Contents Objective............................................................................................................................. 3 General ............................................................................................................................... 4
Review by: 15/07/2014
Page 2 of 4
Issued: 26/04/2011
MID-GP 52-10-1 Midstream Insulation Specification
Objective For all new build insulation and renewal of existing damaged insulation, Midstream has adopted the following North Sea Level 2 STPs. NSSPU-GP 52-10-1 Thermal Insulation NSSPU-GIS 52-101-1 Insulation of Metal Surfaces for Offshore Facilities and Onshore Plant These supersede any site specific insulation specifications at CATS, FPS, Pipelines and SVT. This level 3 document has been produced to detail the insulation specification selected by Midstream from the above documents and to provide additional insulation guidance for all Midstream assets.
Review by: 15/07/2014
Page 3 of 4
Issued: 26/04/2011
MID-GP 52-10-1 Midstream Insulation Specification
General For Midstream, the insulation specification, CMS/26/P/PS/01 developed from the requirements of the STP documents by the Midstream EMM contractor, shall be used for all new build and renewal of existing damaged insulation or cladding. A series of application drawings have been developed to assist the applicators and for the inspection of the finished jobs. It is not mandatory when reapplying existing insulation or cladding following inspection, provided the existing system and design has performed satisfactorily. However BP require that certain practices included in the specification are followed to maximise the resistance to CUI. A controlled copied of CMS/26/P/PS/01 shall be embedded in this document as Appendix 1 along with application drawings. Controlled copies of the CMS/26/P/PS/01 and the application drawings shall also be stored in Documentum
CMS-26-P-PS-01 Insulation Specification for BP Midstream Contract BIS Midstream Insulation Specification Drawings Actual products used shall be agreed between BP and the EMM contractor and detailed in Appendix 2 (to be developed).