REKAPITULASI TOTAL ISTANSI
: BADAN LINGKUNGAN HIDUP DAERAH
PEKERJAAN
: PERENCANAAN TAMAN KOTA
ANGGARAN
: TAHUN 2013
LOKASI
: KABUPATEN GOWA PROVINSI SULAWESI SELATAN JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
A
PENATAAN TAMAN KOTA ADIPURA
Rp.
403,700,000.00
B
PENATAAN TAMAN KOTA PATUNG PEMUDA
Rp.
235,950,000.00
C
PENATAAN TAMAN KOTA PATUNG PERAHU
Rp.
328,616,200.00
D
PENATAAN TAMAN KOTA KEBUN KEHATI MAWANG
Rp.
498,753,200.00
E
RUMAH KOMPOS
Rp.
22,000,000.00
Rp.
1,489,019,400.00
Total Cost + PPN 10%
Terbilang : satu milyar empat ratus delapan puluh sembilan juta sembilan belas ribu empat ratus rupiah,-
Mengetahui,
Dibuat Oleh,
Pejabat Pembuat Komitmen (PPK)
Konsultan Perencana
Badan Lingkungan Hidup Daerah Gowa
CV. CIPTA HIRARCHY KONSULTAN
ZULFIADY MAS'UD S,Si, M.Si
AMIRUDDIN ACHMAD, ST
Nip. 19801008 201001 1016
Direktur
Mengetahui, Kepala Badan Lingkungan Hidup Gowa
Drs. H. ZULKARNAEN, M.Si Nip. 195811021981021003
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) INSTANSI PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : D. PENATAAN TAMAN KOTA KEBUN KEHATI MAWANG : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I.
Pekerjaan Persiapan
Rp.
3,250,000.00
II.
Pekerjaan Pagar Batu Merah
Rp.
106,663,305.06
III.
Pekerjaan Joging Trek
Rp.
29,842,514.47
IV.
Pekerjaan Pagar BRC
Rp.
45,379,215.88
V.
Pekerjaan Taman
Rp.
255,878,717.00
VI.
Pekerjaan Mekanikal
Rp.
9,775,041.44
VII.
Pekerjaan Lain - Lain
Rp.
2,623,254.80
Real Cost
Rp.
453,412,048.65
PPN 10%
Rp.
45,341,204.86
Total Biaya Fisik
Rp.
498,753,253.51
Dibulatkan
Rp.
498,753,200.00
Terbilang : EMPAT RATUS SEMBILAN PULUH DELAPAN JUTA TUJUH RATUS LIMA PULUH TIGA RIBU DUA RATUS RUPIAH,-
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST Direktur
RENCANA ANGGARAN BIAYA (RAB) YAYASAN PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI NO.
-
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : D. PENATAAN TAMAN KOTA KEBUN KEHATI MAWANG : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN URAIAN PEKERJAAN
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
ANALISA I. 1. 2. 3. 4. 5.
Pekerjaan Persiapan Pengukuran & Pas. Bowplank P3K (Pertolongan Pertama Pada Kecelakaan) Administrasi, Dokumentasi Dan Quality Kontrol Alat Bantu Kerja Pekerjaan Pembersihan Lokasi
II. 1. 2. 3. 4. 5. 6.
-
1.000 1.000 1.000 1.000 1.000
ls ls ls ls ls
250,000.00 250,000.00 500,000.00 750,000.00 1,500,000.00 Jumlah (I)
250,000.00 250,000.00 500,000.00 750,000.00 1,500,000.00 3,250,000.00
Pekerjaan Pagar Batu Merah Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pek. Pondasi Bt. Kosong Pek. Pondasi Bt. Kali 1 : 4 Pek. Sloof Beton 15/15 - Beton K. 175 - Besi Polos - Bekisting 7. Pek. Kolom Beton 11/11 8. Pek. Ringbalk 10 x 15 9. Pek. Batu Merah 10. Pek. Plesteran 11. Pek. Acian 12. Pek. Pengecatan Kw.2
A6.1 A6.9 A6.11 B6.9 B6.2
53.910 17.970 7.815 15.630 39.388
m3 m3 m3 m3 m3
43,750.00 2,175.00 113,500.00 275,730.00 571,590.00
2,358,549.38 39,084.53 887,002.50 4,309,659.90 22,513,558.28
E6.5 E6.17 E6.21 E6.35 E6.36 C6.3 D6.4 D6.27 SPL.4
3.517 527.513 35.168 75.400 156.300 186.360 250.080 250.080 250.080
m3 Kg m2 M' M' m2 m2 m2 m2
741,970.00 16,095.00 106,830.00 80,657.00 95,953.00 86,885.00 40,621.20 21,022.50 36,037.00 Jumlah (II)
2,609,323.00 8,490,313.69 3,756,944.03 6,081,537.80 14,997,453.90 16,191,888.60 10,158,549.70 5,257,306.80 9,012,132.96 106,663,305.06
III. 1. 2. 3. 4. 5. 6.
Pekerjaan Joging Trek Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pek. Kansteen Beton Tampa Tulangan 12/55 Pek. Paving Blok t. 8 cm K. 225 Pek. Pair Urug
A6.1 A6.9 A6.11 E6.5 SPL.5 A6.11
5.058 1.265 1.897 16.691 151.800 18.975
m3 m3 m3 m3 m2 m2
43,750.00 2,175.00 113,500.00 741,970.00 97,925.00 113,500.00 Jumlah (III)
221,287.50 2,750.29 215,281.13 12,384,518.06 14,865,015.00 2,153,662.50 29,842,514.47
IV. 1. 2. 3. 4. 5. 6. 7. 8. 9.
Pekerjaan Pagar BRC Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pek. Pondasi Bt. Kosong Pek. Pondasi Bt. Kali 1 : 4 Pek. Beton Dudukan Kolom Pagar BRC Pek. Pagar BRC T.1.2 ex Elecroplating Galvanized Pek. Tiang BRC 1,2" ex Electroplating Galvanised Pek. Pintu Tunggal Lebar 90 Cm Tinggi 1,2 m
A6.1 A6.9 A6.11 B6.9 B6.2 E6.5 SPL.6 SPL.7 -
17.360 5.787 2.464 4.928 22.400 0.552 103.700 46.000 1.000
m3 m3 m3 m3 m3 m3 M' Bh Set
43,750.00 2,175.00 113,500.00 275,730.00 571,590.00 741,970.00 212,050.00 141,650.00 1,250,000.00 Jumlah (IV)
759,500.00 12,586.00 279,664.00 1,358,797.44 12,803,616.00 409,567.44 21,989,585.00 6,515,900.00 1,250,000.00 45,379,215.88
NO.
URAIAN PEKERJAAN
V. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27.
Pekerjaan Taman Pek. Timbunan t. 25 cm Rumput Gajah Mini Beringin Dollar 1,50 - 2,00 m Serut 1,50 - 2,00 m Agave klomentia Ketapang Kencana t.2,00 - 2,50 m Kamboja Plumeria t. 2,50 - 3,00 m Lilis Paris Putih Amarilis Pandanus Keladi Raja Nolina Helicolinia Krokot Merah Krokot Putih Adam Hawa Sambang Dara Song of india Irish Osmoxylon Puring Nanas Merah Pandang bali Cabang t. 1,50 - 2,00 m Nampo Pohon Mangga 5 Rasa T. 1,500 - 2,00 m Pohon Rambutan Lengkeng Gowa T. 1,500 - 2,00 m
VI. 1. 2. 3. 4. 5. 6. 7.
Pekerjaan Mekanikal Pipa 3/4 Maspion (turun disumur) Selang Air 3/4 Serat Kran Air 3/4" Saringan Katup Otomatis Pipa 4" Maspion Pompa Air (setara Zhimizu tipe PS. 130 Bit) Bak Kontrol 1m x 1m ( 2 Buah ) Galian Tanah Pasangan Batu Bata 1 : 3 Pleteran 1 : 3 Pek. Penutup Saluran Lama t. 10 cm - Beton K. 175 - Besi Polos - Bekisting 2 x Pakai Pek. Penutup Saluran (grill besi diameter 12 jarak 8 cm)
8.
9.
VII. Pekerjaan Lain - Lain 1. Pek. Kansteeng Teras Kuburan (12 x 50 ) 2. Pek. Pembersihan
KODE
VOL.
A6.16 -
697.990 1645.700 2.000 1.000 15.000 30.000 2.000 2.000 700.000 700.000 500.000 50.000 5.000 450.000 500.000 500.000 500.000 30.000 50.000 500.000 150.000 300.000 20.000 4.000 50.000 4.000 3.000
G6.26 G6.35 G6.32 -
4.000 50.000 1.000 1.000 23.000 1.000
A6.1 C6.2 D6.3
SAT. m3 m2 Phn Phn Pbg Pbg Phn Phn Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Phn Pbg Phn Phn
HARGA SAT.
JML. HARGA
118,300.00 45,000.00 5,000,000.00 7,000,000.00 100,000.00 65,000.00 450,000.00 1,500,000.00 15,000.00 10,000.00 15,000.00 150,000.00 350,000.00 15,000.00 2,500.00 2,500.00 2,500.00 75,000.00 50,000.00 7,500.00 25,000.00 30,000.00 75,000.00 750,000.00 25,000.00 450,000.00 450,000.00 Jumlah (VI)
82,572,217.00 74,056,500.00 10,000,000.00 7,000,000.00 1,500,000.00 1,950,000.00 900,000.00 3,000,000.00 10,500,000.00 7,000,000.00 7,500,000.00 7,500,000.00 1,750,000.00 6,750,000.00 1,250,000.00 1,250,000.00 1,250,000.00 2,250,000.00 2,500,000.00 3,750,000 3,750,000.00 9,000,000.00 1,500,000.00 3,000,000.00 1,250,000.00 1,800,000.00 1,350,000.00 255,878,717.00
M' M' Bh Bh M' Bh
21,865.00 10,000.00 29,475.00 15,000.00 90,470.00 650,000.00
87,460.00 500,000.00 29,475.00 15,000.00 2,080,810.00 650,000.00
1.600 8.000 8.000
M3 M2 M2
43,750.00 89,738.10 42,226.88
70,000.00 717,904.80 337,815.04
E6.5 E6.17 E6.25 -
1.300 110.500 10.790 2.000
M3 Kg M2 M2
741,970.00 16,095.00 189,390.00 250,000.00
964,561.00 1,778,497.50 2,043,518.10 500,000.00 9,775,041.44
E6.5 -
0.840 1.000
M' ls
741,970.00 2,000,000.00 JumlahI (VII)
623,254.80 2,000,000.00 2,623,254.80
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) INSTANSI PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : B. PENATAAN TAMAN KOTA PATUNG PEMUDA : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I.
Pekerjaan Persiapan
Rp.
4,740,000.00
II.
Pekerjaan Pembongkaran
Rp.
7,885,315.20
III.
Pekerjaan Pedestrian
Rp.
57,583,502.72
IV.
Pekerjaan Pagar BRC
Rp.
21,034,209.20
V.
Pekerjaan Patung Pemuda
Rp.
28,131,159.65
VI.
Pekerjaan Taman
Rp.
92,926,926.05
VII.
Pekerjaan Lain - Lain
Rp.
2,201,340.00
Real Cost
Rp.
214,502,452.83
PPN 10%
Rp.
21,450,245.28
Total Biaya Fisik
Rp.
235,952,698.11
Dibulatkan
Rp.
235,950,000.00
Terbilang : DUA RATUS TIGA PULUH LIMA JUTA SEMBILAN RATUS LIMA PULUH RIBU RUPIAH,-
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST Direktur
RENCANA ANGGARAN BIAYA (RAB) YAYASAN PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI NO.
-
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : B. PENATAAN TAMAN KOTA PATUNG PEMUDA : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN URAIAN PEKERJAAN
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
ANALISA I. 1. 2. 3. 4. 5. 6.
Pekerjaan Persiapan Pengukuran & Pas. Bowplank P3K (Pertolongan Pertama Pada Kecelakaan) Administrasi, Dokumentasi Dan Quality Kontrol Alat Bantu Kerja (tracle) Pek. Pembersihan Lokasi Pek. Subur Bor
-
1.000 1.000 1.000 1.000 1.000 1.000
II. 1. 2. 3. 4. 5. 6. 7.
Pekerjaan Pembongkaran Pek. Pembongkaran Kansting Pek. Pembongkaran Pedestrian (jalan keramik) Pek. Pembongkaran Tanaman Lama Pek. Pembongkaran Aspal Lama Pek. Bongkar dan Pasang 3 Reklame Pek. Pembongkran dan pasang Kembali Patung Pek. Bongkaran Dudukan Patung
-
III. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.
Pekerjaan Pedestrian Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pek. Pondasi Bt. Kosong Pek. Pondasi Bt. Kali 1 : 4 Pek. Plesteran 1 : 3 Pek. Acian Pek. Lantai Kerja Pek. Batu Alam Undersheet (atas) 25 x 25 Pek. Batu Alam Undersheet Dinding 10 x 20 Pek. Dinding Batu Alam Acak Pek. Dinding Batu Sikat Pek. Lantai Pedistrian Batu sikat Pek. Lantai Pedistrian Batu Acak Pek. Lantai Pedistrian Batu Andesit Pek. Lis Plesteran 1 : 2 Pek. Cat Mowilex Luar Pek. Merapikan kembali ex bongkaran dgn beton t. 10 cm
IV. 1. 2. 3. 4.
Pekerjaan Pagar BRC Pek. Dudukan Kolom Pagar BRC Pek. Pagar BRC T.1.2 Pek. Tiang BRC 1,2" Pek. Pintu Lebar 90 cm
V. 1. 2. 3. 4. 5. 6.
Pekerjaan Patung Pemuda Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pek. Pondasi Bt. Kosong Pek. Pondasi Bt. Kali 1 : 4 Pek. Poer Pondasi - Beton K. 175 - Besi - Bekisting
ls ls ls ls ls ls
250,000.00 250,000.00 500,000.00 2,000,000.00 240,000.00 1,500,000.00 Jumlah (I)
250,000.00 250,000.00 500,000.00 2,000,000.00 240,000.00 1,500,000.00 4,740,000.00
51.800 41.73 1.000 132.300 1.000 1.000 1.000
m' m2 ls m2 ls ls ls
15,000.00 12,000.00 250,000.00 25,000.00 50,000.00 2,000,000.00 1,000,000.00 Jumlah (II)
777,007.20 500,808.00 250,000.00 3,307,500.00 50,000.00 2,000,000.00 1,000,000.00 7,885,315.20
A6.4 A6.9 A6.11 B6.9 B6.2 D6.3 D6.27 E6.1 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 SPL.4 E6.5
17.507 4.377 2.580 5.160 29.245 54.550 46.950 3.202 18.375 14.000 17.500 8.750 13.300 11.638 9.450 226.900 34.830 3.890
m3 m3 m3 m3 m3 m2 m2 m3 m2 m2 m2 m2 m2 m2 m2 m' m2 m2
58,200.00 2,175.00 113,500.00 275,730.00 571,590.00 42,226.88 21,022.50 609,013.13 314,977.50 314,977.50 270,977.50 193,977.50 193,977.50 270,977.50 193,977.50 20,000.00 36,037.00 741,970.00 Jumlah (III)
1,018,878.30 9,519.16 292,830.00 1,422,766.80 16,716,149.55 2,303,476.30 987,006.38 1,949,999.12 5,787,837.55 4,409,685.00 4,742,106.25 1,697,303.13 2,579,900.75 3,153,525.04 1,833,087.38 4,538,000.00 1,255,168.71 2,886,263.30 57,583,502.72
E6.5 SPL.6 SPL.7 -
0.360 72.000 30.000 1.000
m3 M' Bh Set
741,970.00 212,050.00 141,650.00 1,250,000.00 Jumlah (IV)
267,109.20 15,267,600.00 4,249,500.00 1,250,000.00 21,034,209.20
A6.1 A6.9 A6.11 B6.9 B6.2
3.060 0.765 1.020 2.040 14.94
m3 m3 m3 m3 m3
43,750.00 2,175.00 113,500.00 275,730.00 571,590.00
133,875.00 1,663.88 115,770.00 562,489.20 8,542,355.39
E6.5 E6.17 E6.20
0.675 57.375 1.688
m3 Kg m2
741,970.00 16,095.00 144,280.00
500,829.75 923,450.63 243,472.50
NO.
URAIAN PEKERJAAN
KODE
VOL.
SAT.
E6.5 E6.17 E6.22
1.125 151.875 9.000
m3 Kg m2
741,970.00 16,095.00 289,390.00
835,013.04 2,444,428.13 2,604,510.00
E6.5 E6.17 E6.24
0.600 69.000 4.980
m3 Kg m2
741,970.00 16,095.00 369,390.00
445,182.00 1,110,555.00 1,839,562.20
10. Pek. Dinding Batu Alam Acak 11. Pek. Dinding Batu Sikat 12. Pek. Pengecatan Patung
SPL.2 SPL.2 SPL.4
19.200 11.100 13.100
m2 m2 m2
270,977.50 193,977.50 36,037.00 Jumlah (V)
5,202,768.00 2,153,150.25 472,084.70 28,131,159.65
VI. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.
Pekerjaan Taman Pek. Timbunan Rumput Gajah Mini Adam Hawa Kertas Belimbing tinggi 75-100 cm Agave Sikas 50 - 70 Cm Osmoxylon Sansiefera Nanas Merah Sambang Dara Asoka Daun Kecil Siklot Sedang Sansifera Tiger Sansifera Tanduk Rusa Hamparan Koral Putih Hamparan Pasir Putih Susun Batu Kali Sedang Ø 15 -20
A6.16 -
66.64 122.500 300.000 9.000 15.000 5.000 150.000 200.000 12.000 120.000 1200.000 16.000 25.000 25.000 60.000 20.000 4.300
m3 m2 Pbg Phn Pbg Phn Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg krg krg M3
118,300.00 45,000.00 2,500.00 400,000.00 100,000.00 5,000,000.00 25,000.00 30,000.00 100,000.00 75,000.00 10,000.00 150,000.00 75,000.00 75,000.00 125,000.00 125,000.00 135,000.00 Jumlah (VI)
7,883,926.05 5,512,500.00 750,000.00 3,600,000.00 1,500,000.00 25,000,000.00 3,750,000.00 6,000,000.00 1,200,000.00 9,000,000.00 12,000,000.00 2,400,000.00 1,875,000.00 1,875,000.00 7,500,000.00 2,500,000.00 580,500.00 92,926,926.05
VII. 1. 2. 3. 4. 5.
Pekerjaan Lain - Lain Pek. Pembersihan Pompa Air (setara Zhimizu tipe PS. 130 Bit) Selang Air 3/4 Serat Pipa PVC 3/4 Kran Air 3/4"
G6.26 G6.35
1.000 1.000 50.000 1.000 1.000
ls Ls M' M' Bh
1,000,000.00 650,000.00 10,000.00 21,865.00 29,475.00 JumlahI (VII)
1,000,000.00 650,000.00 500,000.00 21,865.00 29,475.00 2,201,340.00
7.
7.
Pek. Kolom Beton 50/50 - Beton K. 175 - Besi - Bekisting Pek. Plat Beton t. 15 cm - Beton K. 175 - Besi - Bekisting
HARGA SAT.
JML. HARGA
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) INSTANSI
: BADAN LINGKUNGAN HIDUP DAERAH
PEKERJAAN
: PERENCANAAN TAMAN KOTA
SUB PEKERJAAN
: C. PENATAAN TAMAN KOTA PATUNG PERAHU
ANGGARAN
: TAHUN 2013
LOKASI
: KABUPATEN GOWA PROVINSI SULAWESI SELATAN JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.) 3,220,000.00
I.
Pekerjaan Persiapan
Rp.
II.
Pekerjaan Pembongkaran
Rp.
7,038,000.00
III
Pekerjaan Kansteen
Rp.
IV.
Pekerjaan Pagar BRC
Rp.
41,488,371.30 18,303,014.50
V.
Pekerjaan Taman
Rp.
125,490,040.00
VI
Pek. Sclupture Perahu
Rp.
100,501,286.41
VII.
Pekerjaan Lain - Lain
Rp.
2,701,340.00
Real Cost
Rp.
298,742,052.21
PPN 10%
Rp.
29,874,205.22
Total Biaya Fisik
Rp.
328,616,257.43
Dibulatkan
Rp.
328,616,200.00
Terbilang :TIGA RATUS DUA PULUH DELAPAN JUTA ENAM RATUS ENAM BELAS RIBU DUA RATUS RUPIAH,-
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST Direktur
RENCANA ANGGARAN BIAYA (RAB) YAYASAN
: BADAN LINGKUNGAN HIDUP DAERAH
PEKERJAAN
: PERENCANAAN TAMAN KOTA
SUB PEKERJAAN
: C. PENATAAN TAMAN KOTA PATUNG PERAHU
ANGGARAN
: TAHUN 2013
LOKASI
: KABUPATEN GOWA PROVINSI SULAWESI SELATAN URAIAN PEKERJAAN
NO.
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
ANALISA I.
Pekerjaan Persiapan
1.
Pengukuran & Pas. Bowplank
-
1.000
ls
220,000.00
220,000.00
2.
P3K (Pertolongan Pertama Pada Kecelakaan)
-
1.000
ls
250,000.00
250,000.00
3.
Administrasi, Dokumentasi Dan Quality Kontrol
-
1.000
ls
500,000.00
500,000.00
4.
Alat Bantu Kerja
-
1.000
ls
500,000.00
500,000.00
5.
Pek. Pembersiahn LoKasi
-
1.000
ls
250,000.00
250,000.00
6.
Pek. Subur Bor
-
1.000
ls
1,500,000.00
1,500,000.00
Jumlah (I)
3,220,000.00
II.
Pekerjaan Pembongkaran
1.
Pek. Pembongkaran Tugu Perahu lama
-
1.000
ls
1,500,000.00
1,500,000.00
2.
Pek. Pembongkaran Kansting
-
121.200
m'
15,000.00
1,818,000.00
3.
Pek. Pembongkaran Pohon Lama
-
6.000
Buah
200,000.00
1,200,000.00
4.
Pek. Bongkaran Aspal
-
60.800
m2
25,000.00
1,520,000.00
5.
Pekerjaan Bongkaran Reklame + Pasang kembali
-
1.000
ls
1,000,000.00
1,000,000.00
Jumlah (II)
7,038,000.00
III. Pekerjaan Kansteen 1.
Pekerjaan Galian
A6.1
16.331
m3
43,750.00
714,476.88
2.
Pekerjaan Batu Kosong
B6.9
5.065
m3
275,730.00
1,396,627.60
3.
Pekerjaan Batu Kali
B6.2
23.477
m3
571,590.00
13,419,447.07
4.
Pek. Batu Alam Undersheet Dinding 10 x 20
SPL.2
18.150
m2
317,177.50
5,756,771.63
5.
Pekerjaan Batu Alam Acak
SPL.2
21.750
m2
193,977.50
4,219,010.63
6.
Pek. Batu Alam Undersheet (atas) 25 x 25
SPL.2
14.075
m2
314,977.50
4,433,308.31
7.
Pekerjaan Lis Plsteran
-
169.580
m'
20,000.00
3,391,600.00
8.
Pek. Pengecatan Kw.1
SPL.4
61.600
m2
36,037.00
2,219,879.20
9.
Pekerjaan Relief Profil
-
69.850
m'
85,000.00
5,937,250.00
Jumlah (III)
41,488,371.30
IV. Pekerjaan Pagar BRC 1.
Pek. Dudukan Kolom Pagar BRC
E6.5
0.300
m3
741,970.00
222,591.00
2.
Pek. Pagar BRC T.1.2
SPL.6
62.670
m'
212,050.00
13,289,173.50
3.
Pek. Tiang BRC 1,2"
SPL.7
25.000
Bh
141,650.00
3,541,250.00
4.
Pek. Pintu Lebar 90 cm
-
1.000
Set
1,250,000.00
1,250,000.00
Jumlah (IV)
18,303,014.50
V.
Pekerjaan Taman
1.
Pek. Timbunan Tanah Humus
A6.16
38.800
m3
118,300.00
4,590,040.00
2.
Rumput Gajah Mini
-
40.000
m2
45,000.00
1,800,000.00
3.
Siklot
-
14.000
Pbg
150,000.00
2,100,000.00
4.
Agave Sedang
-
25.000
Pbg
100,000.00
2,500,000.00
5.
Sambang Dara
-
200.000
Pbg
75,000.00
15,000,000.00
6.
Karambosa Kuning
-
500.000
Pbg
45,000.00
22,500,000.00
7.
Karambosa Hijau
-
500.000
Pbg
45,000.00
22,500,000.00
8.
Lily Paris Putih
-
300.000
Pbg
15,000.00
4,500,000.00
9.
Sikas 1,00 -1,25 Cm
-
5.000
Phn
10,000,000.00 Jumlah (V)
50,000,000.00 125,490,040.00
URAIAN PEKERJAAN
NO.
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
VI
Pek. Sclupture Perahu
1.
Pekerjaan Galian
A6.1
6.400
m3
43,750.00
2.
Pek. Urug Kembali
A6.9
2.133
m3
2,175.00
4,640.00
Pek. Pondasi Batu Kosong
B6.9
1.620
m3
275,730.00
446,682.60
Pek. Pondasi Batu Kali
B6.2
7.375
m3
571,590.00
4,215,756.33
3.
4.
5.
280,000.00
Pek. Poer Pondasi - Beton K. 175
E6.5
3.136
m3
741,970.00
2,326,892.12
- Besi
E6.17
376.320
Kg
16,095.00
6,056,870.40
- Bekisting
E6.20
14.112
m2
144,280.00
2,036,079.36
Pek. Kolom 0,4 x 2,00 - Beton K. 175
E6.5
2.160
m2
741,970.00
1,602,655.20
- Besi
E6.17
172.800
Kg
16,095.00
2,781,216.00
- Bekisting
E6.22
12.960
m2
289,390.00
3,750,494.40
1.000
ls
65,000,000.00
65,000,000.00
1.000
ls
12,000,000.00
12,000,000.00
Jumlah (VI)
100,501,286.41
Perahu Pinisi Ukuran Panjang 5,00 m x lebar 120 cm - Kayu Terbuat dari kayu Jati - layar Dari Kulit Sapi Ukuran Tinggi 6 m x 3 lebar - Tinggi Badan Perahu 115 cm - Finishin Clear
6.
Relief Ombak
VII. Pekerjaan Lain - Lain 1.
Pompa Air (setara Zhimizu tipe PS. 130 Bit)
-
1.000
Ls
650,000.00
650,000.00
2.
Selang Air 3/4 Serat
-
50.000
M'
10,000.00
500,000.00
3.
Pipa PVC 3/4
G6.26
1.000
M'
21,865.00
21,865.00
4.
Kran Air 3/4"
G6.35
1.000
Bh
29,475.00
29,475.00
5.
Pek. Pembersihan
-
1.000
ls
1,500,000.00 JumlahI (VII)
1,500,000.00 2,701,340.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) INSTANSI PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : E. RUMAH KOMPOS : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I.
Pekerjaan Persiapan
Rp.
1,100,000.00
II.
Pekerjaan Pondasi
Rp.
3,727,087.16
III.
Pekerjaan Dinding dan Beton
Rp.
7,111,015.53
IV.
Pekerjaan Atap
Rp.
7,063,493.39
V.
Pekerjaan Lain - Lain
Rp.
1,072,956.03
Real Cost
Rp.
20,074,552.11
PPN 10%
Rp.
2,007,455.21
Total Biaya Fisik
Rp.
22,082,007.33
Dibulatkan
Rp.
22,000,000.00
Terbilang : DUA PULUH DUA JUTA RUPIAH,-
Mengetahui, Pejabat Pembuat Komitmen (PPK) Badan Lingkungan Hidup Daerah Gowa
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
ZULFIADY MAS'UD S,Si, M.Si Nip. 19801008 201001 1016
AMIRUDDIN ACHMAD, ST Direktur
Mengetahui, Kepala Badan Lingkungan Hidup Gowa
Drs. H. ZULKARNAEN, M.Si Nip. 195811021981021003
RENCANA ANGGARAN BIAYA (RAB) YAYASAN PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI
-
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : E. RUMAH KOMPOS : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN URAIAN PEKERJAAN
NO.
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
ANALISA I. 1. 2. 3. 4.
Pekerjaan Persiapan Pengukuran & Pas. Bowplank P3K (Pertolongan Pertama Pada Kecelakaan) Administrasi, Dokumentasi Dan Quality Kontrol Alat Bantu Kerja
II. 1. 2. 3. 5. 6. 8.
Pekerjaan Pondasi Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pek. Pondasi Bt. Kosong Pek. Pondasi Bt. Kali 1 : 4 Pek. Timbunan Tanah
-
1.00 1.00 1.00 1.00
ls ls ls ls
250,000.00 200,000.00 250,000.00 400,000.00 Jumlah (I)
250,000.00 200,000.00 250,000.00 400,000.00 1,100,000.00
A6.1 A6.9 A6.11 B6.9 B6.2 A6.16
6.73 2.24 0.90 1.80 3.29 8.00
M3 M3 M3 M3 M3 M3
43,750.00 2,175.00 113,500.00 275,730.00 571,590.00 118,300.00 Jumlah (II)
294,525.00 4,880.70 102,150.00 496,314.00 1,882,817.46 946,400.00 3,727,087.16
III. Pekerjaan Dinding dan Beton 1. Pek. Sloof 15/15 - Beton K. 175 - Besi Polos - Bekisting 2. Pek. Kolom Kayu Kls II 11/11 3. Pek. Batu Merah 1 : 4 4. Pek. Plesteran 1 : 4 5. Pek. Acian
E6.5 E6.17 E6.21 F6.13 C6.2 D6.4 D6.27
0.410 61.500 3.403 0.46 14.45 28.90 28.90
M3 Kg M2 M3 M2 M2 M2
741,970.00 16,095.00 106,830.00 5,111,924.00 89,738.10 40,621.20 21,022.50 Jumlah (III)
304,207.70 989,842.50 363,542.49 2,375,204.37 1,296,715.55 1,173,952.68 607,550.25 7,111,015.53
IV. 1. 2. 3. 4. 5. 6.
Pekerjaan Atap Pek. Kuda-Kuda Kayu Kls II Pek. Gording Kls II Pek. Balok Atas 5/10 Kls II Pek. Atap Seng Gelombang Pekerjaan Nok Seng Pekerjaan Lisplank Woodplank
F6.13 F6.15 F6.15 F6.18 SPL.1 F6.32
0.146 0.420 0.090 49.000 7.000 20.800
M3 M3 M3 M2 M' M'
5,111,924.00 4,617,095.00 4,617,095.00 48,480.00 27,090.00 67,300.00 Jumlah (IV)
743,784.94 1,939,179.90 415,538.55 2,375,520.00 189,630.00 1,399,840.00 7,063,493.39
V. 1. 2.
Pekerjaan Lain - Lain Pek. Cat Kayu Pek. Pembersihan
H6.8 -
23.15 1.00
M2 ls
35,555.00 250,000.00 JumlahI (V)
822,956.03 250,000.00 1,072,956.03
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) INSTANSI PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : A. PENATAAN TAMAN KOTA ADIPURA : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN JENIS PEKERJAAN
NO.
TOTAL HARGA (Rp.)
I.
Pekerjaan Persiapan
Rp.
3,800,000.00
II.
Pekerjaan Pembongkaran
Rp.
13,547,280.91
III.
Pekerjaan Pedestrian
Rp.
74,479,049.31
IV.
Pekerjaan Pagar BRC
Rp.
32,904,734.72
V.
Pekerjaan Patung Adipura
Rp.
21,099,035.01
VI.
Pekerjaan Taman
Rp.
162,836,130.00
VII.
Pek. Sclupture
Rp.
55,178,797.98
VIII.
Pekerjaan Lain - Lain
Rp.
3,201,340.00
Real Cost
Rp.
367,046,367.92
PPN 10%
Rp.
36,704,636.79
Total Biaya Fisik
Rp.
403,751,004.72
Dibulatkan
Rp.
403,700,000.00
Terbilang : EMPAT RATUS TIGA JUTA TUJUH RATUS RIBU RUPIAH,-
Mengetahui, Pejabat Pembuat Komitmen (PPK) Badan Lingkungan Hidup Daerah Gowa
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
ZULFIADY MAS'UD S,Si, M.Si Nip. 19801008 201001 1016
AMIRUDDIN ACHMAD, ST Direktur
Mengetahui, Kepala Badan Lingkungan Hidup Gowa
Drs. H. ZULKARNAEN, M.Si Nip. 195811021981021003
RENCANA ANGGARAN BIAYA (RAB) YAYASAN PEKERJAAN SUB PEKERJAAN ANGGARAN LOKASI NO.
-
: BADAN LINGKUNGAN HIDUP DAERAH : PERENCANAAN TAMAN KOTA : A. PENATAAN TAMAN KOTA ADIPURA : TAHUN 2013 : KABUPATEN GOWA PROVINSI SULAWESI SELATAN URAIAN PEKERJAAN
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
ANALISA I. 1. 2. 3. 4. 5. 6.
Pekerjaan Persiapan Pengukuran & Pas. Bowplank P3K (Pertolongan Pertama Pada Kecelakaan) Administrasi, Dokumentasi Dan Quality Kontrol Alat Bantu Kerja Pek. Pembersihan Lokasi Pek. Subur Bor
II. 1. 2. 3. 4. 5. 6. 7. 8.
Pekerjaan Pembongkaran Pek. Pembongkaran Pos Timbangan Pek. Pembongkaran Tugu KKN Pek. Pembongkaran Kansting Pek. Pembongkaran Pedestrian (jalan keramik) Pek. Pembongkaran Aspal Lama Pek. Pembongkaran Keramik Tugu Adipura Pek. Pembongkaran Tanaman Existing Pek. Perapihan ex Bongkaran dengan Beton K.175 t.12 cm
III. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 18. 18.
-
1.00 1.00 1.00 1.00 1.00 1.00
ls ls ls ls ls ls
350,000.00 200,000.00 500,000.00 750,000.00 500,000.00 1,500,000.00 Jumlah (I)
350,000.00 200,000.00 500,000.00 750,000.00 500,000.00 1,500,000.00 3,800,000.00
E6.5
1.00 1.00 121.20 74.10 28.21 27.70 1.00 6.60
ls ls m' m2 M2 M2 ls M3
1,000,000.00 325,000.00 15,000.00 12,000.00 25,000.00 15,000.00 3,500,000.00 741,970.00 Jumlah (II)
1,000,000.00 325,000.00 1,818,000.00 889,200.00 705,250.00 415,500.00 3,500,000.00 4,894,330.91 13,547,280.91
Pekerjaan Pedestrian Pek. Galian Tanah (Pondasi) Pek. Urugan Kembali Pek. Pasir Urug (Bawah Pondasi) Pasir Urug Bawah Lantai Batu Alam Pek. Pondasi Bt. Kosong Pek. Pondasi Bt. Kali 1 : 4 Pek. Plesteran 1 : 3 Pek. Lantai Kerja t. 5 cm Pek. Batu Alam Undersheet (atas) 25 x 25 Pek. Batu Alam Undersheet Dinding 10 x 20 Pek. Dinding Batu Alam Acak Pek. Dinding Batu Sikat Pek. Lantai Pedistrian Batu sikat bunga teratai Pek. Lantai Pedistrian Batu Acak Pek. Lantai Pedistrian Batu Undersheet 30 x 30 Pek. Lantai Pedistrian Batu sikat Pek. Lis Plesteran 1 : 2 Pek. Cat
A6.1 A6.9 A6.11 A6.11 B6.9 B6.2 D6.3 E6.1 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 SPL.2 D6.2 SPL.4
15.26 3.82 5.37 9.75 10.73 36.81 40.40 3.25 31.46 15.96 18.62 1.71 6.84 12.72 19.68 19.68 398.80 59.82
M3 M3 M3 M3 M3 M3 M2 M3 M2 M2 M2 M2 M2 M2 M2 M2 M' M2
43,750.00 2,175.00 113,500.00 113,500.00 275,730.00 571,590.00 42,226.88 609,013.13 314,977.50 317,177.50 270,977.50 193,977.50 193,977.50 270,977.50 193,977.50 270,977.50 20,000.00 36,037.00 Jumlah (III)
667,625.00 8,297.63 608,927.50 1,106,454.75 2,958,582.90 21,039,084.72 1,705,965.95 1,978,988.15 9,909,979.59 5,062,152.90 5,045,601.05 331,701.53 1,326,806.10 3,446,833.80 3,817,477.20 5,332,837.20 7,976,000.00 2,155,733.34 74,479,049.31
IV. 1. 2. 3. 4.
Pekerjaan Pagar BRC Pek. Dudukan Kolom Pagar BRC Pek. Pagar BRC T.1.2 Pek. Tiang BRC 1,2" Pek. Pintu Lebar 90 cm
E6.5 SPL.6 SPL.7 -
0.58 115.20 48.00 1.00
M3 M' BH Set
741,970.00 212,050.00 141,650.00 1,250,000.00 Jumlah (IV)
427,374.72 24,428,160.00 6,799,200.00 1,250,000.00 32,904,734.72
V. 1. 2. 3. 4. 5.
Pekerjaan Patung Adipura Pek. Batu Alam Undersheet Dinding 10 x 20 Pek. Batu Alam Undersheet Dinding & Lt 30 x 30 (bawah) Pek. Dinding Beton K. 100 Pek. Pengecatan Patung Pek. Pemasangan Kembali Logo Gowa
SPL.2 SPL.2 E6.1 SPL.4 -
43.68 11.51 3.61 25.20 1.00
M2 M2 M3 M2 ls
317,177.50 316,077.50 609,013.13 36,037.00 500,000.00 Jumlah (V)
13,854,313.20 3,638,052.03 2,198,537.38 908,132.40 500,000.00 21,099,035.01
NO. VI. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 13. 14. 15. 16. 17. 18. 19.
URAIAN PEKERJAAN Pekerjaan Taman Pek. Timbunan dari Luar Rumput Gajah Mini Serut / Kolasa Besar Tinggi 2,50 - 3,00 m Beringin Dollar tinggi 2,00 - 2,50 m Cemara Udang 1,50 - 2,00 m Sikas 50 - 70 Cm Sikas 1,00 -1,25 Cm Lily Paris Putih Amarilis Sansiefera Sambang Dara Keladi Raja Agave Krokot Merah Krokot Putih Osmoxylon Karambosa Kuning Adam Hawa Azoka Song of india
VII. Pek. Sclupture a. Bunga Teratai 1. Pek. Timbunan Tanah 2. Pek. Batu Kosong 3. Pek. Batu Kali dudukan Sclupture 1 : 4 4. Pek. Pasir Urug 5. Pek. Pondasi Poer - Beton K. 175 - Besi Polos - Bekisting 6. Pek. Kolom 40/40 - Beton K. 175 - Besi Polos - Bekisting 7. Pek. Sloof 20/30 - Beton K. 175 - Besi Polos - Bekisting 8. Pek. Pas. Batu Acak 9. Pek. Batu Alam Andesit Dinding 10 x 20 10. Pek. Paving Blok t. 8 cm K. 225 11. Pek. Pembuatan Narasi dari Plat Kuningan 12. Pek. Daun Bunga Teratai 12 Daun + 1 Mahkota (klopak) ( Rangka Pipa Gip 2" + Besi diameter 10 + Pipa PVC + acc)
1. 2. 3. 4. 5. 6. 7. VIII. 1. 2. 3. 4. 5.
b.Meriam dan Tempat Duduk Galian Tanah Pek. Batu Kosong Pek. Bt Kali dudukan Sclupture & Keliling wadah 1 : 4 Pek. Canon-canon ( meriam artifisial) Pek. Batu Alam Acak ( tempat Duduk ) Pek. Rabat Beton T. 7 cm Pek. Hamparan Koral Putih Pekerjaan Lain - Lain Pompa Air (setara Zhimizu tipe PS. 130 Bit) Selang Air 3/4 Serat Pipa PVC 3/4 Kran Air 3/4" Pek. Pembersihan
KODE
VOL.
SAT.
HARGA SAT.
JML. HARGA
A6.16 -
221.10 54.00 2.00 1.00 1.00 3.00 2.00 500.00 500.00 100.00 100.00 30.00 25.00 250.00 250.00 150.00 100.00 300.00 1,000.00 30.00
M3 M2 Phn Phn Phn Phn Phn Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg Pbg
118,300.00 45,000.00 15,000,000.00 10,000,000.00 7,500,000.00 5,000,000.00 10,000,000.00 15,000.00 10,000.00 30,000.00 75,000.00 150,000.00 100,000.00 2,500.00 2,500.00 25,000.00 45,000.00 2,500.00 10,000.00 50,000.00 Jumlah (VI)
26,156,130.00 2,430,000.00 30,000,000.00 10,000,000.00 7,500,000.00 15,000,000.00 20,000,000.00 7,500,000.00 5,000,000.00 3,000,000.00 7,500,000.00 4,500,000.00 2,500,000.00 625,000.00 625,000.00 3,750,000.00 4,500,000.00 750,000.00 10,000,000.00 1,500,000.00 162,836,130.00
A6.16 B6.9 B6.2 A6.11
7.150 2.300 7.700 1.150
M3 M3 M3 M3
118,300.00 275,730.00 571,590.00 113,500.00
845,845.00 634,179.00 4,401,243.00 130,525.00
E6.5 E6.17 E6.20
0.250 20.000 0.750
M3 Kg M2
741,970.00 16,095.00 144,280.00
185,492.50 321,900.00 108,210.00
E6.5 E6.17 E6.22
0.304 36.480 3.040
M3 Kg M2
741,970.00 16,095.00 289,390.00
225,558.88 587,145.60 879,745.60
E6.5 E6.17 E6.21 SPL.2 SPL.2 SPL.5
0.384 57.600 3.187 7.700 8.250 4.900 1.000
M3 Kg M2 M2 M2 M2 ls
741,970.00 16,095.00 154,980.00 270,978 317,177.50 97,925.00 2,000,000.00
284,916.48 927,072.00 493,952.26 2,086,526.75 2,616,714.38 479,832.50 2,000,000.00
-
1.000
ls
A6.1 B6.9 B6.2 SPL.2 E6.1 -
7.72 3.16 5.61 4.00 17.76 0.91 13.50
M3 M3 M3 BH M2 M2 M2
43,750.00 275,730.00 571,590.00 2,000,000.00 270,977.50 609,013.13 125,000.00 Jumlah (VII)
337,750.00 871,306.80 3,206,619.90 8,000,000.00 4,812,560.40 554,201.94 1,687,500.00 55,178,797.98
G6.26 G6.35 -
1.00 50.00 1.00 1.00 1.00
ls M' M' Bh ls
650,000.00 10,000.00 21,865.00 29,475.00 2,000,000.00 JumlahI (VIII)
650,000.00 500,000.00 21,865.00 29,475.00 2,000,000.00 3,201,340.00
18,500,000.00
18,500,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN KODE
KOEFESIEN
SATUAN
HARGA SATUAN
KEBUTUHAN
ANALISA
A
A6.1
A6.4
A6.9
A6.11
A6.16
B
C
Menggali 1 M3 tanah biasa sedalam 1 m 0.750 Oh Pekerja 0.025 Oh Mandor
@ Rp @ Rp
55,000.00 100,000.00
Rp Rp Rp
41,250.00 2,500.00 43,750.00
Menggali 1 M3 tanah keras sedalam 1 m 1.000 Oh Pekerja 0.032 Oh Mandor
@ Rp @ Rp
55,000.00 100,000.00
Rp Rp Rp
55,000.00 3,200.00 58,200.00
Mengurug kembali 1 M3 galian 0.025 Oh Pekerja 0.008 Oh Mandor
@ Rp @ Rp
55,000.00 100,000.00
Rp Rp Rp
1,375.00 800.00 2,175.00
Mengurug 1 M3 pasir urug 1.200 M3 Pasir urug 0.300 Oh Pekerja 0.010 Oh Mandor
@ Rp @ Rp @ Rp
80,000.00 55,000.00 100,000.00
Rp Rp Rp Rp
96,000.00 16,500.00 1,000.00 113,500.00
Mengurug 1 M3 Tanah Timbunan 1.200 M3 Tanah timbunan 0.300 Oh Pekerja 0.010 Oh Mandor
@ Rp @ Rp @ Rp
84,000.00 55,000.00 100,000.00
Rp Rp Rp Rp
100,800.00 16,500.00 1,000.00 118,300.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
135,000.00 1,130.00 130,000.00 75,000.00 55,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
162,000.00 184,190.00 67,600.00 112,500.00 33,000.00 4,800.00 7,500.00 571,590.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
135,000.00 80,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
162,000.00 34,560.00 42,900.00 29,250.00 3,120.00 3,900.00 275,730.00
PEKERJAAN PONDASI B6.2 Memasang 1 M3 pondasi batu kali, campuran 1PC : 4PP 1.200 M3 Batu Kali 163.000 Kg Semen Portland 0.520 M3 Pasir pasang 1.500 Oh Tukang batu 0.600 Oh Pekerja 0.060 Oh Kepala Tukang Batu 0.075 Oh Mandor B6.9
JUMLAH HARGA
Memasang 1 M3 batu kosong (aanstamping) 1.200 M3 Batu kali 0.432 M3 Pasir urug 0.780 Oh Pekerja 0.390 Oh Tukang batu 0.039 Oh Kepala Tukang Batu 0.039 Oh Mandor
PEKERJAAN DINDING C6.2
C6.3
Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 3PP 70.000 Bh Batu merah @ Rp 600.00 Rp 14.370 Kg Semen Portland @ Rp 1,130.00 Rp 0.040 M3 Pasir pasang @ Rp 130,000.00 Rp 0.300 Oh Pekerja @ Rp 55,000.00 Rp 0.100 Oh Tukang batu @ Rp 75,000.00 Rp 0.010 Oh Kepala Tukang Batu @ Rp 80,000.00 Rp 0.015 Oh Mandor @ Rp 100,000.00 Rp Rp Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP 70.000 Bh Batu merah @ Rp 600.00 Rp 11.500 Kg Semen Portland @ Rp 1,130.00 Rp 0.043 M3 Pasir pasang @ Rp 130,000.00 Rp 0.300 Oh Pekerja @ Rp 55,000.00 Rp 0.100 Oh Tukang batu @ Rp 75,000.00 Rp 0.010 Oh Kepala Tukang Batu @ Rp 80,000.00 Rp 0.015 Oh Mandor @ Rp 100,000.00 Rp Rp
42,000.00 16,238.10 5,200.00 16,500.00 7,500.00 800.00 1,500.00 89,738.10 42,000.00 12,995.00 5,590.00 16,500.00 7,500.00 800.00 1,500.00 86,885.00
D
PEKERJAAN PLESTERAN D6.2 Memasang 1 M2 plesteran 1PC : 2PP, tebal 15 mm 10.224 Kg Semen Portland 0.020 M3 Pasir pasang 0.300 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.015 Oh Mandor D6.3
D6.4
D6.27
E
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,130.00 130,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
11,553.12 2,600.00 16,500.00 11,250.00 1,200.00 1,500.00 44,603.12
Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm 7.776 Kg Semen Portland 0.023 M3 Pasir pasang 0.300 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.015 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,130.00 130,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
8,786.88 2,990.00 16,500.00 11,250.00 1,200.00 1,500.00 42,226.88
Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm 6.240 Kg Semen Portland 0.024 M3 Pasir pasang 0.300 Oh Pekerja 0.150 Oh Tukang batu 0.015 Oh Kepala Tukang Batu 0.015 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
1,130.00 130,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
7,051.20 3,120.00 16,500.00 11,250.00 1,200.00 1,500.00 40,621.20
Memasang 1 M2 acian 3.250 Kg Semen Portland 0.150 Oh Pekerja 0.100 Oh Tukang batu 0.010 Oh Kepala Tukang Batu 0.008 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp
1,130.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp
3,672.50 8,250.00 7,500.00 800.00 800.00 21,022.50
PEKERJAAN BETON E6.1 Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87 230.000 Kg Semen Portland @ Rp 1,130.00 Rp 893.000 Kg Pasir beton (Kg) @ Rp 85.63 Rp 1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 150.00 Rp 200.000 Ltr Air @ Rp 150.00 Rp 1.200 Oh Pekerja @ Rp 55,000.00 Rp 0.200 Oh Tukang batu @ Rp 75,000.00 Rp 0.020 Oh Kepala Tukang Batu @ Rp 80,000.00 Rp 0.060 Oh Mandor @ Rp 100,000.00 Rp Rp E6.5 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66 326.000 Kg Semen Portland @ Rp 1,130.00 Rp 760.000 Kg Pasir beton (Kg) @ Rp 85.63 Rp 1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 150.00 Rp 215.000 Ltr Air @ Rp 150.00 Rp 1.650 Oh Pekerja @ Rp 55,000.00 Rp 0.275 Oh Tukang batu @ Rp 75,000.00 Rp 0.028 Oh Kepala Tukang Batu @ Rp 80,000.00 Rp 0.083 Oh Mandor @ Rp 100,000.00 Rp Rp E6.17 Pembesian 1 Kg dengan besi polos atau besi ulir 10.500 Kg Besi beton polos @ Rp 14,000.00 Rp 0.150 Kg Kawat beton @ Rp 23,600.00 Rp 0.070 Oh Pekerja @ Rp 55,000.00 Rp 0.070 Oh Tukang besi @ Rp 80,000.00 Rp 0.007 Oh Kepala Tukang Besi @ Rp 80,000.00 Rp 0.004 Oh Mandor @ Rp 100,000.00 Rp Untuk Pembesian 10 Kg Rp Untuk Pembesian Polos 1 Kg Rp
259,900.00 76,463.13 154,050.00 30,000.00 66,000.00 15,000.00 1,600.00 6,000.00 609,013.13 368,380.00 65,075.00 154,350.00 32,250.00 90,750.00 20,625.00 2,240.00 8,300.00 741,970.00 147,000.00 3,540.00 3,850.00 5,600.00 560.00 400.00 160,950.00 16,095.00
E6.35
E6.36
E6.20
Membuat 1 M' Kolom Praktis Beton Bertulang ( 11 x 11) 0.002 M3 Kayu Kls III 0.01 Kg Paku 3.000 Kg Besi beton polos 0.450 Kg Kawat beton 4.000 Kg Semen Portland 0.006 M3 Pasir Beton 0.009 M3 Batu Pecah 2 -3 cm 0.180 Oh Pekerja 0.020 Oh Tukang Batu 0.020 Oh Tukang Kayu 0.020 Oh Tukang besi 0.006 Oh Kepala Tukang 0.009 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,140,000.00 17,500.00 14,000.00 23,600.00 1,130.00 137,000.00 240,000.00 55,000.00 80,000.00 80,000.00 80,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,280.00 175.00 42,000.00 10,620.00 4,520.00 822.00 2,160.00 9,900.00 1,600.00 1,600.00 1,600.00 480.00 900.00 80,657.00
Membuat 1 M' Kolom Praktis Beton Bertulang ( 10 x 15) 0.003 M3 Kayu Kls III 0.02 Kg Paku 3.600 Kg Besi beton polos 0.050 Kg Kawat beton 5.500 Kg Semen Portland 0.009 M3 Pasir Beton 0.015 M3 Batu Pecah 2 -3 cm 0.297 Oh Pekerja 0.033 Oh Tukang Batu 0.033 Oh Tukang Kayu 0.033 Oh Tukang besi 0.010 Oh Kepala Tukang 0.015 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,140,000.00 17,500.00 14,000.00 23,600.00 1,130.00 137,000.00 240,000.00 55,000.00 80,000.00 80,000.00 80,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
6,420.00 350.00 50,400.00 1,180.00 6,215.00 1,233.00 3,600.00 16,335.00 2,640.00 2,640.00 2,640.00 800.00 1,500.00 95,953.00
Memasang 1 M2 bekisting untuk pondasi 0.040 M3 Kayu klas III (papan) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang kayu 0.026 Oh Kepala Tukang Kayu 0.026 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,140,000.00 17,500.00 6,500.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
85,600.00 5,250.00 650.00 28,600.00 19,500.00 2,080.00 2,600.00 144,280.00
2,140,000.00
Rp
42,800.00
17,500.00 6,500.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
5,250.00 650.00 28,600.00 19,500.00 2,080.00 2,600.00 101,480.00
2,140,000.00 17,500.00 6,500.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
96,300.00 5,250.00 650.00 28,600.00 19,500.00 2,080.00 2,600.00 154,980.00
Memasang 1 M2 bekisting untuk Pondasi 2 Kali Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (Papan 2 kali Pakai) 0.300 Kg Paku biasa 2" - 5" @ Rp 0.100 Ltr Minyak bekisting @ Rp 0.520 Oh Pekerja @ Rp 0.260 Oh Tukang kayu @ Rp 0.026 Oh Kepala Tukang Kayu @ Rp 0.026 Oh Mandor @ Rp
E6.21
Memasang 1 M2 bekisting untuk sloof 0.045 M3 Kayu klas III (papan) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian 0.023 M3 Kayu klas III (papan) (Papan 2 kali Pakai) 0.300 Kg Paku biasa 2" - 5" 0.100 Ltr Minyak bekisting 0.520 Oh Pekerja 0.260 Oh Tukang batu 0.026 Oh Kepala Tukang Batu 0.026 Oh Mandor
E6.22
Memasang 1 M2 bekisting untuk kolom 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp
2,140,000.00
Rp
48,150.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
17,500.00 6,500.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
5,250.00 650.00 28,600.00 19,500.00 2,080.00 2,600.00 106,830.00
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
2,140,000.00 17,500.00 6,500.00 3,100,000.00 120,000.00 20,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
85,600.00 7,000.00 1,300.00 46,500.00 42,000.00 40,000.00 36,300.00 24,750.00 2,640.00 3,300.00 289,390.00
2,140,000.00
Rp
42,800.00
17,500.00 6,500.00 3,100,000.00
Rp Rp Rp
7,000.00 1,300.00 23,250.00
120,000.00
Rp
21,000.00
20,000.00
Rp
20,000.00
55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp
36,300.00 24,750.00 2,640.00 3,300.00 182,340.00
2,140,000.00 17,500.00 6,500.00 3,100,000.00 120,000.00 20,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
85,600.00 7,000.00 1,300.00 55,800.00 42,000.00 40,000.00 36,300.00 24,750.00 2,640.00 3,300.00 298,690.00
2,140,000.00
Rp
42,800.00
17,500.00 6,500.00 3,100,000.00
Rp Rp Rp
7,000.00 1,300.00 27,900.00
120,000.00
Rp
21,000.00
@ Rp
20,000.00
Rp
20,000.00
@ Rp @ Rp @ Rp @ Rp
55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp
36,300.00 24,750.00 2,640.00 3,300.00 186,990.00
Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
E6.23
Memasang 1 M2 bekisting untuk balok 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.018 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 2.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.009 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.000
Btg
0.660 0.330 0.033 0.033
Oh Oh Oh Oh
Dolken kayu Ø8-10/400 cm (dolken 2x pakai) Pekerja Tukang kayu Kepala Tukang Kayu Mandor
E6.24
Memasang 1 M2 bekisting untuk lantai 0.040 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.015 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 6.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian 0.020 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.008 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
E6.25
Memasang 1 M2 bekisting untuk dinding 0.030 M3 Kayu klas III (papan) 0.400 Kg Paku biasa 2" - 5" 0.200 Ltr Minyak bekisting 0.020 M3 Kayu klas II (balok) 0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm 3.000 Btg Dolken kayu Ø8-10/400 cm 0.660 Oh Pekerja 0.330 Oh Tukang kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian 0.015 M3 Kayu klas III (papan) @ Rp (papan 2 x pakai) 0.400 Kg Paku biasa 2" - 5" @ Rp 0.200 Ltr Minyak bekisting @ Rp 0.010 M3 Kayu klas II (balok) @ Rp (Balok 2x pakai) 0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp (Multipleks 2x pakai) 1.500 Btg Dolken kayu Ø8-10/400 cm @ Rp (dolken 2x pakai) (spacer 2x pemakaian) 0.660 Oh Pekerja @ Rp 0.330 Oh Tukang kayu @ Rp 0.033 Oh Kepala Tukang Kayu @ Rp 0.033 Oh Mandor @ Rp
2,140,000.00 17,500.00 6,500.00 3,100,000.00 120,000.00 20,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
85,600.00 7,000.00 1,300.00 46,500.00 42,000.00 120,000.00 36,300.00 24,750.00 2,640.00 3,300.00 369,390.00
2,140,000.00
Rp
42,800.00
17,500.00 6,500.00 3,100,000.00
Rp Rp Rp
7,000.00 1,300.00 23,250.00
120,000.00
Rp
21,000.00
20,000.00
Rp
60,000.00
55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp
36,300.00 24,750.00 2,640.00 3,300.00 222,340.00
2,140,000.00 17,500.00 6,500.00 3,100,000.00 120,000.00 20,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
64,200.00 7,000.00 1,300.00 62,000.00 42,000.00 60,000.00 36,300.00 24,750.00 2,640.00 3,300.00 303,490.00
2,140,000.00
Rp
32,100.00
17,500.00 6,500.00 3,100,000.00
Rp Rp Rp
7,000.00 1,300.00 31,000.00
120,000.00
Rp
21,000.00
20,000.00
Rp
30,000.00
55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp
36,300.00 24,750.00 2,640.00 3,300.00 189,390.00
F
PEKERJAAN KAYU F6.13 Memasang 1 M3 konstruksi Kuda-Kuda Konvensional 1.100 M3 Balok Kayu 15.000 Kg Besi Strip tebal 5 mm 5.600 Kg Paku 4.000 Oh Pekerja 12.000 Oh Tukang Kayu 1.200 Oh Kepala Tukang kayu 0.200 Oh Mandor
F6.15
F6.18
SPL.1
F6.32
G
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,100,000.00 16,500.00 17,500.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
3,410,000.00 465,000.00 924.00 220,000.00 900,000.00 96,000.00 20,000.00 5,111,924.00
Memasang 1 M3 konstruksi Gording 1.100 M3 Balok Kayu 15.000 Kg Besi Strip tebal 5 mm 3.000 Kg Paku 2.400 Oh Pekerja 7.200 Oh Tukang Kayu 0.720 Oh Kepala Tukang Kayu 0.120 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
3,100,000.00 16,500.00 17,500.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
3,410,000.00 465,000.00 495.00 132,000.00 540,000.00 57,600.00 12,000.00 4,617,095.00
Memasang 1 M2 MENUTUP ATAP DENGAN ATAP SENG 0.700 Lbr Seng Gelombang 0.020 Kg Paku Seng 0.120 Oh Pekerja 0.060 Oh Tukang Kayu 0.006 Oh Kepala Tukang Kayu 0.006 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
50,000.00 65,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
35,000.00 1,300.00 6,600.00 4,500.00 480.00 600.00 48,480.00
Memasang 1 M2 MENUTUP ATAP DENGAN ATAP NOK 0.300 Lbr Seng Plat 0.040 Kg Paku Seng 0.150 Oh Pekerja 0.060 Oh Tukang Kayu 0.008 Oh Kepala Tukang Kayu 0.006 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
35,000.00 65,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
10,500.00 2,600.00 8,250.00 4,500.00 640.00 600.00 27,090.00
Memasang 1 m' Lisplank Ukuran 2 x 0.8/30 cm, woodplank 1.100 M' Woodplank T. 8 @ Rp 0.050 Kg Paku sekrup 2" - 3" @ Rp 0.100 Oh Pekerja @ Rp 0.120 Oh Tukang kayu @ Rp 0.012 Oh Kepala Tukang Kayu @ Rp 0.050 Oh Mandor @ Rp 1.000 Ls Alat Bantu @ Rp
30,000.00 150,000.00 60,000.00 80,000.00 100,000.00 100,000.00 5,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
33,000.00 7,500.00 6,000.00 9,600.00 1,200.00 5,000.00 5,000.00 67,300.00
@ Rp
9,500.00
@ Rp @ Rp @ Rp @ Rp
55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
11,400.00 3,325.00 1,980.00 4,500.00 480.00 180.00 21,865.00
@ Rp
48,000.00
@ Rp @ Rp @ Rp @ Rp
55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp
57,600.00 16,800.00 4,455.00 10,125.00 1,080.00 410.00 90,470.00
PEKERJAAN PIPA DAN SANITER G6.26
G6.32
Memasang 1 M' pipa PVC tipe AW diameter 3/4" 1.200 M' Pipa PVC AW 3/4'' 35 % Perlengkapan 0.036 Oh Pekerja 0.060 Oh Tukang pipa 0.006 Oh Kepala Tukang pipa 0.002 Oh Mandor
Memasang 1 M' pipa PVC tipe AW diameter 4" 1.200 M' Pipa PVC AW 4'' 35 % Perlengkapan 0.081 Oh Pekerja 0.135 Oh Tukang pipa 0.014 Oh Kepala Tukang pipa 0.004 Oh Mandor
G6.35
Memasang 1 Bh kran diameter 3/4" atau 1/2" 1.000 Bh Kran air biasa 1/2" - 3/4" 0.025 Bh Seal tape 0.010 Oh Pekerja 0.100 Oh Tukang pipa 0.010 Oh Kepala Tukang pipa 0.005 Oh Mandor
@ Rp @ Rp @ Rp @ Rp @ Rp @ Rp
Rp Rp Rp Rp Rp Rp Rp
20,000.00 125.00 550.00 7,500.00 800.00 500.00 29,475.00
210,000.00 211,000.00 212,000.00 170,000.00 100,000.00 1,130.00 130,000.00 55,000.00 75,000.00 80,000.00 100,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
231,000.00 232,100.00 233,200.00 187,000.00 110,000.00 13,277.50 4,550.00 34,100.00 26,250.00 2,800.00 3,000.00 314,977.50 316,077.50 317,177.50 270,977.50 193,977.50
SPL.2
H
Memasang 1 M2 dinding batu Alam Undersheet 1.100 M2 Batu Alam Undersheet 25/25 @ Rp 1.100 M2 Batu Alam Undersheet 30/30 @ Rp 1.100 M2 Batu Alam Undersheet 10/20 @ Rp 1.100 M2 Batu Alam Acak @ Rp 1.100 M2 Batu Alam Sikat @ Rp 11.750 Kg Semen Portland @ Rp 0.035 M3 Pasir pasang @ Rp 0.620 Oh Pekerja @ Rp 0.350 Oh Tukang batu @ Rp 0.035 Oh Kepala Tukang Batu @ Rp 0.030 Oh Mandor @ Rp Batu Alam Undersheet 25/25 Batu Alam Undersheet 30/30 Batu Alam Undersheet 10/20 Batu Alam Acak Batu Alam Sikat PEKERJAAN PENGECATAN
20,000.00 5,000.00 55,000.00 75,000.00 80,000.00 100,000.00
H6.8
SPL.3
Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup 0.200 Kg Cat meni @ Rp 21,000.00 Rp 0.150 Kg Dempul @ Rp 25,000.00 Rp 0.170 Kg Cat dasar @ Rp 55,000.00 Rp 0.260 Kg Cat kayu @ Rp 50,000.00 Rp 0.070 Oh Pekerja @ Rp 55,000.00 Rp 0.009 Oh Tukang cat @ Rp 75,000.00 Rp 0.006 Oh Kepala Tukang Cat @ Rp 80,000.00 Rp 0.0025 Oh Mandor @ Rp 100,000.00 Rp Rp Melabur 1 M2 bidang Batu Alam dengan Coating 0.360 Ltr Coating @ Rp 50,000.00 Rp 0.040 Oh Pekerja @ Rp 55,000.00 Rp 0.063 Oh Tukang cat @ Rp 75,000.00 Rp 0.063 Oh Kepala Tukang Cat @ Rp 80,000.00 Rp 0.0025 Oh Mandor @ Rp 100,000.00 Rp Rp
4,200.00 3,750.00 9,350.00 13,000.00 3,850.00 675.00 480.00 250.00 35,555.00 18,000.00 2,200.00 4,725.00 5,040.00 250.00 30,215.00
SPL.4
Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup), (Interior) 0.100 Kg Plamur tembok @ Rp 21,000.00 Rp 2,100.00 0.100 Kg Cat dasar @ Rp 12,000.00 Rp 1,200.00 0.260 Kg Cat tembok Kw. 1 (Interior) @ Rp 50,000.00 Rp 13,000.00 0.060 Oh Pekerja @ Rp 55,000.00 Rp 3,300.00 0.189 Oh Tukang cat @ Rp 75,000.00 Rp 14,175.00 0.0189 Oh Kepala Tukang Cat @ Rp 80,000.00 Rp 1,512.00 0.0075 Oh Mandor @ Rp 100,000.00 Rp 750.00 Rp 36,037.00
SPL.4
Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup), (Eksterior) 0.100 Kg Plamur tembok @ Rp 21,000.00 Rp 2,100.00 0.100 Kg Cat dasar @ Rp 12,000.00 Rp 1,200.00 0.260 Kg Cat tembok Kw. 1 (Exterior) @ Rp 12,000.00 Rp 3,120.00 0.060 Oh Pekerja @ Rp 55,000.00 Rp 3,300.00 0.189 Oh Tukang cat @ Rp 75,000.00 Rp 14,175.00 0.0189 Oh Kepala Tukang Cat @ Rp 80,000.00 Rp 1,512.00 0.0075 Oh Mandor @ Rp 100,000.00 Rp 750.00 Rp 26,157.00
H6.22
I
Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat mutakhir dengan tebal 200 µm 0.300 Kg Cat meni @ Rp 21,000.00 0.006 Oh Pekerja @ Rp 55,000.00 0.060 Oh Tukang cat @ Rp 75,000.00 0.012 Oh Kepala Tukang Cat @ Rp 80,000.00 0.006 Oh Mandor @ Rp 100,000.00
PEKERJAAN SALURAN SPL.5 Mengerjakan 1 M2 Pasangan Paving Block 50.000 Bh Paving Block K300, Uk. 10 x 20 Tbl 8 cm @ Rp 0.250 Oh Tukang Batu @ Rp 0.025 Oh Kepala Tukang Batu @ Rp 0.125 Oh Pekerja @ Rp 0.003 Oh Mandor @ Rp SPL.6
SPL.7
1 M' MEMASANG PAGAR BRC T. 1,2 M 1.0000 m' Pagar Brc 0.100 Oh Pekerja 0.020 Oh Mandor 0.050 Oh Tukang Batu 0.010 Oh Kepala Tukang Batu
@ Rp @ Rp @ Rp @ Rp @ Rp
1,400.00 75,000.00 80,000.00 55,000.00 100,000.00
200,000.00 55,000.00 100,000.00 75,000.00 80,000.00
1 BH TIANG PAGAR PAGAR BRC 1,5" (termasuk baut, u-clip, angkur dan cup 1.2000 m' Pipa BRC 1,5" @ Rp 108,000.00 0.100 Bh Pekerja @ Rp 55,000.00 0.020 Bh Mandor @ Rp 80,000.00 0.050 Oh Tukang Batu @ Rp 75,000.00 0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
Rp Rp Rp Rp Rp Rp
6,300.00 330.00 4,500.00 960.00 600.00 12,690.00
Rp Rp Rp Rp Rp Rp
70,000.00 18,750.00 2,000.00 6,875.00 300.00 97,925.00
Rp. Rp. Rp. Rp. Rp. Rp
200,000.00 5,500.00 2,000.00 3,750.00 800.00 212,050.00
Rp. Rp. Rp. Rp. Rp. Rp
129,600.00 5,500.00 2,000.00 3,750.00 800.00 141,650.00
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST Direktur
DAFTAR HARGA BAHAN DAN UPAH Tahun Anggaran 2013 I.
HARGA BAHAN BAHAN BATU, PASIR, CIPPING DAN BATU MERAH Batu Kali Pasir pasang Pasir beton Pasir beton (Kg) Pasir urug split/chipping 2-3 cm split/chipping 2-3 cm(Kg) Tanah Timbunan Batu merah Paving Block K225, Uk. 10 x 20 Tbl 8 cm Air BAHAN SEMEN Semen PC 50kg (zak) Semen Portland BAHAN BESI Besi beton polos Kawat beton Paku biasa 2" - 5" Besi Strep Paku Seng Woodplank T. 8 Paku sekrup 2" - 3" BAHAN PLAPON DAN ATAP Multipleks 1.22 x 2.44 x 9 mm Seng Gelombang Seng Plat BAHAN KERAMIK Batu Alam Undersheet 25/25 Batu Alam Undersheet 30/30 Batu Alam Undersheet 10/20 Batu Alam Acak Batu Koral Alam Sikat BAHAN KAYU Kayu klas II (balok) Kayu klas II (papan) Kayu klas III (balok) Kayu klas III (papan) Dolken kayu Ø8-10/400 cm Bambu, Uk. Besar BAHAN CAT Cat tembok Kw. 1 (Interior) Cat tembok Kw. 1 (Exterior) Cat tembok Metrolite Cat kayu Cat Besi Minyak bekisting Cat meni Plamur tembok Lem kayu Kertas amplas Dempul Minyak cat Cat dasar Cat dasar Kayu Coating
SAT M3 M3 M3 Kg M3 M3 Kg M3 Bh Bj Ltr
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
HARGA 135,000.00 130,000.00 137,000.00 85.63 80,000.00 240,000.00 150.00 84,000.00 600.00 1,400.00 150.00
Zak Kg
Rp. Rp.
56,500.00 1,130.00
Kg Kg Kg Kg Kg M' Kg
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
14,000.00 23,600.00 17,500.00 16,500.00 65,000.00 30,000.00 150,000.00
Lbr Lbr Lbr
Rp. Rp. Rp.
120,000.00 50,000.00 35,000.00
M2 M2 M2 M2 M2
Rp. Rp. Rp. Rp. Rp.
210,000.00 211,000.00 212,000.00 170,000.00 100,000.00
M3 M3 M3 M3 Btg Btg
Rp. Rp. Rp. Rp. Rp. Rp.
3,100,000.00 3,780,000.00 2,085,000.00 2,140,000.00 20,000.00 20,000.00
Kg Kg Kg Kg Kg Ltr Kg Kg Kg Lbr Kg Kg Kg Kg Ltr
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
45,000.00 50,000.00 20,000.00 50,000.00 51,000.00 6,500.00 21,000.00 21,000.00 25,000.00 4,000.00 25,000.00 30,000.00 12,000.00 55,000.00 50,000.00
BAHAN PIPA Pompa Air (setara Zhimizu tipe PS. 130 Bit) Pipa PVC AW 1/2'' Pipa PVC AW 1'' Pipa PVC AW 1 1/2'' Pipa PVC AW 3/4'' Pipa PVC AW 2'' Pipa PVC AW 3'' Pipa PVC AW 4'' Slang Air Serat 3/4" Lem pipa Kran Air 3/4 Seal Tape TANAMAN Agave Adam Hawa Amarilis Asoka Daun Kecil Beringin Dollar 1,50 - 2,00 m Beringin Dollar tinggi 2,00-2,50 m Cemara Udang Helicolinia Irish klomentia Krokot Merah Krokot Putih Keladi Raja Karambosa Kuning Ketapang Kencana t.2,00 - 2,50 m Kamboja Plumeria t. 2,50 - 3,00 m Lily Paris Putih Nolina Nampo Nanas Merah Osmoxylon Osmoxylon Pandang bali Cabang t. 150 - 200 Pandanus Puring Palm Lontara tinggi Batang 2 - 2,5 m Rumput Gajah Mini Serut /Kolasa 1,50 - 2,00 m Serut / Kolasa 2,50 - 3,00 m Siklot Sikas 50 -70 Cm Sikas 1,00 -1,25 Cm Sansiefera Sambang Dara Song of india Sansifera Tiger Sansifera Tanduk Rusa Song of india Pohon Mangga 5 Rasa T. 1,500 - 2,00 m Pohon Rambutan Lengkeng Gowa T. 1,500 - 2,00 m
M' M' M' M' M' M' M' M' Klg Bh Roll Pbg Pbg Pbg Pbg Phn Phn Phn Pbg Pbg Pbg Pbg Pbg Pbg Pbg Phn Phn Pbg Phn Pbg Pbg Pbg Pbg Phn Pbg Pbg Phn M2 Phn Phn Pbg Phn Phn Pbg Pbg Pbg Pbg Pbg Pbg Phn Phn
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
650,000.00 7,800.00 12,000.00 11,000.00 9,500.00 13,000.00 37,000.00 48,000.00 10,000.00 75,000.00 20,000.00 5,000.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
100,000.00 2,500.00 10,000.00 10,000.00 5,000,000.00 10,000,000.00 7,500,000.00 15,000.00 7,500.00 65,000.00 2,500.00 2,500.00 150,000.00 45,000.00 450,000.00 1,500,000.00 15,000.00 350,000.00 25,000.00 75,000.00 25,000.00 25,000.00 750,000.00 15,000.00 30,000.00 8,500,000.00 45,000.00 7,000,000.00 15,000,000.00 150,000.00 5,000,000.00 10,000,000.00 30,000.00 75,000.00 50,000.00 75,000.00 75,000.00 100,000.00 450,000.00 450,000.00
II.
HARGA UPAH KERJA Tukang kayu Tukang las Tukang Pipa Tukang gali Tukang batu Tukang besi Tukang cat Tukang listrik Kepala Tukang Kayu Kepala Tukang Batu Kepala Tukang Cat Kepala Tukang Listrik Kepala Tukang Pipa Kepala Tukang Besi Mandor Pekerja
Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 80,000.00 75,000.00 90,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 100,000.00 55,000.00
Dibuat Oleh, Konsultan Perencana CV. CIPTA HIRARCHY KONSULTAN
AMIRUDDIN ACHMAD, ST Direktur
25
#REF!
encana ARCHY KONSULTAN
CHMAD, ST