Best practices for SAP 3PL integration.Full description
LIMSFull description
SAP FIDescription complète
LIMS
Full description
SAP FIFull description
Hybris-SAP Integration Architecture
SAP FIFull description
Ce document présente une introduction aux tests d'intégration avec Arquillian qui permet de faire des tests d'intégration JavaEE dans n'importe quel conteneur, avec une facilité déconcertante. Il p...
Full description
Description complète
Full description
Sap Pp Configuration PackFull description
SAP PP CaseStudyFull description
Full description
SAP PP Integration with Other Modules KEY POINTS PP-SD
Availability Check
MTO Scenario-MRP Run, Requirement Types
Variant Configuration - Selection/requirements of BOM Components and operation PP-MM
Goods movements - Backflush, Auto Goods Receipt
STO, Reservation created for Production Order/Planning
Creation of Purchase Requisitions, Purchase orders with MRP Run
Quota arrangements/info record usage for sub-contracting/to sub-contracting/to choose the right vendor PP-CO
Price update in material master
Assigning price to activity type for the specific period in the fiscal year.
Activity Type in the Cost center assigned in the WorkCenter
Order Type - Settlement Profile, Costing and Valuation Variants
Product cost Collector
Standard Cost Estimate
WIP and Variance Calculation
Costing Sheets for overheads PP-FI
Account posting entries for each Goods movement related to PP with Valuation Class, Material Type and Movement Type PP-QM
Inprocess inspection with Inspection Type 03-Discrete(After Production Order Release) and 13-Repetetive Manufacturing(Manually Manufacturing(Manually through MFPR)
Goods Receipt inspection with Inspection Type 04 for both Discrete and Repetitive Manufacturing PP-PS
BOM transfer (CN33) to required project with BOM usage 3 (Universal).
Components assigned to WBS and/or Network in the Project.
If the components are attached to WBS, than they are planned with respect the project system. MRP is run at Project level (MD51). The procured material attached to WBS are reseverd as project stock against the the particular project.
The component attached to network are planned at plant level and are reserved as plant stock.