Risk Assessment of HVAC System Commissioning StageFull description
Full description
Full description
RISK ASSESSMENTFull description
Risk Based Thinking as per ISO 9001:2015
power plant,boilers,types of boilers
power plant
A general thermal plant layoutFull description
Deskripsi lengkap
Excavation Risk Assessment SheetFull description
Risk Assessment Methods
Excavation Risk Assessment SheetFull description
Descrição completa
Hydrotest Risk Assessment new
risk assement
Jack Up drill rig movement operationFull description
HS.SAF.34.F02
TASK RISK ASSESSMENT Task: PRE-INTERNAL WIRING OF POWER PLANT INTERFACE PANEL SOP No: Depar!e" : Area: POWER PLANT INTERFACE PANEL PHASE 2 P#S Sr # Activity Personnel Hazard Risk Countermeasures Resonsi!le Residual Involved Risk P S T P S T PREPARATION Emal ! ! " 0 0 1 Interference #upervisor to ensure approved Emal $ •
operators/ electrician s
•
•
with operational activity Hazard due to operational activit
•
•
•
•
•
•
•
F%&e:
Re'%s%o": $($3-)*"-20$3+
PT$ from Emal operation is availa%le prior to enter any Emal facilities& Only competent and authorized personnel to %e deployed' supervisor to control& #upervisor to (ive tool %o) tal* prior to start the tas* and must %e documented& This shall cover the method statement and ris* assessment& Proper coordination with Emal shift supervisor prior to commencement of the activity& activity& Activity shall %e carried out the personnel supervision of receivin( activity& Ensure all wor*ers received the +i( , trainin( from E-A. trainin( $or* chec* list has to %e completed& Area to %e cordon o and
operation / contractor supervisor
Pa,e $ o $
HS.SAF.34.F02
•
•
proper si(n %oards to %e placed& 2ollow the 3olden Rules 4TE#T +E2ORE O5 TO56H4 In case of emer(ency' immediately contact E-A. Emer(ency Response Team' EMERGENCY NO:02-509 2111
2
PRE PRE INT INTER ERNA NA. . $IRI $IRIN3 N3
Emal Emal rep& rep&'' En(r&' #upv& Elec' and helpers
Only competent and authorized personnel to %e deployed' supervisor to control& Proper coordination with Emal shift supervisor prior to commencement of the activity& activity& Activity shall %e carried out the personnel supervision of receivin( activity& +arricade the area with si(n %oard for avoid unauthorized entry and provide appropriate electrical insulation material& 2ollow the 3olden Rules 4TE#T +E2ORE O5 TO56H4 Inspect all hand tools to %e used for the tas*' do not use homemade hand tools' use appropriate hand protection& In case of emer(ency' immediately contact E-A. Emer(ency Response Team'
Emal operation / contractor supervisor
0
EMERGENCY NO:02-509
F%&e:
Re'%s%o": $($3-)*"-20$3+
Pa,e $ o $
0
1
HS.SAF.34.F02 2111 •
•
•
#upervisor to ensure (ood illumination at wor*in( area prior to start the 7o%& O%serve (ood house*eepin( around the wor*in( area& $al*way and (an(way to %e *ept free of o%struction&