Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
PFLNG
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
Project No
10003
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
1/ 207
DSME Specific Reference
N/A
TECHNIP DSME CONSORTIUM
PIPING SUPPORTS CONSTRUCTION STANDARD
Pages modified under thisrevision:75,79,81-86,88-89,99-100,117,154,156-157,162,177-180,185-187,194-205 Classification and Certification Society: YES Document Class: 2 Damien Amigues 2014.02.17 14:52:01 +08'00'
Prashant Tanksale 2014.02.17 14:45:59 +08'00'
Don Andres Carlos A. Tavanlar 2014.02.17 14:34:01 +08'00'
3
17-Feb-2014
Issued For Construction
DAT
PTA
DAM
2
21-Oct-2013
Issued For Construction
DAT
PTA
PAG
1
17-Jul-2013
Issued For Construction
CMM
PTA
PAG
0
01-Nov-2012
Issued For Design
CMM
PTA
PAG
A
07-June-2012
IFR -Issued For Review
CMM
PTA
PAG
Rev
Date DD-MMM-YYYY
STATUS
Written By (name & visa)
Checked By (name & visa)
Approved By (name & visa)
DOCUMENT REVISIONS Sections changed in last revision are identified by a vertical line in the left margin
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
2/ 207
N/A
CONTENTS 1.
PROJECT SCOPE
4
1.1 General outlines
4
1.2 Definitions
4
2.
PURPOSE
5
3.
REFERENCES
6
3.1 Reference Codes and Document
6
3.2 Reference specification
6
3.3 COMPANY Technical Standard
6
PIPE SUPPORTS GENERAL NOTES
6
4.1 Pipe Support Identification
7
4.2 Numbering of Tagged Items
7
4.3 Primary and Secondary Pipe Supports Tagging in Isometrics.
7
5.
DETAILED INFORMATION RELATING TO STANDARD SUPPORTS
8
6.
SPECIFIC REQUIREMENTS FOR SUPPORT COMPONENTS WELDED ON PIPE 11
7.
MATERIAL (VENDOR SUPPLIED)
11
8.
PIPE SHOE HEIGHTS
11
9.
TABLE 1: PIPE SPANS FOR PIPES RESTING ON MORE THAN TWO SUPPORTS
13
10.
TABLE 2
18
11.
TABLE 3
20
12.
TABLE: 4-5-6 COLLECTION OF STANDARD STRUCTURAL ELEMENTS 22
4.
13.
12.1 TABLE 4
22
12.2 TABLE 5
22
12.3 TABLE 6
22
TABLE 7
23
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
3/ 207
N/A
14.
SYNOPTIC TABLE
24
15.
PIPE SUPPORTS STANDARD SERIES
25
15.1 Welded Support Series
26
15.2 Clamp Supports Series
30
15.3 Hanger Support Series
32
15.4 Structural Support Series
34
15.5 Vessel Supports Series
37
15.6 Cold Supports Series
38
15.7 RTRP Supports Series
42
ATTACHMENT ATTACHMENT A:
STRUCTURAL MEMBER SIZE AND LOAD SELECTION
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
1.
PROJECT SCOPE
1.1
General outlines
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
4/ 207
N/A
COMPANY intends to develop a Floating LNG Production Unit in East Malaysia for capitalising on the availability of the gas resulting from the development of several gas fields in Malaysia. The purpose is to execute the Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) for the PETRONAS Floating LNG Project. The design basis is based on a new built vessel. The FLNG plant shall be designed for 1 MTPA production of LNG. Design life for both Hull/marine and Topside are expected to be 20 years. This project is to be implemented in an Alliance between COMPANY and a consortium comprising of Technip Geoproduction (M) Sdn Bhd, Technip France and Daewoo Shipbuiding & Marine Engineering Co. Ltd (hereinafter collectively referred to as “TDC”). The COMPANY and TDC have /will enter into a contract for the implementation of the PROJECT on an Alliance basis (“CONTRACT”) 1.2
Definitions For clarification purposes, the definitions used in the present PROJECT Procedure are recalled here:
PROJECT: means the development and implementation of the PETRONAS Floating LNG project (also referred as ”PFLNG Project”)
WORKS: means all work in relation to the PROJECT required to be performed for the realisation the PROJECT.
COMPANY: means Petroliam Nasional Berhad (“PETRONAS”) and MISC Berhad (“MISC”)
CONTRACTOR: means a consortium comprising of TPGM, TPF and DSME (also referred as “TDC”)
ALLIANCE INTEGRATED TEAM: The team set up by COMPANY and the CONTRACTOR to facilitate the smooth implementation of the WORKS.
FEED: Front End Engineering Design
TPF: TECHNIP France SAS
TPGM: TECHNIP GEOPRODUCTION (M) SDN BHD
DSME: Daewoo Shipbuilding and Marine Engineering Co. Ltd.
POC: Paris Operating Centre
KLOC: Kuala Lumpur Operating Centre
OOC: DSME OKPO Operating Centre
OC: Operating Centre
BOM: Bill of Material (of ISO)
CAD: Computer Aided Design
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
2.
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
5/ 207
N/A
MDS: Multi Discipline Supports
IT: Information Technology
MTO: Material Take-Off
P&ID: Process and Instrumentation Diagram
PDMS: AVEVA Plant Management Design System Software
ID: Issuing Department
LDE: Lead Discipline Engineer
DCM: Document Control Managers
DCC: Document Control Center
JANUS: Progress Measurement Tool
MDR: Master Document Register
EDMS: Electronic Documents Management System
DDB: Disciplines Project Database (one for each discipline)
PDB: Project Data Base (unique for the Project)
PDB Comments: Project Data Base implemented for record, dispatch and storage of Copy Comments
FDB: Front Data Base
IDC: Inter-Discipline Check
PWHT: Post Weld Heat Treatment
BOP: Bottom of Pipe
YARD: Means Construction Site where all Fabrication/Installation work related to PROJECT is performed.
PURPOSE The purpose of this document is to stipulate basic design data, documentation and requirements for the design, material supply and fabrication of pipe supports in piping systems to be used for PETRONAS Floating LNG project. All piping systems shall be evaluated and analyzed for adequate supports concept and definition in accordance with applicable codes and standards, and suppliers’ recommendations as applicable. This standard mainly applies to metallic piping system. All non-metallic such as RTRP and CPVC etc. piping shall be supported in accordance with Manufactures’ recommendations. Support standards indicated for RTRP and CPVC piping are for reference only. This pipe support construction standard shall be used for topsides piping scope (including inside hull) for PETRONAS Floating LNG project. This standard includes the general notes, tables, list, synoptic tables and compilation of pipe support construction details.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
3.
REFERENCES
3.1
Reference Codes and Document
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
6/ 207
N/A
Piping supports shall be designed, installed, fabricated and erected in complete accordance with the most recent edition of the following reference codes:
3.2
ASME B31.3 Process Piping
MSS SP58 Pipe Hangers and Supports - Materials, Design and Manufacture
MSS SP69 Pipe Hangers and Supports - Selection and Application
Reference specification The following specification shall be used in conjunction with this specification.
3.3
4.
5867-0000-JSD-1300-10022
Topside Piping Classes
5867-0000-JSD-1300-10002
Topside Piping Design Job Specification
5867-0000-JSD-1300-10008
Piping Stress Job Specification
5867-0000-JSD-1300-10010
Topsides Piping Support Job Specification
5867-0000-JSD-1300-10025
Piping Fabrication, Installation & Testing
5867-0000-JSD-2200-10001
Topside Hot Insulation Specification
5867-0000-JSD-2200-10002
Topside Cold Insulation Specification
5867-0000-JSD-2300-10001
Job Specification for Painting
COMPANY Technical Standard PTS 31.38.01.11
Piping - General requirements
PTS 31.38.01.10
Piping Classes Part 1:- Basis of Design
PTS 31.38.01.12
Piping Classes - Refining & Chemicals
PTS 31.38.01.15
Piping Classes - Exploration & Production
PTS 31.38.01.29
Pipe Supports
PTS 31.38.01.31
Shop and Field Fabrication of Steel Piping
PTS 30.46.00.31
Thermal Insulation
PTS 31.46.00.31
Acoustic insulation for piping
PTS 30.48.00.31
Protective Coatings & Lining
PIPE SUPPORTS GENERAL NOTES A pipe support tag number shall identify all supports. Tag Nos & variable data shall be shown on piping isometrics.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
4.1
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
7/ 207
N/A
Pipe Support Identification PS / SP -- PDMS Design Area -- SERIAL No. XX
--
YYYY
--
ZZZ (3 Digit)
PS: Pipe Supports (Standard) SP: Special Pipe Supports PDMS Design Area: Refer doc. no. 5867-1000-DW-0051-10011 to 10014 4.2
Numbering of Tagged Items (Controlled in the tagged items data sheets) In case, if the PS or SP support is having TAGGED ITEMS (Spring Hangers. Rigid Struts, Sliding Plates etc). Then the same will be identified in the component notes of support modeller, so that it will be reflected in isometric against the support. E.g: 1101-HGR-01 (Refer below for the details of numbering of tagged items).
PDMS Design Area
YYYY ---
Serial No.
A A A XX
--
Z Z (2 Digits)
HGR / VHS / CHS / SSP/ RST
HGR (Hanger Rod), VHS (Variable Spring Support), CHS (Constant Spring Support), SSP (Sliding Plates), RST (Rigid Struts)
4.3
Primary and Secondary Pipe Supports Tagging in Isometrics. The Pipe Support may consist of combination of Primary and Secondary Standard Supports. The entire standard supports are tagged with the variables as per Support Construction Standard. Primary supports are attached to pipe, like shoe, stopper, guide, trunnion, etc. and Secondary supports are structural supports, like Cantilever bracket, T-post, L-type, Portal type etc. CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
8/ 207
N/A
The secondary structural support tagged with unique no. and other primary supports are tagged with suffix P1, P2, P3 etc. at same support location. In case the pipe support without any secondary support, then the first primary support will be tagged with unique no. and other primary supports are tagged with suffix P1, P2, P3 etc. at same support location. Special supports shall be individually detailed, in the form of dimensional drawings, and include some Standard Support components such as trunnion, guide, stopper etc. 5.
may
DETAILED INFORMATION RELATING TO STANDARD SUPPORTS Pipe support location shall be indicated in Piping Isometrics for pipe sizes 2"Dia. and above. Pipe sizes smaller than 2"Dia. shall be supported by YARD unless otherwise noted. Standard supports shall be used. Special supports shall be used when the loading or dimension criteria of standard supports are exceeded. These shall be designed and checked by the responsible Structural/Civil Engineer where necessary. All standard dimensions or loads are specified per metric system: Millimetres (mm) for dimensions and Kilo Newton (KN) for loads. Pipe nominal diameters are defined in inches. If other structural shapes or threaded parts are used, YARD shall make sure that used materials are equivalent to those defined in quality, dimensions and mechanical properties. YARD shall make sure that all structural supports attached to primary steel or circular sections shall be provided with doubler plate. LENGTHS DEFINED ON CONSTRUCTION STANDARD SUPPORT SERIES STC-1391, STC-13 92 AND STC-1394: Length "X" or other variables defined in pipe support isometrics are the theoretical calculated lengths from ground level, structural beam or concrete beam level. To take into account the effective length of structures, YARD shall add allowance to the lengths defined to be adjusted in field.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
9/ 207
N/A
MAIN BEAM
PIPE
75 mm
X + 200 mm
75 mm
STEEL
*
X + 100
*
٭- From insulation edge or edge of bare pipe
STANCHIONS TYPE
PORTAL TYPE
SUPPORT WELDED COMPONENTS
Generally, support weld fillet shall be performed according to the following detail. When other impositions are required (full penetration, etc.), a special support detail shall be indicated. e = Thickness of the other element. e' = Thickness of the thinnest element . a = Thickness of the weld filler .
e' a e
All welding of dissimilar materials shall be covered by special welding procedure. YARD shall field check all pipe supports after installation and add necessary reinforcement, bracing or stiffeners. Limit this reinforcement to secondary structures only and attachment like rigid struts and springs.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
10/ 207
N/A
All pipework “permanent and temporary” shall be securely fastened to minimize vibration and prevent damage during transportation. Pipe shoe with variable height shall be adjusted by shim or field weld support. For all lines, shimming plates will be in YARD’s scope for thickness ≤ 20mm. Shimming under elbow supports shall be fully welded to the support after all joints in piping are made up. Shims under pipe or sliding supports shall be fully welded to support steel after all piping joints are made up. All pipe supports should rest on structural steel and not on grating. Thickness of support base plate shall not be less than chequered plate or deck / floor plate thickness. All guides, line stops, anchors and spring supports shall be installed only where indicated on piping isometrics. During installation and welding of guide and line stop components, gaps specified on isometrics according to stress analysis calculation shall be strictly followed. They shall not be added in the field without prior approval. All commercial parts called for on Pipe Support Construction Standard shall be identified by catalogue number. Equivalent parts by other manufacturers may be substituted with the approval of the COMPANY. Spring and level arms shall be protected against overload during hydrostatic test. All restraints or stops installed for this purpose shall be removed immediately after testing has been completed. Refer Piping Fabrication, Installation & Testing Speccification doc. No. 5867-0000-JSD-130010025. Where shims or packings are called for on steel supports, they must be seal welded to the supporting steel. Packings shall be provided on Base Spring Supports, as required to suit the installed dimensions. Welds not specified shall be 6 mm continuous fillet. Fillet welds to piping however, shall not be greater than the pipe wall thickness. All supports shall be seal welded. For Welding and Non Destructive Examination (NDE), refer specification doc. no. 5867-0000JSD-1300-10025 section 6 and section 8. For stress relieved lines, welded attachments such as trunnions, dummy pipes, stanchions and protection shields shall be welded before stress relieving (PWHT). All pipe support elements and structures shall be painted in accordance with the Painting Specification Document 5867-0000-JSD-2300-10001 prior to installation of piping. After painting, each standard support element shall be paint marked or tagged with its relevant tag number (except for guiding angles and U-bolts). All vent/weep holes to be plugged with mastic after final installation and testing. All sharp corners shall be rounded off and rounding radius shall be R15. YARD shall drill holes on steel plates and concrete according to the effective bolt diameter and length used as per stud bolt or expansion bolt manufacturer. Fireproofing: pipe supports in the Fireproofing zone which need Passive Fire Protection (PFP) and in the Cryogenic Spill Protection (CSP) shall be fireproofed according to Passive fire & Cryogenic Spill Protection Philosophy 5867-0000-JSD-1900-10005. All base type springs shall be stitch welded to the structural steel and sealed with mastic. All non-metallic pads under uninsulated lines shall be properly secured on the structural steel.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
11/ 207
N/A
All support details for Non-metallic piping shall be in accordance with the Manufacturer’s recommendations. 6.
SPECIFIC REQUIREMENTS FOR SUPPORT COMPONENTS WELDED ON PIPE All attachments welded directly to piping shall be of the same material as parent pipe. YARD shall ensure that such welding is performed prior to PWHT or in accordance with the parent pipes that have a particular welding requirement. Attachment welds shall be continuous. Stitch welding is not permitted.
7.
MATERIAL (VENDOR SUPPLIED) Itemised material like Spring Supports, Rigid Struts and Sliding Plates shall be stored and protected in shop before field installation. Particular care should be taken during installation of Sliding Plates for welding, positioning at support points and protection to avoid damage to P.T.F.E and Stainless Steel parts. YARD shall follow requirements of Itemized Material Suppliers.
8.
PIPE SHOE HEIGHTS Pipe shoe height “H” specified on pipe support isometrics will be the total height from bottom of pipe to top of support beam. UNINSULATED LINE/ SLOPING LINE
INSULATED LINE
H
H
PIPE SHOE HEIGHTS (WITHOUT SLIDING PLATE)
* BOP Setting for LINES SUPPORT Shoe (Dia. < 24”) Saddle (Dia. > 24”)
INSULATION THICKNESS: E E 50mm 50mm < E 100mm 100mm < E 150mm E > 150mm E 100mm
PIPE SHOE HEIGHT 100mm 150mm 200mm E+50mm 150mm (1)
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
12/ 207
N/A
(1) Saddles are used subject to insulation thickness ‘E’ above * BOP Setting for COLD INSULATED LINES Cold insulated lines shall be purchased as a complete assembly of pipe shoe and insulated blocks from supplier. Where cold insulated lines pipe supports are fabricated by the YARD, the following table specifies the pipe shoe height. The following table also serve as information for the supplier to fabricated the cold pipe shoe height. PIPE DIAMETER
INSULATION THICKNESS: E
PIPE SHOE HEIGHT
1/2” TO 6”
E 80mm 80mm < E 130mm E > 130mm
8” TO 24”
E 80mm 80mm < E 130mm E > 130mm
26” & Above
E 80mm 80mm < E 130mm E > 130mm
150mm (MINI) 200mm 250mm 200mm (MINI) 250mm 300mm 200mm (MINI) 250mm 300mm
When Sliding Plates are required, Pipe shoe height "H" specified on pipe support isometrics will be the effective height, refer detail below. The effective height will be adjusted on prefabrication according to Sliding Plates assembly. (Height of sliding plate = 15mm) INSULATED LINE
UNINSULATED LINE
H
H
15
15
PIPE SHOE HEIGHTS (WITH SLIDING PLATE)
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
9.
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
13/ 207
N/A
TABLE 1: PIPE SPANS FOR PIPES RESTING ON MORE THAN TWO SUPPORTS TABLE – 1A: CARBON STEEL AND HEAVY WALL STAINLESS STEEL The data below are applicable to:
Carbon steel pipes, STD wall and heavier with a maximum temperature of 350°C. Austenitic stainless steel pipes, schedule 40S and heavier, DN < 400 with a maximum temperature of 350°C. Duplex stainless steel pipes, schedule 10S and heavier with a maximum temperature of 280°C. PIPE DIAMETER
MAXIMUM SPAN (MM) (NOTE 1,2,3) VAPOUR SERVICE
DN (MM)
INCH
25 40 50 80 100 150 200 250 300 350 400 450 500 600
1” 1-1/2” 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"
BARE 3850 4750 5350 6550 7500 9150 10500 11800 12900 15150 (NOTE 4) 16250 (NOTE 4) 17250 (NOTE 4) 18200 (NOTE 4) 18950 (NOTE 4)
INSULATED (NOTE 3) 2300 3000 3600 4600 5550 6800 8050 9050 9800 11850 12850 13750 14450 16050
LIQUID SERVICE BARE 3450 4100 4550 5450 6100 7100 7950 8700 9150 10850 11200 11500 11750 12150
INSULATED (NOTE 3) 2250 2800 3300 4200 4900 5800 6700 7400 7800 9300 9750 10150 10400 10950
NOTES: Pipe spans are based on the following assumptions: 1. Spans are based on straight pipe, other configurations shall be multiplied by a shape factor (see sketch below). 2. Free draining pipes with a slope less than 1.5 mm/m require an additional check of the span. 3. The weight of insulation and sheeting is based on insulation thickness varying from 70 mm for DN 25 to 200 mm. For DN 600 and above, and density of 190 kg/m3 is considered. 4. Spans limited by deflection. All other spans are limited by longitudinal bending stress. 5. Maximum deflection of the pipe between support points is considered as 6 mm. 6. Above values are basic guide lines only, span can be reduced based on stress analysis requirement. L1 = 0.65L
L2 = 0.75L
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
14/ 207
N/A
TABLE – 1B: STAINLESS STEEL, SCHEDULE 10S The data below are applicable to austenitic stainless steel pipes, schedule 10S with a maximum temperature of 350°C PIPE DIAMETER
MAXIMUM SPAN (MM) (NOTES 1,2,3) VAPOUR SERVICE
DN (MM)
INCH
25 40 50 80 100 150 200 250 300 350 400 450 500 600
1” 1-1/2” 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"
LIQUID SERVICE
BARE
INSULATED (NOTE 4)
BARE
INSULATED (NOTE 4)
3900 4850 5450 6700 7650 9400 10750 12000 13000 13750 14700 15650 16450 18050
2200 2800 3300 4050 4800 5750 6800 7600 8250 8700 9450 10150 11000 12700
3450 4000 4300 4950 5300 5950 6450 6950 7350 7600 7750 7850 8400 9050
2100 2600 3000 3500 4000 4600 5200 5650 6050 6300 6550 6750 7300 8050
NOTES: Pipe spans are based on the following assumptions: 1. Spans are based on straight pipe, other configurations shall be multiplied by a shape factor (see sketch below). 2. Free draining pipes with a slope less than 1.5 mm/m require an additional check of the span. 3. Spans are limited by longitudinal bending stress. 4. The weight of insulation and sheeting is based on insulation thickness varying from 70 mm for DN 25 to 200 mm. For DN 600 and above, and density of 190 kg/m3 is considered. 5. Maximum deflection of the pipe between support points is considered as 6 mm. 6. Above values are basic guide lines only, span can be reduced based on stress analysis requirement. L1 = 0.65L
L2 = 0.75L
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
15/ 207
N/A
TABLE – 1C: MAXIMUM SPAN - PIPE GUIDES & HOLD DOWN SUPPORTS FOR CS AND LOW ALLOY STEEL–HORIZONTAL PIPES (Applicable for PFLNG PROJECT only) DN (mm) 40 50 80 100 150 200 250 300 350 400 450 500 600
(1) :
PIPE DIAMETER INCH WALL THK (SCHED) 180 1/2” 2" STD 3" STD 4" STD 6" STD 8" 20 10" 20 12" 20 14" 20 16" 20 18" 20 20" STD 24" STD
WALL THK (mm)
MAXIMUM GUIDE/ HOLD DOWN SPANS IN MM UN-INSULATED PIPE INSULATED PIPE (40mm THK) PIPE EMPTY PIPE FULL PIPE EMPTY PIPE FULL OF OF WATER WATER
5.08
6000 / 6000
6000 / 6000
6000 / 6000
6000 / 6000
3.91 5.486 6.02 7.11 6.35 6.35 6.35 7.92 7.92 7.92 9.52 9.52
6000 / 6000 12000 / 18000 12000 / 18000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 36000 24000 / 36000 24000 / 48000 24000 / 48000 24000/ 48000 24000 / 48000
6000 / 6000 12000 / 18000 12000 / 18000 18000 / 18000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000
6000 / 6000 12000 / 18000 12000 / 18000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 36000 24000 / 36000 24000 / 48000 24000 / 48000 24000 / 48000 24000 / 48000
6000 / 6000 12000 / 12000 12000 / 12000 18000 / 18000 18000 / 18000 18000 / 18000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000 24000 / 24000
EXCEPT STRESS ANALYSIS REQUIREMENT SUPPORT SPANS SHALL BE LIMITED TO 12 METERS MAXIMUM.(Refer Table-1A ) H = HOLD DOWN SPAN
G = GUIDE SPAN
NOTES: Pipe guide and hold down spans are based on the following assumptions: 1. 2. 3. 4. 5. 6. 7.
All piping in PFLNG project are subjected to various environmental and operational conditions which are considered in stress analysis. Applicable conditions are taken into considerations for calculation of guide and hold down spans. However blast case not considered. Adequate flexibility on account of thermal growth and equipment sway shall be ensured while specifying guides and hold downs. Maximum operating stresses and stress range due to lateral and vertical deflection of the pipe between guide / hold down are maintained within B31.3 code limits. Pipes are considered to be placed on elevation 56500 mm for consideration of wind effect, hull accelerations and structural deflections (hogging & sagging etc.). Pipe schedules (SCH) are as shown above (The use of lower schedules would require shorter guide and hold down spans). Insulation density is taken as 200 kg/m³. Table is only valid for continuous piping without heavy concentrated loads (in line items valves, tees etc.) or direction changes. Necessary equivalent effect of these loads to be considered while specifying guide/ hold down restraints. CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
16/ 207
N/A
TABLE – 1D: MAXIMUM SPAN - PIPE GUIDE & HOLD DOWN SUPPORTS. FOR STAINLESS STEEL HORIZONTAL PIPES (Applicable for PFLNG PROJECT only) PIPE DIAMETER
DN
INCH
WALL THK (SCHED)
WALL THK (mm)
1-1/2” 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24"
40S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S 10S
3.68 2.8 3.05 3.05 3.05 3.75 4.6 4.8 4.8 4.8 4.8 5.5 6.35
(mm) 40 50 80 100 150 200 250 300 350 400 450 500 600 (2) :
ADMISSIMIBLE PIPE SPANS IN METRES UN-INSULATED PIPE INSULATED PIPE (THK as per-IC insulation) PIPE EMPTY PIPE FULL PIPE EMPTY PIPE FULL OF OF WATER WATER 6000 / 6000 6000 / 6000 6000 / 6000 6000 / 6000 6000 / 6000 6000 / 6000 6000 / 6000 6000 / 6000 12000 / 12000 12000 / 12000 12000 / 12000 12000 / 12000 12000 / 18000 12000 / 18000 12000 / 18000 12000 / 12000 12000 / 24000 12000 / 12000 12000 / 24000 12000 / 12000 24000 / 24000 24000 / 24000 24000 / 24000 18000 / 18000 24000 / 24000 24000 / 24000 24000 / 24000 18000 / 18000 24000 / 24000 24000 / 24000 24000 / 24000 18000 / 18000 24000 / 36000 24000 / 24000 24000 / 36000 24000 / 24000 24000 / 36000 24000 / 24000 24000 / 36000 24000 / 24000 24000 / 36000 24000 / 24000 24000 / 36000 24000 / 24000 24000/ 36000 24000 / 24000 24000 / 36000 24000 / 24000 24000 / 48000 24000 / 24000 24000 / 48000 24000 / 24000
EXCEPT STRESS ANALYSIS REQUIREMENT SUPPORT SPANS SHALL BE LIMITED TO 12 METERS MAXIMUM.(Refer Table-1B ) H = HOLD DOWN SPAN
G = GUIDE SPAN
NOTES: Pipe guide and hold down spans are based on the following assumptions: 1. 2. 3. 4. 5. 6.
All piping in PFLNG project are subjected to various environmental and operational conditions which are considered in stress analysis. Applicable conditions are taken into considerations for calculation of guide and hold down spans. However blast case not considered. Adequate flexibility on account of thermal growth and equipment sway shall be ensured while specifying guides and hold downs. Maximum operating stresses and stress range due to lateral and vertical deflection of the pipe between guide / hold down are maintained within B31.3 code limits. Pipes are considered to be placed on elevation 56500 mm for consideration of wind effect, hull accelerations and structural deflections (hogging & sagging) . Pipe schedules (SCH) are as shown above (The use of lower schedules would require shorter guide and hold down spans) Insulation thickness and equivalent density is taken from project specified IC insulation.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
7.
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
17/ 207
N/A
Table is only valid for continuous piping without heavy concentrated loads (in line items valves, tees etc.) or direction changes. Necessary equivalent effect of these loads needs to be considered while specifying guide/ hold down restraints.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
10.
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
18/ 207
N/A
TABLE 2 MATERIALS SPECIFICATIONS FOR SUPPORT MEMBERS
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
19/ 207
N/A
TABLE 2 (continued) MATERIALS SPECIFICATIONS FOR SUPPORT MEMBERS
A 36
Notes: 1. The material for pipe support welded to piping shall be the same as, or material equivalent to the material specified for piping. (Eg. SS304 to be replaced by SS316 as per Piping Class) 2. Sheet of insulation material shall be inserted between support and pipe to avoid any direct contact. 3. Impact testing is required as per ASME B31.3. 4. According to pipe with cold insulation. Components supplied with itemized material. (Refer to suppliers for designation and characteristics.) 5. For all bolts coating shall be zinc nickel + fluorocarbon coated. CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
20/ 207
N/A
TABLE 3 HEAT TREATMENT FOR WELD SUPPORTS PIPING
ELEMENT WELDED T O PIPE
OPE. T EMP. MAT ERIAL
(°C) -29 T O 342
C.S. C.S.
343 T O 427
CS CH
-46 T O -29
CL
20 T O 75
CG
-29 T O 342
( LOW TEM P . )
C.S.
SUPPORT MATC L
11.
CONTRACTOR DOCUMENT NO
( GA LV A N IZED )
5 Cr – ½ Mo
-29 T O 342
9 Cr – 1 Mo
343 T O 650
AISI 304 L
-29 T O 342
AS AH AS AH AS AH AS AH SS
343 T O 650
SH
- 29 T O 200
DS
C - ½ Mo 1¼ Cr ½ Mo 2¼ Cr 1 Mo
343 T O 468 -29 T O 342 343 T O 650 -29 T O 342 343 T O 650
AISI 316 L AISI 321 H
WELDING HEAT T REAT MENT (2) (3) (4) PRE-HEAT ING (5)
PIPE
SHAPES PLAT ES & BARS
A 106 Gr B (A 53-B) A 333-6
P n°
/
T EMP.
REQUIRED
°C
Or
A 387-11 A 516-60
1
SA or SB > 25 mm
PWHT (6)
79
T < 16 mm
Not used
A 335-P11
/
A 387-11
3
A 335-P11
/
A 387-11
4
149
149 All
PWHT for all
A 335-P11
/
A 387-11
5A
177
A 335-P11
/
A 387-11
5B
177
A 312-T p 304
/
A 204 T p 304
8
A790 UNS S31803 / A928 CL1 UNS
/
S31803
10H
AISI 904 L D up le x S . S .
CONDIT IONS NOT REQUIRING
T S > 490 Mpa
A 36 /
CONDIT ION
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
Disc
Doc. Type
PFLNG
TDC
PIP
STD
CONTRACTOR DOCUMENT NO Unit
Seq
Project No
Unit
Doc. Type
0000
10003
5867
0000
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
10003
3
Sheet DSME Specific Reference
21/ 207
N/A
TABLE 3 (continued) HEAT TREATMENT FOR WELD SUPPORTS Notes on Heat Treatment: 1. The requirements of this table are in accordance with those of ASME code B31.3 and requirements of ASME shall prevail. 2. SA= support thickness, SB= piping thickness, T= throat thickness of fillet welds, TS= tensile strength. 3. The side of fillet welds shall be 8/10 of the smaller thickness to be welded. 4. Welding operations may not be performed with an ambient temperature of less than -20°C. 5. For ambient temperature of less than 5°C, preheating shall be carried out notwithstanding the required conditions. 6. When lines are heat-treated for process and stress corrosion cracking purposes, verify whether support-piping welds (nonpressurized part weld) are to be heat-treated notwithstanding material characteristics. In all events, heat treatment (PWHT) shall be performed for Caustic soda service piping classes.
CONFIDENTIAL – Not to disclose without authorization
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
PFLNG
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
Seq
0000
Project No
10003
5867
Unit
0000
Doc. Type
STC
Mat. Code
Originator OC: KLOC Serial No
1390
Rev.
Sheet
3
22/ 207
DSME Specific Reference
10003
12.
TABLE: 4-5-6 COLLECTION OF STANDARD STRUCTURAL ELEMENTS
12.1
TABLE 4 SHAPES CHANNELS
BEAMS SHAPE CODE W4 W6 W8 -
DESIGNATION W4x13 W6x15 W8x31 W8x15 W10x49
12.2
DESIGNATION C4x7.25 C6x10.5 C8x18.75
ANGLES SHAPE CODE C4 C6 C8
DESIGNATION L2x2x3/16 L3x3x1/4
LENGTH (mm) 100 120
DIA 40
MACHINE BOLTS DIA LENGT (mm) H(mm) 140 160
50 60
65
70 70
140
170
80
185 190 160 90
70
12.3
195 170
85
110 110 135 120
170 160
TABLE 6 FLATS WIDTH
THK 5 6 8 10 12 15 20
SHAPE CODE L2 L3
TABLE 5 STUD BOLTS
8 10 12 16 18 20 22 24 30 36
N/A
30
50 50 50 50
30 50
60
75
80 80 80
100
150 160
90 110 100
300 300 150 160 200 210 300 150 250 300
PLATES THK 3 5 6 8 10 320 370 12 15 20
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
PFLNG
13.
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
Project No
10003
5867
Unit
0000
Doc. Type
Mat. Code
STC
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
23/ 207
DSME Specific Reference
N/A
TABLE 7 EQUIVALENT STRUCTURAL STEEL AS PER PIPE SUPPORT STANDARD
CODE IN STC
EQUIVALENT STRUCTURAL STEEL AS PER OTHER STANDARD
L2 x 2 x 3/16
L2
JIS – L50 x 50 x 6
L3 x 3 x 1/4
L3
JIS – L75 x 75 x 6
C4 x 7.25
C4
JIS – C100 x 50 x 5/7.5
C6 x 13
C6
JIS – C150 x 75 x 6.5/10
C8 x 18.75
C8
JIS – C200 x 80 x 7.5
W4 x 13
W4
JIS – H100 x 100 x 6 x 8
W6 x 15
W6
JIS – H150 x 150 x 7 x 10
W8 x 15
---
W8 x 31
W8
W10 x 49
---
For Steel Plate: ASTM A36 (Yield Strength 248MPa)
---
JIS – H200 x 200 x 8 x 12
Steel Plate Steel S355 ( Yield Strength 355 MPa) or DNV Grade DH36TM (Yield Strength 355 Mpa.)
For Steel Angle and Shapes: ASTM A36 (Yield Strength 248MPa)
Steel Angle and Shapes ---
Steel S355 ( Yield Strength 355 MPa) or DNV Grade DH36 (Yield Strength 355 Mpa.)
* Bolting & Pipes material used in STC shall be maintained as per STC.
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
14.
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
24/ 207
DSME Specific Reference
N/A
SYNOPTIC TABLE TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS SYNOPTIC TABLE
ITEM NO. STC-1390-
DRAWING TITLE
Rev
Date
Rev
Date
A1
Synoptic Table of Welded Supports ( Sht. 1 to 1 )
A B C
07-June-12 -
A2
Synoptic Table of Clamped Supports ( Sht. 1 to 1 )
A B C
07-June-12 -
A3
Synoptic Table of Hanger and Spring Supports ( Sht 1 to 1 )
A B C
07-June-12 -
A4
Synoptic Table of Structural Supports ( Sht 1 to 2 )
A B C
07-June-12 -
Synoptic Table of Vessel Supports ( Sht. 1 to 1 )
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
A5
A6
A7
Synoptic Table of Pipe Supports for Cold Lines ( Sht. 1 to 1 ) Synoptic Table of Pipe Supports for RTRP Lines ( Sht. 1 to 1 )
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
25/ 207
DSME Specific Reference
N/A
PIPE SUPPORTS STANDARD SERIES TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS PIPE SUPPORT STANDARD SERIES
ITEM NO. STC
1391
1392
1393
1394
1395
1397
1398
DRAWING TITLE
WELDED SUPPORTS SERIES
CLAMPED SUPPORTS SERIES
HANGER SUPPORTS SERIES
STRUCTURAL SUPPORTS SERIES
VESSEL SUPPORTS SERIES
COLD SUPPORTS SERIES
RTRP SUPPORTS SERIES
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.1
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
26/ 207
DSME Specific Reference
N/A
Welded Support Series TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS WELDED SUPPORTS SERIES
ITEM NO. STC-1391-
DRAWING TITLE
001
SS/GS Pipes 1/2” to 24” Dia. Isolator Pad WS001
002
CS Pipes 6” to 24” Dia. Protection Shield WS002
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
003
SS Pipes 6” to 24” Dia. Protection Shield WS003
A B C
07-June-12 -
006
Pipes 2” to 24” Dia. Gusset on Pipe WS006
A B C
07-June-12 -
007
Pipes 6” to 24” Dia. Gusset on Elbow WS007
A B C
07-June-12 -
Pipes 1/2" to 1 1/2" Dia. Bracing For Small Bore Branch Connection WS008
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
008
009
Pipes 1/2" to 1 1/2" Dia. Bracing For Small Bore Branch Connection WS009
010
Pipes 1/2" to 24" Dia. Line Guide (For Pipe & Pipe Attachment) GL100
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
27/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS WELDED SUPPORTS SERIES ITEM NO. STC-1391-
DRAWING TITLE
Rev
Date
Rev
Date
Pipes 1/2" to 24" Dia. Support Guide (For Pipe Shoe, Prop & Stanchion) GL200 Pipes 26" to 56" Dia. Support Guide (For Pipe Saddle) GL201
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13
3
17-Feb-14
020
Pipes 1/2" to 24" Dia. Line Stop (For Pipe & Pipe Attachment) GT100
A B C
07-June-12 -
021
Pipes 1/2" to 24" Dia. Support Stop (For Pipe Shoe, Prop & Stanchion) GT200
A B C
07-June-12 -
022
Pipes 26" to 56" Dia. Support Stop (For Pipe Saddle) GT201
A B C
07-June-12 -
030
Pipes 6" to 24" Dia. Line Guide with Hold Down GH100
A B C
07-June-12 -
031
Pipes 1/2" to 56" Dia. Support Guide with Hold Down (For Pipe Shoe, Saddle, Prop & Stanchion) GH200
A B C
07-June-12 -
100
Pipes 1/2" to 24" Dia. Pipe Shoe WS100
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
011
012
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
Orig
PFLNG
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
Sheet
3
28/ 207
10003
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS WELDED SUPPORTS SERIES ITEM NO. STC-1391-
DRAWING TITLE
110
Pipes 26" to 56" Dia. Pipe Saddle LD100
111
Pipes 26" to 56" Dia. Pipe Saddle with Sliding Plates LD101
200
Pipes 2" to 24" Dia. Pipe Stanchion WS200
210
Pipes 2" to 24" Dia. Elbow Stanchion WS210
300
Pipes 8" to 24" Dia. Adjustable Pipe Stanchion WS300
301
Pipes 1/2" to 6" Dia. Adjustable Stanchion WS301
310
Pipes 8" to 24" Dia. Adjustable Elbow Stanchion WS310
400
Pipes 2” to 24” Dia. Elbow Dummy Support WS400
500
Pipes 2” to 6” Dia. Single Pivot WS500
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
29/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS WELDED SUPPORTS SERIES ITEM NO. STC-1391-
DRAWING TITLE
510
Pipes 2” to 24” Dia. Double Pivot WS510
610
Pipes 2” to 24” Dia. Double Prop WS610
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.2
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
30/ 207
DSME Specific Reference
N/A
Clamp Supports Series TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS CLAMPED SUPPORTS SERIES
ITEM NO. STC-1392
DRAWING TITLE
001
Pipes 1/2" to 24" Dia Clamp For Pipe Shoe CS001
002
Pipes 2" to 24" Dia Clamp For Pipe Stanchion & Pivot CS002
009
Pipes 1/2" to 1 1/2" Dia. Clamp Type Bracing For Small Bore Branch Connection CS009
021
CS/AS/LTCS Pipes 1/2" to 6" Dia. U-Bolt (Guide) CS021
022
CS/AS/LTCS Pipes 1/2" to 6" Dia. U-Bolt (Tight) CS022
023
Pipes 1/2" to 6" Dia. Un-Insulated U-Bolt (Guide) CS023
024
Pipes 1/2" to 6" Dia. Un-Insulated U-Bolt (Tight) CS024
100
Pipes 1/2" to 24" Dia. Clamp Type Pipe Shoe CS100
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 01-Nov-12 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
31/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS CLAMPED SUPPORTS SERIES ITEM NO. STC-1392
DRAWING TITLE
200
Pipes 2" to 24" Dia. Clamp Type Pipe Stanchion CS200
210
Pipes 1/2" to 6" Dia. Clamp Type Elbow Stanchion CS210
300
Pipes 8" to 24" Dia. Clamp Type Adjustable Pipe Stanchion CS300
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.3
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
32/ 207
DSME Specific Reference
N/A
HANGER SUPPORT SERIES TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS HANGER SUPPORTS SERIES
ITEM NO. STC-1393
DRAWING TITLE
001
Pipes 2" to 12" Dia. Single Tie-Rod Hanger HGR01
002
Pipes 2" to 24" Dia. Double Tie-Rod Hanger HGR02
005
Pipes 2" to 24" Dia. Single Variable Spring Hanger VHS01
006
Pipes 2" to 24" Dia. Double Variable Spring Hanger VHS02
007
Pipes 2" to 24" Dia. Single Variable Spring Base VHS03
009
Pipes 2" to 24" Dia. Single Constant Spring Hanger CHS01
010
Pipes 2" to 24" Dia. Double Constant Spring Hanger CHS02
011
Pipes 2" to 24" Dia. Single Constant Spring Base CHS03
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
33/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS HANGER SUPPORTS SERIES ITEM NO. STC-1393
013
014
021
030
DRAWING TITLE Pipes 12" to 56" Dia. Sliding Plates Assembly SS001/SS002 Pipes 12" to 56" Dia. Sliding Plates Assembly SS003/SS004/SS005 Pipes 2" to 24" Dia. Single Rigid Strut RS001 Pipes 2" to 56" Dia. Acoustic Attenuation Pads Assembly SA001
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.4
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
34/ 207
DSME Specific Reference
N/A
Structural Support Series TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS STRUCTURAL SUPPORTS SERIES
ITEM NO. STC-1394
DRAWING TITLE
011
Structural Support Cantilever Bracket SB001
012
Structural Support Cantilever Bracket For Vertical Supports SB002
013
Structural Support Cantilever Bracket For Vertical Pipes SB003
021
Structural Support Cantilever Bracket With Bracing SB011
031
Structural Support T- Post Type SB021
032
Structural Support Inverted T- Post SB022
033
Structural Support Vertical Stanchion Type (For Pipes 2”Dia. and Below) SB023
041
Structural Support Inverted L- Type SB031
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
35/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS STRUCTURAL SUPPORTS SERIES ITEM NO. STC-1394
DRAWING TITLE
042
Structural Support L- Type SB032
043
Structural Support Chair Type SB033
044
Structural Support Chair Type SB034
051
Structural Support Portal Type SB041
052
Structural Support Portal Type SB042
053
Structural Support Portal Type SB043
054
Structural Support Portal Type SB044
071
Structural Support Portal Type SB061
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
36/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS STRUCTURAL SUPPORTS SERIES ITEM NO. STC-1394 102
105
DRAWING TITLE Structural Support L- Type SB032 Structural Support Chair Type SB033
Rev
Date
Rev
Date
A B C
07-June-12 -
A B C
07-June-12 -
0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.5
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
Sheet
3
37/ 207
DSME Specific Reference
10003
N/A
Vessel Supports Series TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS VESSEL SUPPORTS SERIES
ITEM NO. STC-1395
DRAWING TITLE
001
Pipes 2" to 6" Dia. Bracket For Vertical Pipe Support (Max. Load: 12KN) VW001
Rev
Date
Rev
Date
A B
07-June-12 -
0 1
01-Nov-12 17-Jul-13
C
-
2
21-Oct-13
3
17-Fev-14
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Fev-14
002
Pipes 8" to 24" Dia. Double Bracket For Vertical Pipe Support (Max. Load: 20KN) VW002
A B C
07-June-12 -
003
Pipes 8" to 24" Dia. Double Bracket For Vertical Pipe Support (Load: 20KN < P≤50KN) VW003
A B C
07-June-12 -
004
Pipes 2" to 6" Dia. Bidirectional Vertical Pipe Guide VW004
A B C
07-June-12 -
005
Pipes 8" to 24" Dia. Bidirectional Vertical Pipe Guide VW005
A B C
07-June-12 -
006
Pipes 8" to 24" Dia. Unidirectional Vertical Pipe Guide VW006
A B C
07-June-12 -
007
Pipes 6" and Below Common Bracket For Guide VW007
A B C
07-June-12 -
007
Pipes 6" and Below Common Bracket For Guide VW007
A B C
07-June-12 -
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.6
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
38/ 207
DSME Specific Reference
N/A
Cold Supports Series TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS COLD SUPPORTS SERIES
ITEM NO. STC-1397
DRAWING TITLE
Rev
Date
Rev
Date
001
Pipes 2" to 24" Dia. Cold Isolation Block Detail For Vessel Clips CL001
A B C
07-June-12 -
0 1 2
01-Nov-12 17-Jul-13 27-Sep-13
3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
002
003
Pipes 1/2” to 24” Dia. Shell and Protection For Cold Insulated Pipe Shoe CL002 Pipes 26” to 56” Dia. Shell and Protection For Cold Insulated Pipe Shoe CL003
004
Pipes ½” to 24” Dia. Shell and Protection for Cold Insulated Pipe Shoe W/insert Plate CL004
005
Pipes ½” to 24” Dia. Shell and Protection for Durolight Pipe Shoe CL005
006
Pipes 26” to 56” Dia. Shell and Protection for Durolight Pipe Shoe CL006
007
Pipes ½” to 24” Dia. Shell and Protection for Durolight Pipe Shoe W/insert Plate CL007
100
Pipes 2" to 24" Dia. Cold Insulated Pipe Shoe with Wooden Block CL100
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
A B C
07-June-12 -
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
39/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS COLD SUPPORTS SERIES ITEM NO. STC-1397
DRAWING TITLE
Rev
Date
Rev
Date
101
Pipes 2" to 24" Dia. Durolight Insulated/Uninsulated Pipe Shoe CL101
A B C
07-June-12 -
21-Oct-13 17-Feb-14
102
Pipes 26" to 56" Dia. Durolight Insulated/Uninsulated Pipe Shoe CL102
A B C
07-June-12 -
Pipes 2" to 18" Dia. Shoe On Trunnion for Durolight Insulated / Uninsulated Pipe CL103
A B C
07-June-12 -
107
Pipes 1/2" to 24" Dia. Hanger Clamp For Durolight Insulated / Uninsulated Pipe CL107
A B C
07-June-12 -
108
Pipes 2" to 24" Dia. Durolight Insulated / Uninsulated Pipe Shoe With Axial Stop CL108
A B C
07-June-12 -
110
Pipes 1/2" to 24" Dia. Cold Insulated Pipe Shoe with PUF Shell CL110
A B C
07-June-12 -
111
LTCS/SS Pipes 2" to 24" Dia. Cold Insulated Pipe Shoe with PUF Shell CL111
A B C
07-June-12 -
112
Pipes 26" to 56" Dia. Cold Insulated Pipe Shoe with PUF Shell And Sliding Plates CL112
A B C
07-June-12 -
0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3
103
21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
40/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS COLD SUPPORTS SERIES ITEM NO. STC-1397
DRAWING TITLE
Rev
Date
Rev
Date
113
Pipes 2" to 18" Dia. Cold Insulated Pipe Shoe on Trunnion with PUF Shell CL113
A B C
07-June-12 -
0 1 2
Pipes 8" to 56" Dia. Cold Insulated Hold Down Guide Pipe Shoe/Saddle with PUF Shell CL114
A B C
07-June-12 -
0 1 2
115
Pipes 8" to 56" Dia. Cold Insulated Hold Down Pipe Shoe/Saddle with PUF Shell CL115
A B C
07-June-12 -
0 1 2
116
Pipes 8" to 56" Dia. Cold Insulated Lateral Guide Pipe Shoe/Saddle with PUF Shell CL116
A B C
07-June-12 -
0 1 2
117
Pipes 1/2" to 24" Dia. Cold Insulated Hanger Clamp with PUF Shell CL117
A B C
07-June-12 -
0 1 2
118
Pipes 1/2" to 24" Dia. Cold Insulated Pipe Shoe w/ Axial Stop with PUF Shell CL118
A B C
07-June-12 -
0 1 2
200
Pipes 2” to 24” Dia. Cold Insulated Pipe Stanchion CL200
A B C
07-June-12 -
0 1 2
210
Pipes 2” to 24” Dia. Cold Insulated Elbow Stanchion CL210
A B C
07-June-12 -
0 1 2
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
114
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
41/ 207
DSME Specific Reference
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS COLD SUPPORTS SERIES ITEM NO. STC-1397
DRAWING TITLE
Rev
Date
Rev
Date
300
Pipes 8” to 24” Dia. Cold Insulated Adjustable Pipe Stanchion CL300
A B C
07-June-12 -
0 1 2
310
Pipes 8” to 24” Dia. Cold Insulated Adjustable Elbow Stanchion CL310
A B C
07-June-12 -
0 1 2
01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14 01-Nov-12 17-Jul-13 21-Oct-13 17-Feb-14
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
15.7
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
Sheet
3
42/ 207
DSME Specific Reference
10003
N/A
RTRP Supports Series TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS RTRP SUPPORTS SERIES
ITEM NO. STC-1398
DRAWING TITLE
Rev
Date
Rev
Date
001
Pipes 1" to 6" Dia. RTRP Rest FG001
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B
-
0 1
17-Jul-13
C
-
2
21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
011
Pipes 1" to 6" Dia. RTRP U-Bolt (Guide) FG011
012
Pipes 1" to 6" Dia. RTRP U-Bolt ( Tight) FG012
013
Pipes 1" to 6" Dia. RTRP U-Bolt Achor FG13
025
Pipes 2” to 24” Dia. RTRP Clamp Rest FG025
026
Pipes 2” to 24” Dia. RTRP Clamp Guide FG026
027
Pipes 2” to 24” Dia. RTRP Clamp Anchor FG027
028
Pipes 2” to 24” Dia. RTRP Clamp Vertical Stopper FG028
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Doc. Type
Disc
PIP
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
Rev.
Sheet
3
43/ 207
DSME Specific Reference
10003
N/A
TITLE CONSTRUCTION STANDARD - PIPE SUPPORTS RTRP SUPPORTS SERIES ITEM NO. STC-1398
DRAWING TITLE
033
Pipes 2” to 24” Dia. RTRP Anchor Flange Frame-CL150 HD FG033
034
Pipes 2” to 24” Dia. RTRP Rest Flange Frame-CL150 HD FG034
Rev
Date
Rev
Date
A B C
-
0 1 2
17-Jul-13 21-Oct-13
A B C
-
0 1 2
17-Jul-13 21-Oct-13
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
Engineering, Procurement, Construction, Installation and Commissioning with Alliance Scheme for PETRONAS Floating LNG Project PIPING SUPPORTS CONSTRUCTION STANDARD COMPANY DOCUMENT NO Proj
PFLNG
Orig
TDC
Disc
PIP
Doc. Type
STD
CONTRACTOR DOCUMENT NO Unit
0000
Seq
10003
Project No
5867
Unit
0000
Doc. Type
STC
Mat. Code
1390
Originator OC: KLOC Serial No
10003
Rev.
Sheet
3
44/ 207
DSME Specific Reference
N/A
ATTACHMENT “A” STRUCTURAL MEMBER SIZE AND LOAD SELECTION
This document is CONFIDENTIAL. Neither the whole nor any part of this document including its contents by any means (electronic, mechanical, reprographic, recording or otherwise) may be disclosed to any third party without prior written consent of PETRONAS. The Copyright of this document belong to PETRONAS. All rights reserved.
SYNOPTIC TABLE STC 1390- _ _ _
WELDED PIPE SUPPORTS SERIES STC 1391- _ _ _
CLAMPED PIPE SUPPORTS SERIES STC 1392- _ _ _
HANGER SUPPORTS SERIES STC 1393- _ _ _
STRUCTURAL SUPPORTS SERIES STC 1394- _ _ _
VESSEL SUPPORTS SERIES STC 1395- _ _ _
COLD SUPPORTS SERIES STC 1397- _ _ _
RTRP SUPPORTS SERIES STC 1398- _ _ _