Job Safety Analysis/ Job Hazard Analysis for the use of hand tools
PERSONAL PROTECTIVE EQUIPMENT: Hard Hat, Safety Shoes Suitable for Electrical Work, PVC Gloves Safety Goggles SEQUENCE OF BASIC JOB STEPS
POTENTIAL HAZARDS
Plan the work involving Permit Applicant, Permit Issuer & Worksite Supervisor.
•
Refer Appendix - 10 of KOC F & S Regions, HSEMS Procedure Doc. No. SA.KOC.022 ‘Electrical Multilock & Tagout’
•
Ensure the correct tools & required PPEs are ready to use prior to carrying electrical isolation.
•
Identify the equipment to be isolated and any safety override to be carried out prior to isolation.
• • •
Raise electrical Isolation Certificate as per procedure. Obtain the permit from Asset Owner. Ensure the isolation to be carried out by authorized electrical person only.
•
Stop the equipment from local switch prior to isolating from substation.
Presence of Flammable / Toxic Gas in the Substation
•
Ensure the substation is free from flammable / toxic atmosphere.
Fire & Explosion
•
Keep suitable fire extinguishers ready for use.
• •
Identify & confirm the switchgear feeding electrical power to the equipment. Isolate safely electrical power from the switchgear.
Electrical Shock
•
Confirm the electrical isolation through proper tools.
Unauthorized Energizing of Equipment
•
Install lock & tag as per procedure as well as keep the key in safe custody.
•
Endorse the isolation in the permit and record details in the Isolation Logsheet as per procedure.
•
Place the Fuses removed in safe custody and record the information of Fuse removed & Earthing applied in the Isolation Certificate.
Non-compliance of KOC -HSEMS Procedures, F & S Regulations In-appropriate Tools & PPE Unintended Shutdown of other equipment / Unit / System