BILL OFF QUANTITY (BOQ) Pekerjaan Lokasi Jenis Pek.
: : :
FASUM Perumahan LARISA RESIDENCE POS SECURTY
VOLUME
HARGA
JMLH HARGA
SATUAN
TUNGGAL
NO.
URAIAN PEKERJAAN
S AT
TUNGGAL
( Rp. )
( Rp. )
1.
2.
3.
5.
6. 6.
8.
Ls Ls Ls M' Ls
1,000 1,000 1,000 14,000 0,000
I 1 2 3 4 5
PEKERJAAN PERSIAPAN : Direksikeet / Bouwkeet Air Kerja + Listrik Kerja Pengukuran, Pemat.& Pembers. Lapangan. Pemasangan Bouwplank Ke Keamanan
II
PEKERJAAN PONDASI :
1 2 3 4 5 III III
Galian tanah pondasi Urugan tanah kembali & pemadatan bekas galian pondasi Urugan tanah bawah lantai Urugan pasir bwh pondasi & lantai. Pondasi Umpak batu kali camp 1 Pc : 4 pasir PEKE PEKERJ RJAA AAN N LAN LANTAI TAI I A. DINDING MASIF Pasangan Dinding Bata merah ad. 1Pc : 3 Kpr Pasa Pasang ngan an beto beton n ber bertu tula lang ng ad. ad. 1 Pc: Pc: 2 Ps : 3 Krl - Sloof beton S2 15/20 cm 4d10, d6 - 150/200 - Kolom K1 15/25 cm 4d12, 2d10, d8-150/200 - Kolom K2 15/15 cm 4d10, d8-150/200 - Balok beton B2 15/15 cm 4d10, 2d10, d8-150/200 - Balok beton B2 15/20 cm 4d12, 2d10, d8-150/200 - Plat Atap t = 10 cm - Ban jendela Peke Pekerj rjaa aan n Ples Pleste tera ran n ad. ad. 1 Pc : 5 Psr Psr - Plesteran dinding luar - Plesteran dinding dalam - Pas. Batu andesit 10/30 Acian Dinding KM / WC ,Keramik ex. Mulia/setara 20x20 B. DINDING KOMPONEN Peke Pekerj rjaa aan n Pin Pintu & Jend Jendel ela a Pas. Kusen Alumunium - Kusen Type P1 (2,00x 0,75) - Kusen Type J1 (1 x 1,2) - Kusen Type V1 (0,55 x 0,5) Pas. Da Daun Pi Pintu & jendela - Type P1 Pintu Frame Kaca - Type J1 Jendela Frame Kaca Pas. Kaca Polos T = 5 mm - Type P1 - Type J1 - Type V1 Pas. Kunci tanam 2 slaag Pas. Kusen & daun pintu PVC lengkap (KM/WC)
1 2
3
4 5 1
2
3
4 5
C. PEKERJAAN LANTAI
1
Pas. Pas. Lant Lantai ai Kera Keramik mik uk. 40 x 40 40 cm ex. Mulia Mulia KW-1 KW-1 / seta setara ra :
313.540,00
200.000,00 8.110,00 50.000,00
200.000,00 113.540,00 -
1.381.053,76
M³ M³ M³ M³ M³
M²
3,970 1,390 1,454 0,364 2,760
40,390
18.200,00 4.180,00 4.180,00 108.550,00 455.600,00
82.240,00
72.254,00 5.808,11 6.077,72 39.457,93 1.257.456,00 35.183.807,48 17.654.818,56 3.321.673,60
M³ M³ M³ M³ M³ M³ M³
0,420 0,550 0,340 0,140 0,660 1,460 0,110
2.702.700,00 3.259.480,00 2.742.920,00 2.468.628,00 2.742.920,00 2.860.890,00 879.850,00
1.135.134,00 1.792.714,00 932.592,80 345.607,92 1.810.327,20 4.176.899,40 96.783,50
M² M² M² M² M²
30,710 29,300 7,390 60,010 7,620
24.940,00 24.040,00 225.000,00 9.200,00 46.977,00
765.907,40 704.372,00 1.662.750,00 552.092,00 357.964,74 2.990.809,00
M' M' M'
5,500 10,800 2,100
75.000,00 75.000,00 75.000,00
412.500,00 810.000,00 157.500,00
BH BH
1,000 2,000
500.000,00 300.000,00
500.000,00 600.000,00
M² M² M² BH BH
0,860 1,640 0,190 1,000 1,000
76.000,00 76.000,00 76.000,00 95.481,00 210.888,00
65.360,00 124.640,00 14.440,00 95.481,00 210.888,00 457.430,48
URAIAN PEKERJAAN
NO.
SAT
VOLUME TUNGGAL
1.
2 3
2. - R. Jaga + teras Teras depan uk. 30 x 30 ex Mulia KW-1 / Setara hitam unpolish Lantai KM / WC ,Keramik ex. Mulia/setara 20x20
3. M² M² M²
5. 2,900 2,300 1,820
HARGA
JMLH HARGA
SATUAN
TUNGGAL
( Rp. )
( Rp. )
6. 66.573,00 73.970,00 51.779,00
8. 193.061,70 170.131,00 94.237,78
D. PEKERJAAN SANITAIR
11.828.940,00
1
Pas. Pipa Leiding PVC dia 3/4" + Accessories
M'
6,000
11.680,00
70.080,00
2
Pas. Kran Leiding 0 1/2"
BH
1,000
39.340,00
39.340,00
4
Pas. Pipa pembuangan : - Sal Tinja pipa PVC dia 4"
M'
6,000
38.840,00
233.040,00
- Sal air kotor bawah lantai PVC dia 3"
M'
8,000
33.310,00
266.480,00
5
Pas. Closet Jongkok ex INA
BH
1,000
125.000,00
125.000,00
6
Pas. septiktank lengkap
BH
1,000
1.000.000,00
1.000.000,00
7
Pas. Sumur resapan
BH
1,000
750.000,00
750.000,00
8
Pas. Floor Drain
Bh
1,000
45.000,00
45.000,00
9
Water torn 1 m3
BH
1,000
1.300.000,00
1.300.000,00
10
Sumur bor + casing + pompa
Bh
1,000
8.000.000,00
8.000.000,00
1 2 3 4
E. PEKERJAAN PENGECATAN Pengecatan Metrolite pada dinding luar Pengecatan Metrolite pada dinding dalam Pengecatan Metrolite pada dinding KM/WC Pengecatan Metrolite pada Plafond
M² M² M² M131
30,710 29,300 6,900 13,610
18.172,00 18.172,00 18.172,00 18.172,00
558.062,12 532.439,60 125.386,80 247.320,92
TtK TtK TtK unit TtK
3,000 1,000 1,000 1,000 2,000
99.800,00 99.800,00 115.000,00 85.750,00 94.325,00
788.600,00 299.400,00 99.800,00 115.000,00 85.750,00 188.650,00
1.463.209,44
F. PEKERJAAN INSTALASI LISTRIK
1 2 3 4 5
Titik lampu Titik stop kontak Titik outlet TV Box panel MCB outbow Presto ( 4 MCB) MCB (1200 Watt)
V
PEKERJAAN ATAP.
1
Water proofing Dak Atap
283.200,00
M²
7,080
40.000,00
283.200,00