DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI KOTA TAHUN ANGGARAN PAKET PEKERJAAN
: : : : :
ACEH LANGSA 2010 SEKTOR AIR BERSIH DAN DRAINASE PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA
No.
A.
U01 U02 U03 U04 U05 U06 U07 U08
Uraian Jenis
Satuan
Harga (Rp)
UPAH
Pekerja Mandor Tukang Kepala Tukang Operator Pembantu Operator Mekanik Mekanik Pembantu
Org/ Hari Org/ Hari Org/ Hari Org/ Hari Org/ Hari Org/ Hari Org/ Hari Org/ Hari
49,700.00 82,300.00 78,700.00 94,500.00 122,300.00 75,000.00 122,300.00 75,000.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI KOTA TAHUN ANGGARAN PAKET PEKERJAAN
: : : : :
ACEH LANGSA 2010 SEKTOR AIR BERSIH DAN DRAINASE PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA
No. B.
Uraian Jenis
Satuan
Harga (Rp)
M01
BAHAN Air Bersih Pengecoran
M02
Angker Bolt D22+Mur+Ring
M03 M04 M05
Bar Pengaman Baja profil Bambu
Unit Kg Btg
M06
Batu Bata
Buah
M07
Batukali / Batu Belah (Sungai / Gunung)
M3
202,800.00
M08
Batu pecah 3 - 5 cm
M3
290,950.00
M09
Batu pecah 2 - 3 cm
647,600.00
M10
Baut dan Mur Steel 1 1/2"
M3 Bh
M11
Bh
12,000.00
M12
Baut Picer Ø16 mm Base Plat 16 mm
Bh
170,000.00
M13
Besi beton polos
Kg
16,200.00
M14 M15
Besi beton ulir/strip Cat Tembok Cat Menie Besi Filter Formite/penjaga jarak bekisting/spacer Ijuk Kantor Lapangan (Type C) Kawat beton Kawat Bronjong dia. 5 mm Kawat las Koral Beton Balok Kayu Klas II Kayu Klas III (Borneo) Kayu Klas IV (Sengon) untuk Papan Begesting Kayu Dolken Ø 8-10 cm (panjang 4 M) Lempengan Rumput Minyak Bensin Minyak cat Minyak Solar Minyak Tanah Minyak Bekisting Paku Kayu Pasir beton/Kerikil Pasir Pasang Pasir urug Paving blok Pelumas / Oli Plywood 9 mm Pipa PVC Ø 1 12" Semen Portland (@ 40 Kg) Tanah Timbun Tanah Timbun Pilihan Plat Baja, t = 5 mm Pintu Air Sorong (B = 0,7 H = 1,0) Lengkap+pemasangan Pintu Air Koklep (B = 0,7 H = 1,25) Lengkap+pemasangan Pipa GIP ¢ 75 mm Pipa GIP ¢ 100 mm Pipa GIP ¢ 150 mm Pipa GIP ¢ 200 mm Pipa GIP ¢ 250 mm
Kg Kg Kg Bh Bh Kg M2 Kg Kg Kg
24,800.00 25,900.00
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53
Liter Bh
M3 M3 M3 M3 Btg M2 Ltr Ltr Ltr Ltr Ltr Kg M3 M3 M3 M2 Ltr Lbr Btg Zak M3 M3 m2 Set Set M' M' M' M' M'
150.00 42,000.00 1,200,000.00 28,300.00 34,100.00 600.00
22,000.00
22,200.00 400,000.00 4,000.00 13,600.00 2,220,000.00 10,500.00 22,800.00 16,000.00 141,100.00 3,926,100.00 3,553,900.00 2,948,100.00 62,500.00 28,100.00 8,100.00 21,700.00 8,100.00 6,700.00 3,800.00 11,600.00 141,100.00 129,600.00 112,500.00 83,700.00 36,200.00 150,500.00 71,900.00 50,300.00 51,700.00 122,600.00 25,700.00 3,000,000.00 4,000,000.00 96,006.00 200,946.00 272,689.50 344,433.00 544,978.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI KOTA TAHUN ANGGARAN PAKET PEKERJAAN
M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65 M66 M67 M68 M69 M70 M71 M72 M73 M74 M75 M76 M77 M78 M79 M80 M81 M82 M83 M84 M85 M86 M87 M88 M89 M90 M91 M92 M93 M94 M95 M96 M97 M98 M99 M100 M101 M102 M103 M104 M105 M106 M107 M108 M109 M110 M111
: : : : :
ACEH LANGSA 2010 SEKTOR AIR BERSIH DAN DRAINASE PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA
Air Realease CI Ø 50 mm Air Realease CI Ø 75 mm Air Realease CI Ø 100 mm Air Realease CI Ø 150 mm Air Realease CI Ø 200 mm All Range Bend 45° Bend CI 22.5° Ø 75 mm Bend CI 45° Ø 75 mm Bend CI 90° Ø 75 mm Bend CI 45° Ø 100 mm Bend CI 45° Ø 150 mm Bend CI 90° Ø 100 mm Bend CI 45° Ø 200 mm Bend CI 90° Ø 200 mm Bend CI 45° Ø 250 mm Bend CI 90° Ø 250 mm Blinde Flange Clamp Ø 100 mm Clamp Ø 150 mm Clamp Ø 200 mm Clamp dia. 200 mm dan Angker Bolt+Mur+Ring Clamp dia. 150 mm dan Angker Bolt+Mur+Ring Clamp dia. 100 mm dan Angker Bolt+Mur+Ring Dop GIP Ø 100 mm Dop GIP Ø 150 mm Dop GIP Ø 200 mm Flange GIP Ø 75 mm Flange GIP Ø 100 mm Flange GIP Ø 150 mm Flange GIP Ø 200 mm Flange Socket GIP dia. 200 mm Flange Socket GIP dia. 150 mm Flange Socket GIP dia. 100 mm Los Flange GIP dia. 100 mm Los Flange GIP dia. 150 mm Los Flange GIP dia. 200 mm Flexible Joint Ø 150 mm Flexible Joint Ø 200 mm Gate Valve CI Ø 100 mm Gate Valve CI Ø 150 mm Gate Valve CI Ø 200 mm Perangkat Mur, Baut & Ring Flange Ø 100 mm Perangkat Mur, Baut & Ring Flange Ø 150 mm Perangkat Mur, Baut & Ring Flange Ø 200 mm Reducer GIP Ø 100-75 mm Reducer GIP Ø 150-100 mm Reducer GIP Ø 200-100 mm Socket GIP Ø 100 mm Socket GIP Ø 150 mm Dop Flange GIP dia. 200 mm Tee GIP Ø 150-150-150 mm Tee GIP Ø 200-200-200 mm Tee GIP Ø 200 - 100 - 200 mm Tee GIP Ø 150 - 100 - 150 mm Tee All Flange CI Ø 150-100-150 mm Tee All Flange CI Ø 200-100-200 mm Tee All Flange CI Ø 200-150-200 mm Tee All Flange CI Ø 200-200-200 mm
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Set Set Set Set Set Set Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Set Set Set Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
1,854,412.00 1,954,412.00 3,384,171.00 4,813,930.00 7,220,895.00 459,900.00 179,100.00 199,477.00 248,240.00 258,373.00 442,349.00 316,185.00 626,325.00 708,768.00 1,310,750.00 1,337,500.00 326,500.00 52,034.00 89,276.00 208,098.00 250,098.00 131,276.00 94,034.00 268,796.00 383,994.00 499,192.00 100,000.00 130,000.00 165,000.00 200,000.00 590,392.00 419,400.00 248,408.00 56,900.00 110,700.00 164,500.00 798,200.00 798,200.00 855,754.00 1,702,905.00 2,822,393.00 35,450.00 127,600.00 137,500.00 250,352.00 330,737.00 421,791.00 162,822.00 187,450.00 516,000.00 972,162.00 1,069,378.00 1,069,378.00 972,162.00 612,254.00 991,890.00 1,030,410.00 1,049,670.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI KOTA TAHUN ANGGARAN PAKET PEKERJAAN
M112 M113 M114 M115 M116 M117 M118 M119 M120 M121 M122 M123 M124 M125 M126 M127 M128 M129 M130 M131 M132 M133 M134 M135 M136 M137 M138 M139 M140 M141 M142 M143 M144 M145 M146 M147 M148 M149 M150 M151 M152 M153
: : : : :
ACEH LANGSA 2010 SEKTOR AIR BERSIH DAN DRAINASE PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA
Wall Flange Ø 200 mm Pipa PVC RRJ S 12.5 ¢ 75 mm Pipa PVC RRJ S 12.5 ¢ 100 mm Pipa PVC RRJ S 12.5 ¢ 150 mm Pipa PVC RRJ S 12.5 ¢ 200 mm Pipa PVC RRJ S 12.5 ¢ 250 mm Bend 11.25° PVC Ø 75 mm Bend 45° PVC Ø 75 mm Bend 90° PVC Ø 75 mm Bend 11.25° PVC Ø 100 mm Bend 22.5° PVC Ø 100 mm Bend 45° PVC Ø 100 mm Bend 90° PVC Ø 100 mm Bend 11.25° PVC Ø 200 mm Bend 22.5° PVC Ø 200 mm Bend 45° PVC Ø 200 mm Bend 90° PVC Ø 200 mm Bend 11.25° PVC Ø 250 mm Bend 22.5° PVC Ø 250 mm Bend 45° PVC Ø 250 mm Bend 90° PVC Ø 250 mm Dop PVC Ø 75 mm Dop PVC Ø 100 mm Dop PVC Ø 150 mm Dop PVC Ø 200 mm Flange Socket PVC Ø 75 mm Flange Socket PVC Ø 100 mm Flange Socket PVC Ø 150 mm Flange Socket PVC Ø 200 mm Reducer PVC Ø 100-75 mm Reducer PVC Ø 200-75 mm Reducer PVC Ø 200-100 mm Socket PVC Ø 75 mm Socket PVC Ø 100 mm Socket PVC Ø 200 mm Tee PVC Ø 100-100-100 mm Tee PVC Ø 200-100-200 mm Tee PVC Ø 200-200-200 mm Street Box Water Meter Box Meter Air Ø 300 mm Meter Air Ø 150 mm
Bh M' M' M' M' M' Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
425,000.00 41,578.00 70,495.00 132,932.50 195,370.00 307,188.00 56,528.00 62,528.00 68,507.00 93,723.00 96,111.00 99,871.00 117,219.00 274,733.00 290,533.00 335,333.00 390,532.00 586,300.00 629,200.00 1,015,938.00 1,206,693.00 27,214.00 96,428.00 199,675.00 302,922.00 102,185.00 122,863.00 294,691.50 466,520.00 64,228.00 337,425.00 337,425.00 60,324.00 81,133.00 275,088.00 339,546.00 1,800,000.00 2,160,000.00 225,000.00 5,000,000.00 28,269,400.00 15,471,000.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI KOTA TAHUN ANGGARAN PAKET PEKERJAAN
No. C. A01 A02 A03 A04 A05 A06 A07 A08 A09
: : : : :
ACEH LANGSA 2010 SEKTOR AIR BERSIH DAN DRAINASE PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA
Uraian Jenis SEWA ALAT Alat Pengetesan Pipa Jack Hammer Concrete Mixer dan Vibrator Stamper Excavator Buldozer Vibro roller Mesin Las Alat Bantu Perpipaan (tracker & katrol)
Satuan
Hk Hk Hk Hk Jam Jam Jam Hk Hk
Harga (Rp)
75,000.00 150,000.00 100,000.00 150,000.00 343,208.28 547,125.46 267,913.36 100,000.00 50,000.00
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA URAIAN ANALISA ALAT No.
A. 1. 2. 3. 4.
5.
B. 1.
URAIAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. b. c. Alat Yang Dipakai : a. b. c.
Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat (*)
Pw Cp A W B A' W' B'
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
KOEF.
SATUAN
EXCAVATOR 80-140 HP 80.0 HP 0.5 M3 5.0 Tahun 2,000.0 Jam 770,000,000 Rupiah 5.0 Tahun 2,000 Jam 770,000,000 Rupiah
C
77,000,000
i x (1 + i)^A' (1 + i)^A' - 1
D
0.33438
( B' - C ) x D W'
E
115,862.57
Rupiah
F
770.00
Rupiah
G
116,632.57
Rupiah
0.002 x B' W'
Biaya Pasti per Jam C.
KODE
=
(E+F)
A05
Alat Baru Alat Baru Alat Baru
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms
H
97,200.00
Rupiah
2.
Pelumas
I
43,440.00
Rupiah
3.
Perawatan dan perbaikan
(12,5 % - 17,5 %) x B' W'
K
57,750.00
Rupiah
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2
L M
17,471.43 10,714.29
Rupiah Rupiah
Biaya Operasi per Jam
P
226,575.71
Rupiah
S
343,208.28
Rupiah
4. 5.
KET.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
=
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
20.00 % / Tahun 17,471.43 Rp./Jam 10,714.29 Rp./Jam 8,100.00 Liter 8,100.00 Liter 36,200.00 Liter
URAIAN ANALISA ALAT No.
URAIAN
KODE
KOEF.
SATUAN
KET.
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA A. 1. 2. 3. 4.
5.
B. 1.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. b. c. Alat Yang Dipakai : a. b. c.
Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat (*)
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
=
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
b. Asuransi, dll =
C.
=
BULLDOZER 100-150 HP 140.0 HP 1.5 M3 5.0 Tahun 2,000.0 Jam 1,210,000,000 Rupiah 5.0 Tahun 2,000.0 Jam 1,210,000,000 Rupiah
C
121,000,000
i x (1 + i)^A' (1 + i)^A' - 1
D
0.33438
( B' - C ) x D W'
E
182,069.75
Rupiah
F
0.00
Rupiah
G
182,069.75
Rupiah
0.002 x B' W'
Biaya Pasti per Jam
Pw Cp A W B A' W' B'
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms
H
170,100.00
Rupiah
2.
Pelumas
I
76,020.00
Rupiah
3.
Perawatan dan perbaikan
(12,5 % - 17,5 %) x B' W'
K
90,750.00
Rupiah
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2
L M
17,471.43 10,714.29
Rupiah Rupiah
Biaya Operasi per Jam
P
365,055.71
Rupiah
S
547,125.46
Rupiah
4. 5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
=
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
20.00 % / Tahun 17,471.43 Rp./Jam 10,714.29 Rp./Jam 8,100.00 Liter 8,100.00 Liter 36,200.00 Liter
A06
Alat Baru Alat Baru Alat Baru
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA URAIAN ANALISA ALAT No.
A. 1. 2. 3. 4.
5.
B. 1.
URAIAN
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. b. c. Alat Yang Dipakai : a. b. c.
Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat Umur Ekonomis Jam Kerja Dalam 1 Tahun Harga Alat (*)
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B
2.
Faktor Angsuran Modal
3.
Biaya Pasti per Jam : a. Biaya Pengembalian Modal =
=
b. Asuransi, dll =
=
KOEF.
SATUAN
VIBRATORY ROLLER 5-8 T. Pw 75.0 HP Cp 7.0 Ton A 5.0 Tahun W 1,600.0 Jam B 431,200,000 Rupiah A' 4.0 Tahun W' 1,280 Jam B' 287,466,667 Rupiah
C
43,120,000
i x (1 + i)^A' (1 + i)^A' - 1
D
0.38629
( B' - C ) x D W'
E
73,740.98
Rupiah
F
449.17
Rupiah
G
74,190.15
Rupiah
0.002 x B' W'
Biaya Pasti per Jam C.
KODE
(E+F)
Rupiah -
BIAYA OPERASI PER JAM KERJA
1.
Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms
H
91,125.00
Rupiah
2.
Pelumas
I
40,725.00
Rupiah
3.
Perawatan dan perbaikan
(12,5 % - 17,5 %) x B' W'
K
33,687.50
Rupiah
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2
L M
17,471.43 10,714.29
Rupiah Rupiah
Biaya Operasi per Jam
P
193,723.21
Rupiah
S
267,913.36
Rupiah
4. 5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
=
=
(H+I+K+L+M)
D.
TOTAL BIAYA SEWA ALAT / JAM = ( G + P )
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
20.00 % / Tahun 17,471.43 Rp./Jam 10,714.29 Rp./Jam 8,100.00 Liter 8,100.00 Liter 36,200.00 Liter
KET.
A07
Sewa Alat Sewa Alat Sewa Alat
PEMBANGUNAN TAN
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
5 E10
5 4 3 2 1 0 -1 -2 -3 -4 -5 -6 -7 -8 -9 15
0 770,000,000 1 513,333,333 2 308,000,000 3 154,000,000 4 51,333,333 5 0 6 0 7 51,333,333 8 154,000,000 9 308,000,000 10 513,333,333 11 770,000,000 12 1,078,000,000 13 1,437,333,333 14 1,848,000,000 > 15th ?
Kondisi Alat Nilai B' dari Depresiasi
Alat Baru 770,000,000
5 E04
5 4 3 2 1 0 -1 -2 -3 -4 -5 -6 -7 -8 -9 15
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 > 15th ?
Kondisi Alat Nilai B' dari Depresiasi
1,210,000,000 806,666,667 484,000,000 242,000,000 80,666,667 0 0 80,666,667 242,000,000 484,000,000 806,666,667 1,210,000,000 1,694,000,000 2,258,666,667 2,904,000,000 Alat Baru 1,210,000,000
4 E19
5 4 3 2 1 0 -1 -2 -3 -4 -5 -6 -7 -8 -9 15
0 431,200,000 1 287,466,667 2 172,480,000 3 86,240,000 4 28,746,667 5 0 6 0 7 28,746,667 8 86,240,000 9 172,480,000 10 287,466,667 11 431,200,000 12 603,680,000 13 804,906,667 14 1,034,880,000 > 15th ?
Kondisi Alat Nilai B' dari Depresiasi
Sewa Alat 287,466,667
PERHITUNGAN PRODUKSI ALAT
1. BULDOZER Kapasitas bucket Beban Koefisien traksi Reaksi kritis Kecepatan maju Kecepatan mundur Jarak dorong rata-rata Waktu maju (Wp) Waktu mundur (Wj) Waktu buang/pindah, dll Total waktu (Ws) Trip perjam Produksi maks. alat Faktor koreksi (Fk) Efisiensi kerja siang (a) Ketrampilan operator (b) Cuaca cerah (C) Cara kerja (d) Kekerasan tanah (e) Total Fk Taksiran produksi Dibulatkan
= = = = =
4.4 x 0.7 0.7 x 4.7 km/jam 5.5 km/jam
=
4.4
= =
x
axbxcxdxe 177.93 x
1.65 7.26
= =
40.44
= = = = = = = = = =
0.34
= = = = = = =
1 m3 tanah diperlukan faktor alat (buldozer) 1 m2 tanah diperlukan faktor alat (buldozer) 1 Ha tanah diperlukan faktor alat (buldozer)
4.40 m3 7.26 ton 5.08 78.33 91.67 50.00 0.64 0.55 0.30 1.48 40.44 177.93
ton m/menit m/menit m menit menit menit menit trip m3
0.75 0.75 0.90 0.90 0.75 0.34 60.80 m3/jam 61.00 m3/jam
= = = =
0.0164 0.0049 49.1803 0.0203
jam jam = jam Ha/jam
= = = =
0.80 1.32 18.50 19.82
m3 ton ton ton
96.77
= = = = = = = = = =
10.90 0.62 0.62 96.77 77.42
ton m/menit m/menit m menit menit menit menit trip m3
0.52
= = = = = = =
0.80 0.80 0.90 0.90 0.52 40.13 m3/jam 40.00 m3/jam
203.33 m2/jam
Sumber : Hasil Perhitungan
2. EXCAVATOR Kapasitas bucket Beban Berat excavator Berat total Koefisien traksi Reaksi kritis Kecepatan maju Kecepatan mundur Jarak dorong rata-rata Waktu maju (Wp) Waktu mundur (Wj) Waktu buang/pindah, dll Total waktu (Ws) Trip perjam Produksi maks. alat Faktor koreksi (Fk) Efisiensi kerja siang (a) Ketrampilan operator (b) Cuaca cerah (C) Faktor muat (d) Kekerasan tanah (e) Total Fk Taksiran produksi Dibulatkan
=
= = = =
=
= =
0.8
0.55 0.55 x - km/jam - km/jam
0.8
x
axbxcxd 77.42 x
1 m3 tanah diperlukan faktor alat (buldozer) 1 m2 tanah diperlukan faktor alat (buldozer) 1 Ha tanah diperlukan faktor alat (buldozer) 1 m3 tanah diperlukan faktor alat (excavator) Sumber : Hasil Perhitungan
x
1.65
19.82
= = = = =
0.0250 0.0075 75.0000 0.0133 0.0250
jam jam = jam Ha/jam jam
133.33 m2/jam
PERHITUNGAN PRODUKSI ALAT
3. VIBRATOR ROLLER Kecepatan alat (V) Lebar efektif pemadatan (B) Effisiensi (E) Faktor kembang (Fk) Tebal hamparan (t) Jumlah lintasan (N) Produksi alat
=
(V x B x t x E) / (N x Fk)
1 m3 tanah diperlukan faktor alat (Vibrator roller) Sumber : Hasil Perhitungan
= = = = = =
3.00 km/jam 1.10 m 0.80 1.20 0.30 m 10.00
=
66.00 m3/jam
=
0.0152 jam
PEMERINTAH ACEH DINAS BINA MARGA DAN CIPTA KARYA Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915
BIDANG PROGRAM DAN PELAPORAN PERENCANAAN PENGEMBANGAN INFRASTRUKTUR
ENGINEER ESTIMATE (EE)
A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA SMA 2 LANGSA
KONSULTAN PERENCANA
CV. ZIYAD IDOLA CONSULTANT KONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
PEMERINTAH ACEH DINAS BINA MARGA DAN CIPTA KARYA Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915
BIDANG PROGRAM DAN PELAPORAN PERENCANAAN PENGEMBANGAN INFRASTRUKTUR
ENGINEER ESTIMATE (EE)
NOMOR KONTRAK TANGGAL PEKERJAAN KODE PAKET NILAI KONTRAK NILAI KONTRAK FISIK SUMBER DANA DPA SKPA
: : : : : : : :
07-AC/CTR/BPP.P-OTSUS/DBC/APBA/2010 20 MEI 2010 Perencanaan Pengembangan Infrastruktur (KOTA LANGSA) PR INFRA 13/2010 Rp. 162.923.000,Rp. 6.447.585.000,OTSUS TAHUN ANGGARAN 2010
KONSULTAN PERENCANA
CV. ZIYAD IDOLA CONSULTANT KONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
6,447,585,000.00
REKAPITULASI TOTAL KEGIATAN LOKASI TAHUN ANGGARAN
: PERENCANAAN PENGEMBANGAN INFRASTRUKTUR (KOTA LANGSA) : KOTA LANGSA : 2010
NO.
URAIAN
TOTAL HARGA
A.
PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA-SMA2 LANGSA
B.
Rp.
SISTEM DRAINASE KOMPLEK PERUMAHAN SUNGAI PAOH KECAMATAN LANGSA BARAT
Rp.
TOTAL
Rp.
PPn 10%
Rp.
JUMLAH SELURUHNYA
Rp.
DIBULATKAN
Rp.
Terbilang : Enam Milyar Empat Ratus Empat Puluh Tujuh Juta Lima Ratus Delapan Puluh Lima Ribu Rupiah,-
Banda Aceh, September 2010 Konsultan Perencana, CV. ZIYAD IDOLA CONSULTANT
Disetujui Oleh :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Perencanaan Pengembangan Infrastruktur Dinas Bina Marga dan Cipta Karya Aceh
Mawaddah Noer, ST Nip. 197404142006042002
Abdullah, ST Direktur
Mengetahui ;
Kepala Bidang Program dan Pelaporan Dinas Bina Marga dan Cipta Karya
Kuasa Pengguna Anggaran / Kuasa Pengguna Barang
Ir. Mohd. Sanusi, M.Si Pembina Tk. I / Nip. 19560707 198703 1 002
(Rp.)
TOTAL HARGA
(Rp.)
2,370,121,110.20
3,491,320,400.74
5,861,441,510.94 586,144,151.09 6,447,585,662.03 6,447,585,000.00
atus Delapan Puluh Lima Ribu Rupiah,-
Banda Aceh, September 2010 Konsultan Perencana, CV. ZIYAD IDOLA CONSULTANT
n
a Barang
2
DAFTAR KUANTITAS DAN HARGA
Kegiatan Pekerjaan Lokasi Tahun Anggaran
: : : :
Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Kecamatan Langsa Barat, Kota Langsa 2010
NO.
URAIAN PEKERJAAN
SAT
KUANTITAS
1
2
3
4
KODE ANALISA
HARGA SATUAN (Rp) 6
JUMLAH HARGA (Rp) 7=4x6
I.
PEKERJAAN PERSIAPAN
1
Mobilisasi dan Demobilisasi
Ls
1.00
A.1
21,000,000.00
21,000,000.00
2
Pembersihan Lapangan
Ls
1.00
Taksir
2,000,000.00
2,000,000.00
3
Dewatering
Ls
1.00
Taksir
6,500,000.00
6,500,000.00
4
Sewa Direksi Keet
Unit
1.00
Taksir
2,000,000.00
2,000,000.00
5
Papan Nama Proyek
Unit
1.00
Taksir
750,000.00
750,000.00
6
Adm. / Gbr. Lap / Dok. / Pas. Profil
Ls
1.00
Taksir
4,500,000.00
Jumlah Harga Pekerjaan I (dipindah ke lembar Rekapitulasi) II.
PEKERJAAN TANGGUL BANJIR
1
Timbunan Tanah Didatangkan dan
2
dipadatkan dengan Alat Berat
M3
3,099.57
B.6
156,697.00
485,693,320.29
Pasangan Gebalan Rumput
M2
3,334.38
B.8
42,535.00
141,827,853.30
Jumlah Harga Pekerjaan II (dipindah ke lembar Rekapitulasi) III.
4,500,000.00 36,750,000.00
627,521,173.59
PEKERJAAN SALURAN DRAINASE
1
Galian Tanah Biasa
M3
2,057.62
B.2
48,434.00
99,658,767.08
2
Timbunan Tanah Hasil Galian
M3
685.87
1/3 x B.2
16,144.67
11,073,196.34
3
Urugan Pasir
M3
62.16
B.7
150,733.00
9,369,563.28
4
Pasangan Batu Kosong (aanstamping)
M3
248.65
D.2
364,629.00
90,665,000.85
5
Beton Tumbuk Lantai Kerja K.100
M3
62.16
C.1
598,775.00
37,219,854.00
6
Beton Struktur K.225
M3
420.43
C.3
1,184,505.00
498,001,437.15
7
Pekerjaan Besi
Kg
44,035.67
C.4
18,165.00
799,907,945.55
8
Bekisting
M2
2,179.31
C.7
511,321.00
1,114,326,968.51
9
Pipa Drain Hole PVC dia. 1 1/2"
Bh
457.00
D.5
22,501.00
10,282,957.00
Jumlah Harga Pekerjaan III (dipindah ke lembar Rekapitulasi) IV.
2,670,505,689.76
PEKERJAAN PINTU AIR (1 UNIT)
1
Galian Tanah Biasa
M3
19.78
2
Timbunan Tanah Hasil Galian
M3
4.95
3
Urugan Pasir
M3
8.71
4
Pasangan Batu Kosong (aanstamping)
M3
17.42
5
Beton Tumbuk Lantai Kerja K.100
M
3
B.2
48,434.00
1/3 x B.2
16,144.67
958,024.52 79,835.38
B.7
150,733.00
1,312,884.43
D.2
364,629.00
6,351,837.18
8.35
C.1
598,775.00
4,999,771.25
3
6
Beton Cor K.175
M
15.68
C.2
739,466.00
11,594,826.88
7
Beton Struktur K.225
M3
31.02
C.3
1,184,505.00
36,743,345.10
8
Pekerjaan Besi
Kg
842.66
C.4
18,165.00
15,306,918.90
9
Bekisting
M2
123.75
C.7
511,321.00
63,275,973.75
10
Pipa Sandaran Galvanis Ø3"
M'
20.00
M49
96,006.00
1,920,120.00
11
Pintu Air Sorong (B = 0,7 H = 1,0)
Set
2.00
M47
3,000,000.00
6,000,000.00
12
Pintu Air Koklep (B = 0,7 H = 1,25)
Set
2.00
M48
4,000,000.00
8,000,000.00
Jumlah Harga Pekerjaan IV (dipindah ke lembar Rekapitulasi)
156,543,537.39
REKAPITULASI DAFTAR KUANTITAS DAN HARGA Kegiatan Pekerjaan Lokasi Tahun Anggaran
NO.
: : : :
Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa Barat Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Kecamatan Langsa Barat, Kota Langsa 2010
URAIAN PEKERJAAN 2
1 I.
PEKERJAAN PERSIAPAN
II.
PEKERJAAN TANGGUL BANJIR
III.
PEKERJAAN SALURAN DRAINASE
IV.
PEKERJAAN PINTU AIR (1 UNIT)
A. Jumlah Harga B. Pajak Pertambahan Nilai (PPn) = 10 % (A)
JUMLAH HARGA (Rp) 3 36,750,000.00 627,521,173.59 2,670,505,689.76 156,543,537.39
3,491,320,400.74 349,132,040.07
C. Jumlah (A) + (B)
3,840,452,440.81
D. DIBULATKAN
3,840,452,000.00
Terbilang : Tiga Milyar Delapan Ratus Empat Puluh Juta Empat Ratus Lima Puluh Dua Ribu Rupiah,-
KET. 4
ENGINEER'S ESTIMATE KEGIATAN
: PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
PEKERJAAN
: INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA
LOKASI
: KOTA LANGSA
TAHUN ANGGARAN
: 2010
No
URAIAN PEKERJAAN
2
1 A.
VOLUME
3
SAT.
KODE ANALISA
4
5
HARGA
JUMLAH
SATUAN
HARGA
(Rp)
(Rp)
6
7
PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH LANGSA LAMA - SMA 2 LANGSA
I. 1
PEKERJAAN PERSIAPAN Direksi keet (sewa)
1.000
Ls
Ditaksir
3,000,000.00
3,000,000.00
2
Pembersihan Lokasi Pekerjaan
1.000
Ls
Ditaksir
1,700,000.00
1,700,000.00
3
Pematokan/Pengukuran (setting out)
1.000
Ls
Ditaksir
4,850,000.00
4,850,000.00
4
Mobilisasi dan Demobilisasi
1.000
Ls
Ditaksir
5,000,000.00
5,000,000.00
5
Administrasi, Dokumentasi dan Pelaporan
1.000
Ls
Ditaksir
2,500,000.00
2,500,000.00
6
Papan Nama Proyek
1.000
Ls
Ditaksir
750,000.00
750,000.00
7
Gambar Pekerjaan Selesai (As Built Drawing)
1.000
Ls
Ditaksir
3,000,000.00
3,000,000.00
Jumlah (I)
20,800,000.00
II. 1
2
PENGADAAN PIPA Pengadaan Pipa GIP Panjang efektif 6 m'/batang - Pipa GIP dia. 150 mm
27.000
M'
M51
272,689.50
7,362,616.50
- Pipa GIP dia. 200 mm
202.000
M'
M52
344,433.00
69,575,466.00
- Pipa PVC dia. 200 mm
4,002.000
M'
M116
195,370.00
781,870,740.00
- Pipa PVC dia. 150 mm
515.000
M'
M115
132,932.50
68,460,237.50
- Pipa PVC dia. 100 mm
95.000
M'
M114
70,495.00
6,697,025.00
Jumlah (II)
933,966,085.00
972,162.00
Pipa PVC lengkap dengan Rubber Ring Joint Panjang efektif 6 m'/batang (seri S-12,5)
III.
PENGADAAN ASESORIES
1
(Lengkap dengan Baut, Mur, Rubber Ring dan Gasket) Tee RRJ GIP dia. 150 mm
1.00
Bh
M104
972,162.00
2
Bend GIP dia. 200 mm x 90
1.00
Bh
M67
708,768.00
708,768.00
3
Bend PVC dia. 200 mm x 90º
5.00
Bh
M128
390,532.00
1,952,660.00
4
Bend PVC dia. 200 mm x 45º
8.00
Bh
M127
335,333.00
2,682,664.00
5
Bend PVC dia. 200 mm x 22.5º
3.00
Bh
M126
290,533.00
871,599.00
6
Gate Valve GIP dia. 200 mm
1.00
Bh
M94
2,822,393.00
2,822,393.00
7
Gate Valve GIP dia. 150 mm
2.00
Bh
M93
1,702,905.00
3,405,810.00
8
Flange Socket PVC dia. 200 mm
11.00
Bh
M140
466,520.00
5,131,720.00
9
Flange Socket PVC dia. 150 mm
9.00
Bh
M139
294,691.50
2,652,223.50
10
Flange Socket GIP dia. 200 mm
8.00
Bh
M84
590,392.00
4,723,136.00
11
Flange Socket GIP dia. 150 mm
10.00
Bh
M85
419,400.00
4,194,000.00
12
Loos Flange GIP dia. 200 mm
10.00
Bh
M89
164,500.00
1,645,000.00
13
Loos Flange GIP dia. 150 mm
10.00
Bh
M88
110,700.00
1,107,000.00
14
Dop PVC dia. 150 mm
1.000
Bh
M135
199,675.00
199,675.00
Jumlah (III)
33,068,810.50
IV. 1
PEMASANGAN PIPA Pekerjaan Tanah a. Galian Tanah
2,523.760
M³
B.3
52,334.00
132,078,455.84
b. Urugan Kembali
2,092.685
M³
1/3 x B3
17,444.67
36,506,192.26
258.180
M³
B.7
150,733.00
38,916,245.94
2.400
M³
C.2
739,466.00
1,774,718.40
c. Urugan Pasir 2
Pekerjaan Beton - Beton Cor K175 (trust block)
3
Pipa PVC lengkap dengan Rubber Ring Joint Panjang efektif 6 m'/batang (seri S-12,5)
a
- Pipa PVC dia. 200 mm
4,002.000
M'
E.4
23,413.00
93,698,826.00
b
- Pipa PVC dia. 150 mm
515.000
M'
E.3
19,514.00
10,049,710.00
4
Pengetesan Aliran Pipa
4,517.000
Ls
(E.12+E.13)/2
5,623.50
25,401,349.50
Jumlah (IV)
338,425,497.94
No
URAIAN PEKERJAAN
2
1 V. 1
VOLUME
SAT.
KODE ANALISA
3
4
5
HARGA
JUMLAH
SATUAN
HARGA
(Rp)
(Rp)
6
7
PERLINTASAN PIPA Perlintasan Pipa dia. 200 mm (5 unit) - Pipa GIP dia. 200 mm
32.000
M'
M52
344,433.00
11,021,856.00
Asesories : - Flange GIP dia. 200 mm
8.000
Bh
M83
200,000.00
1,600,000.00
- Flange GIP dia. 150 mm
8.000
Bh
M82
165,000.00
1,320,000.00
- Tee GIP dia. 150 x 150 x 150 mm
1.000
Bh
M104
972,162.00
972,162.00
- Gate Valve CI dia. 200 mm x 90º
1.000
Bh
M94
2,822,393.00
2,822,393.00
- Gate Valve CI dia. 150 mm x 90º
1.000
Bh
M93
1,702,905.00
1,702,905.00
- Bend CI dia. 200 mm x 45º
8.000
Bh
M66
626,325.00
5,010,600.00
12.000
Bh
M89
164,500.00
1,974,000.00
- Flange Socket PVC RRJ dia. 200 mm
4.000
Bh
M140
466,520.00
1,866,080.00
- Baut dan Mur Ring Flange dia. 200 mm
2.000
Set
M97
137,500.00
275,000.00
- Trust Block
0.600
C.2
739,466.00
443,679.60
M74
250,098.00
2,500,980.00
8,500,000.00
42,500,000.00
- Los Flange GIP dia. 200 mm
- Clamp dia. 200 mm dan Angker Bolt+Mur+Ring
10.000
M³ Set
- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa
5.000
Unit
Ditaksir
- Pipa GIP dia. 150 mm
27.000
M'
M51
272,689.50
7,362,616.50
Asesories : - Bend CI dia. 150 mm x 45º
(termasuk galian dan urugan) 2
Perlintasan Pipa dia. 150 mm (4 unit)
12.000
Bh
M64
442,349.00
5,308,188.00
- Los Flange GIP dia. 150 mm
6.000
Bh
M88
110,700.00
664,200.00
- Flange Socket PVC RRJ dia. 150 mm
2.000
Bh
M139
294,691.50
589,383.00
- Baut dan Mur Ring Flange dia. 150 mm
1.000
Set
M96
127,600.00
127,600.00
- Trust Block
0.480
C.2
739,466.00
354,943.68
- Clamp dia. 150 mm dan Angker Bolt+Mur+Ring
8.000
M³ Set
M75
131,276.00
1,050,208.00
- Pabrikasi dan Pemasangan Perlintasan Jalan Pipa
4.000
Unit
Ditaksir
7,000,000.00
28,000,000.00
Jumlah (V)
117,466,794.78
(termasuk galian dan urugan)
No
URAIAN PEKERJAAN
1
2
VI. 1
PEMBUATAN JEMBATAN PIPA (3 UNIT) + PERLINTASAN (1 UNIT) Pekerjaan Tanah
KODE ANALISA
5
HARGA
JUMLAH
SATUAN
HARGA
(Rp)
(Rp)
6
7
4
- Galian Tanah
50.655
M³
B.3
52,334.00
2,650,978.77
- Urugan Kembali
12.664
M³
1/3 x B3
17,444.67
220,914.90
1.620
M³
B.7
150,733.00
244,187.46
- Pasangan Batu Kosong
1.620
M³
D.2
364,629.00
590,698.98
- Beton Cor Lantai K100
0.810
M³
C.1
598,775.00
485,007.75
- Beton Bertulang K225
24.696
C.3
1,184,505.00
29,252,535.48
798.360
M³ Kg
C.4
18,165.00
14,502,209.40
31.740
M2
C.6
194,462.00
6,172,223.88
- Pipa PVC dia. 100 mm
144.000
M'
M114
70,495.00
10,151,280.00
- Pipa GIP dia. 200 mm
92.000
M'
M52
344,433.00
31,687,836.00
- Pipa GIP dia. 150 mm
102.000
M'
- Flange Socket GIP dia. 200 mm
3.000
Bh
M84
590,392.00
1,771,176.00
- Flange Socket GIP dia. 150 mm
5.000
Bh
M85
419,400.00
2,097,000.00
- Flange Socket GIP dia. 100 mm
4.000
Bh
M86
248,408.00
993,632.00
- Gate Valve CI dia. 200 mm
2.000
Bh
M94
2,822,393.00
5,644,786.00
- Gate Valve CI dia. 150 mm
3.000
Bh
M93
1,702,905.00
5,108,715.00
- Gate Valve CI dia. 100 mm
4.000
Bh
M92
855,754.00
3,423,016.00
- Street Block
4.000
Bh
M150
225,000.00
900,000.00
- Tee GIP dia. 200 - 100 - 200 mm
2.000
Bh
M106
1,069,378.00
2,138,756.00
Pekerjaan Pasangan/Beton
- Pembesian - Bekisting Pondasi 3
SAT.
3
- Urugan Pasir 2
VOLUME
Pemasangan Pipa dan Asesories A. Pemasangan Pipa Jembatan
B. Asesories
- Tee GIP dia. 150 - 100 - 150 mm
3.000
Bh
M107
972,162.00
2,916,486.00
36.000
Bh
M02
42,000.00
1,512,000.00
- Bar Pengaman
8.000
Set
M03
1,200,000.00
9,600,000.00
- Bend CI dia. 200 mm x 45º
5.000
Bh
M66
626,325.00
3,131,625.00
- Bend CI dia. 150 mm x 45º
9.000
Bh
M64
442,349.00
3,981,141.00
- Bend CI dia. 100 mm x 45º
4.000
Bh
M63
258,373.00
1,033,492.00
- Air Realease CI Ø 50 mm
2.000
Bh
M54
1,854,412.00
3,708,824.00
- Air Realease CI Ø 100 mm
3.000
Bh
M56
3,384,171.00
10,152,513.00
- Angker Bolt D22+Mur+Ring
- Base Plat 16 mm
6.000
Bh
M12
170,000.00
1,020,000.00
15,540.000
Kg
M04
28,300.00
439,782,000.00
- Baut dan Mur Steel 1 1/2"
42.000
Set
M10
22,000.00
924,000.00
- Los Flange GIP dia. 200 mm
10.000
Bh
M89
164,500.000
1,645,000.00
- Los Flange GIP dia. 150 mm
19.000
Bh
M88
110,700.000
2,103,300.00
- Los Flange GIP dia. 100 mm
7.000
Bh
M87
56,900.000
398,300.00
- Trust Block
0.960
C.2
739,466.00
709,887.36
- Pabrikasi dan Pemasangan Perlintasan Pipa Jembatan
4.000
M³ Unit
12,000,000.00
48,000,000.00
Jumlah (VI)
648,653,521.98
- Baja Profil H.70.30.1,3.2,4
VII. 1
Ditaksir
PEKERJAAN LAIN-LAIN Pengadaan dan Pemasangan Pompa Centrifugal (termasuk panel, Instalasi dan Asesories) dengan spesifikasi :
2
a. Pompa kapasitas 60 ltr/det, Head = 40 meter/37,5 kw/2900-3000 rpm
1.000
Unit
Ditaksir
78,000,000.00
78,000,000.00
b. Pompa kapasitas 50 ltr/det, Head = 40 meter/30 kw/2900-3000 rpm
1.000
Unit
Ditaksir
64,000,000.00
64,000,000.00
c. Pompa kapasitas 20 ltr/det, Head = 40 meter/18,5 kw/2900-3000 rpm
2.000
Unit
Ditaksir
46,000,000.00
92,000,000.00
a. Meter air Ø 300 mm
1.000
Unit
M152
28,269,400.00
28,269,400.00
b. Meter air Ø 300 mm
1.000
Unit
M153
15,471,000.00
15,471,000.00
Jumlah (VII)
277,740,400.00
Pengadaan dan Pemasangan Meter air :
REKAPITULASI DAFTAR KUANTITAS DAN HARGA KEGIATAN
: PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
PEKERJAAN
: INSTALASI JARINGAN PIPA TRANSMISI PDAM TIRTA KEUMUNENG - LANGSA
LOKASI
: KOTA LANGSA
TAHUN ANGGARAN
: 2010
NO.
URAIAN PEKERJAAN
1
2
JUMLAH HARGA (Rp.)
A.
PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH LANGSA LAMA - SMA 2 LANGSA
I.
PEKERJAAN PERSIAPAN
20,800,000.00
II.
PENGADAAN PIPA
933,966,085.00
III.
PENGADAAN ASESORIES
33,068,810.50
IV.
PEMASANGAN PIPA
338,425,497.94
V.
PERLINTASAN PIPA
117,466,794.78
VI.
PEMBUATAN JEMBATAN PIPA (3 UNIT) + PERLINTASAN (1 UNIT)
648,653,521.98
VII.
PEKERJAAN LAIN-LAIN
277,740,400.00
A. Jumlah Harga
2,370,121,110.20
B. Pajak Pertambahan Nilai (PPn) = 10 % (A)
237,012,111.02
C. Jumlah (A) + (B)
2,607,133,221.22
D. DIBULATKAN
2,607,133,000.00 Terbilang : Dua Milyar Enam Ratus Tujuh Juta Seratus Tiga Puluh Tiga Ribu Rupiah,-
KET
JENIS PEKERJAAN SATUAN PEKERJAAN KODE ANALISA NO
URAIAN
: : :
MOBILISASI/DEMOBILISASI LS A.1 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4 5
MOBILISASI ALAT & PERSONIL Excavator Buldozer Vibro roller
bh bh bh
1.000 1.000 1.000
3,500,000.00 3,500,000.00 3,500,000.00
3,500,000.00 3,500,000.00 3,500,000.00
B 1 2 3 4 5
DEMOBILISASI ALAT & PERSONIL Excavator Buldozer Vibro roller
bh bh bh
1.000 1.000 1.000
3,500,000.00 3,500,000.00 3,500,000.00
3,500,000.00 3,500,000.00 3,500,000.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Hasil Perhitungan
21,000,000.00 21,000,000.00 21,000,000.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3) : M3 URAIAN
SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
1.5000 0.6000 0.0600 0.0750
49,700.00 78,700.00 94,500.00 82,300.00
74,550.00 47,220.00
B 1 2 3
BAHAN PC Batu Kali Pasir Pasang
kg m3 m3
163.0000 1.2000 0.5200
1,257.50 202,800.00 129,600.00
204,972.50 243,360.00 67,392.00
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
6,172.50
643,667.00 643,667.00 643,667.00
: PASANGAN BATU KOSONG (AANSTAMPING) : M3 URAIAN
SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
0.7800 0.3900 0.0390 0.0390
49,700.00 78,700.00 94,500.00 82,300.00
38,766.00 30,693.00
B 1 2
BAHAN Batu Kali Pasir Urug
m3 m3
1.2000 0.4320
202,800.00 112,500.00
243,360.00 48,600.00
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
3,209.70
364,628.70 364,628.70 364,629.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: PLESTERAN 1 : 3 : M2 URAIAN
SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
0.2000 0.1500 0.0150 0.0100
49,700.00 78,700.00 94,500.00 82,300.00
9,940.00 11,805.00
B 1 2 3
BAHAN PC Pasir Pasang
kg m3
7.7760 0.0230
1,257.50 129,600.00
9,778.32 2,980.80
C 1
PERALATAN
823.00
-
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
35,327.12 35,327.12 35,327.00
: PLESTERAN 1 : 4 : M2 URAIAN
SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
0.2000 0.1500 0.0150 0.0100
49,700.00 78,700.00 94,500.00 82,300.00
9,940.00 11,805.00
B 1 2 3
BAHAN PC Pasir Pasang
kg m3
6.2400 0.0240
1,257.50 129,600.00
7,846.80 3,110.40
C 1
PERALATAN
823.00
-
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
33,525.20 33,525.20 33,525.00
NO
A 1 2 3
B 1 C 1 2
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1 C 1
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1 C 1 2 3 4
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1
C 1 2 3
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 B 1 C 1
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3
TENAGA Pekerja Mandor
B 1
BAHAN
C 1 2
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Analisa SNI 2007
GALIAN TANAH BIASA SEDALAM 1 METER M3 SATUAN
OH OH
KUANTITAS
0.7500 0.0250
HARGA SATUAN Rp.
49,700.00 82,300.00
JUMLAH Rp.
37,275.00 2,057.50
39,332.50 39,332.50 39,333.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3
TENAGA Pekerja Mandor
B 1
BAHAN
C 1 2
PERALATAN
GALIAN TANAH BIASA SEDALAM 2 METER M3 SATUAN
OH OH
KUANTITAS
0.9000 0.0450
HARGA SATUAN Rp.
49,700.00 82,300.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JUMLAH Rp.
44,730.00 3,703.50
48,433.50 48,433.50 48,434.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3
TENAGA Pekerja Mandor
B 1
BAHAN
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Analisa SNI 2007
GALIAN TANAH KERAS SEDALAM 1 METER M3 SATUAN
OH OH
KUANTITAS
1.0000 0.0320
HARGA SATUAN Rp.
49,700.00 82,300.00
JUMLAH Rp.
49,700.00 2,633.60
52,333.60 52,333.60 52,334.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3
TENAGA Pekerja Mandor
B 1
BAHAN
C 1 2 3 4
PERALATAN
GALIAN TANAH LUMPUR SEDALAM 1 METER M3 SATUAN
OH OH
KUANTITAS
HARGA SATUAN Rp.
1.2000 0.0450
49,700.00 82,300.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JUMLAH Rp.
59,640.00 3,703.50
63,343.50 63,343.50 63,344.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Mandor
B 1
BAHAN
C 1
PERALATAN
MEMADATKAN TANAH (PER 20 CM) M3 SATUAN
OH OH
KUANTITAS
0.5000 0.0500
HARGA SATUAN Rp.
49,700.00 82,300.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JUMLAH Rp.
24,850.00 4,115.00
28,965.00 28,965.00 28,965.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
URAIAN
:
TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT
:
M3 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Mandor Operator Pembantu Operator
OH OH OH OH
0.3000 0.0100 0.2905 0.2905
49,700.00 82,300.00 122,300.00 75,000.00
14,910.00 823.00 35,528.15 21,787.50
B 1
BAHAN Tanah Timbun
m3
1.2000
51,700.00
62,040.00
C 1 2 3
PERALATAN Excavator Buldozer Vibro roller
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Analisa SNI 2007
Jam Jam Jam
0.0250 0.0164 0.0152
343,208.28 547,125.46 267,913.36
8,580.21 8,969.27 4,059.29
156,697.42 156,697.42 156,697.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
TIMBUNAN PASIR URUG M3 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2
TENAGA Pekerja Mandor
OH OH
0.3000 0.0100
49,700.00 82,300.00
14,910.00 823.00
B 1
BAHAN Pasir urug
m3
1.2000
112,500.00
135,000.00
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
150,733.00 150,733.00 150,733.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
PEKERJAAN GEBALAN RUMPUT M2 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3
TENAGA Pekerja Mandor Alat bantu
OH OH set
0.1500 0.0150 0.0125
49,700.00 82,300.00 10,000.00
7,455.00 1,234.50 125.00
B 1
BAHAN Lempengan Rumput
m2
1.2000
28,100.00
33,720.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Hasil Perhitungan
(B)
42,534.50 42,534.50 42,535.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
BETON K.175 (TANPA ACUAN) M3 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4 5 6
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
49,700.00 78,700.00 94,500.00 82,300.00
82,005.00 21,642.50 2,646.00 6,830.90
B 1 2 3 4 5 6
BAHAN Pasir Beton Kerikil PC Air
kg kg kg Liter
760.00 1,029.00 326.00 215.00
100.79 104.52 1,257.50 150.00
76,597.14 107,549.56 409,945.00 32,250.00
C 1 2 3
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan Harga pekerjaan (diluar PPN) Jumlah dibulatkan
739,466.10 739,466.10 739,466.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
BETON STRUKTUR K.225 (TANPA ACUAN) M3 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4 5
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
49,700.00 78,700.00 94,500.00 82,300.00
82,005.00 21,642.50 2,646.00 6,830.90
B 1 2 3 4
BAHAN Kerikil (batu pecah 2-3 cm) Pasir Beton PC Air
kg kg kg Liter
1,047.00 698.00 371.00 215.00
479.70 100.79 1,257.50 150.00
502,249.78 70,348.43 466,532.50 32,250.00
C 1 2
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Analisa SNI 2007
1,184,505.11 1,184,505.11 1,184,505.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2
: :
URAIAN
BESI TULANGAN POLOS 10 KG SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
3
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
0.0700 0.0700 0.0070 0.0040
49,700.00 78,700.00 94,500.00 82,300.00
3,479.00 5,509.00 661.50 329.20
B 1 2
BAHAN Besi beton polos Kawat Beton
kg kg
10.5000 0.1500
16,200.00 10,500.00
170,100.00 1,575.00
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan Harga pekerjaan (diluar PPN) Jumlah untuk 1 Kg Besi Jumlah dibulatkan
181,653.70 181,653.70 18,165.37 18,165.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2
: :
URAIAN
BESI TULANGAN ULIR 10 KG SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
3
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
0.0700 0.0700 0.0070 0.0040
49,700.00 78,700.00 94,500.00 82,300.00
3,479.00 5,509.00 661.50 329.20
B 1 2
BAHAN Besi beton ulir Kawat Beton
kg kg
10.5000 0.1500
24,800.00 10,500.00
260,400.00 1,575.00
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan Harga pekerjaan (diluar PPN) Jumlah untuk 1 Kg Besi Jumlah dibulatkan
271,953.70 271,953.70 27,195.37 27,195.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
ACUAN BETON/BEKISTING UNTUK PONDASI M2 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
OH OH OH OH
0.5200 0.2600 0.0260 0.0260
49,700.00 78,700.00 94,500.00 82,300.00
25,844.00 20,462.00
B 1 2 3
BAHAN Paku Kayu kelas III Minyak bekisting
kg m3 liter
0.3000 0.0400 0.1000
11,600.00 3,553,900.00 3,800.00
3,480.00 142,156.00 380.00
C 1
PERALATAN
2,139.80
-
Jumlah (termasuk biaya umum dan keuntungan)
194,461.80
Harga pekerjaan (diluar PPN) Jumlah dibulatkan
194,461.80 194,462.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
B 1 2 3 4 5 6 7
BAHAN Paku Kayu kelas III Balok kayu kelas II Minyak bekisting Plywood tebal 9 mm Kayu dolken Formite/penjaga jarak bekisting/spacer
C 1
PERALATAN
ACUAN BETON/BEKISTING UNTUK DINDING M2 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
49,700.00 78,700.00 94,500.00 82,300.00
32,802.00 25,971.00 3,118.50 2,715.90
kg m3 m3 liter lembar batang buah
0.4000 0.0300 0.0200 0.2000 0.3500 3.0000 4.0000
11,600.00 3,553,900.00 3,926,100.00 3,800.00 150,500.00 62,500.00 4,000.00
4,640.00 106,617.00 78,522.00 760.00 52,675.00 187,500.00 16,000.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
511,321.40 511,321.40 511,321.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
B 1 2 3 4 5 6
BAHAN Paku Kayu kelas III Balok kayu kelas II Minyak bekisting Plywood tebal 9 mm Kayu dolken
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Analisa SNI 2007
ACUAN BETON/BEKISTING UNTUK LANTAI M2 SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
49,700.00 78,700.00 94,500.00 82,300.00
32,802.00 25,971.00 3,118.50 2,715.90
kg m3 m3 liter lembar batang
0.4000 0.0400 0.0150 0.2000 0.3500 6.0000
11,600.00 3,553,900.00 3,926,100.00 3,800.00 150,500.00 62,500.00
4,640.00 142,156.00 58,891.50 760.00 52,675.00 375,000.00 -
698,729.90 698,729.90 698,730.00
Kebutuhan Waktu dan Tenaga untuk Pemasangan Tulangan Pengelak 32.96 Tukang jam 0.27 Besi Beton kg 1.10 produksi 1jam tukang 4.12 Satu hari kg/hari (8Ulir jam) Vol. baja kg yang akan dikerjakan #REF! waktu jam yang dibutuhkan jika dikerjakan hari 60 orang #REF! Pekerja jam 0.13 Besi Beton 1.10 produksi 1jam tukang kg 8.27 Satu hari (8Ulir jam) kg/hari Vol. baja yang akan dikerjakan kg waktu yang dibutuhkan jam #REF! 66.17 jika dikerjakan 50 orang hari Kebutuhan Waktu dan Tenaga untuk Pemasangan Bekisting dan Perancah Pengelak Pekerja jam 2.45 Kayu acuan dan perancah m3 0.52 produksi 1 jam pekerja m3/jam 0.21 Satu hari (8 jam) m3/hari Vol. Bekisting dan perancah m3 #REF! 1.68 waktu yang dibutuhkan jam jika dikerjakan 1 orang hari Kebutuhan Waktu dan Tenaga untuk Pemasangan Tulangan Peimpah Tukang jam 0.27 Besi baja Beton 1.10 produksi kg 1jam tukang 4.12 Satu hari kg/hari (8Ulir jam) 32.96 Vol. kg yang akan dikerjakan waktu jam yang dibutuhkan #REF! jika dikerjakan hari 60 orang Pekerja jam 0.13 Besi Beton Ulir kg 1.10 produksi 1jam tukang 8.27 Satu hari (8 dibutuhkan jam) kg/hari Vol. baja yang akan dikerjakan kg waktu yang jam #REF! 66.17 jika dikerjakan 50perancah orang hari Kebutuhan Waktu dan Tenaga untuk Pemasangan Bekisting dan Perancah Pelimpah Pekerja jam 2.45 Kayu acuan dan m3 0.52 produksi 1(8jam m3/jam Satudikerjakan hari jam) m3/hari 1.68 Vol. Bekisting dan perancah m3 waktu yang dibutuhkan jam #REF! 0.21 jika 1pekerja orang hari
NO
A 1 2 3 4
B 1 C 1 2
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1 2 3 4
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B
1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 4 B 1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1 C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
A 1 2 3 B 1
C 1 2 3
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
PENGELASAN M' SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3
TENAGA Tukang Kepala Tukang
OH OH
0.5000 0.0210
49,700.00 82,300.00
24,850.00 1,728.30
B 1 2
BAHAN Kawat Las Solar
Kg Liter
2.3000 0.7500
16,000.00 8,100.00
36,800.00 6,075.00
C 1 2
PERALATAN Mesin Las (sewa)
Jam
0.0710
14,285.71
1,014.29
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Hasil Perhitungan
70,467.59 70,467.59 70,468.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Mandor Kepala Tukang Tukang
B 1
BAHAN
C 1 2
PERALATAN
PEMASANGAN PIPA PVC DIA. 75 MM - 100 MM M' SATUAN
OH OH OH OH
KUANTITAS
0.0810 0.0041 0.0135 0.1350
HARGA SATUAN Rp.
49,700.00 82,300.00 94,500.00 78,700.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JUMLAH Rp.
4,025.70 337.43 1,275.75 10,624.50
16,263.38 16,263.38 16,263.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Mandor Kepala Tukang Tukang
B 1
BAHAN
C 1
PERALATAN
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Hasil Perhitungan
PEMASANGAN PIPA PVC DIA. 150 MM M' SATUAN
OH OH OH OH
KUANTITAS
0.0972 0.0049 0.0162 0.1620
HARGA SATUAN Rp.
49,700.00 82,300.00 94,500.00 78,700.00
JUMLAH Rp.
4,830.84 403.27 1,530.90 12,749.40
19,514.41 19,514.41 19,514.00
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Tukang Kepala Tukang Mandor
B 1
BAHAN
C 1 2 3 4
PERALATAN
PEMASANGAN PIPA PVC DIA. 200 MM M' SATUAN
OH OH OH OH
KUANTITAS
0.1166 0.1944 0.0194 0.0059
HARGA SATUAN Rp.
49,700.00 78,700.00 94,500.00 82,300.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JUMLAH Rp.
5,795.02 15,299.28 1,833.30 485.57
23,413.17 23,413.17 23,413.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Mandor Kepala Tukang Mandor
B 1
BAHAN
C 1
PERALATAN
PEMASANGAN PIPA PVC DIA. 250 MM M' SATUAN
OH OH OH OH
KUANTITAS
0.1341 0.2236 0.0224 0.0068
HARGA SATUAN Rp.
49,700.00 78,700.00 94,500.00 82,300.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
JUMLAH Rp.
6,664.77 17,597.32 2,116.80 559.64
26,938.53 26,938.53 26,939.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
A 1 2 3 4
TENAGA Pekerja Tukang Kepala tukang Mandor
B
BAHAN
PEMASANGAN PIPA GSP/STEEL DIA. 75 MM M' SATUAN
OH OH OH OH
KUANTITAS
0.1080 0.1800 0.0180 0.0054
HARGA SATUAN Rp.
49,700.00 78,700.00 94,500.00 82,300.00
JUMLAH Rp.
5,367.60 14,166.00 1,701.00 444.42
1
Pengelasan Keliling
M'
0.2355
115,292.50
27,151.38
C 1 2 3
PERALATAN Alat Bantu
Ls
1.0000
75,000.00
75,000.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
123,830.40 123,830.40 123,830.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
PEMASANGAN PIPA GSP/STEEL DIA. 100 MM M' SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala tukang Mandor
OH OH OH OH
0.1350 0.2250 0.0225 0.0068
49,700.00 78,700.00 94,500.00 82,300.00
6,709.50 17,707.50 2,126.25 559.64
B 1
BAHAN Pengelasan Keliling
M'
0.3140
115,292.50
36,201.85
C 1 2 3
PERALATAN Alat Bantu
Ls
1.0000
75,000.00
75,000.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
138,304.74 138,304.74 138,305.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
PEMASANGAN PIPA GSP/STEEL DIA. 150 MM M' SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala tukang Mandor
OH OH OH OH
0.1688 0.2813 0.0281 0.0085
49,700.00 78,700.00 94,500.00 82,300.00
8,389.36 22,138.31 2,655.45 699.55
B 1
BAHAN Pengelasan Keliling
M'
0.4710
115,292.50
54,302.77
C 1 2 3
PERALATAN Alat Bantu
Ls
1.0000
75,000.00
75,000.00
Jumlah (termasuk biaya umum dan keuntungan)
163,185.44
Harga pekerjaan (diluar PPN) Jumlah dibulatkan
163,185.44 163,185.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
: :
URAIAN
PEMASANGAN PIPA GSP/STEEL DIA. 200 MM M' SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
A 1 2 3 4
TENAGA Pekerja Tukang Kepala tukang Mandor
OH OH OH OH
0.2026 0.3376 0.0337 0.0102
49,700.00 78,700.00 94,500.00 82,300.00
10,069.22 26,569.12 3,184.65 839.46
B 1
BAHAN Pengelasan Keliling
M'
0.6280
115,292.50
72,403.69
C 1 2 3
PERALATAN Alat Bantu
Ls
1.0000
75,000.00
75,000.00
Jumlah (termasuk biaya umum dan keuntungan) Harga pekerjaan (diluar PPN) Jumlah dibulatkan
188,066.14 188,066.14 188,066.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 75 MM
:
M'
URAIAN
A 1 2 3
TENAGA Pekerja Tukang Mandor
B 1
Air bersih
C 1 2 3
:
SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
OH OH OH
0.1130 0.0450 0.0230
49,700.00 78,700.00 82,300.00
5,616.10 3,541.50 1,892.90
M3
0.4140
150,000.00
62,100.00
Hk
1.0000
75,000.00
75,000.00
BAHAN
PERALATAN Mesin tes pipa (sewa)
Jumlah Pengetesan Pipa untuk 75 M' Jumlah Pengetesan Pipa untuk 1 M' Harga pekerjaan (diluar PPN) Jumlah dibulatkan
148,150.50 1,975.34 1,975.34 1,975.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
URAIAN
:
PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 100 MM
:
M' SATUAN
KUANTITAS
HARGA SATUAN
JUMLAH
Rp. A 1 2 3
TENAGA Pekerja Tukang Mandor
B 1
Air bersih
C 1 2 3
Rp.
OH OH OH
0.1880 0.0750 0.0380
49,700.00 78,700.00 82,300.00
9,343.60 5,902.50 3,127.40
M3
0.7360
150,000.00
110,400.00
Hk
1.0000
75,000.00
75,000.00
BAHAN
PERALATAN Mesin tes pipa (sewa)
Jumlah Pengetesan Pipa untuk 75 M' Jumlah Pengetesan Pipa untuk 1 M' Harga pekerjaan (diluar PPN) Jumlah dibulatkan
203,773.50 2,716.98 2,716.98 2,717.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 150 MM
:
M'
URAIAN
A 1 2 3
TENAGA Pekerja Tukang Mandor
B 1
Air bersih
C 1 2 3
:
SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
OH OH OH
0.2630 0.1050 0.0530
49,700.00 78,700.00 82,300.00
13,071.10 8,263.50 4,361.90
M3
1.6560
150,000.00
248,400.00
Hk
1.0000
75,000.00
75,000.00
BAHAN
PERALATAN Mesin tes pipa (sewa)
Jumlah Pengetesan Pipa untuk 75 M' Jumlah Pengetesan Pipa untuk 1 M' Harga pekerjaan (diluar PPN) Jumlah dibulatkan
349,096.50 4,654.62 4,654.62 4,655.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN SATUAN PEKERJAAN NO
URAIAN
A 1 2 3
TENAGA Pekerja Tukang Mandor
B 1
Air bersih
:
PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 200 MM
:
M' SATUAN
KUANTITAS
HARGA SATUAN Rp.
JUMLAH Rp.
OH OH OH
0.3380 0.1350 0.0680
49,700.00 78,700.00 82,300.00
16,798.60 10,624.50 5,596.40
M3
2.5760
150,000.00
386,400.00
BAHAN
C 1 2 3
PERALATAN Mesin tes pipa (sewa)
Jumlah Pengetesan Pipa untuk 75 M' Jumlah Pengetesan Pipa untuk 1 M' Harga pekerjaan (diluar PPN) Jumlah dibulatkan Sumber : Hasil Perhitungan
Hk
1.0000
75,000.00
75,000.00
494,419.50 6,592.26 6,592.26 6,592.00
REKAP ANALISA HARGA SATUAN PEKERJAAN PROPINSI KOTA TAHUN ANGGARAN PAKET PEKERJAAN
KODE ANALISA A A.1 B B.1 B.2 B.3 B.4 B.5 B.6 B.7 B.8 C C.1 C.2 C.3 C.4 C.5 C.6 C.7 C.8 D D.1 D.2 D.3 D.4 D.5 E E.1 E.2 E.3 E.4 E.5 E.6 E.7 E.8 E.9 E.10 E.11 E.12 E.13
: : : : :
ACEH LANGSA 2010 SEKTOR AIR BERSIH DAN DRAINASE PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
URAIAN PEKERJAAN PERSIAPAN MOBILISASI/DEMOBILISASI PEKERJAAN TANAH GALIAN TANAH BIASA SEDALAM 1 METER GALIAN TANAH BIASA SEDALAM 2 METER GALIAN TANAH KERAS SEDALAM 1 METER GALIAN TANAH LUMPUR SEDALAM 1 METER MEMADATKAN TANAH (PER 20 CM) TIMBUNAN TANAH DIDATANGKAN & PEMADATAN DENGAN ALAT BERAT TIMBUNAN PASIR URUG PEKERJAAN GEBALAN RUMPUT PEKERJAAN BETON BETON NON STRUKTUR (K.100) BETON K.175 (TANPA ACUAN) BETON STRUKTUR K.225 (TANPA ACUAN) BESI TULANGAN POLOS BESI TULANGAN ULIR ACUAN BETON/BEKISTING UNTUK PONDASI ACUAN BETON/BEKISTING UNTUK DINDING ACUAN BETON/BEKISTING UNTUK LANTAI PEKERJAAN PASANGAN PASANGAN BATU 1 : 4 (TERMASUK SIAR 1 : 3) PASANGAN BATU KOSONG (AANSTAMPING) PLESTERAN 1 : 3 PLESTERAN 1 : 4 DRAIN HOLE PEKERJAAN PIPA PENGELASAN PEMASANGAN PIPA PVC DIA. 75 MM - 100 MM PEMASANGAN PIPA PVC DIA. 150 MM PEMASANGAN PIPA PVC DIA. 200 MM PEMASANGAN PIPA PVC DIA. 250 MM PEMASANGAN PIPA GSP/STEEL DIA. 75 MM PEMASANGAN PIPA GSP/STEEL DIA. 100 MM PEMASANGAN PIPA GSP/STEEL DIA. 150 MM PEMASANGAN PIPA GSP/STEEL DIA. 200 MM PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 75 MM PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 100 MM PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 150 MM PENGETESAN SAMBUNGAN PIPA PVC/GIP DIA. 200 MM
Sumber : Hasil Perhitungan
SATUAN
LS M3 M3 M3 M3 M3 M3 M3 M2 M3 M3 M3 KG KG M2 M2 M2 M3 M3 M2 M2 BH M' M' M' M' M' M' M' M' M' M' M' M' M'
REKAP ANALISA HARGA SATUAN PEKERJAAN
HARGA SATUAN Rp. 21,000,000.00 39,333.00 48,434.00 52,334.00 63,344.00 28,965.00 156,697.00 150,733.00 42,535.00 598,775.00 739,466.00 1,184,505.00 18,165.00 194,462.00 194,462.00 511,321.00 698,730.00 643,667.00 364,629.00 35,327.00 33,525.00 22,501.00 70,468.00 16,263.00 19,514.00 23,413.00 26,939.00 123,830.00 138,305.00 163,185.00 188,066.00 1,975.00 2,717.00 4,655.00 6,592.00