Rev.: 0.0 Date of Issue: Page No.: Page 2 of 7
TABLE OF CONTENTS
1. Scope 2. Refe Refere renc ncee Docume Document nts/ s/Dr Draw awin ings gs 3. Access /E /Egress 4. Heal Health th and and Saf Safet et Ha! Ha!ar ards ds 4.1 Safet Safet Rules Rules During During "esting esting 4.2 4.2 Safe Safet t #ight #ightin ingg 4.3 "as$ #ightin #ightingg 4.4 Emerge Emergenc nc Arrang Arrangeme ements nts 4.% Ris$ Ris$ and and &ontro &ontrols ls %. A''r A''re( e(ia iatition onss ) Def Defin initition ionss *. Roles/ Roles/ Respon Responsi' si'ilit ilities ies / &omp &ompete etence nce +. "esting sting ) &ommis &ommission sioning ing ,roced ,rocedure uress +.1 ,re-&o ,re-&ommi mmissio ssionin ningg +.2 Start Start up proced procedure ure +.3 Sstem Sstem ,rogra ,rogrammi mming ng +.4 inal inal "estin estingg . "raining 0. or$ing Hrs. 1. anpower anpower Reuire Reuirement ment ) Super(ision Super(ision 11. 11. "est "est 5nstrume 5nstruments nts Reuire Reuirements ments 12. ,erson ,ersonnel nel Eui Euipme pment nt 13. 13. Dist Distri ri'u 'utition on 14. 14. Atta Attach chme ment ntss 14.1&ommissioning &hec$ #ist 14.2Ris$ Assessment.
Rev.: 0.0 Date of Issue: Page No.: Page 3 of 7
The method statement aims to provide necessary information for Testing and Commissioning of SIEMENS Lighting Control System installed in Ducab Extension The system consists of Lighting Control !anels !o"er Supply# $elay Module# Timer and !ush button in different areas to provide effective energy management as per the re%uirement
Lighting Control system Dra"ings Schematic Diagram Commissioning Chec&list
"he &ommissioning of the Sstem will commence onl when ain &ontractor clearance is gi(en for access to conduct "esting and &ommissioning.
Health and Safet procedures ' ain &ontractor and A&A5R/7"S will 'e implemented for this 8o'. A routine safet chec$ will 'e done ' the Safet 9fficer 5n-charge as per A&A5R Safet ,rocedure.
5n order to ensure safe conditions during testing the following rules ha(e to 'e followed6 ,ersons engaged with this commissioning are e:perienced and ha(e recei(ed proper and adeuate training related to procedures and test euipment utili!ed for the particular testing acti(it. "est instruments and test leads should 'e maintained in a safe condition and the test methods not to create danger either for the operator or for other persons.
Safet #ights will 'e used in case of power failure ensuring good illumination at the wor$ing area to aid e(acuation if necessar.
Adeuate lighting shall 'e pro(ided to ensure good illumination at the wor$ing area.
;eneral 6 Site Safet procedures will 'e followed and in case of an emergenc< Safet 9fficer will administer the emergenc arrangements as per the sstem< stop wor$ and report to nearest Assem'l ,oint< etc. r. > &ontact =o. ire ,recautions6 =o significant fire ris$s associated with this acti(it 'ut general fire precaution measures will 'e ta$en. &ommunications6 ?ia mo'ile phones issued to all Engineers.
Rev.: 0.0 Date of Issue: Page No.: Page 4 of 7
,lease refer to the attached Ris$ Assessment.
&
- ain &ontractor @&EB
,
- ,ro8ect anager @A&A5RB
,E
- ,ro8ect Engineer @A&A5RB
S&E
- Site &ommissioning Engineer @7"SB
S9
- Safet 9fficer @A&A5RB
CA/C& - Cualit Assurance/Cualit &ontrol @A&A5RB
will ha(e the o(erall responsi'ilit of the ,ro8ect for e:ecution< ualit and safet maintain the planning and progress and coordination with ain &ontractor. will 'e responsi'le for da to da acti(ities in the Site for Sstem "esting and &ommissioning< report preparation and demonstration of Sstem &ommissioning. will 'e directl responsi'le for the Sstem installation. will 'e responsi'le for Health and Safet aspects in the Site in line with ain &ontractor Safet reuirements. will o(ersee the ualit reuirements and ualit control measures for the ,ro8ect.
&hec$ the panel ) 'atteries for an e:terior damages. &hec$ the de(ices arrangement and wiring terminations in the panel &hec$ the tightness of the ca'le terminations. &hec$ the E57 ca'ling loop and panel to panel. #a'els ) identifications. "he incoming power suppl ca'le and all out going wires from the sstem must 'e meggered 'efore terminating on the sstem or the light fi:tures and the (alue noted down ' the installer.
ollowing are the prereuisites to the commissioning procedure
Rev.: 0.0 Date of Issue: Page No.: Page 5 of 7
All the #ighting control ,anels need to 'e installed in electrical room near to the respecti(e D7 in accordance with shop drawings. &a'ling for panel to panel has to 'e completed.
"he ,ower suppl module needs< 1-< 23?< % H!.
All the lighting control de(ices ha(e to 'e installed as shown in schematic drawing. "he #ine in and #ine out ca'le terminated in the rela modules are properl la'eled. "he E57 ca'le termination on the e(er module has to 'e looped properl as per manufacture instruction.
&hec$ the power suppl module.. ,ower test the all lighting control de(ices. &hec$ the polarit of E57 ca'le termination. &hec$ no short circuit is found in the panel.
"he sstem is programmed for the all the de(ices and circuits connected with the lighting control sstem. "he no. of de(ices and tpe of the de(ices are entered. Address all the E57 de(ices as reuired. Download the application program for the respecti(e de(ices. ;roup the de(ices as per the site reuirement &arr out the functional programming test manuall from the E"S software ,rogram de(ices as per the application reuired as the site
Remo(e E57 power suppl and chec$ all circuits are fail of safe mode unction test is conducted and demonstrated
&ommissioning Engineers who will conduct the &ommissioning shall ha(e the e:perience in #ighting &ontrol Sstem &ommissioning. "ool 7o: tal$s will pro(ide general training and awareness for each acti(it and also undergo further training ' the Cualit Assurance Department
Site =ormal or$ing Hours.
Rev.: 0.0 Date of Issue: Page No.: Page 6 of 7
,ro8ect Engineer @A&A5RB Site &ommissioning Engineer @7"SB Safet 9fficer @A&A5RB
;eneral "ool 'o: Digital ultimeter
All &ommissioning Engineers and "echnicians shall ha(e the necessar ,ersonnel ,rotecti(e Euipment such as Safet Shoes and Helmet.
ain &ontractor &onsultant E, Senior echanical Engineer Health and Safet 9fficer
&ommissioning &hec$ #ist Ris$ Assessment.