This is a analysis of how to work safe in regards to the jobs of surveyingDeskripsi lengkap
This is a analysis of how to work safe in regards to the jobs of surveyingFull description
job safety assessmentFull description
Description : job safety assessment
Full description
sample of Job safety analysis for welding work
JSA ChevronFull description
Description : Risk Management
Job Safety Analysis/ Job Hazard Analysis for the use of hand tools
contoh JSA OSHAFull description
Keselmatan alat angkat dan angkut
sample of Job safety analysis for welding workFull description
las..Deskripsi lengkap
las..
Deskripsi lengkap
chipping
jsa radioFull description
MITISA HOLDINGS SDN BHD
Revision No. Page No.
Jobs Safety Analysis
Effective Date
0 1
of
6
15/01/09
JSA NO : 002 - PILING WORKS
Project Name: Cadangan Pmbangunan Bangunan Tambahan Bagi ibu Pejabat polis kontijen kontijen Kuala Kuala Lumpur (IPK KL) Serta Komponennya Di Atas Lot PT112,Seksyen 56,Mukim ,Bandar Kuala Lumpur.
Slips, trips and falls; abrasions, strains and sprains; manual handling injuries such as back damage.
0 2
Effective Date
Effects
Risk Rating
Serious Illness / Injury Major Damage
3
L
3
L
H
of
6
15/01/09 Responsible Person
Controls 1.
Traffic control by signalman with flag.
2
Access ways and unloading zone identified.
Piling supervisor Foreman
1.Work
area to be kept clear at all times ± no storing of materials and/or rubbis
Fatality/ Per manent Disability
12
Fatality/ Per manent Disability
8
Fatality/ Per manent Disability
12
H
3. Sufficient ground preparation 3.1 Ensure crane is tested and thoroughly examined. 3.2 Ensure crane operator is a competent person.
Serious Illness / Injury Major Damage
9
H
4
H
5. Pile lifting zone to be cleared when lifting is in progress.
Rig operator
Piling supervisor Foreman
Crane driver 2.
Load unbalance.
3. Plant overturn
4 Deformed wire rope and sling. 5. Fall of equipment / materials
6.
Oil leakage.
M
M
2
Piling rig seating on 2 nos. of steel plates. 2.1 Usage of crane for lifting activities. 2.2 Usage of tagline to guide load. 2
y
6.
All wire rope and sling are to be inspected prior to usage.
Usage of hydraulic joint clips to avoid leakage.
Piling rig operator.
MITISA HOLDINGS SDN BHD
Revision No. Page No.
Jobs Safety Analysis
Item
Job Steps
Hazards
Stockpiling of piling materials.
1.
3
Effective Date
Effects
Risk Rating
7. Potential fire
3
0
Low
Congestion
M
Controls
of
6
15/01/09 Responsible Person
7. Ensure no flammable material at welding site. Provide extinguisher
1.
M
Sufficient area for stock piling taking into consideration the distance from stock area to work zone.
Piling supervisor Foreman Crane driver
2.
4.
Lifting of pile and placing into casing prior to be driven to the design depth.
L
2.
3. Excessive dragging of Pile causing wire rope and sling damage
L
3 Ensure wire rope and sling are examined and tested. Homemade splice is prohibited.
4. Broken pile.
L
4. All broken pile to be removed from site accordingly.
1.
H
1.
2.
Trips and falls
Fall of material due to snapping of wire rope or unsecured placement in the casing.
Struck by lifted pile
M
3
Correct stacking manner
Ensure wire rope and sling are examined and tested. Homemade splice is prohibited.
Piling supervisor
1.1
Area to be kept clear other than responsible person for the task.
Piling rig operator.
1.2
Pile to be driven only after it has been well secured into the casing and confirmed by responsible person.
Foreman
MITISA HOLDINGS SDN BHD
Revision No. Page No.
Jobs Safety Analysis
Item
Job Steps
Hazards
Welding of pile joints for continuation of driving
4
Effective Date
Effects
Risk Rating
Controls 2.
5
0
1.Burn
on body parts specifically face cause by exposure to welding arc
M
1.
Fire caused by welding sparks
L
2.1
Care in lifting and maneuvering of Pile. Usage of tag line to control the swinging of pile.
1.
Welder to be certified and experienced.
1.1
Full face shield with smoked
Personnel injury
M
2.
6
15/01/09 Responsible Person
Obstruction free ground work area.
Glass and welding glove 2.
of
Piling supervisor Foreman Welder
Fire extinguisher to be on site.
2.1
Ensure no flammable materials at the work area.
4
Personnel Protection
5
Monitor Compliance
The Project Manager or the appointed personal shall on a weekly basis audit this procedure.
6
Records.
Copy of the JSA to be retain in the site safety file by the contractor.
Remarks / Precaution to be taken not captured in the JSA :
4
1.
All site personnel shall at all times wear the minimum Personnel Protection Equipment
All Personnel
Project Manager or Appointed Personal
MITISA HOLDINGS SDN BHD
Revision No. Page No.
Jobs Safety Analysis
Effective Date
Qualifications and experience required to complete the task:
Personnel, Duties and Responsibilities (Supervisory staff and others):
1.
1.
2.
Competent machinery operators
0 5
of
6
15/01/09
Training Required to Complete Work:
Safety Supervisor to ensure compliance to the JSA at all times.
Competent Piling Supervisors
2.
JSA to be briefed to all workers involved in the activity and recorded.
3. Welder and Piling crew Engineering Details/Certificates/Workcover Approvals:
This SWMS/JSA has been developed through consultation with our employees and has been read & signed by all employees undertaking the works: Print Names
Signature
Date
Print Names
5
Signature
Date
MITISA HOLDINGS SDN BHD
Revision No. Page No.
Jobs Safety Analysis
0 of
6
Effective Date
6
15/01/09
RISK MATRIX. Probability
Practically Impossible
Not likely to Occur
Could occur i.e heard of happening
Know To Occur i.e Has Happened in The Past.
Know To Be A Common Or Repeating Occurrence
Minor illness /injury Minor Damage
1
2
3
4
5
Moderate illness /Injury Damage
2
4
6
8
10
Serious Illness / Injury Major Damage
3
6
9
12
15
Fatality/Permanent Disability
4
8
12
16
20
Consequence
L
Low ( L:1-3 )
M
Medium ( M:4-8 )
H
High ( H:9-20 )
Minor illness /injury Minor Damage
Required first Aid Treatment : repairable / immediate replacement
Moderate illness /Injury Damage
Out patient / 4 days and less MC: repairable but limited workdays
Serious Illness / Injury Major Damage
Warded / temporary disability / more than 4 days MC irreparable / total lost