2.14366413 Overburden Pressure Df - D = 0.00 IF (foundation depth-D) is <= 0, then this component is 0 *Volume of concrete x 2.5 + (Total volume of excavation i.e. L x B x D - volume of concrete) x 1.8 OB Load(Ptot) 1.25 Eb = {M_E-W} / (P + Pob) OB Press(Pob) 0.276 El = {M_N-S} / (P + Pob) R = 0.138 or 0.15 * fck
Permissible Punching Shear Stress Ks = (0.5 + c) c = L / B c = 0.25 * Sqrt(Fck)
Ks = c =
= Ks * c 0.85 111.80
= t/m2
R = Mu / b * de2 - N/mm2 Pt (Req) = 0.5*Fck/Fy{[1-(1-4.6*Mu/B*de^2)/Fck]^0.5}*b*de Pt (Req) Min = 0.12% Ast - Reinforcement to be required = Pt (req) * A * d Ast - Reinforcement Provided Pt (Provided) @ Efffective depth d from face of column =0.85*sqrt(0.8*Fck)*(sqrt(1+5*)-1)/6* Allowable Shear Stress (t/m2)