SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal Marine Engineer & Naval Architect MATERIALS & MARINE STRUCTURES DEPARTMENT MANAGER R+D COTECMAR Km 9 Via Mamonal - Cartagena
[email protected] [email protected]
SHIP CONTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING OVERVIEW
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
KEY CONCEPTS • • • • • • •
Long history from the earliest beginnings of mankind Very traditional and conservative Slow introduction of change Basic approach is similar over the years Change from wood to iron to steel Change from oars to sail to steam with paddlewheel to propeller to diesel Factors impacting shipbuilding (compared to automobile and aircraft industry) Portability of the product - able to pick it up anywhere in the world Use in world trade - product travels all over the world Flags of convenience Foreign labor costs/conditions World trade growth National goals (policies) Relatively low labor skills required for both shipbuilding and ship operation Labor intensive with easily transferred shipbuilding skills and contribution to balance of payments makes it an attractive industry for developing countries Relatively low investment cost.
• •
Shipbuilding Industry made up of many segments Company Types: depends on where you are in supply chain
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING AROUND THE WORLD
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING AROUND THE WORLD Largest shipbuilding countries in world are Japan and Korea each at about 33% of world demand Europe comes in at a paltry 10% China growing fast at 2% per year. Currently about 9% To maintain its leading position Japan has been able to improve productivity at an average of 7% per year over the past 20 years. Korean productivity is lower at 5% per year but still impressive. U.S. shipbuilding struggles to improve at an annual rate of 2 ½%
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING AROUND THE WORLD
THE WORLD FLEET AS A WHOLE Ship Type Category Number Cargo Ships 40 000 Passenger Vessels 7 500 Naval Ships and Craft 26 500 Other Self-Propelled Vessels 42 000 Barges and Other Inshore 238 000 Vessels Total 354 000
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
THE WORLD FLEET OF NAVAL SHIPS AND CRAFT Ship Type Category Number Aircraft Carriers 30 Submarines 600 Large Surface Combatants 800 Small Surface Combatants 8150 Mine-Warfare Ships and Craft 1070 Amphibious-Warfare Ships and 5200 Craft Seagoing Auxiliaries 1700 Service and Other Craft 8900 Total 26 450
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
MARINE COMPANIES AND EMPLOYMENT Industry Sector
Companies/ Organizations Min. Max.
Employment (000s) Min. Max.
Ship Design
350
450
25
35
Shipbuilding
450
500
335
400
Manufacturing
800
1,000
500
800
Ship Operation
2000
3000
1750
2250
Navies
400
450
2500
2750
Ship Repair
500
600
100
120
4500
6000
5200
6355
Totals
Min/Max Range given due to uncertainty
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
MAJOR SHIPYARDS Region North America South America Western Europe Eastern Europe Asia World Total
Countrie s 1 1 6 1 4 13
Yards 3 1 9 1 25 39
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
MEDIUM-SIZED SHIPYARDS Region North America Western Europe Eastern Europe Asia World Total
Countrie s 1 8 4 5 18
Yards 6 23 7 40 76
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SMALL SHIPYARDS Region North America South America Western Europe Eastern Europe Africa Australasia Asia World Total
Countries
Yards
2 5 14 8 2 1 11 47
36 13 144 37 10 10 110 347
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
NUMBER OF SHIPS DELIVERED ANNUALLY Country
Number
Revenues (US $ Billions)
USA Germany Japan Korea China
5– 8 30 – 40 175 – 250 150 – 200 20 - 40
11 5 20 15 2
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
European Shipbuilding
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
GENERAL OBSERVATIONS • The shipyards are the few private shipyards that are still trying to compete in commercial shipbuilding. • Their productivity is still lower than Japan but is similar to Korea. • Some of the shipyards have a very long history (up to 300 years) whereas some are relatively new (50 years) • They have all been “modernized” but three of them were the reconstructed East German Shipbuilders and are the most modern. •Most shipyards receive some subcontracted structural blocks. However the Dutch carry it to the extreme of having hulls subcontracted which they complete.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Kvaerner Masa Turku Shipyard Findland
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Flensburgh Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Volkeswerft Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Volkeswerft Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aker MTW Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aker MTW Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aker MTW Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Kvaerner Warnow Shipyard Germany
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Asian Shipbuilding
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
GENERAL OBSERVATIONS •Japan became the world shipbuilding leader in 1960s. Taking about 30 years to accomplish it. •Japanese shipyards have production workers of 700 to 1,200, of which up to 50% could be in-house sub contractors. •Japanese shipyards deliver from 5 VLCCs to 21 Bulk Carriers per year. •Japanese shipyard annual steel throughput is from 120,000 to 200,000 tonnes. •Japanese shipyards, as a block, are the most automated.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Kawasaki Shipyard Japan
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
IHI Kure Shipyard Japan
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Oshima Shipyard Japan
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Sanoyas Shipyard Japan
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Samho Shipyard Korea – Hyundai Subsidiary
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Daewoo Shipyard Korea
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Samsung Shipyard Korea
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hanjin Busan Shipyard
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
GUANGZHOU Shipyard
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHANGHAI WAIGAOQIAO Shipyard
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Dalian New Shipyard
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hyundai Shipyard Korea The World’s Largest Shipyard
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hyundai Shipyard Korea The World’s Largest Shipyard
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
MARKETS, DEMAND AND SUPPLY IN SHIPBUILDING
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
KEY CONCEPTS: • Market Share of different types of ships • • • • • •
Large Medium Niche Changing value over time of different ship types per CGT World Shipbuilding capacity is 50% greater than demand Result is fierce competition and prices below construction cost This requires subsidies in some form or other from governments Korea has increased its shipbuilding capacity by 50% over 1994-96, whereas most other countries are constraining their ambitions China is increasing number and capacity of shipyards, and their capability in size and complexity of ships
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING MARKETS (Continued)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DEMAND AND SUPPLY • 40+ Million GT World shipbuilding annual capacity • Current annual shipbuilding demand 30+ Million GT
• Demand has peaked, capacity still increasing mainly in China but in Korea repair yards are being converted into new construction yards. • Competition is fierce and shipbuilding subsidies are required by most countries
• Profit levels are low <5%
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING MARKETS Markets Segments by Ship Type LARGE VOLUME Bulk Carriers General Cargo Tankers
INTERMEDIATE VOLUME Container Ships RO RO Ships Chemical Tankers Ferries Reefer Ships
NICHE VOLUME Passenger /Cruise Ships Car Carrier LPG Carrier Oil/Bulk/Ore LNG Carrier
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SUPPLY (Continued) • Hyundai, with 6 drydocks and 16,000 workers produces 60 to 70 ships per year. • Daewoo, with 3 drydocks and 8,000 workers produces 30 to 40 ships per year • Japanese shipyards focus assembly on 1 dry-dock and produce 6 to 8 ships per year. • General Dynamics with two shipyards and 14000 workers produce 4 ships per year. • Newport News Shipbuilding with 18,000 workers produce one aircraft carrier every 4 to 5 years plus a few submarines
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
FACTORS EFFECTING SHIPBUILDING MARKETS, DEMAND AND SUPPLY
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
FACTORS AFFECTING SHIPBUILDING MARKETS, DEMAND AND SUPPLY
• Freight rates and scrapping rates depend on surplus Tonnage. • Surplus tonnage for tankers is reducing and, of course, is impacted by the double hull requirement • Surplus for bulk carriers is at ten year higher.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DESIGN FOR PRODUCTION
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DESIGN AND PRODUCTION MUST WORK INTERACTIVELY cost
determined
Design
created
time
• concurrent • interactive
Production
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DFP PRINCIPLES There are two main principles for DFP for ships, namely 1) all design should strive for simplicity, and 2) all design should be the best suitable for a given shipyard facility. These can be further expanded as follows: Simplicity in Design •reduction in joint weld length, •minimum number of parts, •minimum number of parts to be formed, •part standardization, •reduction of part variability, •minimum fitting/fairing of erection joints, •elimination of need for highly accurate fitting, •integration of structure and outfit, •elimination of need for staging, and •consideration of access.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DFP PRINCIPLES (Continued) Matching to Shipyard Facilities •checking that blocks and machinery package units and outfitted blocks are within shipyard lifting capability, •assembly and block sizes fit panel line, workstations and door openings, •use maximum plate sizes and corresponding block breaks to minimize connecting joint weld length, and •maximize design for in-shop versus on-ship work.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DFP IN BASIC DESIGN HULL FORM USAGE
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
• Merchant Ship • Naval & Coast Guard Vessel • Recreational Vessel • Utility Tugs
• Research & Environmental Ship • Ferries
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DFP IN BASIC DESIGN HULL FORM BY SUPPORT TYPE
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
• Aerostatic Support - ACV (Air Cushion Vehicles) - SES (Captured Air Bubble) • Hydrodynamic Support - Hydrofoil - HYSWAS (HYdrodynamic Small Waterplane Area Ship) -Planning Hull • Hydrostatic Support - Conventional Ship - Catamaran - SWATH (Small Waterplane Area Twin Hull) - Deep Displacement • Submarine - Submarine - AUV/ROV
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aerostatic Support - Supported by cushion of air generated by a fan. - ACV (Air Cushion Vehicle) hull material : rubber propeller : placed on the deck amphibious operation - SES (Surface Effect Ship) side hull : rigid wall(steel or FRP) bow : skirt propulsion system : water jet propulsion, supercavitating propeller, not amphibious operation
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aerostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aerostatic Support
E
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Aerostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrodynamic Support Planning Hull
- supported by the hydrodynamic pressure developed under the hull at high speed - V or flat type shape - commonly used in pleasure boat, patrol boat, missile boat, racing boat
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrodynamic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrodynamic Support
Hydrofoil Ship - supported by a hydrofoil, like wing on an aircraft - fully submerged hydrofoil ship - surface piercing hydrofoil ship
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrodynamic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrodynamic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrodynamic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
• Displacement ship - conventional type of ship - carries high payload - low speed • SWATH - small waterplane area twin hull (SWATH) - low wave-making resistance - excellent roll stability - large open deck - disadvantage : deep draft and cost
• Catamaran/Trimaran - twin hull - other characteristics are similar to SWATH • Submarine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydrostatic Support
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DFP IN BASIC DESIGN HULL FORM DEVELOPMENT
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
The Design Spiral
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry • Since the ship is a 3-dimensional shape, data
in x, y and z directions is necessary to represent the ship hull. •Table of Offsets •Lines - body plan (front View) - shear plan (side view) - half breadth plan (top view)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry
Figure 2.2 - The Projection of Lines onto 3 Orthogonal Planes
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry Intersection of planes (waterlines) parallel to the baseline (keel).
Figure 2.3 - The Half-Breadth Plan
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry Intersection of planes (buttock lines) parallel to the centerline plane
Figure 2.4 - The Sheer Plan
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry Intersection of planes to define section line Sectional lines show the true shape of the hull form Forward sections from amidships : R.H.S. Aft sections from amid ship : L.H.S.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry SHIP SURFACE FAIRING
• • • • • •
Maximize parallel body Maximize flat of bottom and flat of side Use a straight line stem profile Use a flat vertical transom Make sure the forefoot shape has fair frame lines Select a bilge radius so that one plate width can handle bilge strake • Eliminate shape that forces decision to use castings in the stem and stern
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry EconoForm: Entirely flat or conical surfaces, patented in 1999
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry
Fishing vessel
Tug
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship Hull Form and Geometry
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
DESIGN/PRODUCTION INTERFACES
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Design/Production Interfaces • Implementation of the Build Strategy in order to: Prepare a design that takes into account agreed processes, facilities and equipment design out non-value work
ensure integration of steel and outfit work to give shortest delivery schedule increase STANDARDIZATION
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Design/Production Interfaces (Continued) • Definition of processes and standards to allow simple of effective planning systems to be used. • Development of Interim Product System
• Production simplification • Definition of optimum methods based on existing facilities and equipment to maximize flowline production
• Identification of facility and equipment changes that will improve productivity • Communication of change to technical and planning functions
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Design/Production Integration (Continued) These can be seen in the following current shipbuilding practices: Use of 3D product model as design/ production integrator, Product-oriented Work Breakdown Structures (PWBS), Intermediate product catalogs/databases, Development of Shipbuilding Policies, Use of Build Strategies, Preparation of engineering as workstation information packages, Use of Concurrent Engineering and associated teams to ensure design/production engineering, and The use of design build plans by the most recent design/planning
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Continued)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Continued)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Continued)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Continued)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Continued)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Engineering for Ship Production (Cont.)
Vosper Thornycroft BAE Marine Barrow BAE Marine Govan
BLOCK A
MEGA-BLOCK B + C
BLOCK D
BLOCK E
BLOCK F
UK MOD TYPE 45 SHIP GRAND BLOCK BREAKDOWN
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
UK MOD TYPE 45 SHIP BOW GRAND BLOCK
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
UK MOD TYPE 45 SHIP BOW GRAND BLOCK
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
UK MOD TYPE 45 BOW SECTION DESTROYER
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
UK MOD TYPE 45 MID BODY DESTROYER
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
COMPLETED UK TYPE 45 DESTROYER
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SPANISH FRIGATE BLOCK BREAKDOWN Spanish Built Norwegian Frigate Block Breakdown
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
NAVAL SHIP ON-BLOCK OUTFITTING
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
NAVAL SHIP ON-BLOCK OUTFITTING
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
B&V Construction inside a Covered Floating Drydock
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING PROCESS
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING PROCESSES
• The shipbuilding process consists of fabricating raw material into ship parts and assembling them, along with purchased equipment and components (interim products) to produce the finished product, namely the ship. • All shipyards have the same basic processes.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPBUILDING PROCESSES NON-CONSTRUCTION Administering Managing Marketing Designing Estimating Contracting Engineering Planning Ordering/Buying Managing Material Delivering Guaranteeing
CONTRUCTION Storing Handling Preparing Cutting Fabricating Welding Assembling Block Constructing Block Outfitting & Painting Block Erecting Zone Outfitting Launching Testing
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPYARD PROCESSES (Continued) • Processing Equipment Structure Blast & Prime Cut and Mark Plate Forming Shape Forming Panel Line Assembly Line Block Line Curved Block Assembly • Processing Equipment Pipe Cutting Flanging Bending
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Structural Plate Parts
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Pipe Pieces
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Structural Profiles
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hull Fitting Parts
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Slot Web Frame System
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Split Double Bottom Block Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Subassembly Pallets
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Block Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Grand Block Assembly
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Curved Block Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Large Block being Outfitted
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Block Assembly Jig
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Outfitted Block Being Erected in Building Dock
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Grand Block Being Outfitted
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Grand Block Assembly
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Grand Block Assembly
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Grand Block Assembly
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Modern Covered Inclined Building Berth
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Building Dock
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Elevator for Mega Block Movement to Building Dock
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
A Very Heavy Lift Movement (14000 t)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Subcontracted Blocks (Some Outfitted) delivered on Barge
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Subcontracted Blocks (Some Outfitted) delivered on Barge
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
ZONE OUTFITTING
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
ZONE CONSTRUCTION • Zone Construction is a management methodology based on organizing work by Zone rather than by System. • Zone Construction relies as much on who does the planning, scheduling and control, as the actual tools and techniques for organizing the work. • The intent of breaking the ship down into Zones is to reduce the management tasks in size by being “Productoriented” rather than System-oriented. • Zone construction may or may not use Advanced Outfitting.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
ZONE CONSTRUCTION (Continued) The benefits of Zone Outfitting are:
• Reduced Work Package size and scope, by focusing on Zones rather that the ship or large portions of it. • This results in a level that an individual is more capable of understanding and managing. • Forcing all departments to pay attention to the planning and interfaces in which they are involved. • Forcing Production to take an active role early in the product development. • Promoting the use of multi-skilled teams. • Engineering provides technical documentation that supports Zone Outfitting.
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
ADVANCED OUTFITTING
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
ADVANCED OUTFITTING • It is the fitting to ship structure, before and after it is erected on the building berth, of outfit items at a significantly earlier time in the building sequence than is traditional. • The organization of information and materials to a plan that applies labor and facilities to integrate ship’s structure and outfit materials at the earliest and most cost effective stage of the construction process. • Advanced Outfitting is normally divided into three types, namely: On Unit On Block On Board
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
ADVANCED OUTFITTING (Continued) GOALS • Minimize on board outfitting • Reduce outfitting time thus total building time • Simplify outfit planning • Avoid interference between trades • Improve material handling • Improved use of cranes • Improved quality, productivity and worker safety BENEFITS • Reduced/eliminated overhead work • Improved access, (workers and material) ventilation and lighting • Reduced/eliminated scaffolding • Reduced/eliminated on board services • Improved tool/equipment availability
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
On-block Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
On-block Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
On-block Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Finish On-block Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Finish On-block Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Modular cabin Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Multilevel On-unit Advanced Outfitting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
LAUNCHING METHODS
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
End Inclined Sliding Launch
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
End Inclined Sliding Launch
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Launching Ways and Cribbing
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Rotating Fore Poppet
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Stern Cribbing and Shoring
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Center Ground Way with Teflon Strips
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Center Way Crushing Strip Fore Poppet
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Side Launching
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Side launching Excitement
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
To Have a Canal –> Will Build ships
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ship In Floating Dock Prior to Launch
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ingalls Launching Sequence
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Submersible Barge Launching System
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Getting the Foot out of the Shoe – Launching from Building Dock
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Building Ledge and Dry-dock
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Multiple Repair Ledges for Overflooding
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
SHIPYARD EQUIPMENT
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Plates Leaving Blast and Prime Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Material Handling – Automated Guided Vehicle (AGV)
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Plasma Cutting and Marking Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Laser Cutting and Marking Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Automated Milling Machine – Two plates at a time
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Panel Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Laser Welding Panel Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Laser Welding Panel Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Two Large Panel Lines
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Special Panel Turnover Device for Two-sided Welding
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Material Handling – Profile Magazine – pre-processing
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Material Handling – Profile Magazine – post-processing
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Profile Cutting and Marking Line with Conveyors
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Material Handling and Robotic Arm for Profile Cutting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Same Robotic Arm used for Welding and Cutting
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Semi Automatic Stiffener Fit and Tack Weld Station
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Sub Assembly Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Long Plate Butt and Girder Fillet Laser Welding Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Double Bottom Welding Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Material Handling for Robotic Tack Welding Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Stiffener Handling and Tack Welding
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Welding Subassembly Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Double Hull Welding Workstation
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Double Hull Welding Line
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Double Hull Welding Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Robotic Welding Machine Working with Curved Panels
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Rolls for Shaping Plate with Single or Minimum Double Curvature
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Ring Press for Shaping Plate with Double Curvature
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Hydraulic CNC Frame Bender
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Plate Shaping by Line-heating
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Early Tilt Table for Welding Curved Plate Panels
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Moving Curved Block Line – Pin Jigs on Platforms
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Modern (In Line) Tilt Table for Welding Curved Plate Panels
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Modern (In Line) Tilt Table for Welding Curved Plate Panels
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Pipe Stowage Magazine – pre processing
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Pipe Bending Machine
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Material Handling Automation – Conveyor Systems
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Material Handling Building Dock gantry/Goliath Cranes
SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal
Grand Block Elevator
THANKS SHIP CONSTRUCTION, KEY NOTES FOR THIS FASCINATING PROCESS Roberto Morante Villareal Marine Engineer & Naval Architect MARINE STRUCTURES & MATERIALS DEPARTMENT MANAGER
[email protected] [email protected]