Energy consumption and predictions for residential buildings play an important role within the energy management and system, as the availability and demand of energy resources is the dynamic and seasonal changes. Human beings are unaware of the cost
Energy consumption and predictions in the residential buildings play an important role within the energy management and system, as the availability in the demand of energy resources is dynamic. Human beings are unaware of the value of energy consumed
summer training at NTPC Dadri.
this file contains all concept of working capital.
compensation of companyFull description
Full description
Lakshmi NarayanaFull description
HR policies at NTPC.. hope it helpsFull description
construction material consumption
Lakshmi
This file included fuel consumption of construction machinery such as motor grader,vibratory roller,skid steer loader,Generator.....All values are got by actual construction site situations.Full description
Descripción completa
good novelFull description
A u x i l i ar Au ary y p o w er c o n s u m p t i o n reduc re ductio tion n opport opp ortuni unitie ties s in the th erma rmall powe po werr pla pl ant nts s
By Lakshmi Narain
Auxiliary power consumption in a thermal power plant is a major source of energy consumption.
During the financial year 2007-08, total generation by coal plants was 488157.46 Mus with a PLF of 78.75 %.
Auxiliary power consumption was 8.17 % . If this APC gets reduced only by 0.17 %, fresh capacity addition of about 120 MW can be achieved without any investment.
APC reduction initiatives not only reduces energy intensity but also ensures more revenues because of increase in energy export.
APC REDUCTION OPPORTUNITIES
On line monitoring of power consumption of various auxiliaries through OLEMS Monitoring the power consumption of each equipment before and after overhaul Energy efficient coating of the pumps Introduction of VFDs Better O&M practices Conducting energy audit in a structured manner and implementation of recommendations as per action plan Introduction of latest state of the art technologies on specific systems without waiting for R&M of the whole power plant Check audits
On Line Energy Management System
As per CEA notification “Regulations on Installation and Operation of Meters – 2006” meters for energy accounting and auditing are to be installed and monitored.
On Line Energy Management System
To measure, monitor, trend & compare power consumption of all major systems/ sub systems/ auxiliaries for improving Sp. Energy Consumption
Installation of energy meters on all HT drives and on LT drives > 100KW, which can be hooked up to a central server with the software for assessment of SEC
Already installed and working at Tanda, Dadri coal, Simhadri, Kawas, Faridabad of NTPC Under procurement / installation at other stations
Monitoring the power consumption of each equipment before and after overhaul
This helps in assessing the power savings achieved due to maintenance jobs carried out during the overhaul and thus see the effectiveness of different maintenance job carried out.
Energy efficient coating of the pumps
4 -5 % improvement in pump efficiency is achievable.
Introduction of VFDs
Suitable for drives where i. load fluctuation are frequent ii. motor loading less than 60-70 % on various occasions iii. equipments designed with margin for safety purposes Depending the above factors, pay backs can be 2-7 years Technology available for HT & LT applications, which has proven to be reliable. IGBT/IGCC already in use at Dahanu.
Better O&M practices
Conducting energy audit in a structured manner and implementation of action plan
Conducting energy audit in a structured manner and implementation of action plan Energy Audit System includes
Preparation of Energy Audit Procedure
Preparation of Energy Audit Schedule
Conduct of Energy Audits
Preparations of Reports indicating recommendations, saving potential and action plan.
Implementation of the action plan including sustainability of energy savings.
Check audit The purpose of check audit is to assess the sustainability of the energy savings
Introduction of latest state of the art technologies on specific systems without waiting for R&M of the whole power plant