FPSO Pioneiro de Libra Specification Code: Total No. of Pages (incl. One
DOCUMENT COVER SHEET
2 1 0 A REV. NO.:
07-Oct-2015 10-Sep-2015 30-Apr-2015 27-Feb-2015 DATE dd-Mmm-yyyy
Re-Issued for Construction Issued for Construction Issued for Design Issued for Review ISSUE PURPOSE
1 of 56
Cover Sheet)
AT AT AT TSK
CKT CKT CKT CKT / AT
CHT CHT CHT CHT
WRITTEN BY
CHECKED BY
APPROVED BY
Revision History JURONG SHIPYARD PTE LTD (A subsidiary of SembCorp Marine Ltd) SINGAPORE ENG.DEPARTMENT D353 SECTION Document Title:
Project Title:
FPSO Pioneiro de Libra 22-0508
Job No.:
TOPSIDES PIPING CONSTRUCTION STANDARD
OOGTK Document No.:
OOGTK SFI:
OOGTK02-04-L-07-SA001009-001 Technip Document No.:
407
5982-0000-STC-1390-00001 JSPL SFI No.: 101 JSPL Document No.: 0508-TP-101-101-01-11-01
Class:
ABS-I
Scale
Rev. No.:
OOGTK Doc. Status Code
N.A
2
4
This document and the information contained within comprise proprietary information owned solely by Jurong Shipyard Pte Ltd. This document is provided subject to the provision that the information herein will not be disclosed or reproduced unless specifically authorised in writing by Jurong Shipyard Pte Ltd nor will be used in any way detrimental to or in competition with interest of Jurong Shipyard Pte Ltd. This documents, reproductions previously authorised in writing and associated in writing and associated information shall be returned when they have served their intended purposes, or on demand.
FPSO Pioneiro de Libra Technip Doc No.:
5982-0000-STC-1390-00001
Rev. No.:
2
Date:
07-Oct-2015
Page 2 of 56
Contents DEFINITIONS, ABBREVIATIONS AND ACRONYMS ......................................................................3 HOLDS LIST ......................................................................................................................................3 MAIN CHANGES IN THIS ISSUE .....................................................................................................3 1.
INTRODUCTION ......................................................................................................................4
2
SCOPE .....................................................................................................................................5
3
GENERAL NOTES ...................................................................................................................5
4
ABBREVIATIONS ....................................................................................................................5
5
LIST OF STANDARDS ............................................................................................................6
___________________________________________________________________________________________________________________________ TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X) 2ND Floor, Wisma Technip, 241 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia
FPSO Pioneiro de Libra Technip Doc No.:
5982-0000-STC-1390-00001
Rev. No.:
2
Date:
07-Oct-2015
Page 3 of 56
DEFINITIONS, ABBREVIATIONS AND ACRONYMS: Owner: Company: Contractor: Subcontractor: DM: DCC: ENG: EWT: FPSO: JSPL: OOG/TK Party: Party’s: TP:
Field Owner Representative – Petrobras; Odebrecht/Teekay Joint Venture; Jurong Shipyard Pte Ltd; Technip; Delta Marine – Hull Conversion Designer; Document Control Centre; General Engineering (include meetings related to ONE Area); Extended Well Testing; Floating Production, Storage and Offloading vessel; Jurong Shipyard P L (JSPL); Odebrecht/Teekay Joint Venture; Either one of JSPL or TP; Both JSPL and TP collectively; Technip
HOLDS LIST: Hold
Section
Description
1 2 3 4
MAIN CHANGES IN THIS ISSUE: Section
Main Changes In This Issue
___________________________________________________________________________________________________________________________ TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X) 2ND Floor, Wisma Technip, 241 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia
FPSO Pioneiro de Libra Technip Doc No.:
1.
5982-0000-STC-1390-00001
Rev. No.:
2
Date:
07-Oct-2015
Page 4 of 56
INTRODUCTION
The Libra Oil field is a large ultra-deep-water oil prospect located in the Santos Basin, about 230 km off the coast of Rio de Janeiro at a water depth of up to 2,500 m. Production rights were awarded to a consortium led by Petrobras. In January 2014, Petrobras issued an ITT for the supply of an Extended Well Test (EWT) to support the Libra development for data acquisition. Teekay and Odebrecht Oil & Gas have been awarded intend to bid for the supply of the EWT and have engaged TP to support them in the development of the Topside Design. Genesis have performed a Concept study. The process plant on the EWT FPSO shall be capable of handling a maximum of 8000 Sm3/D of liquids and 4,000,000 Sm3/D of gas. The FPSO hull shall be a converted tanker that will be refurbished and modified in accordance with an accepted Flag Administration.
___________________________________________________________________________________________________________________________ TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X) 2ND Floor, Wisma Technip, 241 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia
FPSO Pioneiro de Libra Technip Doc No.:
2
5982-0000-STC-1390-00001
Rev. No.:
2
Date:
07-Oct-2015
Page 5 of 56
SCOPE
This document covers all Topsides Piping Construction Standards to be used for FPSO LIBRA EWT Detailed Design. This document does not supersede the requirements of the Project Specifications as defined in the Contract. For the avoidance of doubt in the case of conflict between this document and the requirements of the Project Specifications, then the Project Specifications shall govern.
3
GENERAL NOTES
3.1 All materials of construction shall be in accordance Topsides Piping Material Specification document no. OOGTK02-04-L-07-SA-001002-001. 3.2 The standards shall be read in conjunction with the following documents: OOGTK02-04-I-87-XX-000004-001 – OOGTK02-04-I-87-XX-000003-001 –
Instrument Hook Up Typical /Standard. Instrument Hook-up drawings.
3.3 Branches in size range of DN20 to DN50 where a valve is mounted shall be assessed for bracing back to the parent pipe. Bracing design shall be in accordance with Topsides Pipe Supports Construction Standard document no. OOGTK02-04-L-07-SA-001010-001. 3.4 For pipe grounding detail, refer to OOGTK02-03-L-07-SA-000002-001 (JSPL Piping Construction Standard).
4
ABBREVIATIONS BE BW CE CJ FB FF GALV NPTF NPTM PE RB RF RTJ SCH SE SMLS SW TE WN
Beveled End Butt Weld Capillary Ends (Female Solder Cup) Compact Flange End Full Bore Flat Face Galvanized National Pipe Thread Female National Pipe Thread Male Plain End Reduced Bore Raised Face Ring Type Joint Schedule Socket End Seamless Socket Weld Threaded End Welding Neck
___________________________________________________________________________________________________________________________ TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X) 2ND Floor, Wisma Technip, 241 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia
FPSO Pioneiro de Libra Technip Doc No.:
5
5982-0000-STC-1390-00001
Rev. No.:
2
Date:
Page 6 of 56
07-Oct-2015
LIST OF STANDARDS
PIPING CONSTRUCTION STANDARD ITEM NO. STC-1390-
DRAWING TITLE
0100-001 to 0100-006
Process Vent On Piping (PV) Typical Arrangements
0101-001 to 0101-006
Process Drain On Piping (PD) Typical Arrangements
0102-001 to 0102-0106
Hydrotest Vent On Piping (VT) Typical Arrangements
0103-001 to 0103-006
Hydrotest Drain On Piping (DT) Typical Arrangements
0104-001 to 0104-004
Thermowell On Piping (TW) Typical Arrangements
0105-001 to 0105-007
Pressure Gauges & Transmitters (PI/PT) Typical Arrangements
0106-001 to 0106-004
Pressure Instrument on Piping (PIF/PT) Typical Arrangements
Rev
Date
Rev
Date
A
27-FEB-15
2
07-OCT-15
0
30-APR-15
1
10-SEP-15 2
07-OCT-15
2
07-OCT-15
2
07-OCT-15
2
07-OCT-15
2
07-OCT-15
2
07-OCT-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
___________________________________________________________________________________________________________________________ TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X) 2ND Floor, Wisma Technip, 241 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia
FPSO Pioneiro de Libra Technip Doc No.:
5982-0000-STC-1390-00001
Rev. No.:
2
Date:
Page 7 of 56
07-Oct-2015
PIPING CONSTRUCTION STANDARD ITEM NO. STC-1390-
DRAWING TITLE
0107-001 to 0107-002
Chemical Injection (CI) Typical Arrangements
0108-001 to 0108-002
Sample Connections (SC) Typical Arrangements
0109-001
General Piping Standards Orifice Instrument Connections
0109-002
0110-001
0110-002
General Piping Standards Orifice Instrument Connections
General Piping Standards Bird Screen Installation General Piping Standards Utility Station Arrangement
0110-003
General Piping Standards Inserted 45 deg Branch Connection
0110-004
General Piping Standards Inserted 45 deg Branch Connection
Rev
Date
Rev
Date
A
27-FEB-15
2
07-OCT-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
2
07-OCT-15
0
30-APR-15
1
10-SEP-15
A
27-FEB-15
2
07-OCT-15
0
30-APR-15
1
10-SEP-15 2
07-OCT-15
A
27-FEB-15
0
30-APR-15
1
10-SEP-15
0
30-APR-15
1
10-SEP-15
2
07-OCT-15
0
30-APR-15
1
10-SEP-15
2
07-OCT-15
1
10-SEP-15
2
07-OCT-15
1
10-SEP-15
2
07-OCT-15
___________________________________________________________________________________________________________________________ TECHNIP GEOPRODUCTION (M) SDN BHD (79917-X) 2ND Floor, Wisma Technip, 241 Jalan Tun Razak, 50400 Kuala Lumpur, Malaysia