Job Safety Analysis Sheet JOB DESCRIPTION: Functional Testing of CO2 Flooding System
JSA Ref. No. JSA / KOC / 32
Facility:
Permit No. Date:
Work Area / Equipment:
PERSONAL PROTECTIVE EQUIPMENT & TOOLS: Hard Hat, Safety Shoes, Hand Gloves, Coverall, Portable Radio, Step Ladder SEQUENCE OF BASIC JOB STEPS
POTENTIAL HAZARDS
Refer HSEMS Procedures - Doc. No. SA.KOC.004 “Permit to Work” and SA.KOC.020 “Plant Safety Override Registration”.
Take a Cold Work Permit from Asset Owner.
Refer manufacturer instruction for functional testing & CO2 Flooding System.
Asses the risk & Override the Fire Shutdown & CO2 actuation of the zone where CO2 Flooding System is to be tested.
Do not remove override prior to resetting the alarm in the panel.
Plan the work involving personnel responsible for preparation of CO2 Flooding System functional testing.
Conduct Tool Box Talk.
Maintain a radio communication between worker at CO2 Flooding System location & person stationed near F & G panel / Control Room.
Accidental Release of CO2
Close the isolation valve on CO2 Cylinder Bank Manifold or isolate CO2 bottles individually before function testing.
CO2 Exposure / Asphyxiation
Ensure no body is inside the enclosure for which CO2 Flooding System is to be function tested.
Defective Appliances
Keep the spare appliances (such as pneumatic switch, actuator etc) for replacement in case found defective.
Ensure CO2 Cylinders are not leaking.
Replace empty CO2 Cylinder.
Fault Alarm
Confirm the alarm through radio communication; whenever CO2 Flooding System is function tested.
Leaking Discharge Nozzles
Ensure the closure of pneumatic switch / actuator before lining up CO2 Cylinder Bank after completion of functional testing.
Failure to Reset the Fire Alarm
Do not line up CO2 Cylinder prior to resetting the fire detection alarm on F & G panel.
Reset the fire detection alarm at F & G panel.
Remove the Fire Shutdown override after evaluating the risk.