Descripción: Pipeline pigging do's and don'ts and pigging selection guide
Full description
Descripción: Presentation of Unpiggiable Pipelines
Presentation of Unpiggiable Pipelines
anterior pig
pig chancho scrapperDescripción completa
pig luncherFull description
Descripción: Contoh Pigging Procedure
Full description
Full description
Building instructions for a mythical pig using Creator 3-in-1 Mythical Creatures set.Descrição completa
Descripción: pig
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services for Feasibility Study and Detailed Design Environmental Environmental Impact Assessment Report
Appendix F2 Pigging Operation and the PIG
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Description of Pigging Operation The gas pigging station is to facilitate the launching and receiving of inspection tools, for which HKCG usually described it as Pipe Inspection Gauge, PIG in short term. The pigging operation involves the cleaning, inspection and integrity check (such as checking of gas pipe’s wall thickness) of the submarine gas pipelines. This kind of inspection method is so far the most reliable and comprehensive one for submarine gas pipelines. Here are the general procedures / steps to describe the pigging operation. Step
Description
1
Inert gas (Nitrogen) is injected into the pig launcher after confirmation of closing the isolation valve of the pig launcher to remove any residual town gas inside the pig launcher. This step is to provide a gas free environment when the pig launcher is opened in next step.
2
Upon the pig launcher is town gas free, the pig launcher is opened up. Pipe Inspection Gauge (PIG) is then inserted into the pig launcher.
3
After insertion of the pig into the launcher, close the door of the pig launcher and then purge the pig launcher with inert gas. The isolation valve for the pig launcher and behind the PIG is opened and the pig launcher will then fill up with town gas. The town gas flow will carry the PIG to pass through the submarine gas pipelines upon the open of another isolation valve of the pig launcher.
4
PIG arrives at the other end of the submarine gas pipeline at where a pigging station is designed for receiving the PIG.
5
Inert gas (Nitrogen) is injected into the pig receiver after confirmation of closing the isolation valve of the pig receiver to remove any residual town gas inside the pig launcher. This step is to provide a gas free environment when the pig receiver is opened in next step.
6
Upon the pig receiver is town gas free, the pig receiver is opened up. PIG is then taken out from the pig receiver.
7
All the isolation valves are then closed. The pipe receiver will be isolated from the main gas pipeline during normal situation.
Remark: The duration of each run of PIG for one submarine gas pipeline from the pig launcher to the pig receiver is about 1-day.
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
1
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Isolation Valve
Isolation Valve
Isolation Valve
Setup of the Pigging Operation
Valve Closed
Valve Open
Valve Closed
Town gas flows from pigging station to the submarine gas pipeline (as shown by arrows) under normal situation, pig launcher and pig receiver are isolated from the town gas transmission system
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
2
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Pigging Operation
Valve Closed Valve Open
Valve Closed
Step 1: Use an inert gas (Nitrogen) to remove residual gas inside the pig launcher
Valve Closed Valve Open
Valve Closed
Step 2: Open up the pig launcher and insert the pig
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
3
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Valve Open Valve Closed
Valve Open
Step 3: Use town gas flow to carry the pig into the submarine gas pipelines
Valve Open
Valve Closed
Valve Open
Step 4: Pig arrives at the other end of the submarine gas pipeline at where a pigging station is designed for receiving the Pig.
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
4
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Valve Closed
Valve Open
Valve Closed
Step 5: Use inert gas (Nitrogen) to remove residual gas inside the pig receiver
Valve Open
Valve Closed
Valve Closed
Step 6: Open up the pig receiver and take out the pig
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
5
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Valve Open
Valve Closed
Valve Closed
Step 7: The pipe receiver will be isolated from the gas pipeline during normal situation.
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
6
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Photo: Example of Pig
Photo: Installation of the pig during pigging operation
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc
7
Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development Consultancy Services f or Feasibility Study and Detailed Design Environmental Impact Assessment Report
Photo: Installation of the pig during pigging operation
237926/TNI/ENL/33/C April 2010 P:\Hong Kong\INF\Projects2\237926 Twin 400 Gas Main\Environmental\MM Report\EIA\Final\1st\Appendices\App F2\App F2.doc