom cylinder Upper frame (Head side) Dozer Dozer foot Lower frame Head side Dozer cylinder (Head side) Dozer Rod side Dozer cylinder Lower frame (Rod side)
180 182
0.1~1.0
-
0.6 or less
Section
Arm point
182 180
-
85
0.5 or less
1.2 or more
Service limit
Remedy
2.0
--------1.0 or more 2.0
0.6~1.0
1.2 or more
0.6~2.0
2.0 or more
0.6~1.0
1.2 or more
-
85 90 95 102 268 273 210 215 303 304 353 354 360 365 95 100 95 100 95 100 95 100 60 63 80 82 80 82
2.5
1.0 or more 2.0 0.5 or less
Shim adjustment
1.2 or more
0.6~2.0
2.0 or more
2.5
0.6~1.0
1.2 or more
2.0
0.6~2.0
2.0 or more
2.5
0.6~1.0
1.2 or more
2.0
1.0~2.0
2.0 or more
3.0
Note : When the clearance exceed upper limit of standard value,adjust it with shim.
-96Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E Item
Basic size
Arm Bucket link side Bucket link Bucket Arm Idler link (Arm connection) Link side Rod side Bucket link (Idler link connection ) Link side Rod side Bucket link Bucket link (Rod side) Head side Bucket cylinder Arm (Head side) Rod side Arm cylinder Arm (Rod side) Head side Arm cylinder Bracket (Head side) Arm Arm foot Boom Front Boom Front boom (Front side) Bracket Front Boom Front boom (Rear side) Rear Boom Rear Boom Boom foot Upper frame Rod side Off-set cylinder Front Boom (LH) (Rod side) Head side Off-set cylinder Front boom (RH) (Head side) Rod side Boom cylinder Rear Boom (Rod side) Head side Boom cylinder (Head side) Upper frame Dozer Dozer foot Lower frame Head side Dozer cylinder Dozer (Head side) Rod side Dozer cylinder Lower frame (Rod side)
250
Section
A B C D D' E F G H I J K L M N O P Q R
Arm point
-
252 210
Standard Repairable value level 0.6~1.0
1.2 or more
0.5 or less
1.0 or more
0.6~1.0
1.2 or more
0.6~2.0
2.0 or more
0.6~1.0
1.2 or more
0.5 or less
1.0 or more
Service limit
Remedy
2.0
-
244 90 98 90 100 100 106 300 305 226 232 335 336 464 465 574 581 100 108 100 108 80 400 90 94 128 150 90 92 90 92
2.5
2.0 1.2 or less 1.2 or more 0.5 or less 0.6~2.0 or less
2.0 or more
2.5
0.6~1.0 or less
1.2 or more
2.0
0.6~2.0 or less
2.0 or more
2.5
0.6~1.0 or less
1.2 or more
2.0
1.0~2.0
2.0 or more
3.0
Note : When the clearance exceed upper limit of standard value,adjust it with shim.
-97Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Shim adjustment
14-3 TYPE AND DIMENSION OF PIN SK75UR-3E . SK130UR-1E (O) Off-set cylinder rod side pin
(E) Upper boom attaching pin
(N) Off-set cylinder head side pin
(D) Front boom attaching pin (C) Boom cylinder rod side pin
(A) Boom foot pin
(D) Front boom attaching pin
(F) Arm cylinder attaching pin (E) Upper boom attaching pin (G) Upper boom top pin
(B) Boom cylinder head side pin
(H) Arm cylinder rod side pin (I) Bucket cylinder head side pin
(M) Bucket drive pin
(J) Idler link pin (K) Arm point pin
(L) Bucket cylinder rod side pin
(Q) Dozer cylinder rod side pin
(R) Dozer cylinder head side pin
(P) Dozer foot pin DOZER BLADE
-98Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E TYPE OF PIN 1
2
L1 L2
L2 2
2
1
D
D
32
L1
3
1
D
4
D
L1
L1 L2
1
D 1
D
5
6
L2 1
D
1
D
L2 L1
L1
7
8
2
1
D
L1 L2
13
L1 L2
13
D 1
D
L2 L1 9
(SK75UR -3E )9 (SK130UR -1E )10
10
L2 1
1 2
D
D D
L1
-99Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E . SK130UR-1E 11
12
L1
L1
L2
1
L2
1
2
D D
2
D D
13
14
L1 1
2
L2
D
D
1
2
D D
L1
15
L1 L2 1
2
D D
-100Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E . SK130UR-1E DIMENSIONS OF PIN Unit : mm Model
SK75UR-3E
SK130UR-1E
Type of pin
L1
L2
D1
D2
Type of pin
L1
L2
D1
D2
A Boom foot pin
1
481
466
60
59
2
775
716
70
73
B Boom cylinder head pin
3
180
-
75
-
3
180
-
80
-
C Boom cylinder rod pin
4
233
216
75
-
5
631
597
80
-
D Front boom attaching pin
4
483
466
55
-
4
616
599
70
-
E Upper boom attaching pin
6
404
387
55
-
6
424
407
70
-
F Arm cylinder attaching pin
7
123.5
109
85
70
13
124
-
90
75
G upper boom top pin
3
328
-
60
-
3
315
-
70
-
H Arm cylinder rod pin
4
206
192
65
-
3
210
-
75
-
I
Bucket cylinder head pin
4
185
168
50
-
4
214
197
60
-
J
Idler link pin
8
263
246
50
-
14
368
328
60
57
9
371
303
50
48
9
470
391
65
62
10
263
246
50
-
15
368
328
60
57
M Bucket drive pin
9
371
303
50
48
9
470
391
65
62
N Off-set cylinder head pin
3
163
-
55
-
3
185
-
70
-
O Off-set cylinder rod pin
3
163
-
55
-
3
185
-
70
-
P Dozer pin
11
132
118
50
48
9
235
218
60
-
Q Dozer cylinder rod pin
12
181
167
70
68
4
197
180
60
-
R Dozer cylinder head pin
12
181
167
70
68
4
197
180
60
-
Type
Name
K Arm point pin L
Bucket cylinder rod pin
-101Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
14-4 TYPE AND DIMENSION OF BUSHING SK75UR-3E . SK130UR-1E
(C) Front boom right side
(B) Front boom left side
(A) Boom foot
(D) Arm foot
(H) Bucket drive (E) Idler link (F) Arm point (I) Bucket lug
(G) Bucket link (cylinder rod side)
(J) Dozer foot DOZER BLADE
-102Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E TYPE OF BUSHING 1
2
1
2
D D
1
2
1
2
D D
L1
L1
3
4
1
2
D D
D D
L1
L1 5
6
1
2
D D
1
2
1
2
D D
L1
L1
7
8
1
2
D D
D D
L2 L1
L1
9
1
2
D D
L2 L1 -103Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E DIMENSIONS OF BUSHING Unit : mm Model
SK75UR-3E
SK130UR-1E
Type of bushing
L1
L2
D1
D2
Type of bushing
L1
L2
D1
D2
A Boom foot
1
65
-
60
75
2
85
-
70
85
B Front boom left side
3
55
-
55
65
3
80
-
70
85
C Front boom right side
3
55
-
55
65
3
80
-
70
85
D Arm foot
4
55
-
60
75
5
70
-
70
85
E Idler link
6
50
-
50
60
6
66
-
60
75
F Arm top
7
57
48
50
65
7
75
66
65
80
8
36
-
50
60
8
63
-
60
75
H Bucket drive
3
47
39
50
65
5
61
-
65
80
I
Bucket lug
9
53
43
50
65
9
64
49
65
80
J
Dozer foot
3
51
-
50
65
6
56
-
60
75
Type
Name
G
Bucket link (cylinder rod side)
-104Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
14-5 UNDERCARRIAGE SK75UR-3E . SK130UR-1E
RUBBER CLAWLER MAINTENANCE STANDARDS
Place M mark or machine center
mark at
Core
Rubber cover
Seam joint mark M
H h B
Center line of steel cord
SECTION B-B B
A: Distance between the bottom of frame and top of rubber crawler
Lower roller Crawler frame
A
A RUBBER SHOE
IRON SHOE Unit : mm Model
Item
Sag of rubber clawer A
Cracks and cuts on rubber crawler
Breakage of steel cords
Contact surface of rubber crawler and lower roller
Height H / Lug projection h
SK75UR-3E
SK130UR-1E
140~150
165~170
200~230
270~300
-
-
Rubber shoe Standard Iron values shoe Repairable level Service limit Standard values
None
Repairable level
Where the depth of them does not reach to the steel cords.
Service limit
Where the depth of them reachs to the steel cords.
Standard values Repairable level Service limit Standard values
None None Exist None
Repairable level
Where 10 percent of core is visible from outside.
Service limit
Where a half of core is visible from outside.
Standard values Repairable level Service limit
Adjustment
Replace
Replace
Replace
102 {30}
134.5 {43}
-
-
75 {5 }
Remedy
100 {10}
-105Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Replace
SK75UR-3E . SK130UR-1E FRONT IDLER D C
G F
A B
E
Unit : mm Model Item A
B
Dia. of idler projection Tread dia.
C
Flange width
D
Tread width
Standard values Repairable level Service limit Standard values Repairable level Service limit Standard values Repairable level Service limit Standard values Repairable level Service limit Basic dimension
Shaft E
F
Clearance between shaft and bushing
Interference between idler and bushing
G
Plug
-
Oil
Idler rotation
Tolerance
Hole
SK75UR-3E
SK130UR-1E
446 440 438 400 394 392 43 38 36 104
510 504 502 456 450 448 58 52 50 125
---
---
50 -0.050 -0.075
60 -0.030 -0.060
--
--
Remedy
Repair by build-up welding or replace
Replace shaft or bushing
Repairable level Clearance 1.5 Service limit Clearance 2.0 57 64 Basic dimension +0.19 +0.19 Shaft +0.09 +0.14 Tolerance +0.030 +0.030 Hole -0.020 0 Repairable level Interference 0 Service limit Clearance 0.01 Size PT1/8 Engine Oil API 150~160cc 200cc grade CD #30 Rotates smoothly by hand.
Replace shaft or bushing
Replenish Reassemble
-106Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E
SPROCKET B
D
F F
G
A C
E
Unit : mm Code
Model Item Standard
A
O.D. sprocket
Repairable level
Service limit Standard
B
C D E F G
Width of sprocket Repairable level teeth Service limit Standard I.D. sprocket Repairable level bottom Service limit Pitch n o Number of teeth c i i s s n P.C.D. a e B m i d
Tooth profile
SK75UR -3E
SK130UR -1E
540 +30 534 532 38 +0.5 -2.5 32 30 487 481 479 155.6+1 21 527.9 4 R20.64
601+3 590 588 49 -30.5 44 42 532 521 519 171.07+1 21 580.38 3.5 R24+0.5 -
Remedy Reinforcement weld, repair or replace Replace Reinforcement weld, repair or replace
-107Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E UPPER ROLLER
B
G
A
D
E
C
F
Unit : mm Model Item A
B
C
Tread dia
Tread width
Clearance between shaft and bushing
Standard values Repairable level Service limit Standard values Repairable level Service limit Basic dimenson
Shaft Tolerance
Hole Repairable level Service limit Basic dimenson
D
Interference between roller and bushing
Shaft Tolerance
Hole Repairable level Service limit Basic dimension
E
Interference between roller and cover
Shaft Tolerance
Hole Repairable level Service limit Basic dimension
F
G
Interference between collar and shaft
Hole
SK130UR-1E
82 73 70 102 95 92 32 -0.025 -0.050
100 92 88 130
-
-
Clearance 0.7 Clearance 1.0 36 +0.025 0 0 -0.03 Interference 0 Clearance 0.01 50 -0.01 -0.029 +0.030 0 1.0
-
34 +0.08 +0.06 +0.025 0 1.0
Repairable level Service limit Size PT1/8 Engine oil API 20cc grade CD #30 Rotates smoothly by hand.
-
Plug Oil
-
Shaft Tolerance
SK75UR-3E
Roller rotation
Remedy
Replace roller
-
38 Replace shaft or bushing
42
+0.025 0
Replace roller or bushing
60
+0.030 0
Replace roller or cover
-
40 Replace roller or shaft
-
PT1/4 Replenish Reassembly
-108Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E LOWER ROLLER C
C
F
A
B
E
D
Unit : mm Model Item A
B
O.D. of flange
Tread dia
C
Flange width
D
Clearance between shaft and bushing
Standard values Repairable level Service limit Standard values Repairable level Service limit Standard values Repairable level Service limit Basic dimension
Shaft Tolera nce
Hole
Repairable level Service limit Basic dimension
Shaft
Interference between roller and bushing
Tolera nce
F
Plug
-
Oil
Repairable level Service limit Size Engine oil API grade CD #30
E
Roller rotation
Hole
SK130UR -1E
SK75UR -3E 147
Iron 170
Rubber 185
-
-
-
120 110 106 17.5 12 10 40 -0.060 -0.090
140 130 126
Remedy
Reinforcement weld, repair or replace
22 18 16 50
Replace bushing
-
-
Clearance 0.7 Clearance 1.0 44 +0.15 +0.10 +0.025 -0.020 Interference 0 Clearance 0.01 PT 1/4
Clearance 1.0 Clearance 1.5 57 +0.19 +0.09 +0.03 0
90cc
150cc
Rotates smoothly by hand.
Replace bushing
Replenish Reassembly
-109Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E IDLER ADJUSTER ASSY
E
A, B, (C)
F
D
Unit : mm Model Item A Installed length of spring mm B Free length of spring mm C Stroke D Set length
Rubber
Iron
E Outer circumference of piston F
Tightening torque of grease nipple N.m {kgf .m}
SK75UR-3E
SK130UR-1E
Remedy
270 About 320 35 495 495
354.8 About 423 40 686 686
Adjust
Replace piston and seal, if grease leaks
Nor scoring and rusting 59 {6}
59 {6}
Tighten it to specified torque
-110Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E . SK130UR-1E TRACK LINK ASSY E
F
B
D
G
57
A C H K Model
Item A
Link pitch
B
O.D.of bushing
C
Height of link
D
E
Standard values Repairable level Service limit Standard values Repairable level Service limit Standard values Repairable level Service limit Basic dimenson
Shaft Interference Tolerance between Hole bushing and link Repairable level Service limit Basic dimension Interference between track pin and link
Shaft Tolerance
Hole Repairable level Service limit Basic dimension
F
G
H K
Shaft Interference Tolerance between master Hole pin and link Repairable level Service limit Clearance between links (both sides)
Standard values
Repairable level Service limit Standard values Shoe plate Repairable level thickness Service limit Tightening torque of shoe bolt
Unit : mm
SK75UR-3E
SK130UR-1E
155.6 + 0.1 160 164 41 +0.214 +0.174 37 36 75 + 0.15 69 67 41 +0.214 +0.174
171.07 + 0.1 175 179 47 +0.29 +0.24 43 42 90 84 82 47 +0.29 +0.24 +0.074 0
-
Remedy
-
-
41.19 + 0.1
-
Interference 0.05 Interference 0 24 +0.15 0
30 +0.14 +0.11
-
-
Interference 0.05 Interference 0 24 -0.05 -0.08
30 +0.01 -0.02
-
-
Replace the link assy if the service limit is exceeded.
Replace
Replace Interference 0.05 Interference 0 (Both sides) 1.6 (Both sides) 8 (Both sides) 10 26 15 13 . 294N m {30kgf .m}
(Both sides) 1.2 Replace 28 17 15 . 402 + 40N m {41 + 4kgf .m}
-
-
Replace Retighten
-111Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
15. WORKING RANGE SK75UR-3E BACKHOE ATTACHMENT 1.76m Arm
Attachment Type
Item A A' B C D E F G H J K L
Maximum digging reach Maximum reach at ground level
Maximum digging depth Maximum digging height Maximum dumping clearance Minimum dumping clearance Vertical digging depth Minimum swing redius Height at minimum swing Digging depth for 2.4m (8') level bottom Horizontal digging stroke at ground level
Stroke Minimum
At neutral 1.76m Arm +0.28m3 Bucket 6,420 6,280 4,170 7,500 5,430 2,490 3,250 1,160 5,680 3,780 3,020 1,690
At off-set right (Max. 1,330mm) 1.76m Arm +0.28m3 Bucket 5,750 5,600 3,480 6,880 4,820 1,880 2,610 2,050 5,040 3,080 3,070 970
Unit : mm At off-set left (Max. 1,045mm) 1.76m Arm +0.28m3 Bucket 6,060 5,920 3,790 7,160 5,100 2,160 2,900 1,540 5,320 3,400 3,050 1,300
NOTE : Bucket capacities are indicated in heaped capacity.
-112Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK75UR-3E BACKHOE ATTACHMENT 2.06m Arm
Attachment Type
Item A A' B C D E F G H J K L
Maximum digging reach Maximum reach at ground level
Maximum digging depth Maximum digging height Maximum dumping clearance Minimum dumping clearance Vertical digging depth Minimum swing redius Height at minimum swing Digging depth for 2.4m (8') level bottom Horizontal digging stroke at ground level
Stroke Minimum
At neutral 2.06m Arm + 0.22m3 Bucket 6,710 6,570 4,470 7,720 5,650 2,210 3,540 1,240 5,680 4,140 3,540 1,450
At off-set right (Max. 1,330mm) 2.06m Arm + 0.22m3 Bucket 6,010 5,860 3,780 7,100 5,030 1,590 2,900 2,050 5,040 3,450 3,590 710
Unit : mm At off-set left (Max. 1,045mm) 2.06m Arm + 0.22m3 Bucket 6,330 6,190 4,090 7,380 5,310 1,870 3,190 1,540 5,320 3,770 3,570 1,050
NOTE : Bucket capacities are indicated in heaped capacity.
-113Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E BACKHOE ATTACHMENT 2.2m Arm
Attachment Type
Item A A' B C D E F G H J K L
Maximum digging reach Maximum reach at ground level
Maximum digging depth Maximum digging height Maximum dumping clearance Minimum dumping clearance Vertical digging depth Minimum swing redius Height at minimum swing Digging depth for 2.4m (8') level bottom Horizontal digging stroke at ground level
Stroke Minimum
At neutral 2.2m Arm +0.45m3 Bucket 7,570 7,420 4,840 8,480 6,050 2,480 3,530 1,370 6,460 4,500 3,740 1,860
At off-set right (Max. 1,180mm) 2.2m Arm +0.45m3 Bucket 7,140 6,980 4,430 8,090 5,660 2,090 3,170 2,000 6,060 4,090 3,750 1,420
Unit : mm At off-set left (Max. 1,165mm) 2.2m Arm +0.45m3 Bucket 7,150 6,990 4,440 8,100 5,670 2,100 3,180 1,720 6,080 4,110 3,750 1,430
NOTE : Bucket capacities are indicated in heaped capacity.
-114Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
16. LIFTING CAPACITIES SK75UR-3E (1) Condition of Calculation 1) The lifting load shows the lower value either 87% of hydraulic lifting capacity or 75% of tipping load. 2) The load point is on the bucket supporting point,and the bucket position is a closed position. 3) The values in the upper rows show the lifting capacity of a machine facing sideways,and values in the lower rows show a machine facing longitudinally. 4) Unit:ton, Crawler : 450 mm (17.7in), iron crawler 5) Set hydraulic pressure : 300 kgf/cm2 (4,260 psi)
(2) Reference No. list of lifting diagram Unit : ton Arm Bucket No.
1.76m Arm 0.28m3 Bucket (1)
2.06m Arm 0.22m3 Bucket (2)
Note : With bucket and dozer blade up position
1
Unitton
2
-115Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Unitton
SK130UR-1E (1) Condition of Calculation 1) The lifting load shows the lower value either 87% of hydraulic lifting capacity or 75% of tipping load. 2) The load point is on the bucket supporting point, and the bucket position is a closed position. 3) The values in the upper rows show the lifting capacity of a machine facing sideways, and values in the lower rows show a machine facing longitudinally. 4) Unit : ton, Crawler : 500 mm (19.7in), iron crawler 2.2m Arm 0.45m3 Bucket (heaped capacity) 5) Set hydraulic pressure : 350 kgf/cm2 (4,970 psi)
(2) Reference No. list of liffting diagram No. Dozer blade position (1)
(1) Blade up at front
(2) Blade up at rear
Unit : ton
(2)
Unit : ton
-116Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
17. TOOLS & JIGS UPPER FRAME LIFTING JIG SK75UR-3E
Q'ty : 2 sets Material : Mild steel, POK400(SS41)
-117Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SK130UR-1E
22 drill through
SECTION A A Q'ty : 2 sets Material : Mild steel, POK400(SS41)
-118Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
COUNTERWEIGHT LIFTING JIGS SK75UR-3E
Bracket for left side
Bracket for right side
Material: Mild steel POK400(SS41)
SK130UR-1E
Commercial eye bolts For standard weight
For add-on weight
M36
M24 -119-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
ENGINE MOUNTING PEDESTAL SK75UR-3E
Note : Hold the oil pan section of engine. 547 505
21
21 0 3 1
0 0 3
240
2 65
1 2
8 R 1 5
0 8 2
0 8 2 0 4 1
1 2
250
240
200
265
325
0 0 3 0 3 1
21
505 547
21
Material: Plywood or wooden plate
SK130UR-1E
Note : Hold the oil pan section of engine.
Material: Plywood or wooden plate -120Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK75UR-3E . SK130UR-1E TRACK SPRING SET JIG
M30
RETAINER NUT
RETAINER PLATE
STAND
HYDRAULIC JACK
BASE
-121Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
TOOL FOR REMOVING BOOM FOOT PIN SK75UR-3E
2
1 Slide hammer for removing boom foot pin
TOOLS ASSY YR01T00006F1 NO.
TOOLS NAME
TOOLS No.
SHAPE
ROD
YR02B01285P1
APPLICABLE
A 80 M16
e A l o s t h r 5 a 3 p r o f
1
Preheat 300 to 350˚C 4
(50)
4 6
10
16
1350 1416
4 - R 5
50
For removing boom foot pin
10 4
0 1 R 2
2 - C 8
2
HAMMER
For removing boom foot pin
YR02B01286P1 25 30
25 100
(30)
160
-122Copyright Copyright © 2015 Kobelco Kobelco Construction Machinery Co.,Ltd. Co.,Ltd. All rights reserved. [S7Y [ S7YO00 O00207Z 207ZE01] E01] [0604CsCshWbYs] shWbYs]
SK130UR-1E
2
1 Slide hammer for removing boom foot pin
TOOLS ASSY YX01T00002F1 NO.
TOOLS NAME
TOOLS No.
SHAPE
ROD
YX01T01002P1
APPLICABLE
A 80 M24
e A l o s t h r 5 a 3 p r o f
1
Preheat 300 to 350 4
100
4 6
14
16
1350 1416
4 - R 5
50
For removing boom foot pin
10 4
0 1 R 2
2 - C 8
2
HAMMER
For removing boom foot pin
YR02B01286P1 25 30
25 100
(30)
160
-123Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
TOOL FOR REMOVING TRUNNION CYLINDER MOUNTING PIN SK75UR-3E . SK130UR-1E
ARM CYLINDER
SPANNER
1
3
2
Tool for trunnion cylinder pin
TOOLS ASSY YR01T00005F1 NO.
TOOLS NAME
Unit : mm
TOOLS No.
SHAPE
APPLICABLE
116 16 26 drill through 1
GUIDE
2 . 4
40 For trunnion pin
YR02B01283P1 0 4
2 - R 5
200 145
30 25 2
SCREW
8 0 . R For trunnion pin
YR02B01284P1 8 0 . R
M24 X 3.0
M16 X 3.0 M24
3
NUT M24
ZN18C24019
For trunnion pin
Commercial parts
B
B=36
-124Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SPECIAL SPANNER FOR TUBE
Applicable tube diameter mm
Part No.
Hex mm
Drawing of a special spanner mm (in) 70 (2.76)
15
2421T160
16 (0.630)
27
HEX27 8 (0.315)
PART-No. 40 (1.57)
22 (0.866)
+0.3
+0.012
12.7-0.1 (0.500-0.004 )
70 (2.76)
18
2421T138
19 (0.748)
32
HEX32 22 (0.866)
PART-No.
42 (1.65)
22 (0.866)
+0.3
+0.012
12.7-0.1 (0.500-0.004 )
70 (2.76)
22
2421T129
19 (0.748)
30
HEX30 22 (0.866)
PART-No.
40 (1.57)
22 (0.866)
+0.3
+0.012
12.7-0.1 (0.500-0.004 )
70 (2.76)
22
2421T130
23 (0.906)
36
HEX36 11.5 (0.453)
PART-No.
48 (1.89)
22 (0.866)
+0.3
+0.012
12.7-0.1 (0.500-0.004 )
109 (4.29)
28
2421T115
29 (1.14)
41
HEX41 14.5 (0.571)
PART-No.
60 (2.36)
22 (0.866)
+0.3
+0.012
12.7-0.1 (0.500-0.004 )
109 (4.29)
28
2421T231
31 (1.22)
46
PART-No.
HEX46
35 (1.38)
+0.3
80 (3.15)
+0.012
19.5-0.1 (0.768-0.004 )
109 (4.29)
32
2421T232
33 (1.30)
50
PART-No.
HEX50
22 (0.866)
+0.3
80 (3.15)
+0.012
19.5-0.1 (0.768-0.004 )
-125-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
SPECIAL TOOLS
No.
Tools name
Tools No.
1
Allen wrench Nominal 10
ZT22A10000
Shape
Applicable
Pump suction
Commercial tool length (L1) - cut length = Required length 40 (1.57") 10 (0.39") = 30 (1.18")
-
2
Allen wrench Nominal 14
Pump install
ZT22A14000
Commercial tool length (L1) - cut length = Required length 56 (2.20") 11 (0.43") = 45 (1.77")
-
Cut
3
Spanner Nominal 32
Swing motor A,B port
ZT12A32000
Commercial tool length (L1) - cut length = Required length 73 (2.87") 13 (0.51") = 65 (2.56")
-
Additional M10 X 22 threading for M10 Eye bolt 4
Plug PF3/4
For slidng the swing motor
ZE72X12000
PF3/4
O ring
M10 Eye bolt
5
Eye bolt M10 X 18
For slidng the swing motor & Flare hose
ZS91C01000 or commercial equivalent M10
-126-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
No.
Tools name
Tools No.
Shape
Applicable
M8 Eye bolt
6
Plug Nominal tube dia. 22 Reference Eye bolt Nut
ZF83P22000 Reference nut ZS91C00800 ZF93N22000
Flare hose
M8 X 18 Additional threading for M8 Eye M8 Eye bolt
7
Plug Nominal 1-14UNS
YN01H01001P1
M8 X 18 Additional threading Flare hose
ZS91C00800
Eye bolt
M8 Eye bolt
8
9
Plug Nominal 1 3/16-12UN
YN01H01002P1
Eye bolt
ZS91C00800
Eye bolt M8 X 15
M8 X 18 Additional threading Flare hose
For slidng the swing motor & Flare hose
ZS91C00800 or commercial equivalent M8
10
Plug PF1/2
Additional M8 X 20 threading for M8 Eye bolt
ZE72X08000
PF1/2
For slidng the swivel joint
O ring
-127-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
18. SOME CONVERSION UNITS
Units of weight :
Units of pressure :
From
Into
Multiply by
kg
Ib
2.2
Lb
kg
From Kgf / cm
0.454
2
Into
Multiply by
meters
feet
3.28
mm
inches
inches
psi
Divide by
psi
14.223
Pa
9.807
Atm
0.06805
Bars
0.06895
Kgf / cm
MPa
(Mega Pascal)
25.4
2
0.0703
Pa
6894.76
psi
145.04
Into
Multiply by
Gal
0.264
(Pascal)
25.4
mm
Multiply by
(Pascal)
Units of length : From
Into
Units of volu me : Units of power : From
From Into
Multiply by
PS
kW
0.7355
kW
PS
1.360
(US liq) 3
in Liters
Units of flow : From
Into Lit / min Lit / sec
Gal / min
3
(US liq)
cm / min
61.02 3
yard
0.00131
quarts
1.0567
ounces
33.81
(US)
Multiply by
3
0.765
3
46656
3
27
m
3.79
in
0.0631 Yard
3785.4
3
ft
3
3
0.1337
ft / min
3
0.0353
Gal / min
0.264
Gal / sec
0.004403
ft / min
Lit / min
3
yard / min
0.001308
Into
Multiply by
Lbf-ft
0.738
kgf-m
0.1019716
Lbf-ft
0.737561
Lbf-in
8.85075
Kgf-m
0.1382552
N-m
1.35582
Lbf-in
12
cm
764554.9
liters
764.555
Units of torque : From
N-m
Lbf-ft
-128-
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S7YO00207ZE01] [0604CsCshWbYs]