This is a subject which will prepare the students to face the industrial environment, in a theoretical manner. It will expose the student to the various computer center management techniques…Full description
Multiservice Tactics, Techniques, and Procedures for Conducting Peace Operations
Full description
Full description
Jurisdiction and procedures in matrimonial cases.
This is the Repair manual for the Toshiba Libretto U100 / U105 Ultraportable laptop. It is no longer available through Toshiba and is fairly hard to find. The U100 laptop has a 7" screen w…Descripción completa
Procedures in Planning and Conducting Maintenance Preventive Maintenance Preventive maintenance can maintenance can be described as maintenance of equipment or systems before fault occurs. It can be divided into two subgroups: Planned Maintenance and Conditioned-Based Maintenance. Planned Maintenance (PM) is (PM) is any variety of scheduled maintenance to an object or item of equipment. Specifically, PM is a scheduled service visit carried out by a competent and suitable agent, to ensure that an item of equipment is operating correctly to avoid any unscheduled breakdown and downtime of an equipment. Condition Based Maintenance (CBM) is (CBM) is a maintenance strategy that uses the actual condition of the asset to decide what maintenance needs to be done. CBM dictates that maintenance should only be performed when certain indicators show decreasing performance or upcoming failure. Checking a machine for these indicators may include non -invasive measurements, visual inspection, performance data and scheduled tests. Condition data can be gathered at certain intervals, or continuously. The purpose of systematic inspection, detection and correction of existing / f uture problems is very important to maintain equipment / facilities in satisfactory condition before it m ay cause major problem. problem . Maintenance, including Maintenance, including tests, measurements, adjustments, and parts replacement, performed specifically to prevent faults from occurring. Maintenance is divided into two (2) general type. Preventive maintenance is given for maintaining equipment and facilities in satisfactory operating condition to extend the life of the equipment. C orrectiv e maintena maintenance nce is task performed to identify, isolate and rectify a fault so that the f ailed equipment or system can be restored to an operational conditions within the tolerances or limits. 192 Maintenance Procedures In preparing maintenance procedure, you also have to consider designing a systematic plan for both for hardware and software. This saves time, money and frustration and ensures safe conditions to prevent injury to people and damage to computer equipment. Planning Maintenance Procedures for Computer System and Networking: A. Design a systematic maintenance plan for hardware. 1. Design a monitoring, evaluating and updating plan. 2. Place your computer in a well-ventilated area. 3. Schedule the use of computer for f or its longer life. 4. Move the computer only when it is turned off and unplugged. 5. Treat your computer properly. B. Design a systematic maintenance plan for your software. 1. Backup your files. 2. Install or secure passwords. 3. Delete temporary files. 4. Update anti-virus and spyware.
NAME:___________________________________________________________ GRADE AND SECTION:___________ MONITORING PLAN PERFORMANCE NO. _________ HARDWARE PARTS
PC. NO____
PC. NO____
PC. NO____
RECOMMENDATIONS
NAME:___________________________________________________________ GRADE AND SECTION:___________ MONITORING PLAN PERFORMANCE NO. _________ HARDWARE PARTS
PC. NO____
PC. NO____
PC. NO____
RECOMMENDATIONS
NAME:___________________________________________________________ GRADE AND SECTION:___________ MONITORING PLAN PERFORMANCE NO. _________ COMPUTER 1
COMPUTER 2
COMPUTER 3
RECOMMENDATIONS
NAME:___________________________________________________________ GRADE AND SECTION:___________ MONITORING PLAN PERFORMANCE NO. _________ COMPUTER 1
COMPUTER 2
COMPUTER 3
RECOMMENDATIONS
NAME:___________________________________________________ GRADE AND SECTION:___________________
_______________1. It can be described as maintenance of equipment or systems before fault occurs. _______________2. It is a maintenance strategy that uses the actual condition of the asset to decide what maintenance needs to be done. _______________3. It is any variety of scheduled maintenance to an object or item of equipment. ___ _______________4. It includes tests, measurements, adjustments, and parts replacement, performed specifically to prevent faults from occurring. _______________5. is task performed to identify, isolate and rectify a fault so that the failed equipment or system can be restored to an operational conditions within the tolerances or limits. ENUMERATION: Planning Maintenance Procedures for Computer System and Networking A. Design a systematic maintenance plan for hardware. 1-4 1. 2. 3. 4. B. Design a systematic maintenance plan for your software. 1-4 1. 2. 3. 4. ACRONYM: