Subscribe to my channel: https://www.youtube.com/channel/UCf6POYkDlJ5b0QLPhAGyrTg/videos
spades
The technology is growing vastly. Everyone in humanity has some limitations. One of those limitations is visual disability. So we are here with a system that helps the visually disabled people. The framework here contains object detection with voice
Podrugi Milyye (Pauline's Aria)_Queen of Spades Tchaikovsky
Subscribe to my channel: https://www.youtube.com/channel/UCf6POYkDlJ5b0QLPhAGyrTg?sub_confirmation=1
Subscribe to my channel: https://www.youtube.com/channel/UCf6POYkDlJ5b0QLPhAGyrTg?sub_confirmation=1
Podrugi Milyye (Pauline's Aria)_Queen of Spades Tchaikovsky
cstFull description
carteFull description
Full description
fabricationFull description
Full description
SEMINARFull description
practically anything from Of Mice and Men you will ever need. [not complete]
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
APPROVAL REGISTER
DOCUMENT NUMBER:
TITLE:
IOG 115
BLINDS INDS USE OF SPADES AND BL
DOCUMENT OWNER:
UIG/P/CB
SECURITY:
NON CONFIDENTIAL
Document History: Revision
Date
Pages
Reason
3
Oct t 2010
All
3 Yearly Review
2
May 2006
All
3 Yearly Review
1
April 2003
All
Reviewed and Work Practice updated.
0
July 1999
All
Initial Publication
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
LIST OF APPENDICES ������������������������������������������������������������������������������������������������������������������ �
6.0
RELATED DOCUMENTS/REFERENCES ������������������������������������������������������������������������������������ ��
Doc No :IOG:115 Doc Owner: UIG/P/C Page 2 of 10
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
1.0
PURPOSE This procedure provides the details for the use of spectacle or spade type blinds and the administration control associated with the application.
2.0
SCOPE This procedure details the reasons for the insertion of spectacle or spade type blinds and all the precautions and operations associated with them.
3.0
HEALTH SAFETY AND ENVIRONMENT Wear personal protective equipment (PPE) such as coveralls, safety boots, safety helmet, etc. as specified in SPDC Safety Manual. Avoid hydrocarbon spillage to the environment and emission to air in accordance with ISO 14001 standards. Report any potential threat to the environment to the Asset Holders Site Representative and act on instructions in accordance with the HSE-MS policy
4.0
PROCEDURE
4.1
GENERAL 1. Positive isolation of equipment shall be in accordance with IOG 137 “Procedure for Preparation of Equipment for Work Activity”. This is by either breaking pipelines to and from an item of equipment (e.g. removal of a valve in a line) or by inserting a spectacle or spade type blind between a pair of flanges on a pipeline. 2. The spectacle or spade blind used for isolation must conform in rating (in accordance with DEP 30.38.01.11-Gen. Section 8. Piping Components) to the pipe or flange classification to which it is to be fitted. This is also the case for blind flanges that may be fitted. This shall apply whether it is a permanent or temporary one. 3. In the case of removing a valve, a blind flange should be fitted to both open ends of the pipeline. 4. In the case of open drain systems, the spectacle or spade blind should be installed on the downstream side of the drain valve for all permanent vessel
Doc No :IOG:115 Doc Owner: UIG/P/C Page 3 of 10
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
drain connections. 5. Closed drain systems with a double block and bleed arrangement shall have the blind installed on the upstream side of the last valve used. 6. In all other cases, isolating spectacle or spade type blinds shall be installed on the equipment side of isolation valves, so that the individual item can be positively isolated from the process. 4.2
SPADING/BLINDING ACTIVITIES 1. Blinding of process equipment (vessels, columns, pipelines, flowlines, etc.) shall be done under a Permit to Work system. 2. All equipment and pipings must be depressurised to 0 barg (atmospheric) and drained before any line breaking or insertion of spectacle or spade type blinds takes place. 3. A checklist of the status of all spectacle and spade type blinds will be maintained and kept up to date and maintained in the facility check list register (appendix 2) by the Site Operator. 4. Any change to the normal blind position shall be recorded in the ‘blind’ checklist. The authourisation shall be given by the Asset Holder Site Supervisor using the form in appendix 1. 5. The Site Operator shall check the actual valve status of the blinds every two weeks (14days) 6. The Asset Holders Site Representative shall audit the blind check list status under his control every six months using the checklist in appendix 2 to ensure that the check list is up to date, and confirm that the actual position of the blinds are correct on site.
Doc No :IOG:115 Doc Owner: UIG/P/C Page 4 of 10
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
5.0
LIST OF APPENDICES
Appendix 1 1:: Approval for change in blind status BLIND No
LINE No
Doc No :IOG:115 Doc Owner: UIG/P/C Page 5 of 10
SIZE and CLASS
PEFS No
PTW No
Date
BLINDBLIND-IN Name of Authorised Personnel by AHSS
Date
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
BLINDBLIND-OUT Name of Personnel Confirmed By AHSS
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
Appendix 2 2: Facility blind checklist Drawing Number
Line No
Size & Class
����
Location
Reason
���������
I have personally completed the blind checks and confirm the status is as noted above: Name:__________________________________________________ Name
Signed:_________________________________________________ Date:___________________________________________________ Date
Comments: Comments Doc No :IOG:115 Doc Owner: UIG/P/C Page 6 of 10
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
Appendix 3: Example of spades/blinds & colour codes Appendix 3 3.1 .1: .1
��������� ������
Appendix 3 3.2 .2: .2: Raised face blind
Doc No :IOG:115 Doc Owner: UIG/P/C Page 7 of 10
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Select an activity to be audited relevant to the document. Review activity for actions/procedures, which are covered by the document. Audit `as-found' condition/performance against requirements identified in document. Note whether `as-found' is acceptable, highlighting areas of non-compliance. Report audit findings to Line Management, identifying any remedial actions required, along with action plan. Audit Check Sheet
Auditors:
Check Sheet Custodian: Custodian: UIG/P/CB
Date of Audit: Type: Ref:
Objective Evidence Y
N
Acceptable? Y
N
Remarks
Is blinding of process equipment 4.2 (vessels, columns, pipelines, flowlines, etc.) done under a Permit to Work system? Is a checklist of the status of all 4.2 spectacle or spade type blinds maintained and kept up to date in the facility register by the Asset Holders Site Representative. Is any change to the normal blind 4.2 position recorded in the ‘blind’ checklist together with the authorisation (Name and Reference Indicator) for the change and the number of the permit (if applicable)? Does the Site Operator check the actual valve status of the blinds every Doc No :IOG:115 Doc Owner: UIG/P/C Page 8 of 10
4.2 Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
two weeks (14days)? Does the Asset Holders Site 4.2 Representative audit the blind check list status under his control every six months to ensure that the check list is up to date, and confirm that the actual position of the blinds are correct on site. In the case of removing a valve, is a 4.1 blind flange fitted to both open ends of the pipeline? Definitions
Objective Evidence: Evidence Includes data, records etc t hat shows or proves compliance to the requirements.
Acceptable: Indicates that evidence meets the required standard or judged to be in conformity with the standard�
Doc No :IOG:115 Doc Owner: UIG/P/C Page 9 of 10
Rev: 3
Issues: 19/10/2010
Custodian: UIG/P/CB
Review: 19/10/2013
Printed copies are uncontrolled
SHELL EXPLORATION AND PRODUCTION COMPANIES IN NIGERIA [SEPCIN]
Non-confidential PROCEDURE
6.0
RELATED DOCUMENTS/REFERENCES Permit to Work Procedure SEPCiN- HX -2010-0003 SPDC IOG/137
Preparation of Equipment for Work Activity
DEP 30.38.01.11-Gen. SECTION 8. Piping Components.