SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss Transmiss ion Standards Standards & Specifications Specifications Department Department Transmiss Transmiss ion Document Management Management Division
Table Table of Contents -
Face Sheet
1
-
Table of Contents
2
1
Scope
3
2
Definitions
3
3
Engineering drawing specifications
4
Drafting Requirements
12
5
CADD Standard
14
6
Approval/Certification & Submittal of Drawings Electronically
15
7
Turnkey Contract Responsibilities
23
8
Security & Control of Engineering Drawing Data Outside SEC
24
9
Applicable Documents
29
SEEDS-II-00
Date of Issue 2004-10-10
6
Page No.
2 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss Transmiss ion Standards Standards & Specifications Specifications Department Department Transmiss Transmiss ion Document Management Management Division
Table Table of Contents -
Face Sheet
1
-
Table of Contents
2
1
Scope
3
2
Definitions
3
3
Engineering drawing specifications
4
Drafting Requirements
12
5
CADD Standard
14
6
Approval/Certification & Submittal of Drawings Electronically
15
7
Turnkey Contract Responsibilities
23
8
Security & Control of Engineering Drawing Data Outside SEC
24
9
Applicable Documents
29
SEEDS-II-00
Date of Issue 2004-10-10
6
Page No.
2 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss Transmiss ion Standards Standards & Specifications Specifications Department Department Transmiss Transmiss ion Document Management Management Division
1
Scope This standard establishes a uniform means of Computer Aided Design & Drafting (CADD) standard used, in producing new and modifying existing SEC project engineering drawings soft/hard copies and submitted by the contractor.
2
Definitions 2.1
Abbreviations and Letter Symbols: These shall be used where physical space prevents complete spellings as in title blocks and in small drawings. Abbreviations shall only be used when absolutely necessary and never used when the meaning is to be clear. SEC standard Abbreviations and Letter Symbols shall be used to maintain consistency within the SEC documents.
2.2
As-Built Drawing: An Engineering Drawing that has been Prepared/revised to reflect actual field conditions after the completion of construction. Additions or changes to a drawing resulting from facility modification shall also be verified as As-Built drawings.
2.3
CADD Drawings: Engineering Drawings generated electronically using software approved by SEC as its standard medium for development and permanent retention.
2.4
CADD Standard Manual: The tool that provides a unique method to apply the SEC CADD ( SECS-Auto) standards manual.
2.5
Contractor(s): The Design, Construction and Service Contractors; Manufacturers; Vendors; Government Agencies; and other similar organizations, having a contractual relationship or a prospective contractual relationship with SEC that may receive drawings from, or generate drawings for SEC. Subcontractors shall also be considered as Contractors.
2.6
CTAP (Consolidated Transmission Area-Project Department) refers to the SEC organization that manages construction work done by outside contractors.
2.7
DTAP (Developing Transmission Area-Project Department) refers to the SEC organization that manages construction work done by outside contractors.
2.8
DCC (Drawing Completion Certificate) A document bearing the names and signatures of persons authorized, per this procedure, to certify that an Engineering Drawing meets the applicable SEC Engineering, Design, Drafting and CADD Standards. The DCC fulfills the approval/certification requirement in lieu of signing the drawing title bloc k.
2.9
DCC Number: A unique number that identifies a specific DCC for the purpose of cross-referencing the certified DCC and the Engineering Drawings covered by that DCC and as a log number for the permanent archival of the DCC (Appendix B).
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
3 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss Transmiss ion Standards Standards & Specifications Specifications Department Department Transmiss Transmiss ion Document Management Management Division
2.10
Design Agency: Refers to any SEC organization or Contractor charged by SEC with the responsibility of developing and/or modifying of SEC Engineering Drawings/Documents.
2.11
Drawing Name: File system name of the Engineering Drawing in a standard SEC format. The name format is used when transferring drawings to or from EDMS (TSSD/TDMD).
2.12
Drawing Number: An arrangement of eight alpha/numeric characters (prefix + size + “-”+ number) used to provide the unique identity for individual Engineering Drawings.
2.13
E&DD (Engineering and Design Division) of E&DD (Engineering and Design department) refer to the organization that handles engineering, design and procurement of transmission projects
2.14
EDMS (Enterprises Drawing Management System) Refers to that set of software installed and well-established application on the SEC-CADD System and SEC-Intranet which controls the creation, revision, workflow and archival of As-built Drawings/Documents/Manuals and Specifications/Standards etc. And provides tools to manage above effectively in a secured and friendly environment.
2.15
Engineering Drawing: As used throughout in this procedure, is a document produced on an approved SEC engineering form, by SEC (or for SEC by approved sources) which bears a SEC engineering drawing number and which was prepared for the purpose of identifying engineering related information to be used for the construction, operation or maintenance of a SEC Substation/Transmission and Facilities.
2.16
Operation & Maintenance Instruction Manuals: The operation and maintenance instructions manuals should include complete procedure for all equipment installation, testing, operation, maintenance, repair and overhauling etc. showing all the stages of work.
2.17
PCC: Project Completion Certificate is issued by CTAP/PTAP.
2.18
Proponent: Department of SEC organization charged with the overall operation, maintenance, safety and protection of a SEC facility, equipment or property.
2.19
SEC: Saudi Electricity Company.
2.20
SEEDS: Saudi Electricity Company Engineering Drawing Standards.
2.21
Standard Drawings: Specially prepared engineering drawings that have been preapproved by responsible SEC organization for mandatory application in the design of SEC facilities when the information they contain applies and is appropriate during
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
4 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
design. The production of a Standard Drawing follows the normal production requirements presented in this separate Standard Drawings. 2.22
TDMD (Transmission Document Management Division) of TSSD (Transmission Standards & Specifications Department) is the organization Authorized to operate Company CADD and EDMS equipment hardware and software for the development or revision of engineering drawings. It has overall control of the SEC drawings database, revision number assignments, and original drawings. TDMD is the Proponent for Transmission Sector. TSSD/TDMD is located in Room 1-200West, Saudi Electricity Company, Eastern Area Administration Office, Dammam.
2.23
Title Block: The reserved portion of a drawing containing information about the drawing projects of Substation/Transmission and Facilities.
2.24
User: The SEC organization, which creates, controls and/or contracts engineering, procurement and/or construction work to outside contractors is the User. If there is no separate User organization, the Proponent is the User.
2.25
Vendor drawing: Any document developed by a manufacturer that supports the technical requirements of material or equipment and received as part of a purchase order and Turnkey projects.
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
5 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
3
Engineering Drawing specifications (Turnkey Project – Drawings) These are considered to be all the drawings prepared for a specific Turnkey Project whether they are for the design, construction or for procurement. 3.1
Drawings Sheet Quality and Lettering
3.1.1
All Project Engineering drawings sheets from size A to E will be printed on matte plastic mylars, 0.08mm (0.003 inch) thick, quality of which shall match samples obtained from TSSD/TDMD (electronic Files of Boarders will be provided by SEC).
3.1.2
All Project Engineering drawings shall be prepared in capital letters in English language with 3x2.5mm letters on A and B size sheets and 2.5x2mm letters on C, D and E size sheets.
3.1.3
All Project Engineering drawing A to E shall be prepared in MicroStation (J or V8 or latest version) ONLY. CADD format and submitted to TSSD/TDMD, Room 1-200West, Saudi Electricity Company, Eastern Area Administration Office, Dammam or SEC Operating Area Offices. (On CD)
3.1.4
All Project Engineering drawings shall be prepared as SEC symbology. 3.1.4.1 All disciplines symbology table-1 (Appendix - L) 3.1.4.2 Electrical one line diagram symbology table-2 (Appendix – M)
3.2
3.1.5
SEC color table & boarder shall be received from TSSD/TDMD with SEC standard setting.
3.1.6
All Project Engineering drawings save setting shall be as per SEC standard.
Drawing Numbers Request
An estimated block of drawings numbers for any project (as agreed on by the Project Manager or Project Engineer and Contractor) shall be obtained by submitting SEC form no. 15367 (Appendix-K) to TSSD/TDMD, Room 1200West, Saudi Electricity Company, Eastern Area Administration Office, Dammam or SEC Operating Area Offices. 3.3
Drawing Control Sheet
3.3.1
SEEDS-II-00
The Drawing Control Sheet shall be prepared listing details of all As-Built Engineering Drawings required for a particular project, listed by index and drawing numbers in sequence. Date of Issue 2004-10-10
Page No.
6 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
3.4
3.3.2
The Drawing Control Sheet shall be prepared and submitted in Excel format. SEC form no. 16758 (Appendix-H)
3.3.3
The first drawing number from the allocated block of drawing numbers shall be assigned to the Drawing Control Sheet (If only one location).
3.3.4
More then one locations in one project allocated block of drawing numbers can be break-up as per locations and then assigned the first drawing number from the break-up block.
3.3.5
The Drawing Control sheet Number shall be mentioned on all drawings sheets in the reference drawings area.
3.3.6
Drawing Control Sheet shall be prepared separately for each location.
3.3.7
Documents and Manuals required for a particular project shall be mentioned in the last sheet.
3.3.8
Vendor reference drawing number can be entered in remarks column
Drawing Numbering System
All Project Engineering drawing shall consist of the following elements (in the order they appear):
3.4.1
JO NO.
INDEX
PLANT NO.
DRAWING NO.
SHEET NO.
REV. NO.
1234567
P
DA123
EA-123456
04 OF 05
00
Prefix letters C, E, S and W indicates SEC Regional engineering drawings. C - For Central area drawings E - For Eastern area drawings S - For Southern area drawings W - For Western area drawings
3.4.2
Drawing Sheet Size Second letter following prefix letter indicates the sheet size, as follows: A B C D E
SEEDS-II-00
- size sheet, 711 x 1016mm or (28 x 40 in.) - size sheet, 508 x 711 mm or (20 x 28 in.) - size sheet, 356 x 508 mm or (14 x 20 in.) - size sheet, 279 x 432 mm or (11 x 17 in.) - size sheet, 211 x 297 mm or (8.27 x 11.69 in.) Date of Issue 2004-10-10
Page No.
7 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
No sheet sizes differing from these listed shall be used on any Turnkey Project under any circumstances. E A - 123456
Example-I
Prefix (Region code) Size of drawing 3.4.3
Drawing No.
Drawing Number A six (6) digit identifying a drawing number shall be assigned from the allocated block of numbers.
3.4.4
Drawing Revision For Final Projects Drawings (as-built) submitted to TSSD/TDMD shall have zero revision (Existing drawings shall be with next higher revisions).
3.4.5
Drawing Sheet Number A drawing sheet number shall be indicated whenever a drawing consists of more than one sheet, e.g., Sheet 01 of 05, 02 of 05, etc. (All sheets shall have the same title, index, plant no. and sheet size).
3.4.6
Drawing Plant Numbers 3.4.6.1
Five-character code indicating a facility, process or system. Plant codes are maintained by TSSD/TDMD and determine SEC geographic area, and Plant Title.
3.4.6.2
Plant numbers are two alpha and three numeric characters in length. Example-I
(RD123) RD indicates plant or facility in Riyadh area and 123 is numeric numbers assign for plant or facility location.
Example-II
(JD123) JD indicates plant or facility in Jeddah area and 123 is numeric numbers assign for plant or facility location.
Example-III (DA123) DA indicates plant or facility in Dammam area and 123 is numeric numbers assign for plant or facility location.
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
8 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
Example-IV (AS123) AS indicates plant or facility in Asir area and 123 is numeric numbers assign for plant or facility location.
3.4.6.3
3.4.7
Only one Plant Number shall be assigned to an Engineering Drawing.
Exception:
More than one plant number may be allowed under certain circumstances.
Example:
When the drawing contains interrelated information for more than one plant: continuation of transmission lines, interface points, jumpers, tie-in points etc and all such plants fall under the responsibility of the same operating organization.
3.4.6.4
Drawings requiring more than one Plant Number shall be approved by TSSD/TDMD.
3.4.6.5
When an Engineering Drawing is typical for more than one plant, then a separate drawing shall be produced for each plant (Substations, Transmission lines…..etc.) with other new drawing number.
3.4.6.6
While changing the plant number of an existing drawing, revise the drawings that involve changing the plant number and plant description in the title block and state in the revision description CHANGED PLANT NO. FROM XXXXX TO XXXXX along with As-built revision, if any.
Drawing Index 3.4.7.1
The Drawing Index is a single character in the range of A to Z (excluding I and O). For complete listing, refer to standard drawing SE-036001 Rev. 04. (Appendix-N)
3.4.7.2
The Index is shown on Engineering Drawings in the title block. A maximum of three index letters are acceptable on a drawing, arranged by order of importance The Drawing Index Letter shall be correctly selected in accordance to the main subject of the drawing. If drawing shows details of Power and Civil work.
SEEDS-II-00
Example-I
Index A/P for Plan and profile. (Underground or overhead transmission line)
Example-II
Index P/Q for power and civil work.
Date of Issue 2004-10-10
Page No.
9 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
Example-III Index A/P/T for Plan and profile.
(Underground or overhead telecommunication work). 3.4.7.3 3.5
transmission
line
and
The Index implies, but does not determine, a group of associated types.
Drawing Title
Details in the Title block of the drawings should be “Tag Values” instead of plain text. And in the drawing wherever there is a text, which denotes reference of another drawing like “Refer Drawing No.” should be used “Tag Values” instead of plain text. (Appendix-D). The title shall be prepared in the following order: First line for Subject of the Drawing Second line for Service or Equipment Third line for Project Title Fourth line for Project Location
Example-I
PLAN AND PROFILE 380kV OVERHEAD TRANSMISSION LINE FROM GHAZLAN P/P TO 380/230kV GHUNAN SUBSTATION GHAZLAN-GHUNAN
Example-II
SAUDI ARABIA
EQUIPMENT LAYOUT CONTROL AND SWITCHGEAR BUILDING AL-NUZHA 115/13.8kV SUBSTATION AL-HASA
3.6
SAUDI ARABIA
Referencedrawings, Legend and Notes
Reference drawings Legend and Notes shall be placed in the area provided above the title block. Reference drawings listed shall be the necessary minimum engineering drawings only. Do not include Plant or Index reference of the referred drawings nor Standard Drawings. (Appendix-D) 3.7
Scale
3.7.1
SEEDS-II-00
Graphic Scale, a line scale reference shall be included on both new and existing drawing just over the title block on scale drawings. The line scale shall be Date of Issue 2004-10-10
Page No.
10 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
divided into units of length as determined by the scale of the drawing. Refer to SECS-Auto for a list of graphic scales symbols. 3.7.2
The SEED files and attached borders are created at 1:1 scale. Do not change the seed file scale.
3.7.3
Scale symbols shall match the border scale.
3.7.4
For scaled drawings, use the auto-dimensioning command where applicable and don’t drop it.
3.7.5
Do not scale down drawings, instead, rearrange the drawing or split the drawing into two drawings.
3.7.6
The setting of all SEC border files are set at (Global Origin) GO=0,0. This GO is defined at the left bottom corner of the border. No changes are allowed in the GO setting for all drawing types including scaled drawings.
3.7.7
General drawings shall be made to a scale compatible with any anticipated reduction of the drawing such that legibility is maintained.
3.7.8
The scale is the ratio of the linear dimension of an element of an object as represented in the original drawing, to the real linear dimension of the same element of the object itself.
3.7.9
Drawings may be produced to various scales, dependent upon the nature of the drawing concerned. An enlargement scale is where the ratio is greater than 1 : 1 . Full size is indicated by 1 : 1 enlargement by X : 1 and reduction by 1 : X Where it is necessary to use more than one scale on a drawing, each scale shall be clearly identified.
3.7.10 he scale chosen for a drawing depends on the size of the drawing sheet and the size of the object to be depicted. The scale shall be large enough to permit easy and clear interpretation. Details that are too small for clear dimensioning in the main view(s) shall be shown in a separate view to a larger scale.
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
11 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
4
Drafting Requirements
4.1
All existing drawings (raster files) shall be revised and redrawn in an electronic format utilizing Microstation (J or V8 or latest version) ONLY, if required for new project with higher revision.
4.2
Existing Drawing Control Sheet shall be retyped and submitted in Excel format. SEC form no. 16758 (Appendix-H) if required for new project With the next higher revision.
4.3
Existing drawings shall be utilized for any modification of a facility. Creation of new drawings to indicate a change in an existing facility will not be accepted. If, however, this is unavoidable for some reason such as being too crowded or major revision changes, then a new sheet shall be added to the existing drawing.
4.4
New drawings that are created as a continuation of an existing design are considered as continuation drawings of that design bearing the next sequential (numeric) sheet number of that drawing set.
4.5
When revising an existing drawing, the incorrect information on the title block including substation/transmission/facilities description and drawing type shall be corrected or completed.
4.6
Revision diamonds 01 shall be placed in the drawing area in such a way as to make it possible to locate revisions quickly.
4.7
Old revision diamonds, clouds and related notes shall be removed from the drawing.
4.8
If a drawing is completely redrawn, the words Completely redrawn and incorporated revisions (indicate the revision number incorporated) shall be entered in the description column in the revision area above the title block.
4.9
When revising some pages of bulk drawings that have a single electronic file of the complete set such as scope of work, the revision block of only first sheet shall indicate the changes and revision number change. Complete set shall be submitted.
4.10
The standard north arrow symbol shall be drawn in a prominent place in the upper left region of the drawing for all plan view drawings. It shall be drawn pointing upward, or if unavoidable, pointing left, but shall never point right or down.
4.11
Information covered by Standard Drawings, elaborated details, unnecessary views, and repetitions, which add no value to the drawings, shall be omitted.
4.12
non-essential items from design, which add nothing to the accuracy, completeness and clarity of the drawing, shall be eliminated.
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
12 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
4.13
Any shading element is not allowed on drawings. Hatching may be used as an alternative to shading. (Minimum 2mm distance is required between hatching lines).
4.14
Revisions on drawings may be encircled or clouded on the prescribed layer for easy identification of the revised portion during certification and review cycle. However, for 100% As-Built drawings, all revision encirclement or clouding shall be either removed or the level turned off prior to submitting the drawings to TSSD/TDMD.
4.15
The letter O and I shall not be used for identification symbols on the drawings, as they are often confused with Zero and One.
4.16
Text on drawings shall always be uppercase.
4.17
Contractor should not use their company’s LOGO in the SEC Engineering drawings and in drawing control sheet. They should use the reserve place in the title block. (Appendix-D)
4.18
Contractor can be a place manufacturer drawing number or vendor drawing number in left side lower corner. (Appendix-D)
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
13 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
5. CADD Standards 5.1
General SEC CADD standards and SECS-Auto are custom programs based on MicroStation and were developed to assure consistency between drawings. SECS-Auto contains collections of seed files, cell libraries, border files, levels, and line weights, font, and line codes, MDL routines.
5.2
Requirements To ensure maximum productivity from the SEC CADD systems, the CADD standards parameters shall be followed.
SEEDS-II-00
5.2.1
All drawing files shall be created from a SEC product seed file.
5.2.2
Do not override or change the product seed file setups. Do not change the working units.
5.2.3
SEC forms (borders) shall be referenced only. Do not include forms as part of the design file. A border shall remain with the CADD drawing.
5.2.4
Do not drop or change Standard Cells. TSSD/TDMD prior approval is required for any additional cell.
5.2.5
All elements in schematic type drawings (non-scale) shall be placed with grid/unit lock set to ON position.
5.2.6
File design to display the drawing such as that view 1 (maximized) showing the title block with data fields turned OFF position.
5.2.7
Always attach the latest border on Auto-SECS whenever revising or creating new drawings.
Date of Issue 2004-10-10
Page No.
14 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
6
Approval/Certification & Submittal of Drawings Electronically This chapter governs the Approval/Certification and submittal of SEC Engineering Drawings/Documents/Manuals electronically by Contractor/Design agency. Under this chapter, the requirement for producing, manually signing and submitting engineering Drawing hardcopies for the purpose of permanent archival into the corporate drawing system shall be discontinued. See flow chart (Appendix-A). All Engineering Drawings developed (if new) and/or revised (if existing) by SEC organizations, or by other Contractors/Design agency for SEC, shall be developed or revised by means of SEC approved electronic software and formats as specified in the SEC CADD Standards Manual. The final acceptance certificate will not be issued until the TSSD/TDMD (EDMS Administrator) must certifies all final soft copy submittal for suitability of drawings/documents files format as compatible and acceptable for uploading in EDMS. 6.1
refers to submitting the drawings/documents/manuals Interactive Submittal: electronically through the Enterprise Drawing management System (EDMS) by means of a workstation connection to the SEC network, interacting directly with the EDMS.
6.2
refers to submitting the drawings/documents/manuals by Manual Submittal: transmitting all deliverables to TSSD/TDMD manually in the form of CDs or other storage media. (Not through EDMS).
6.3
Approval/Certification Information: This is a characterizing mark identifying that the approval/certification requirement of a specific revision of an Engineering Drawing is covered by a signed DCC (Appendix-B).
6.4
Approval/Certification
6.4.1
All SEC Engineering Drawings shall be approved, certified and dated as required, herein, by means of completing a Drawing Completion Certificate (DCC) and the Approval/Certification (Appendix-E). Uncertified drawings will not be accepted for inclusion into the corporate drawing system.
6.4.2
One single project has one DCC. Engineering Discipline(s) (e.g. Electrical, Instrumentation, Communication, Piping, Mechanical, Structural, Architectural, Civil, etc.) Have one DCC and submittal. No more than one project shall be covered by one DCC.
6.4.3
A Design Agency and the SEC responsible organizations shall approve/certify a DCC as follows: 6.4.3.1
SEEDS-II-00
If a Contractor is responsible for the design work, the Contractor’s technical personnel shall review and sign the Design Agency Date of Issue 2004-10-10
Page No.
15 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
Certification’ block of the DCC. The Contractor’s Engineering Manager or Project manager with overall design responsibility shall certify the drawings by signing in the space marked Certified by in the DCC (Appendix-B).
SEEDS-II-00
6.4.3.2
If a SEC organization is responsible for the design information, that organization’s technical personnel shall review and sign the ‘Design Agency Certification’ block of the DCC. A SEC employee representing the organization charged with the design and generation of the drawings shall certify the drawings by signing the space marked Certified by.
6.4.3.3
A representative from Engineering, Loss Prevention and/or Fire Protection may be required to review certain drawings depending upon their content. The SEC Project manager and the Design Agency shall make this determination prior to releasing the drawings for construction. The Engineering, Loss prevention and/or Fire protection review is indicated by signing in the space marked other in the DCC.
6.4.3.4
The full names of all the signatories, and dates, shall appear where applicable in the title block of each drawing, as required, as well as on the DCC. Drawn By and Checked By shall also be completed in each drawing title block.
6.4.3.5
For revised drawings, the initials of the signatories shall appear where applicable in the revision block of the drawing.
6.4.4
At the signing of the DCC and after affixing the Revision Approval/Certification information, each relevant drawing electronic file shall be managed to prevent subsequent modification until each of these files is transferred into a CD for final submittal.
6.4.5
Approval levels for design changes made to previously certified Engineering Drawings are the same as for new drawings.
6.4.6
Each revision shall be individually approved and certified. Revisions to Key drawings shall be reviewed and initialed by the Construction Agency, Operations and Others (if initially involved).
6.4.7
The signatures in the SEC Review for Drawings block of the DCC are indicative of the reviewer’s familiarity with the contents of the drawings and agreement with the design in principle. The signatures do not relieve the Design Agency of its full responsibility for compliance with all relevant project scope, standards, procedures, specifications, codes, contract documents, etc. Date of Issue 2004-10-10
Page No.
16 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
6.4.8
6.4.9
6.5
After the signing of the DCC, each drawing shall indicate that it is covered by the DCC for approval/certification requirements by completing the Approval/Certification information. The Design Agency shall include in the block the following: 6.4.8.1
The Drawing Completion Certificate number assigned per Item 6.7.
6.4.8.2
The revision number of the drawing being certified. New drawings issued for construction shall bear the revision number 00.
Drawings bearing a completed Approval/Certification and covered by a signed DCC shall be considered as legal documents and may be used for procurement and / or construction.
Submittal
All SEC new, revised, canceled and canceled/superseded Engineering Drawings shall be submitted to the corporate engineering drawing management system (EDMS) for permanent retention and management. 6.5.1
Deliverables When submitting drawings to TSSD/TDMD, the following shall be delivered depending on the type of submittal: 6.5.1.1 • • •
6.5.1.2 • • •
6.5.2
Manual Submittal Completed Original Form No. 15057 (Appendix -F) Drawing Control Sheet. Form No. 16758 (Appendix-H) Electronic Drawing/document/manual files (On CD) Interactive Submittal Completed Original Form No. 15057 (Appendix -F) Drawing Control Sheet. Form No. 16758 (Appendix-H) generated list of processed drawings.
Electronic Drawing File 6.5.2.1
Data compression is not to be used on submitted files.
6.5.2.2
MicroStation files shall have naming format as follows: EA123456.0001.0000
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
17 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
E is the Prefix letter, second letter A is the size of drawing, 123456 is the 6-digit drawing number, .0001 is the sheet number and .0000 is the revision number.
6.5.2.3
Microsoft Excel /Word/Acrobat (PDF) files shall have a naming format as follows: Excel: Word: Acrobat:
EE123456X.0001.0000 EE123456W.0001.0000 EE123456P.0001.0000
E is the Prefix letter, second letter E is the size of drawing, 123456 is the 6-digit drawing number, X or W or P the file type (Excel or Word or Acrobat PDF), .0001 is the sheet number and .0000 is the revision number.
6.5.3
Drawing Index File Storage 6.5.3.1
6.5.4
Media 6.5.4.1
Electronic Drawing files shall be submitted using write-once CDROM only.
6.5.4.2
Each CD-ROM shall be delivered in a protective plastic case. The CD-ROM and Plastic case shall be color labeled as per appendix-P.
6.5.4.3
Media shall be enclosed in suitable Manila envelopes. The Form No. 15057 (Appendix-F). shall be attached to the outside of the envelope.
6.5.5
The Interactive Submittal will remain available as an alternative to the submittal described herein. (For Interactive Submittal deliverables, see Item 6.5.1.2).
6.5.6
In/Out Drawing Submittals 6.5.6.1
SEEDS-II-00
All electronic files on a CD-ROM shall be stored in different directories as per indexes. (Appendix-G).
In/Out drawings are those drawings, which are required to be retrieved for further revision immediately after being submitted to TSSD/TDMD. In this case, the Original Drawings/Digital Files Request Form No. 15345 (Appendix-J) shall be submitted with the Engineering Drawing Submittal Form No.15057 (Appendix-F).
Date of Issue 2004-10-10
Page No.
18 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
6.5.7
SEEDS-II-00
Engineering Drawings Submittal Process 6.5.7.1
Submit the complete package to TSSD/TDMD, Room 1-200 West, Saudi Electricity Company, Eastern Area Administration Office, Dammam or SEC Operating Area Offices.
6.5.7.2
Partial submission is not acceptable.
6.5.7.3
The SEC Project Manager or a delegate shall sign the Engineering Drawing Submittal Form No. 15057 (Appendix-F).
6.5.7.4
All sheets of a multi-sheet drawing shall be submitted together.
6.5.7.5
The TSSD/TDMD receptionist shall compare the contents of the Electronic Drawing media with the contents of the Drawing Control Sheet. The Electronic Drawings on the submittal media constitute the official count of the drawings received. A hard copy of the official count shall be generated for permanent retention (Appendix-H).
6.5.7.6
TSSD/TDMD shall acknowledge receipt of the submittal by stamping and dating as RECEIVED and assigning an TDMD Engineering Drawing Submittal control number (Appendix-F).
6.5.7.7
Engineering Drawings/documents/manual of soft copy submitted to TSSD/TDMD will not be considered accepted until verified through completing the TSSD/TDMD Verification block of the DCC (Appendix-B).
6.5.7.8
When the drawings are accepted for inclusion into the EDMS, TSSD/TDMD shall confirm such by forwarding a signed copy of the DCC to the SEC person responsible for signing the initial submittal. Until such confirmation is received, the TSSD/TDMD responsible for the development of the drawings shall maintain a temporary backup of all the submitted drawings. When confirmed as accepted, the backups shall be deleted unless deemed justified to maintain longer.
6.5.7.9
Any drawing found not in compliance to the SEC CADD Standards Manual and SEEDS-II will be returned to the SEC Project manager or Contractor/Design Agency for correction. After correction, the drawings shall be re-submitted under a new drawing submittal.
6.5.7.10
The submittal deliverables including a hard copy of the drawing official count (Item 6.5.7.5) and the CD shall be filed by TSSD/TDMD as a permanent record. Date of Issue 2004-10-10
Page No.
19 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
6.6
6.7
TSSD/TDMD Approval/Verification
6.6.1
When a drawings/documents/manuals is accepted by TSSD/TDMD for inclusion into the EDMS, the Approval/Certification number and revision number shall be added in the block by contractor (Appendix-E).
6.6.2
When an existing drawing is requested for revision, then the requester shall allow for the Approval/Certification of the new revision by removing the previous Approval/Certification information When possible, this task may be carried out by TSSD/TDMD prior to releasing the drawing to the requester.
DCC Number
The TSSD/TDMD certifying a Drawing Completion Certificate shall assign the DCC number. (Appendix-E). Example
E – 123456
Prefix (Region code) 6.8
DCC No.
PCC Issuance
CTAP/DTAP is responsible to issue the Projact Completion Certificate (PCC) after the execution, completion, submittal and after acceptance of As Built drawings of the project. 6.9
Final As Built Drawings
All As built Drawings are to be sent to TDMD to safe keep and archive in the EDMS system.
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
20 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
7
Turnkey Contract Responsibilities 7.1
7.2
SEEDS-II-00
Contractor’s Responsibilities
7.1.1
All specified requirements for Turnkey Project final drawings/documents/manuals (As-built) shall be prepared as per chapter-3. Engineering Drawings Specifications, which is submitted to CTAP or DTAP.
7.1.2
Purchase of all required drawings sheets (Size A to E) per samples obtained from TSSD/TDMD.
7.1.3
Provide correction work of any drawings required by CTAP or DTAP and TSSD/TDMD.
7.1.4
Coordinate the approval/certification activity by all designated signatories on each DCC and make sure that each has been prepared properly as per the requirements set forth in this chapter.
7.1.5
Make sure that only the latest SEC Engineering Drawing borders used for new as well as for revised drawings.
7.1.6
Five (5) sets of As-Built engineering drawings, manuals and other documents related with project shall be submitted to CTAP or DTAP for SEC record.
7.1.7
Instruction to file documents made by external parties such as agreements, minutes of meetings, govrnment’s concern department permits/approvals…etc should be included in the submittals.
7.1.8
Contractor should produce and submit the Mylar prints from the final as-built drawings CD, which is provided by the TDMD/EDCU.
CTAP or DTAP Responsibilities
7.2.1
SEC Project Manager/Engineer is the authority to certify for filing final project drawings and submits to TSSD/TDMD
7.2.2
TSSD/TDMD shall be involved in checking quality of As-built drawings prior to final submission. TSSD/TDMD shall also be invited to attend Kick-off meeting to explain drawing procedures and also at the Project close out meetings to clear any problems on drawings/documents/manuals.
7.2.3
In case of any misassignment of drawing numbers, poor quality drawings, the Project Manager/Engineer will inform the Contractor to correct all do cuments.
Date of Issue 2004-10-10
Page No.
21 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
7.2.4
Upon the project construction completion, the Project Manager/ Engineer shall assure that good quality set of originals of as-built Engineering drawings are sent to TSSD/TDMD before signing the Technical Completion Certificate (TCC). All Vendor’s operations/maintenance manuals, performance curves, etc. and other related documents of the project, shall be distributed by CTAP or DTAP per distribution list of contract.
7.2.5 7.2.6
7.2.7
7.3
SEC Project Manager/Engineer shall request the contractor to pay the amount for microfilming the project drawings to treasury department. Verify that the submittal package is complete and that it has been prepared in accordance with the submittal requirements as per item 6.5 Submit the drawings/documents/manuals to TSSD/TDMD in a timely manner. Major capital projects may need to coordinate their submittal with TSSD/TDMD in advance.
TSSD/TDMD Responsibilities
7.3.1
Provide copies of drafting procedures/specifications and sample of drawing sheet in soft copies.
7.3.2
Monitor SEC drafting standard.
7.3.3
Entering data of as-built drawings/documents/manuals into the EDMS.
7.3.4
To provide CADD Standards Manual on CD.
7.3.5
The TDMD Transmission Document Management Division is responsible for the following: a) Checking of the Approval/Certification information on each drawing prior to inclusion of the drawings into the EDMS. b) Archive all original submittal documents and electronic files for reference.
future
c) Provide CONTRACTOR with SEC CADD Standards software containing seed files, reference files, cell libraries, font library, menus, command files and user commands to produce engineering drawings. d) Provide system documentation, format instructions and referenced procedures as required to produce drawings in the COMPANY format. e) Provide CONTRACTOR with periodic updates of the information. SEEDS-II-00
Date of Issue 2004-10-10
Page No.
22 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
7.4
Contractor’s Responsibilities on Production of Engineering Drawings:
7.4.1. Prepare engineering drawings in an electronic format utilizing MicroStation (J or V8 or latest version) ONLY, Microsoft Excel or Microsoft Word or Acrobat PDF (conceptual, PTS, E size) as per the requirements of SEC. (Appendix-C).
SEEDS-II-00
7.4.2
Prepare the engineering drawings using the latest version of SEC CADD Standards Manual or other as provided by the Transmission Document Management Division (TDMD).
7.4.3
Prepare and submit all engineering drawings in accordance with SEC CADD Standards Manual and chapter-3.
7.4.4
Ensure to fill the box beneath the title block to indicate the file format type i.e. VECTOR, EXCEL or WORD or PDF.
7.4.5
Ensure that every new drawing is prepared using the latest version of the border from the CADD Standards Manual.
7.4.6
Ensure that each existing drawing is revised/redrawn electronically and carried the higher version of the existing border that includes Approval/Certification Information While revising an existing drawing the old border can be replaced to the latest version.
7.4.7
Request engineering drawing numbers and other engineering data as described in SEC CADD Standards Manual to use with project detail design drawings.
7.4.8
Request existing As-built drawings and revise these per requirement of the project.
7.4.9
Return all unused data and drawing numbers to SEC at the completion of the project.
Date of Issue 2004-10-10
Page No.
23 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
8
Security & Control of Engineering Drawing Data Outside SEC This chapter covers handling, control, transmission, confidentiality, security, storage, protection against unauthorized disclosure; modification; reproduction and eventual destruction of SEC Engineering Drawing Data while they are created or modified by (work-in-progress), or while in the custody of organizations outside of SEC. Included here are drawings of facilities, equipment and properties whose ownership or operations have been entrusted to SEC. Survey maps, cartographic data, photographs (including plant aerial photographs), Engineering Data handled by Vendor Fabrication Shops, Library Drawings And SEC Standard Drawings are not covered by this chapter. Applicable procedures set out in this chapter shall be part of instructions to bidders. Any SEC Engineering Drawing or Vendor drawing and/or electronic database(s) bearing information related to a SEC facility, equipment or property disseminated in any format (including non-SEC formats) and media including, and not limited to, paper; mylar; microfilm; microfiche; sepia; photographs; electronic files on magnetic tapes, cartridges, diskettes, spools, hard disks, optical disks, compact disks, or other electronic storage devices, produced by SEC, or by an organization under contract to SEC. Engineering Drawing Data, which includes information that could lead to making a SEC facility, equipment or property vulnerable to sabotage and/or intentional damage, shall be classified as CONFIDENTIAL or RESTRICTED per GI-XXXX, Classification of Sensitive Documents. Examples are key and emergency drawings, as specified by the Proponent, Security Fences and Shelters drawings of Plant No. W95 Herein after, all Engineering and Vendor Drawings and electronic databases covered by this definition are referred to in 8.2.1 shall be considered the sole property of SEC. 8.1
Instructions
8.1.1
SEEDS-II-00
Engineering Drawings/Documents Data 8.1.1.1
The User is accountable for all Engineering Drawings/Documents Data and drawing numbers transferred to the User's custody. The User shall ensure that Engineering Drawings/Documents Data is protected against loss, unauthorized disclosure; modification; reproduction and destruction. Users are not required to log drawing transfers except for Originals and Duplicate Originals as defined in the SEC CADD Standards Manual.
8.1.1.2
The User shall ensure that only the needed amount of original and duplicate original Engineering Drawing Data, to efficiently perform the specified work, shall be transferred out of SEC to the Contractor.
Date of Issue 2004-10-10
Page No.
24 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
8.1.2
8.1.3
8.1.1.3
The User and the Contractor shall restrict the number of copies, duplicate reproducible, and reference prints made of Engineering Drawing Data on the basis of need-to-know only. Shredding beyond recognition immediately when no longer required shall destroy all such documents.
8.1.1.4
The Contractor is responsible for the safety, security and confidentiality of all Engineering Drawing Data the Contractor generates in the course of performing work under a contract with SEC. This includes all data generated, including the manner in which such Engineering Drawing Data are put into hard copy form such as printing and / or plotting of drawings. Work will be done in the same secured environment as where the computer workstations are located.
Transmittals 8.1.2.1
All Engineering Drawings/Documents transferred using the appropriate forms.
8.1.2.2
Pickup or delivery of Engineering Drawings/Documents Data shall be accomplished by the requester of such data or by a courier, or any other secure delivery system, authorized by the User (such as a courier service organization) or SEC internal mail system. Transfer of custody by any other mail system shall be avoided.
8.1.2.3
Electronic transfer of Un-encrypted Engineering Drawings/Documents Data is permissible only where secure electronic delivery is assured. Where Engineering Drawings/Documents Data shall be transferred via unsecured lines (e.g. modem or commercial e-mail), files shall be encrypted and encryption keys shall be exchanged via an alternate communications method. Unauthorized copying and/or transmittal of files are strictly prohibited.
shall
be
formally
Minimum Security Requirements 8.1.3.1
SEEDS-II-00
Data
The area(s) where Engineering Drawings/Documents Data are handled and stored shall be inaccessible to unauthorized personnel at all times. All main entrances shall be controlled with an access control system. Emergency exits shall be equipped with security alarms that sound whenever the exit is used. User’s department manager shall approve exception to this requirement prior to its implementation for Engineering Drawings/Documents Data to be removed from the secured areas for the purpose of cross checking, design reviews, etc., prior written approvals shall be acquired from the User. Furthermore, Date of Issue 2004-10-10
Page No.
25 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
during the time such Engineering Data is outside the secured area, it shall be kept in locked cabinets during non-working hours. All visitors shall be escorted.
8.1.4
SEEDS-II-00
8.1.3.2
User shall designate a custodian to receive the original and duplicate original drawings and to assume responsibility for their safety, security and confidentiality. The custodian shall be responsible for limiting and logging the access to these original and duplicate original drawings on a need-to-know basis and advising other personnel on the security procedures. This custodian and designated alternate(s) shall be responsible for tracking all Engineering Drawings/Documents Data requested by, or in the custody of, the Contractor.
8.1.3.3
All unwanted hard and electronic copies of Engineering Drawings/Documents Data shall be returned to TSSD/TDMD.
8.1.3.4
All drawing reproduction shall be performed within the Contractor's facilities or in premises outside of Contractor's facilities approved by the User in writing. Such approval shall be given based on an objective evaluation of such premises' internal control procedures to handle confidential documents for clients. Such written approval shall be in place before any Engineering Drawings/Documents Data are delivered to such firms.
8.1.3.5
The Contractor shall obtain the User's written permission prior to transferring Engineering Drawings/Documents Data to any third party. The Contractor shall ensure that the third party agrees in writing to comply with this procedure.
8.1.3.6
The Contractor shall return all originals, and duplicate originals of, Engineering Drawings/Documents Data to the User immediately, upon completion of work or when they are no longer needed.
Electronic Engineering Drawings/Documents Data Access 8.1.4.1
An electronic Engineering Drawings/Documents Data access system shall be implemented, restricting access to only those personnel whose work requires them to have an access to specific set of Engineering Drawings/Documents Data. Such access system shall utilize a combination of individual user LOGON ID, password and access rules.
8.1.4.2
The unauthorized electronic access of Engineering Drawings/Documents Data by Contractor personnel is strictly prohibited under any circumstances and shall be reported to the User. Date of Issue 2004-10-10
Page No.
26 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
8.1.4.3
8.1.5
Electronic Engineering Drawings/Documents Data Files Back-up and Storage 8.1.5.1
8.2
Daily and weekly back-ups are required for all electronic Engineering Drawings/Documents Data files. Weekly back-up files shall be stored in off-site fireproof safe(s) approved by the User and shall be kept for the duration of the job until three (3) months after the submittal of all the Engineering Drawings/Documents Data to the User after which all back-ups shall be destroyed by means of mechanical shredding equipment when approved by the User.
Responsibilities
8.2.1
8.2.2
SEEDS-II-00
Users of electronic Engineering Drawings/Documents Data equipment shall have individual user LOGON IDs and passwords that shall be changed monthly and when necessary. Access for personnel leaving the project, or whose jobs no longer requires access to Engineering Drawing Data, shall be canceled immediately. LOGON IDs and passwords shall not be shared.
Proponents 8.2.1.1
The Proponents shall safeguard all Engineering Drawings/Documents Data in their custody per this procedure.
8.2.1.2
The Proponents shall verify and concur the Engineering Drawings/Digital Files Request prepared by the Users prior to submittal of the request to the TSSD/TDMD. The Proponent may elect to waive this requirement on specific projects with the written concurrence of TSSD/TDMD.
Users 8.2.2.1
The Users shall review and approve of the Contractors' security procedures to ensure they meet the minimum requirements of this procedure prior to releasing any Engineering Drawings/Documents Data to the Contractors.
8.2.2.2
Prior to releasing Engineering Drawings/Documents Data to a Contractor, the User shall assign a member of his project team to oversee the Contractor's compliance with this procedure throughout the execution of the project.
8.2.2.3
If no contractual relationship for the work exists between a Contractor and SEC (e.g. subcontractors), the Users shall ensure that each Date of Issue 2004-10-10
Page No.
27 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
Contractor agrees in writing to commit himself to meet the minimum security requirements by signing a confidentiality agreement as provided by the Contracting organization prior to transferring any original, or copies of, Engineering Drawings/Documents Data or related documents to the Contractor which shall be returned to the User after the completion of the purpose for which these documents were provided to the Contractor.
8.2.3
8.3
8.2.2.4
The Users shall ensure the Engineering Drawings/Documents Data designated by the Proponents as CONFIDENTIAL or RESTRICTED are stamped as such per the SEC requirement.
8.2.2.5
The Users shall review the Contractors' utilization of the Engineering Drawings/Documents Data and drawing numbers, in the Contractors' custody, at each project review phase and perform final counts prior to signing each Final Release Receipt Agreement (FRRA).
8.2.2.6
The Users shall be accountable for all Engineering Drawings/Documents Data and drawing numbers under their care for use by the Contractors.
Transmission Document Management Division (TDMD) 8.2.3.1
Maintains centralized control of all SEC Drawings.
8.2.3.2
Safeguard the Engineering Drawings/Documents Data in its custody as set forth in this chapter.
8.2.3.3
Track drawings overdue for submission by the Users.
8.2.3.4
Issue drawing numbers for the purpose of development of new drawings as well as revision number for modification of existing drawings as set forth in the SEC CADD Standards Manual.
8.2.3.4
Verify drawings submitted conform to drawing related SEC Engineering Standards as well as Drafting and CADD standards as set forth in the SEC CADD Standards Manual.
Non-Compliance
In the event of Mishandling by the Contractor, or his personnel, of any SEC Engineering Drawings/Documents Data, in the custody of the Contractor, the User, jointly with the Proponent, shall investigate the matter and bring their findings to the attention of the SEC contract proponent who may take appropriate action. SEEDS-II-00
Date of Issue 2004-10-10
Page No.
28 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II) Transmiss ion Standards & Specifications Department Transmiss ion Document Management Division
9
Applicable Documents Appendix – A
Flow Chart of Certification & Submittal Of Turnkey Project Drawings
Appendix – B
drawing Completion Certificate (DCC) SEC Form No. XXXXX
Appendix – C
Files Formats for New electronic drawings
Appendix – D
Preparation of Engineering Drawing (Sample)
Appendix – E
Approval/Certification of Turnkey Project Drawings
Appendix – F
Engineering Drawing Submittal SEC Form No. SEC-15057
Appendix – G
Drawing Index File
Appendix – H
Drawing Control Sheet (DCS) SEC Form No. SEC-16758
Appendix – J
Original Drawings/Digital Files Request SEC Form No. SEC-15245
Appendix – K
Request for Assignment of Engineering Drawing Numbers SEC Form No. SEC-15367
Appendix – L
For all disciplines symbology (table-1)
Appendix – M
For Electrical one line diagram symbology (table-2)
Appendix – N
Index Key, Drawing and Equipment (Drawing No. KE-036001)
Appendix – P
Color label for CD-ROM and Plastic case
Appendix – Q
Technical check list of As Built Drawings
SEEDS-II-00
Date of Issue 2004-10-10
Page No.
29 of 29
APPENDIX-A Flow Chart of Submittal & Ap proval/Certification of As Built drawings of the Turnkey Project As Buil t Dr awings Developm ent
(Item-3)
By Contractor/Design Agency
Submittal of As Built drawings
(Item-6.5)
Manual Submittal (Item-6.5.1.1)
Interactive Submittal (Item-6.5.1.2)
SEC-15057 + copy (Appendix-F)
SEC-15057 + copy (Appendix-F)
Drawing Control Sheet (Appendix-H) Electronic Drawing Files (Item-6.5.2)
Drawing Control Sheet (Appendix-H) Generated list of processed drawings
TSSD/TDMD Acknowledgement Acknowledge Receipt Appendix-E (Item-6.5.7.6) Assign Control Number Appendix-E (Item-6.5.7.6)
TSSD/TDMD Appr oval/Verif icati on Review for Compliance
Rejection (Item-6.5.7.9)
Acceptatio n (Item-6.5.7.8)
Return for Correction to Contractor/Design Agency
Assign DCC Number Appendix-B (Item-6.7) Acceptation letter to the Contractor (Item-6.5.7.7)
Submittal return to Contractor/Design agency For Approval/Certification Information or necessary action
Appr oval/Certi fi catio n (Item-6.4) Fill Approval/Certification Information in all Drawings (Item-6.3) Signature on Appendix-E (Item-6.4.1) Prepare the Electronic Drawing File Appendix-G (Item-6.5.2) Signnature on DCC Appendix-B (Item-6.4.3)
Final Submittal of As Built Drawings Contractor produce Mylar prints (Item-7.1.8)
Final Acceptation of As Buil t Issuance of Project Completion Certificate (Item-6.8) Drawings to EDMS Archive (Item-6.9)
APPENDIX-B
!"#$%&'( )*+,-.(/ )0$1(/
DRAWING COMPLETION CERTIFICATE (DCC)
Saudi Electricity Company
FOR TURNKEY PROJECTS (AS-BUIL T DRAWINGS) SEC-xxxxx (2004/10)
DCC No. This is to certify that the drawing (New and Revised) listed in the following pages, carried out under the Job Number indicated in this certificate (and on the drawings), hereby, have been prepared in accordance with the applicable SEC Engineering, Design, Drafting and cadd Standards, Procedures and Practices specific to the project described below per itsScope of Work excep what has (have) been waived to satisfy all the Engineering Drawing approval/certification requiements as set SEEDS-II, Chapter-6.
Contract No. Job Order No. Dwg. Control Sheet No. Discipline TSSD/TDMD Control No.
Project Title Location (s) Contractor Name Address
P. O. Box No.
City
Tel. No.
Fax No.
Zip Code E-mail
CERTIFICATION Design Agency Certification
Discipline Engineer Name
Signature
Date
Name
Signature
Date
Name
Signature
Date
Name
Signature
Date
Name
Signature
Date
Name
Signature
Date
Project Engineer
Certified by (SEC) (Project Manager/Engineering) SEC Review for Key Drawings
Operating Department (Key Drawings)
Engineering Department (Key Drawings)
Others Department NOTES: 1
TDMD shall attach a hardcopy print of the Electronic Drawing official count generated per 6.5.7.5
2
Refer chaprer-6 for Certification and Submittal of Drawings Electronically.
3
Attach copies of all TSSD/TDMD approved waiver requests.
For TSSD/TDMD Use on ly
Verified By Name
Signature
Date
APPENDIX-C
!"#$%&'( )*+,-.(/ )0$1(/
FILES FORMAT FOR NEW ELECTRONIC DRAWINGS/DOCUMENTS
Saudi Electricity Company
SEC-xxxxx (2004/10)
Drawing/Document Type
Drawing Size
File Format
Requirements
Scope of Work and Technical Specifications (SOW/TS) with attached Appendices
E
Microsoft Word (*.doc) + Adobe Portable Document Format (*.pdf)
Single File for multi-pages documents
List of Materials
E
Microsoft Word or Excel (*.doc or *.xls) + Adobe Portable Document Format (*.pdf)
Single File for multi-pages documents
Drawing Control Sheet (DCS)
E
Microsoft Excel (*.xls) + Adobe Portable Document Format (*.pdf)
Single File for multi-pages documents
E
Microsoft Word or Excel (*.doc or *.xls) + Adobe Portable Document Format (*.pdf)
Single File for multi-pages documents
D or E
Microsoft Excel ( *.xls) + Adobe Portable Document Format (*.pdf)
Single File for each Sheet of document
A, B, C, D &E
Microstation (*.dgn) + Adobe Portable Document Format (*.pdf)
Single File for each Sheet of Drawing
Calculations Sheets
Engineering Drawings such as:• Safety Instructions Sheet (SIS) • Instrument Installation Schedule (IIS) • Cable & Conduit Schedule (CCS) • Line Designation Table (LDT) • Equipment Data Sheet • Instrument Specification Sheet (ISS)
Engineering Drawings for which the Forms are available within SEC Software Package
Notes:1.
Drawings format and size shall be as per the table above.
2.
All Project Documents shall be submitted for archival into SEC corporate drawing system. The Project Documents include, but not necessarily limited to, the following: Material take-off sheets, Construction Specifications, Operating Specifications/Instructions, Painting Specifications, Inspection Records, Equipment Lists, Construction Schedules, Construction Bar Charts, Calculations Sheets, Meter Reading Tables, Reports, Studies, Charts, Operation & Maintenance Manuals, Equipment Manuals, Design Criteria, Sketches, Requisitions, Quotations, Spare Part Lists, Performance/Calibration Curves, Purchase Orders, Installation Witness Reports, Name Plates, etc.
...\FORMS\APPENDIX-D.00.dgn 10/12/2004 01:20:13 PM
...\FORMS\APPENDIX-E.00.dgn 10/12/2004 01:32:52 PM
...\FORMS\APPENDIX-E.00.dgn 10/12/2004 01:32:52 PM
APPENDIX-F
!"#$%&'( )*+,-.(/ )0$1(/ Saudi Electricity Company
ENGINEERING DRAWING SUBMITTAL SEC-15057 (2004/10) PROJECT DESCRIPTION
SUBMITTAL TYPE
Project Title Contract No.
Interactive Submittal (Through EDMS)
Job Order No.
Manual Submittal (Not Through EDMS)
PTS No.
TSSD/TDMD Control No. Original Drawings Request (SEC-15345)
Proponent Control No. SUBMITTAL CONTENTS
NUMBER OF DRAWINGS
DCC Number
New
Drawing Control Sheet No.
Revised
Number of CDs.
Un-Revised
Others
Cancelled
SUBMITTED BY
CONSULTANT/CONTRACTOR
Project Manager/Engineer
Name
Badge No.
Project Engineer
APPENDIX-F
!"#$%&'( )*+,-.(/ )0$1(/ Saudi Electricity Company
ENGINEERING DRAWING SUBMITTAL SEC-15057 (2004/10) PROJECT DESCRIPTION
SUBMITTAL TYPE
Project Title Contract No.
Interactive Submittal (Through EDMS)
Job Order No.
Manual Submittal (Not Through EDMS)
PTS No.
TSSD/TDMD Control No. Original Drawings Request (SEC-15345)
Proponent Control No. SUBMITTAL CONTENTS
NUMBER OF DRAWINGS
DCC Number
New
Drawing Control Sheet No.
Revised
Number of CDs.
Un-Revised
Others
Cancelled
SUBMITTED BY
CONSULTANT/CONTRACTOR
Project Manager/Engineer
Name
Badge No.
Project Engineer
Department/Division
Telephone No.
Location
Fax No.
Telephone No.
P. O. Box No.
E-mail
City E-mail Date
Signature
Date
RECEIVED BY
NOTES
TSSD/TDMD Control No. Name
Signature
Date
Zip Code
APPENDIX-G DRAWING INDEX FILE DETAIL-1
DETAIL-2
(EXAMPLE) ALL DRAWINGS OF INDEX "A " SHOULD BE IN FOLDER " INDEX-A"
APPENDIX-H
!"#$%&'( )*+,-.(/ )0$1(/ DRAWING CONTROL SHEET
Saudi Electricity Company
SEC-16758 (2004/10) PROJECT TITLE
PROJECT MANAGER / ENGINEER
CONTRACT NO.
JOB ORDER NO.
DRAFTING OFFICE
ADMINISTRATION BUIL DING PARKING L OT AHMED M. AL -JAFFA R / MOHAMMED Q. RIZWAN
AT GHAZL AN POWER PLANT GHAZLAN
88888/00
12-12345467-123
COMPANY NAME
SAUDI ARABIA
DRAWING NO.
SHEET NO.
INITIAL
FURTHER REV.
DRAWING TITLE
REV. NO.
NO.
REMARKS
DATE
INDEX - A
VENDOR DRAWING NO.
00
SITE LOCATION PLAN
MHA-12345-64
KA-123457
01 OF 02
00
GROUND FLOOR PLAN
MHA-12345-65
KA-123457
02 OF 02
00
FIRST FLOOR PLAN
MHA-12345-66
KA-123456
INDEX - P 00
SITE ELECTRICAL LAYOUT PLAN
MHA-12345-67
KA-123459
01 OF 02
00
ELECTRICAL LAYOUT PLAN, GROUND FLOOR
MHA-12345-68
KA-123459
02 OF 02
00
ELECTRICAL LAYOUT PLAN, FIRST FLOOR
MHA-12345-69
KA-123458
INDEX - Q 00
FOUNDATION DETAILS
MHA-12345-70
KA-123461
01 OF 02
00
FOUNDATIONS LAYOUT, GROUND FLOOR
MHA-12345-71
KA-123461
02 OF 02
00
FOUNDATIONS LAYOUT, FIRST FLOOR
MHA-12345-72
KA-123460
AS B UILT BY
COMPANY NAME
PROJECT COMPLETION DATE
PLANT NO.
INDEX
DRAWING NO.
2002-04-10
DA123
X
KE-123456
SHEET NO.
01
OF
REV. NO.
01
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO . NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DMS
EXCEL
APPENDIX-J
!"#$%&'( )*+,-.(/ )0$1(/ Saudi Electricity Company
ORIGINAL DRAWINGS / DIGITAL FILES REQUEST SEC-15345 (2004/10) PROJECT MANAGER / ENGINEER
BADGE NO.
TELEPHONE NO.
E-MAIL ADDRESS
LOCATION
DATE
PROJECT DESCRIPTION
DEPT./DIVISION
TSSD/TDMD CONTROL NO.
SIGNATURE
PROJECT TITLE CONTRACT NO.
JOB ORDER NO.
CONSULTANT / CONTRACTOR PROJECT MANAGER / ENGINEER TELEPHONE NO.
FAX NO.
P. O. BOX NO. PLANT NO.
INDEX
E-MAIL
CITY
DRAWING NO.
SHEET NO.
ZIP CODE REV. NO.
PLANT NO.
INDEX
DRAWING NO.
SHEET NO.
REV. NO.
APPENDIX-J
!"#$%&'( )*+,-.(/ )0$1(/ Saudi Electricity Company
ORIGINAL DRAWINGS / DIGITAL FILES REQUEST SEC-15345 (2004/10) PROJECT MANAGER / ENGINEER
BADGE NO.
TELEPHONE NO.
E-MAIL ADDRESS
LOCATION
DATE
PROJECT DESCRIPTION
DEPT./DIVISION
TSSD/TDMD CONTROL NO.
SIGNATURE
PROJECT TITLE CONTRACT NO.
JOB ORDER NO.
CONSULTANT / CONTRACTOR PROJECT MANAGER / ENGINEER TELEPHONE NO.
FAX NO.
P. O. BOX NO. PLANT NO.
E-MAIL
CITY
INDEX
DRAWING NO.
SHEET NO.
ZIP CODE REV. NO.
PLANT NO.
INDEX
DRAWING NO.
APPROVED BY TSSD/TDMD MANAGER
RECEIVED BY
SIGNATURE
DATE
BADGE
DATE
NOTE
ORIGINAL DRAWINGS/CDs ARE ALWAYS TO BE PICKED-UP AND RETURN IN PERSON BY THE PROJECT ENGINEER HIMSELF AND NEVER BE SENT BY MAIL
SHEET NO.
REV. NO.
APPENDIX-K
!"#$%&'( )*+,-.(/ )0$1(/ Saudi Electricity Company
REQUEST FOR A SSIGNMENT OF ENGINEERING DRAWING NUMB ERS SEC-15367 (2004/10)
FROM:-
TO:-
DIVISION MANAGER
PROJECT MANAGER / ENGINEER
TSSD / TRANSMISSION DOCUMENT MANAGEMENT DIVISION
NAME
ROOM 1-200 WEST
DEPT. / DIV.
EASTERN AREA ADMINISTRATIVE OFFICE
LOCATION
DAMMAM
TEL. NO. SIGNATURE & DATE
PROJECT DESCRIPTION
CONSULTANT / CONTRACTOR
PROJECT TITLE
NAME
LOCATION
P. O. BOX NO.
PLANT NO.
CITY
CONTRACT NO.
PHONE NO.
JOB ORDER NO.
E-MAIL
ZIP CODE
FAX NO.
PROJECT COMPLETION DATE
UPON PROJECT COMPLETION, PROJECT MANAGER / ENGINEER WILL INFORM TSSD/TDMD OF UNUSED DRAWING NUMBERS.
ALLOCATE A BLOCK OF DRAWING NUMBER
FOR TSSD/TRANSMISSION DOCUMENT MANAGEMENT DIVISION USE ONLY ALLOCATED BLOCK OF DRAWING NUMBERS FROM: APPROVED BY TSSD/TDMD
KE-
DRAWING CONTROL SHEET:-
TO: DATE
ASSIGNED BY
NAME & SIGNATURE
DATE
NAME & SIGNATURE
UPON PROJECT COMPLETION ALL CERTIFIED ORIGINAL DRAWING MUST BE TRANSMITTED WITH DRAWING
IMPORTANT
TRANSMITTAL FORM NUMBER 15057 TO TSSD / TRANSMISSION DOCUMENT MANAGEMENT DIVISION
APPENDIX-L LEVEL COLOR WEIGHT
ALL DISCIPLINES SYMBOL OGY TAB LE-1 DISCIPLINE
LEVEL COLOR WEIGHT
DISCIPLINE
1
1
2
RESERVED FOR USER
33
33
2
PLUMBING LINES
2
2
2
RESERVED FOR USER
34
34
2
PLUMBING SYMBOLS
3
3
2
RESERVED FOR USER
35
35
1
PLUMBING TEXT
4
4
0
CENTER LINES
36
36
2
SURVEY LINES
5
0
1
DIMENSIONS, GEN. TEXT/CALL-OUT & LEADER LINE
37
37
2
SURVEY SYMBOLS
6
6
2
ARCHITECTURAL LINES
38
38
1
SURVEY TEXT
7
7
2
ARCHITECTURAL SYMBOLS
39
39
2
TELECOMMUNICATION LINES
8
8
1
ARCHITECTURAL TEXT
40
40
2
TELECOMMUNICATION SYMBOLS
9
9
2
CIVIL LINES
41
41
1
TELECOMMUNICATION TEXT
10
10
2
CIVIL SYMBOLS
42
42
2
RESERVED FOR USER
11
11
1
CIVIL TEXT (FONT-5)
43
43
2
RESERVED FOR USER
12
12
2
COMPRESSED AIR LINES
44
44
1
RESERVED FOR USER
13
13
2
COMPRESSED AIR SYMBOLS
45
45
2
RESERVED FOR USER
14
14
1
COMPRESSED AIR TEXT
46
46
2
RESERVED FOR USER
15
15
2
ELECTRICAL ENGINEERING LINES
47
47
1
RESERVED FOR USER
16
16
2
ELECTRICAL ENGINEERING SYMBOLS
48
0
3
TITLE
17
17
1
ELECTRICAL ENGINEERING TEXT
49
5
4
DRAWING NUMBER
18
18
2
FIRE PROTECTION LINES
50
3
0
PLOTTING FENCE POINTS (REFERENCE FILE)
19
19
2
FIRE PROTECTION SYMBOLS
51
51
1
REVISION DIAMOND WITH TEXT
20
20
1
FIRE PROTECTION TEXT
52
0
1
NOTES
21
21
2
HVAC LINES
53
0
1
LEGEND
22
22
2
HVAC SYMBOLS
54
14
1
OUTSIDE BORDER REVISION BLOCK (REF. FILE)
23
23
1
HVAC TEXT
55
55
2
CLOUDS
24
24
2
IRRIGATION LINES
56
56
1
AS BUILTS BLOCK (REFERENCE FILE)
25
25
2
IRRIGATION SYMBOLS
57
57
1
REFERENCE DRAWINGS BLOCK (REFERENCE FILE)
26
26
1
IRRIGATION TEXT
58
0
1
INSIDE BORDER REVISION BLOCK (REF. FILE)
27
27
2
MISCELLANEOUS LINES
59
1
2
TITLE BLOCK (REFERENCE FILE)
28
28
2
MISCELLANEOUS SYMBOLS
60
0
3
INSIDE BORDER LINE UPPER (REFERENCE FILE)
29
29
1
MISCELLANEOUS TEXT
61
0
3
INSIDE BORDER LINE LOWER (REFERENCE FILE)
30
30
2
PIPING LINES
62
0
5
OUTSIDE BORDER LINE (REFERENCE FILE)
31
31
2
PIPING SYMBOLS
63
63
0
SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)
32
32
1
PIPING TEXT
ALL DISCIPLINES SYMBOL OGY TAB LE-1
APPENDIX-L LEVEL COLOR WEIGHT
DISCIPLINE
LEVEL COLOR WEIGHT
DISCIPLINE
1
1
2
RESERVED FOR USER
33
33
2
PLUMBING LINES
2
2
2
RESERVED FOR USER
34
34
2
PLUMBING SYMBOLS
3
3
2
RESERVED FOR USER
35
35
1
PLUMBING TEXT
4
4
0
CENTER LINES
36
36
2
SURVEY LINES
5
0
1
DIMENSIONS, GEN. TEXT/CALL-OUT & LEADER LINE
37
37
2
SURVEY SYMBOLS
6
6
2
ARCHITECTURAL LINES
38
38
1
SURVEY TEXT
7
7
2
ARCHITECTURAL SYMBOLS
39
39
2
TELECOMMUNICATION LINES
8
8
1
ARCHITECTURAL TEXT
40
40
2
TELECOMMUNICATION SYMBOLS
9
9
2
CIVIL LINES
41
41
1
TELECOMMUNICATION TEXT
10
10
2
CIVIL SYMBOLS
42
42
2
RESERVED FOR USER
11
11
1
CIVIL TEXT (FONT-5)
43
43
2
RESERVED FOR USER
12
12
2
COMPRESSED AIR LINES
44
44
1
RESERVED FOR USER
13
13
2
COMPRESSED AIR SYMBOLS
45
45
2
RESERVED FOR USER
14
14
1
COMPRESSED AIR TEXT
46
46
2
RESERVED FOR USER
15
15
2
ELECTRICAL ENGINEERING LINES
47
47
1
RESERVED FOR USER
16
16
2
ELECTRICAL ENGINEERING SYMBOLS
48
0
3
TITLE
17
17
1
ELECTRICAL ENGINEERING TEXT
49
5
4
DRAWING NUMBER
18
18
2
FIRE PROTECTION LINES
50
3
0
PLOTTING FENCE POINTS (REFERENCE FILE)
19
19
2
FIRE PROTECTION SYMBOLS
51
51
1
REVISION DIAMOND WITH TEXT
20
20
1
FIRE PROTECTION TEXT
52
0
1
NOTES
21
21
2
HVAC LINES
53
0
1
LEGEND
22
22
2
HVAC SYMBOLS
54
14
1
OUTSIDE BORDER REVISION BLOCK (REF. FILE)
23
23
1
HVAC TEXT
55
55
2
CLOUDS
24
24
2
IRRIGATION LINES
56
56
1
AS BUILTS BLOCK (REFERENCE FILE)
25
25
2
IRRIGATION SYMBOLS
57
57
1
REFERENCE DRAWINGS BLOCK (REFERENCE FILE)
26
26
1
IRRIGATION TEXT
58
0
1
INSIDE BORDER REVISION BLOCK (REF. FILE)
27
27
2
MISCELLANEOUS LINES
59
1
2
TITLE BLOCK (REFERENCE FILE)
28
28
2
MISCELLANEOUS SYMBOLS
60
0
3
INSIDE BORDER LINE UPPER (REFERENCE FILE)
29
29
1
MISCELLANEOUS TEXT
61
0
3
INSIDE BORDER LINE LOWER (REFERENCE FILE)
30
30
2
PIPING LINES
62
0
5
OUTSIDE BORDER LINE (REFERENCE FILE)
31
31
2
PIPING SYMBOLS
63
63
0
SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)
32
32
1
PIPING TEXT
APPENDIX-M LEVEL COLOR WEIGHT
ELECTRICAL ONE LINE DIAGRAM SYMBOLOGY TAB LE-2 DISCIPLINE
LEVEL COLOR WEIGHT
DISCIPLINE
1
1
2
POWER CONVERTERS & GENERATORS
33
142
1
2
2
2
TRANSFORMERS
34
142
1
127V BUS 125V BUS
3
3
2
MACHINES
35
142
1
120V BUS
4
4
2
FIRE EQUIPMENT
36
142
1
110V BUS
5
0
1
GENERAL TEXT/CALL-OUT & TEXT LEADER LINE
37
142
1
48V BUS
6
6
2
OPERATING DEVICES
38
142
1
24V BUS
7
7
2
EARTH & FRAME CONNECTION EQUIPMENTIALITY
39
142
1
12V BUS
8
8
2
MISCELLANEOUS SYMBOLS
40
40
1
EOD PLACE TEXT
9
9
2
RESISTORS, CAPACITORS & INDICATORS
41
135
3
69kV + 66kV LINES
10
10
2
WINDINGS INSTRUMENTS
42
136
4
115kV + 132kV LINES
11
11
2
PRIMARY CELL & ACCUMULATIONS
43
137
5
230kV LINES
12
12
2
SWITCHGEARS
44
138
6
380kV LINES
13
13
2
MOTOR STARTERS
45
139
2
13.8kV 11kV LINES
14
14
2
CONTROL GEAR
46
140
1
2.4kV TO 4.6kV LINES
15
15
2
FUSES
47
142
1
12V TO 480V LINES
16
16
2
GAPS & ARRESTORS
48
0
3
TITLE
17
17
2
METERING DEVICES
49
5
4
DRAWING NUMBER
18
18
2
COMMUNICATIONS SYSTEMS
50
3
0
PLOTTING FENCE POINTS (REFERENCE FILE) REVISION DIAMOND WITH TEXT
19
19
2
LAMPS & SIGNALING DEVICES
51
51
1
20
134
1
34.5kV + 33kV LINES
52
0
1
NOTES
21
134
5
34.5kV + 33kV BUS
53
0
1
LEGEND
22
135
6
69kV + 66kV BUS
54
14
1
OUTSIDE BORDER REVISION BLOCK (REF. FILE)
23
136
8
115kV + 132kV BUS
55
55
2
CLOUDS
24
137
10
230kV BUS
56
56
1
AS BUILTS BLOCK (REFERENCE FILE)
25
138
12
380kV BUS
57
57
1
REFERENCE DRAWINGS BLOCK (REFERENCE FILE)
26
139
4
13.8kV + 11kV BUS
58
0
1
INSIDE BORDER REVISION BLOCK (REF. FILE)
27
140
3
4.16kV BUS
59
1
1
TITLE BLOCK (REFERENCE FILE)
28
141
2
2.4kV BUS
60
0
3
INSIDE BORDER LINE UPPER (REFERENCE FILE)
29
142
1
480V BUS
61
0
3
INSIDE BORDER LINE LOWER (REFERENCE FILE)
30
142
1
380V BUS
62
0
5
OUTSIDE BORDER LINE (REFERENCE FILE)
31
142
1
220V BUS
63
63
0
SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)
32
142
1
208kV BUS
ELECTRICAL ONE LINE DIAGRAM SYMBOLOGY TAB LE-2
APPENDIX-M LEVEL COLOR WEIGHT
DISCIPLINE
LEVEL COLOR WEIGHT
DISCIPLINE
1
1
2
POWER CONVERTERS & GENERATORS
33
142
1
2
2
2
TRANSFORMERS
34
142
1
127V BUS 125V BUS
3
3
2
MACHINES
35
142
1
120V BUS
4
4
2
FIRE EQUIPMENT
36
142
1
110V BUS
5
0
1
GENERAL TEXT/CALL-OUT & TEXT LEADER LINE
37
142
1
48V BUS
6
6
2
OPERATING DEVICES
38
142
1
24V BUS
7
7
2
EARTH & FRAME CONNECTION EQUIPMENTIALITY
39
142
1
12V BUS
8
8
2
MISCELLANEOUS SYMBOLS
40
40
1
EOD PLACE TEXT
9
9
2
RESISTORS, CAPACITORS & INDICATORS
41
135
3
69kV + 66kV LINES
10
10
2
WINDINGS INSTRUMENTS
42
136
4
115kV + 132kV LINES
11
11
2
PRIMARY CELL & ACCUMULATIONS
43
137
5
230kV LINES
12
12
2
SWITCHGEARS
44
138
6
380kV LINES
13
13
2
MOTOR STARTERS
45
139
2
13.8kV 11kV LINES
14
14
2
CONTROL GEAR
46
140
1
2.4kV TO 4.6kV LINES
15
15
2
FUSES
47
142
1
12V TO 480V LINES
16
16
2
GAPS & ARRESTORS
48
0
3
TITLE
17
17
2
METERING DEVICES
49
5
4
DRAWING NUMBER
18
18
2
COMMUNICATIONS SYSTEMS
50
3
0
PLOTTING FENCE POINTS (REFERENCE FILE) REVISION DIAMOND WITH TEXT
19
19
2
LAMPS & SIGNALING DEVICES
51
51
1
20
134
1
34.5kV + 33kV LINES
52
0
1
NOTES
21
134
5
34.5kV + 33kV BUS
53
0
1
LEGEND
22
135
6
69kV + 66kV BUS
54
14
1
OUTSIDE BORDER REVISION BLOCK (REF. FILE)
23
136
8
115kV + 132kV BUS
55
55
2
CLOUDS
24
137
10
230kV BUS
56
56
1
AS BUILTS BLOCK (REFERENCE FILE)
25
138
12
380kV BUS
57
57
1
REFERENCE DRAWINGS BLOCK (REFERENCE FILE)
26
139
4
13.8kV + 11kV BUS
58
0
1
INSIDE BORDER REVISION BLOCK (REF. FILE)
27
140
3
4.16kV BUS
59
1
1
TITLE BLOCK (REFERENCE FILE)
28
141
2
2.4kV BUS
60
0
3
INSIDE BORDER LINE UPPER (REFERENCE FILE)
29
142
1
480V BUS
61
0
3
INSIDE BORDER LINE LOWER (REFERENCE FILE)
30
142
1
380V BUS
62
0
5
OUTSIDE BORDER LINE (REFERENCE FILE)
31
142
1
220V BUS
63
63
0
SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)
32
142
1
208kV BUS
APPENDIX-N D ' T R E C
INDEX
D ' K H C
N W A R N D O E I T R P D I R N C A S E D D E S I V E R
!"#$%&'( )*+,-.(/ )0$1(/
Saudi Electricity Company
D ' R P P A
R D N A ' Q ' ' , J ' X E D N I D E S I V E R
' X ' X E D N I D E D D A D N A ' A ' X E D N I D E S I V E R
DESCRIPTION
A
PLOT PLANS, AREA MAPS, PLAN & PROFILE, FLOW, PIPING & INSTRUMENTS DIAGRAMS, SAFETY INSTRUCTION SHEETS, LIST OF MATERIAL AND SCOPE OF WORK.
D
DRUMS & VESSELS, KNOCK OUT AND APPURTENANCES, TANKS AND APPURTENANCES.
E
HEAT EXCHANGERS, COOLERS, WATER TREATING EQUIPMENT, CONDENSERS, COOLING TOWERS, EVAPORATORS *
F
FURNACES, BOILERS, STACK, HEATERS, INCINERATORS, FLUES, BURNERS.
G
PUMPS: INCLUDING GEAR AND HYDRAULIC COUPLINGS: CENTRIFUGAL, RECIPROCATING, ROTARY, GEAR, EJECTORS.
H
PAINT, HARDWARE
J
INSTRUMENT AND ASSOCIATED ACCESSORIES, PIPING INSTRUMENT DESIGN DATA.
K
COMPRESSORS, INCLUDING GEARS, & HYDRAULIC COUPLINGS, BLOWERS, FANS VACUUM PUMP AIR CONDITIONING, REFRIGERATION. TURBINES (PUMP TURBINE DRIVES) AIR DRYERS. *
L
PIPING LAYOUTS, DETAILS AND MATERIALS, PLUMBING.
M
STEEL FRAMING FOR BUILDINGS, BRIDGES, WALKS, STAIRS, PLATFORM, PIPE SUPPORTS AND ANCHORS, PERIMETER FENCING.
N
INSULATION LAYOUT AND DETAILS
. R E N W O S T I F O T N E S N O C N E T T I R W E H T T U O H T I W T N E M U C O D S I H T M O R F D E N I A T B O E B L L A H S T R A P N I R O L L U F N I N O I T C
APPENDIX-N D ' T R E C
!"#$%&'( )*+,-.(/ )0$1(/
Saudi Electricity Company
D ' R P P A
INDEX
D ' K H C
N W A R N D O E I T R P D I R N C A S E D D E S I V E R
Y B
R Q M
E T A D
6 0 0 1 2 0 0 2
. O N
4
R D N A ' Q ' ' , J ' X E D N I D E S I V E R
' X ' X E D N I D E D D A D N A ' A ' X E D N I D E S I V E R
2
3
REVISIONS DRAWN RIZWAN
BY:-
DATE:- 2004-10-06
CHECKED BY:-
AMJ
DATE:- 2004-03-31
OPRG. DEPT BY DATE:-
ENG'G. DEPT.
DESCRIPTION
A
PLOT PLANS, AREA MAPS, PLAN & PROFILE, FLOW, PIPING & INSTRUMENTS DIAGRAMS, SAFETY INSTRUCTION SHEETS, LIST OF MATERIAL AND SCOPE OF WORK.
D
DRUMS & VESSELS, KNOCK OUT AND APPURTENANCES, TANKS AND APPURTENANCES.
E
HEAT EXCHANGERS, COOLERS, WATER TREATING EQUIPMENT, CONDENSERS, COOLING TOWERS, EVAPORATORS *
F
FURNACES, BOILERS, STACK, HEATERS, INCINERATORS, FLUES, BURNERS.
G
PUMPS: INCLUDING GEAR AND HYDRAULIC COUPLINGS: CENTRIFUGAL, RECIPROCATING, ROTARY, GEAR, EJECTORS.
H
PAINT, HARDWARE
J
INSTRUMENT AND ASSOCIATED ACCESSORIES, PIPING INSTRUMENT DESIGN DATA.
K
COMPRESSORS, INCLUDING GEARS, & HYDRAULIC COUPLINGS, BLOWERS, FANS VACUUM PUMP AIR CONDITIONING, REFRIGERATION. TURBINES (PUMP TURBINE DRIVES) AIR DRYERS. *
L
PIPING LAYOUTS, DETAILS AND MATERIALS, PLUMBING.
M
STEEL FRAMING FOR BUILDINGS, BRIDGES, WALKS, STAIRS, PLATFORM, PIPE SUPPORTS AND ANCHORS, PERIMETER FENCING.
N
INSULATION LAYOUT AND DETAILS
P
ELECTRICAL: POWER GENERATION, TRANSMISSION/DISTRIBUTION, LIGHTING, MOTORS
*
. O C Y T I C I R T C E L E I D U A S
Q
CONCRETE: FOUNDATIONS, SLABS, STEEL BENDING DETAILS ETC.
R
BUILDING, ARCHITECTURAL: PLANS, ELEVATIONS, AND DETAILS INCLUDING WOOD STRUCTURES.
S
MISC. SERVICES, SEWERS, ROADS, PAVING AND GRADING, FIRE PROTECTION EQUIPMENT, HYDROSTATIC TEST DIAGRAMS, FIRE WALLS, FIREPROOFING.
T
COMMUNICATION SYSTEMS AND EQUIPMENTS.
U
ALL SPECIAL EQUIPMENT PERTAINING TO BUILDINGS, STRUCTURE, OR FACILITIES WHICH APPLY TO THAT BUILDING ALONE (SUCH AS LABORATORY AND MESS HALLS)
W
WELDING MACHINES, WELDING CABLES, WELDING ELECTRODES, ALL WELDING TOOLS AND EQUIPMENTS.
X
DRAWING CONTROL SHEET
BY:DATE:-
APPROVAL/CERTF. INFORMATION
NOTE:- * FOR EQUIPMENT NUMBERING SEE SHEET 2 OF 2
DDC NO. REV. NO. THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
AS BUILT BY
DATE DRAWING TITLE
INDEX KEY DRAWING AND EQUIPMENT STANDARD
INDEX
A
PLANT
ZO1
SAUDI ARABIA JOB ORDER NO.
. R E N W O S T I F O T N E S N O C N E T T I R W E H T T U O H T I W T N E M U C O D S I H T M O R F D E N I A T B O E B L L A H S T R A P N I R O L L U F N I N O I T C U D O R P E R O N
DRAWING NO.
SHEET NO.
REV NO.
SE-036001
01 OF 02
04
DWG. CONT. SHT
SEC CAD-E (2004-10) DMS
EXCEL
F O Y T R E P O R P E L O S E H T E R A N I E R E H D E N I A T N O C N O I T A M R O F N I E H T D N A G N I W A R D S I H T
...\FORMS\APPENDIX-P.00.dgn 10/12/2004 01:49:48 PM