laporan kerja praktik di star energy geothermal wayang windu ltd mengenai proses start up main cooling water system
TOEFL ITP Test 1Deskripsi lengkap
Descripción: TOEFL ITP Test 1
TOEFL ITP Test 1
Practice Test-TOEFL ITPDescrição completa
Some exams from practicing TOEFL ITP
Some exams from practicing TOEFL ITP
ITPFull description
Handbook TOEFL ITP
Practice for TOEFL ITPDeskripsi lengkap
Teste do toefl itp
test
pre test post testFull description
Teste do toefl itp
dcFull description
Soal Post Test BHDFull description
Descrição: testing
Descripción: ytujh7u76
ytujh7u76
testing
Inspection and Test Plan Customer: Samson Leusch Contract Number: 900-ITP-A4-IN-0002 Contract/Project Name: Ball Valve On/Off
No. Operation or stage of work Description Characteristics Inspection and Test Plan 1. Pressure Test 2.
3
Low Pressure closure Test High Pressure closure Test
Material identification Casting & Forging Chemical : Body & Connector Heat Treatment Mechanical Visual Inspection
4
5
6
Finished Metal Item Chemical, Stem & Ball Mechanical Finished Non Metal Item Seat, seal, & Density packing In Process
INSPECTION AND TEST PLAN : Work area: (Insert work area)
Stage/ Records Verification Document frequency
Acceptance criteria Inspection/ test procedure/Method
Approved API 594 procedur e and drawings API 598
API 594
Visual inspection
Inspection Level Vendor S
API 598
Report
H
H
API 598
API 598
Report
H
H
Prior to each Heat Test Certificate start work
Standard
Chemical analysis
H
R
R
Prior to 100% Test Certificate start work Prior to each Heat Test Certificate start work Prior to 100% Test Certificate start work
Standard
Review of TC
H
R
R
Standard
Mechanical Test
H
R
R
MSS SP 255
Visual
H
R
R
Prior to L&T Standard / drawing start work sampling plan
Standard / drawing Review of TC or CC
H
R
R
Prior to L&T Standard / drawing start work sampling plan
Standard / drawing Review of TC or CC
-
R
R
Prior to start work Prior to start work
Contractor
Owner R
7
Machined Component Final Inspection Valve Assembly
Visual & Dimension Prior to 5 % at start work random
L&T Drawing
Record
Visual % Measurement -
Shell Test Critical 100% Test Record VTR Approved GAD Air H Seat Test Critical 100% Test Record VTR Approved GAD Air Visual & Dimension Prior to L&T PDI Report Approved GAD Visual & measurement start work sampling Inspection Level : W = Witness Point; H = Hold Point; R = Document Review ; S = Self inspection/verification by Vendor.
H
W
W H H
R R
H: Hold Point implies that relevant testing activities shall not proceed until the continuation of testing is permitted or witnessed by owner. (Notification req'd) W: Witness point implies that owner intends to witness the designated inspection feature. If owner decides not to witness the relevant feature, testing can proceed without permission of owner. (Notification req'd) S: Self point, testing conducted by vendor. Vendor shall prepare all testing activity during Factory Acceptance Test. R: Review inspection & test records (Notification not req'd)