Laporan berkenaan dengan proses membuat pocket menggunakan mesin cnc millingFull description
Scrum pocket guide
Descrição: The only guide to Moscow, Russia, you will ever need.
iohi
The only guide to Katowice, Poland, you will ever need.Full description
Hive (Game) Pocket Rules
Intelligent Cybersecurity for the Real WorldFull description
Pocket english Intermediate - VaughanDescripción completa
Descripción: structural engineer pocket book
zz
Ashrae Pocket Guide
PSC Pocket Checklist
Descrição completa
Pocket contest game buzzwoleDescrição completa
Pocket english Intermediate - VaughanFull description
1: Device Power ON
3: Selecting XCAL App
Press here to Power On
SCVT Pocket Guide
4: Checking GPS Status
2: Enabling GPS
Gototo“Apps”& “Apps”& Select Select “XCAL ”App Go “XCAL ”App Slide Down & Select GPS “On”
5: 4 Selecting Report Mode
6: Setting Band Selection
7: Setting Band Selection
1 When executing the application, a notification screen pops up for checking up the status of DM and GPS. Once both DM and GPS status are completely verified, the application becomes in
If you changing Band You Will See this Prompt Just
Press “Optio n”
Click On This
After Pressi ng “OK” Restar
2 Select1800 / 2300 Band &
Click On “Check” Button to
8: 6: Setting Band Selecting GPS Value Information
9: Selecting Cluster Information
10: Cluster Information Downloaded Select Target Cluste r
Press “Down ” Click On “GPS Value”. Long press on Map Screen to get Lat/Long & Press “Ok” & then press
Cluster, scenarios & Site list informatio n getting downloade d
Press back
12: Identify the correct location for test
13: Stationary Settings
14: Selecting Scenario Press “Settin g”
Select Target Site Select Station1 for Alpha
Select the drive “Cycle” VoLTE “Termination
Stationary Test (12-19)
Perform Stationary Test (ST) as per given process in each sector i.e. in Alpha, Beta & Gamma. 15: Autocall Start
Check PCI of sector before Starting the test Please make sure all circle are green before Starting the test wherever is possible. This might not be achieved in
“SCVT”
Perform the stationary test in front of the Antenna of the testing sector with a distance of 50-100 Meters from the tower in the direction of Antenna facing as shown above.
11: SCFT Stationary Test
“Setting” details can be verified after step 13
Select Scenario as “SCVT” and FTP as local FTP defined
Press “Start ”
16: AutoCall Views
17: AutoCall Views
18: AutoCall Views
19: Drive progress flag selection Once Stationary test completed, select the test completion flag as per below: Select “In Progress” for Station1
1 Click On “Option ”& Then Map to see map or “LTE Summa ry
18: Log Upload
Press “CANCE L”
2
20: SCVT- Stationary 2 for Beta sector Repeat Steps 12-18 for Stationary 2 Beta. Please do following modification in “setting” in step 13 &“flag” in step 17 as shown below.
21: SCVT- Stationary 3 for Gama sector Repeat Steps 12-18 for Stationary 3 Gama. Please do following modification in “setting” in step 13 & “flag” in step 17 as shown below. Select Station 3 for Gama sector
Select Station 2 for Beta sector
Select “In Progress ” for Station2 (Beta
Select “Complet e” for Station3 (Gama
25: Autocall Start
24: Selecting Scenario
“Setting” details can be verified after step 22
29: Map View
To See the Map. Press “Option” & then on Map
23: Moving Settings
Moving Test
Press “Settin g”
(22-28)
“SCVT” Start Moving Test with Handover test by moving clockwise & anticlockwise (preferably walk test) to capture the intra-site HO between all sectors of the site in both directions and then do the remaining drive test covering best server area of all sectors of
Select Target “Moving
“Save”
26: AutoCall Views_DTDL
Select the same drive “Cycle” as Stationary Test
27: AutoCall Views_DTUL
Select in one handse t DTDL & In other DTUL Press “Start ” Simult
Scenario “DTDL” in one handset and Scenario “DTUL” in second handset.
28: AutoCall Views
22: SCVT Moving Test
Serving PCI
You can see Successf ul HO by this Sign
30: DT Completion Flag Select the test completion flag: Press “Complete” or “In Progress”, simultaneously in both DTDL & DTUL Handset, depending on completion of drive.
31: Log Upload for all logs at one go Go to upload “Upload”
1 Press “Select all”
2 Uncheck the “ticks” on folders at top and then press “Upload” Wait Upload to finish. If failed, please cancel and upload again
32: Things to check before SCFT
• Site Database from SOLPAR manager. • 2 LTE Handsets (S4 Mini) fully charged. • Sufficient storage space to store the logfiles. • Magnetic Compass, Tilt Meter & Laser meter • Drive route printout, based on best server plot, prepared by SOLPAR engineer. • Pre checks with LSM-R engineer. • Obtaining door key & site access via respective authority. • Authorization letter from RJIL, to conduct drive test. • Delete the garbage log file or already uploaded log files in to FMS from the both handsets. Always keep backup of log files in
35: Things to remember during SCFT (Very Important) • Check GPS is stable as per step-4. • Never conduct stationary test, in between two sectors i.e. in overlapping zone. Always do in main lobe or in front of the antenna of testing sector as per step-12. • Ensure correct PCI update, during handover when moving clockwise/ Anti clockwise from (alpha PCI to Beta PCI, Beta PCI to Gama PCI, Gama PCI to Alpha PCI & Vice versa) to capture the Handover attempt. If handover doesn’t happen as per requirement, contact circle RF lead immediately. • Please drive through routes given, as