RESEARCH ON UNDERSTANDING INTERIM & FINAL INSPECTION FOR CONSTRUCTION PROJECTS
Prepared by:
AR RIDHA RAZAK 28/6/16
Construction has a major impact on public safety
Construction are becoming more complex
Construction defects can be very expensive to repair
`A
well functioning building control regulatory system system is an important component of modern society.’
1
Submission of Plans
2
3
Issuance of Approvals
Site/Final Inspections
•
Multiple agencies (IWK, TNB, DOSH, MCMC, SYABAS, BOMBA, Local authorities, authorities, JKR, JPS)
4
Certificate of Completion and Compliance
Certificate Completion and Compliance flow chart Complying - UBBL 25A & SDBA 70 (20-27)
Submit Approval: UBBL SEC 3
PSP
SDBA SEC 70 (4)
OSC Obtain Building Plan approval
PSP
Sec 22: Form B Sec 25: Monitor form G1-21 Supervise site : UBBL SEC 5 Submit Form B : UBBL Sec 22
Construction
Obtain approval from authorities according to stage completion where applicable
Professional, Contractor or Tradesmen
Clearance/Confirmation By relevant Technical agencies
certify for completion of stage G1-21
PSP
Sign F form when all document complete attach with relevant document
CCC complete
Original copy to client
Arch keep 1 copy
LAM/LJM 1 copy
PBT 1 copy
TNB SYABAS IWK BOMBA DOSH JKR JPS PBT?
PROSES PERAKUAN BERPERINGKAT JENIS BORANG
KOMPONEN
INSPECTION
Clearance letter
PROFESIONAL
G1
Kerja-Kerja Tanah
PBT
NA
(SP)
G2
Pemancangan Tanah
NA
NOT REQUIRED
(PSP)
G3
Tapak
PBT
NOT REQUIRED
(SP)
G4
Struktur
PBT
NOT REQUIRED
(SP)
G5
Perpaipan Air Dalaman
SYABAS
NOT REQUIRED
(SP)
G6
Perpaipan Sanitari Dalaman
IWK?
NOT REQUIRED
(SP)
G7
Elektrikal Dalaman
TNB
NOT REQUIRED
(SP)
G8
Menentang Kebakaran (Pasif)
BOMBA
YES IF APPLICABLE
(PSP)
G9
Menentang Kebakaran (Aktif)
BOMBA
YES IF APPLICABLE
(SP)
G10
Pengudaraan Mekanikal
PBT
NOT REQUIRED
(SP)
G11
Pemasangan Lif/Eskalator
DOSH
NOT REQUIRED
(SP)
G12
Bangunan
PBT?
NOT REQUIRED
(PSP)
G13
Sistem Bekalan Air Luaran
SYABAS
YES
(SP)
G14
Retikulasi Pembentungan
IWK
YES
(SP)
G15
Loji Rawatan Pembentungan
IWK
YES
(SP)
G16
Sistem Bekalan Elektrik Luaran
TNB
YES
(SP)
G17
Jalan dan Parit
PBT
YES
(SP)
G18
Lampu Jalan
PBT
NOT REQUIRED
(SP)
G19
Parit Luaran Utama
JKR
YES IF APPLICABLE
(SP)
G20
Telekomunikasi
TELCO
NOT REQUIRED
(SP)
G21
Landskap
PBT
NOT REQUIRED
/ (Arkitek / Arkitek Lanskap)
OSC 3.0
PERINGKAT PEMBINAAN PROJEK BERSKALA BESAR/ KECIL Penumpuan kepada hanya 6 proses utama
F1 : FASA 1 PRA PEMBINAAN
F2 : FASA 2 PEMBINAAN
F3 : FASA 3 SIAP PEMBINAAN
Mula
Akhir
P1
P2
P3
P4
P5
P6
Pra Rundingan
Pertimbang an kepada Pelan-pelan Cadangan Pemajuan
Notis Mula Kerja
Pemeriksaan Interim
Pemeriksaan Akhir Peringkat I & Peringkat II
Pendepositan CCC dan BorangBorang G
Proses 5
Proses 6
Untuk projek berskala besar sahaja
Proses 1
Proses 2
Proses 3
Proses 4
PROSES 1 :
PRA RUNDINGAN
AGENSI MEMBERI MAKLUMAT Pelan susunatur Anggaran Permintaan Bekalan Air
•
1.2
PBAN
•
•
• •
Pelan susunatur Anggaran Beban Elektrik Awalan & Muktamad
•
Tetapkan Tapping point & tekanan air
1.3
TNB •
1.1
Agensi Teknikal tetapkan dalam tempoh 14 hari
Tetapkan keperluan TNB 1.6
PEMOHON
Mendapatkan maklumat teknikal
•
1.4 •
•
Pelan susunatur
•
•
1.5 • • •
Pelan susunatur Carian Rasmi Salinan Geran
•
SKMM Tetapkan tapping point (manhole terdekat) setiap NFP Surat Pengesahan tiada halangan gelombang mikro & kes ‘reroute’ jika berkaitan dari dari setiap NFP Anggaran kes pemberian servis setiap NFP
PTG/PTD Tetap jenis-jenis permohonan perihal tanah yang berkaitan
• •
•
•
PEMOHON
Terima Maklumat Tapping Point & Tekanan Air Terima Maklumat Keperluan TNB Terima senarai maklumat Tapping Point, Surat Pengesahan tiada halangan gelombang mikro (jika berkaitan), dan Anggaran Kes Pemberian Servis setiap NFP dari SKMM. Terima maklumat jenis permohonan perihal tanah dari PTG/PTD Maklumat sah 3 bulan dari tarikh makluman
PROSES 2 :
PERTIMBANGAN KEPADA PELAN-PELAN CADANGAN PEMAJUAN
2.1
PEMOHON Pemohon kemuka permohonan secara satu persatu atau secara serentak
AGENSI MEMPERAKUKAN 2.3
124A, 204D, Lain-lain
•
2.4 • •
2.2
•
OSC
•
• • •
•
•
•
Permintaan Tambahan Dokumen / Maklumat Semak kelengkapan dokumen
Lengkap?
• • • •
2.10
2.7
• • •
• • • • • •
OSC Sediakan surat pemakluman keputusan kepada Pemohon
SKMM PTN/PTG JMG PBAN JKR JAS
n a s a l U n a i g a h a b m e p r u s u s n a k u j n u n e m h a r e M s i r a G
OSC Sediakan Pemakluman keatas permohonan yang lulus kepada Mesyuarat Majlis Penuh
2.13
OSC
Jabatan Kejuruteraan PBT
Pelan Struktur Pelan Kerja Tanah Pelan Jalan Parit dan Lampu Jalan Permit Korek Jalan Pelan Laluan Utiliti
AGENSI MENGULAS
•
MESY JK OSC
Jabatan Bangunan PBT
JPS JBPM TNB IWK JPBD
OSC Sediakan surat pengendosan pelan kepada Agensi Memperaku
2.12 2.9
Kemukakan Lengkap
•
OSC
Jabatan Perancang PBT
Pelan Bangunan Permit Papan Adang Permit Roro bin
2.6 •
2.8
Pelan KM Pelan Nama Jalan Pelan Nama Taman Pelan Lanskap
2.5
Tidak
2.11
Pentadbir Tanah Negeri
2.15
OSC Kumpulkan suratsurat Kelulusan Permit dan Pelanpelan yang telah diendos dan serah kepada Pemohon Perlu pindaan dan kemuka ke OSC
2.14
OSC Pemakluman Kelulusan KM Bersyarat Untuk Selesaikan Hal-Hal Tanah kepada PTN
Lengkap ? 2.16
KELULUSAN KPD PEMOHON
PROSES 3 :
NOTIFIKASI (PERMULAAN KERJA BINAAN)
AGENSI TERIMA NOTIFIKASI
JABATAN BANGUNAN
3.3
Terima Borang B, Jadual Kedua UKBS 1984 3.1
3.2
PEMOHON Deposit Notifikasi
OSC Edar notis notis dan dokumen dokumen kepada agensi
3.4
JABAT JABATAN KEJURUTERA K EJURUTERAAN AN Terima Borang B, UUK Kerja Tanah
Senarai semak deposit: Borang B, Jadual kedua UKBS 1984 Borang B. UUK Kerja Tanah PDC 6, MSIG Vol II Borang JKJ103, Seksyen 35 Akta Kilang dan Jentera 1967 Jadual pelaksanaan projek Borang perakuan perunding bagi skop Pengairan dan Saliran JPS Borang perakuan perunding bagi skop Pengurusan Sisa Pepejal dalam bangunan . Pelan Bangunan untuk rekod PPSPPA Senarai perunding-perunding projek yang berurusan dengan PBT Sijil tanah Bayaran caruman infrastruktur (ISF) PBT cek/wang pos/bank deraf
•
3.5
•
APP (IWK/MAJAARI) (IWK/MAJAARI) Terima PDC 6, MSIG VOL II
• •
• •
3.6
DOSH Terima JKJ 103
•
• •
• •
3.7
LAIN-LAIN AGENSI
Terima dokumen-dokumen yang berkaitan
PROSES 4 :
NOTIFIKASI PEMERIKSAAN INTERIM
AGENSI MEMERIKSA 5.4
4.3
PBAN
a. Pemeriksaan Interim b. Sambungan Paip Utama
4.4 4.1
5.2
OSC 4.5
Notifikasi Pemeriksaan Interim untuk projek berskala besar
TNB
Pemeriksaan Interim
4.2
PEMOHON
•
5.5
OSC menerima notifikasi pemeriksaan interim yang menyatakan pemajuan telah memenuhi kehendak agensi peringkat interim dan bersedia untuk pemeriksaan oleh agensi OSC edar notis kepada TNB, BOMBA, PBAN, IWK, DOSH dan JKR/PBT. JKR/PBT.
PBT / JKR Pemeriksaan Interim
4.6
DOSH Pemeriksaan Interim
4.7
APP (IWK/ MAJAARI) MA JAARI) Pemeriksaan Interim
4.8
BOMBA Pemeriksaan Interim
*Bagi sebarang ketidakpatuhan, agensi akan keluarkan notis ketidakpatuhan kepada pemohon
PROSES 5 :
PEMERIKSAAN AKHIR DAN PENGELUARAN SURAT PENGESAHAN CCC
Maklum keperluan pemeriksaan akhir I kepada PBAN,TNB, PBT/JKR Maklum kepada NFP buat sambungan
PEMERIKSAAN AKHIR PERINGKAT I 5.3
NFP Penyambungan komunikasi
•
5.4
5.1
PEMOHON Kemuka Permohonan •
5.2
OSC
PBAN a.Pengemukaan Laporan Pengujian dan Pentauliahan b.Pemeriksaan b.Pemeriksaan Akhir c.Sambungan meter d. Pengeluaran Surat Pengesahan CCC (G13) 5.5 TNB a. Pemeriksaan akhir b.Sambungan elektrik c.Pengeluaran surat pengesahan CCC (G16)
*Agensi salinkan surat pengesahan CCC kepada unit OSC
5.5
Permohonan untuk pemeriksaan akhir I bagi skop PBAN, TNB & PBT/JKR
OSC
PBT / JKR a. Pemeriksaan akhir b.Pengeluaran surat pengesahan CCC (G17)
Maklum keperluan pemeriksaan akhir II kepada JBPM, DOSH, APP (IWK/MAJAARI)
PEMERIKSAAN AKHIR PERINGKAT II 5.7
JBPM a. Pemeriksaan akhir b.Pengeluaran surat pengesahan CCC (G8,G9 (G8,G9))
5.8
DOSH a. Pemeriksaan akhir b.Pengeluaran surat pengesahan CCC (G11 (G11))
5.9
APP (IWK/ MAJAARI) a. Pemeriksaan akhir b.Pengeluaran surat pengesahan CCC (G14,G15 G14,G15))
PSP
Terima surat pengesahan CCC
5.6
Permohonan Sambungan komunikasi. Permohonan pemeriksaan akhir II bagi skop JPBM, DOSH, APP (IWK/MAJAARI)
5.11
5.10
*Agensi salinkan surat pengesahan CCC kepada unit OSC
PROSES 6 :
DEPOSIT CCC
6.3
6.1
JABATAN BANGUNAN
6.2
PEMOHON
Deposit 2 Salinan CCC & Borang G dalam tempoh 14 hari selepas CCC dikeluarkan dikeluarkan
Rekod dan fail CCC & Borang G1 – G21
OSC Terima dan edar CCC (Salinan) Borang G1 – G21 (Salinan) 6.4
LAM/LJM Rekod dan fail CCC & Borang G1 – G21
INSPECTIONS DURING CONSTRCUTION
For a typical development, final inspections and letters of clearance are required from various agencies as follows: follows: Government
Utility providers
Local authority
TNB
Bomba
IWK
DOSH
Water Authority Autho rity eg. SYABAS SYABAS
JKR
MCMC/Telcos
JPS
PENINSULAR MALAYSIA MALAYSIA SUMMARY DEVELOPMENT PERMIT PROCESS CONSTRUCTION PERMIT PROCESS Collation of information from technical agencies Water, Electric, Telecomunications, Land
Submission to OSC for propose development
•
•
KM / BP/ Structure/ Engineering/ Earthwork/ Infrastructure/ Landscape
PRE CONSULTATION
CONSIDERATION FOR DEVELOPMENT
•
Borang JKJ103, Sijil tanah
•
etc
•
FORM A : Submission BP/ Structure
FORM B
Certify FORM G1-G21 By stages
PDC 6, MSIG Vol II
Interim Inspection TNB, BOMBA, PBAN, IWK, DOSH dan JKR/PBT.
Final Inspection I PBAN, TNB & PBT/JKR Permohonan Sambungan komunikasi. Final Inspection II JPBM, DOSH, APP (IWK/MAJAARI)
INTERIM INSPECTION
COMMENCEMENT OF WORK
Deposit CCC to LA, Developer , LAM
FINAL INSPECTION
FORM F FORM G1-G21 CLEARANCE LETTER
DEPOSIT CCC
DLP
CONSTRUCTION PERIOD
Third Schedule: Progress Billing
Apply Developer license & Open Accounts
HOUSING DEVELOPMENT PERMIT PROCESS
Delivery of Vacant Possession
All schedule
Schedule G & I Within 24 Month
Months
DLP 24
Apply Advertising Permit to commence sales
Schedule G
Schedule H
Schedule I
Schedule J
Individual Title
Strata
Individual Title
Strata
Title
Schedule H & J – Within 36 Month
Title Built then sell
Stage billing
Stage billing
10:90
Built then sell 10:90 Super structure stage
STRATA TITLES PROCESS
Submit Sifus to PTG & Submit Schedule Parcel to COB for stratified sales After BP
Obtain Permit And commence sale
Submit Propose Strata Plan to JUPEM at G12 and obtain CPSP
Submit to Land Office
VP & issuance Strata Title
Establish MC SMA 2013
CONSIDERATION FOR DEVELOPMENT
COMMENCEMENT OF WORK
INTERIM INSPECTION
FINAL INSPECTION
DEPOSIT CCC
CLEARANCE LETTER
RELATED G FORM
BOMBA
BOMBA
YES
G8, G9
DBKL
PBT
YES
G12
IWK
LOC
G14, G15
QT
G13
DOSH
YES
NA
TNB
YES
G16
NA
NA
IWK SYABAS
IWK SYABAS
DOSH TNB TELCO
TNB
SYABAS
TELCO
LOC- Letter of Clearance QT- Quality T
END DLP
BOMBA
Application for Inspection •
•
•
•
•
UBBL fire Checklist Forms C1, C2 and C3 to be signed and attached with Bomba certificates for specified items; Certification of sprinkler systems (Borang A) by Mechanical Engineer; Certification of fixed active fire fighting and alarm systems systems (Borang B) by Mechanical Engineer; Copy of receipt (H13) for portable fire extinguishers;
SENARAI SEMAK PEMERIKSAAN
PEMOHONAN PEMERIKSAAN DAN UJIAN SERTA BAYARAN
The Certificate of Completion and Compliance (CCC) forms are to be supported by Forms G8 and G9 •
•
Form G8: Certification Certification by architect for passive fire systems; Form G9 : Certification Certification by engineer for active fire systems;
FORM G8 & G9
SURAT PELEPASAN
CARTA ALIRAN PEMERIKSAAN BOMBA 1.
BORANG SENARAI SEMAK PEMERIKSAAN DAN KEPERLUAN
2.
BORANG PEMOHONAN PEMERIKSAAN DAN UJIAN SERTA BAYARAN
CONSIDERATION FOR COMMENCEMENT DEVELOPMENT OF WORK
INTERIM INSPECTION
FINAL INSPECTION
DEPOSIT CCC
END DLP
MAIN INSPECTION CHECKLIST
SUBMIT SURAT PERAKUAN BY ARCH.
SUBMIT NOTIFICATION FOR INSPECTION TO OSC
SUBMIT FORMS C1, C2 & C3 FOR FIRE DOORS AND EQUIPMENT
FORM G8 BY ARCHTECT
PEMBAYARAN
BUILDING INSPECTION BY BOMBA
ISSUANCE OF CCC BY ARCHITECT
SURAT SOKONGAN BY BOMBA FORM G9 BY M&E ENGR.
SUBMIT SURAT PERAKUAN BY M&E ENGR. SUBMIT BORANG A FOR SPRINKLER SYSTEM SUBMIT BORANG B FOR OTHER ACTIVE FIRE SYSTEMS TIDAK SOKONG FOR
LOCAL AUTHORITY
Final inspection and Letter of Clearance required (where applicable) for : Roads and drainage Street lighting Landscape
The inspections are normally carried out by the Engineering section in the local authorities.
and Letter of Clearance Final inspection and required from JKR for roads where it affects affects and/or impacts on JKR roads from JPS Clearance required from
to ensure that the site complies with MASMA requirements.
CONSTRUCTION PERIOD
CONSIDERATION FOR INTERIM COMMENCEMENT DEVELOPMENT INSPECTION OF WORK
PBT
SUBMIT NOTIFICATION FOR INSPECTION TO OSC
FINAL INSPECTION
DEPOSIT CCC
Building ??
No Clearance letter required
Street lighting
No Clearance letter required
Landscape
No Clearance letter required
Road Drainage
JKR
ROAD
JPS
JPS FOR MASMA
Clearance letter
Clearance letter
Clearance letter
END DLP
FORM G12 BY ARCHITECT
FORM G18 BY M&E ENGINEER
FORM G21 BY LANDSCAPE ARCHITECT
FORM G17 BY CIVIL STRUCUTRE ENGINEER
ISSUANCE OF CCC BY ARCHITECT
IWK
CONSTRUCTION PERIOD
CONSIDERATION COMMENCEMENT FOR DEVELOPMENT OF WORK
PDC 6 Notification of Commencement of Sewerage Works/Septic Tank Works PDC 6-1 Notification for Connection to Public Sewer
INTERIM INSPECTION
PDC 7 Notice of Intermediate Inspection of Sewerage Works
FINAL INSPECTION
DEPOSIT CCC
Handover Sign-Off Form
PDC 8 Notice of Final Inspection
Certificate of compliance ( CoC) & Letter of Completion (LOC)
For upgrading of plant, require kick of meeting before PDC 6. Technical Comments by IWK
FORM G14 & G15 BY C&S ENGINEER
ISSUANCE OF CCC BY ARCHITECT
INSPECTION PROCEDURES FOR SEWERAGE WORKS (IWK) NO.
FORM USED
DESCRIPTION
1
PDC 6
Notification of Commencement of Sewerage Works/Septic Tank Works
2
PDC 6-1
Notification for Connection to Public Sewer
3
PDC 7
4 5 6
PDC 8 -
7
PDC 9
8
-
Notice of Intermediate Inspection of Sewerage Works Technical Comments Notice of Final Inspection Confirmation of Completion of Work Declaration by Competent Person Who Supervised the Septic Tank Works Handover Sign-Off Form
ACTION BY Contractor Consultant IWK
-
END DLP
Developer
REMARKS
-
-
Consultant to Notify
-
-
Consultant to Notify
-
-
-
Consultant to Notify
-
-
-
-
-
IWK to Issue Consultant to Notify IWK to Issue
-
-
Consultant to Declare
-
IWK to Issue
SYABAS
CONSIDERATION COMMENCEMENT FOR OF WORK DEVELOPMENT
CONSTRUCTION PERIOD
QT1 – 6th Schedule
APPLICATION FOR TEST AND INSPECTION OF EXTERNAL WATER RETICULATION SYSTEM / SUPPLY MAIN*
QT2 RESPONSE ON APPLICATION FOR TEST AND INSPECTION OF EXTERNAL WATER RETICULATION SYSTEM / SUPPLY MAIN*
QT3 MATERIAL INSPECTION REPORTS
INTERIM INSPECTION
QT4(a) HYDROSTATIC PRESSURE TEST & LEAKAGE TEST REPORT EXTERNAL EXTERNAL PIPELINE QT4(b) HYDROSTATIC PRESSURE TEST REPORT EXTERNAL PIPELINE & MAIN PIPE COMPLETE WITH FERRULE AND COMMUNICATION PIPE
QT5 WATER TIGHTNESS TEST REPORT FOR RESERVOIR/ SUCTION CISTERN
FINAL INSPECTION
QT7 NOTIFICATION FOR SUBMISSION OF BANK GUARANTEE OVER DEFECT LIABILITY PERIOD (EXTERNAL RETICULATION WATER SUPPLY SYSTEM / SUPPLY MAINS*)
QT11- TENTH SCHEDULE ACCEPTANCE OF HANDING OVER OF EXTERNAL WATER RETICULATION SYSTEM / SUPPLY MAIN* FROM A DEVELOPER
QT8 SUPPORT LETTER FROM DISTRICT O&M DEPT FOR TAPPING WORKS
FORM G13 BY M&E ENGINEER
ISSUANCE OF CCC BY ARCHITECT
QT9 – 11th Schedule CERTIFICATE OF DISINFECTION
QT6(a) FINAL JOINT INSPECTION REPORT (EXTERNAL (EXTERNAL PIPELINE)
QT10- Ninth Schedule
QT6(b) FINAL JOINT INSPECTION REPORT (RESERVOIR/ SUCTION CISTERN/ PUMP HOUSE)
APPLICATION FOR HANDING OVER OF EXTERNAL WATER RETICULATION SYSTEM / SUPPLY MAIN* TO A WATER DISTRIBUTION LICENSEE/ SERVICE LICENSEE
DEPOSIT END DLP CCC
DOSH
CONSTRUCTION PERIOD
CONSIDERATION FOR INTERIM COMMENCEMENT DEVELOPMENT INSPECTION OF WORK
FINAL INSPECTION
PAYMENT FOR INSPECTION & ISSUE PMA NO. BY JKKP
TAK LENGKAP/ MAKLUMAT TAMBAHAN
SUBMIT APPLICATION FORM FOR JKKP INSPECTION
DEPOSIT CCC
COMPLY DOSH CHECK APPLICATION
LIFT AND MACHINERAY INSPECTION BY JKKP
1ST SCHEDULE INSPECTION
Don’t Comply
FORM G11 BY M&E ENGINEER & COMPETEN T PERSON
ISSUANCE OF CCC BY ARCHITECT
END DLP
TNB
•
TNB support for CCC will only onl y be given after : –
–
–
–
•
Sub-station building handover process completed and equipment installed. TNB underground cable installation installation completed. TNB feeder pillar installation installation completed. TNB meter panel installation and cable termination completed.
Inspection with TNB only during the process to handover the sub-station building to TNB.
•
TNB Inspection comprises the below steps: Inspection for Cas Sambungan Pengguna (CSP) estimation. Road condition to be at least first layer crusher run. Inspection for sub-station building handover. Road condition to be at least second layer crusher run and properly compacted. TNB will comment on installation of light fitting, socket outlet, earthing bar, painting, signage, logo, door, compound finishes, gate size etc. Inspection for house meter compartment. TNB will comment on meter panel board, meter standing height from FFL, space in compartment, door size, louver and glass panel size. –
–
–
CONSIDERATION FOR INTERIM COMMENCEMENT DEVELOPMENT INSPECTION OF WORK
Inspection for Cas Sambungan Pengguna (CSP) estimation. Site condition to be as soon as earthwork start
APPLY TO TNB FOR HANDOVER INSPECTION
FINAL INSPECTION
DEPOSIT CCC
END DLP
INTERNAL SUBSTATION INSPECTION( INSTALLATION)
Inspection for substation building handover. Road condition to be at least second layer crusher run and properly compacted. TNB will comment on installation of light fitting, socket outlet, earthing bar, painting, signage, logo, door, compound finishes, gate size etc.
Sub-station building handover process completed and equipment installed.
All comply, TNB to issue clearance letter EXTERNAL INFRA INSPECTION Inspection for TNB Installation from Substation to Customer meter Comperment -TNB underground cable installation completed. -TNB feeder pillar installation completed. -TNB meter panel installation and cable termination completed.
FORM G16 BY M&E ENGINEER
ISSUANCE OF CCC BY ARCHITECT
TELCO
Telcos approval normally involves 2 inspections:
internal and external. Internal Inspection involves design inside premise/house unit to first external manhole. Usually design compliance and internal fiber cable are tested to meet guidelines set by MCMC. Testing done do ne randomly with Telco inspector inspector by selecting few houses or installation. Full test report to be submitted by sub-contractor to Telco.
•
•
•
External Inspection involved involved mandrel test for underground ducting from manhole to manhole. Also done randomly and full test report to be submitted to Telcos. Supporting letter then can be requested requested next day by writing officially to Telco.
CONSIDERATION FOR COMMENCEMENT DEVELOPMENT OF WORK
APPLY TO TELCO FOR INSPECTION
INTERIM INSPECTION
Internal Inspection involves design inside premise/house unit to first external manhole. Usually design compliance and internal fiber cable are tested to meet guidelines set by MCMC.
External Inspection involved mandrel test for underground ducting from manhole to manhole.
FINAL INSPECTION
Testing done randomly with Telco inspector by selecting few houses or installation.
Also done randomly and full test report to be submitted to Telcos.
DEPOSIT CCC
Full test report to be submitted by subcontractor to Telco.
Report/Supporti ng letter / Certificate/ then can be requested next day by writing officially to Telco.
FORM G20 BY M&E ENGINEER
ISSUANCE OF CCC BY ARCHITECT
END DLP
CONCLUSION
By Ar QHWARIZMI
UNDERSTANDING INTERIM/ FINAL INSPECTION PROCESS FOR TECHNICAL AGENCIES FOR CONSTRUCTION PROJECTS
Prepared by:
AR RIDHA RAZAK 28/6/16