A checklist to be used by CIivl Engineer when checking a Drawing for any concrete structure.
How to Read Shop Drawing[1]Full description
Shop drawing
ADDC Check list for Drawing approval (Issued by ADDC Drawing section dept)Full description
Checklist for the Steel Structure Drawing
Full description
CALCULATION HVAC
HVACFull description
HVACDescription complète
Construcon Supervision Management Manual
Date:
Shop drawing review
Rev.
Ground floor HVAC layout S.D review Checklist
SD.C 1.01
Project Title:
Contract No.
Ref. #
Consultant: Arabian Architecture Architecture Supervision Supervision
Contractor:
Control #
Building Name
Drawing Ref.
Specied Locaton
Specs Ref.
In Coordination With:
1- Architectural 2- Mechanical
Item
Disposition
Description of Activities ACCEPT
2.01
Check the title block drawing revi!ion
2.02
Check pro"ect na#e$ !ite in%or#ation! !ite ke& plan
2.0'
Check the na#e(logo! o% contractor$ con!ultant$ )M owner
2.0*
Check the !cale o% drawing #u!t be correct and readable
2.0+
Check di#en!ion! and unit! !hould be con!i!tent$ #eticulou! and in accordance with the pro"ect !tandard!
2.0,
Check ae! D di#en!ion!
2.0/
Check re%rigerant pipe !leeve! location
REJECT
Inspection Date NOT FOUND
(Initials)
Coordinate 7 re%rigerant pipe !leeve with up to roo% re%rigerant pipe !leeve and veri%& the properl& o% their relation!hip
2.0
Check the block out opening! above ceiling %or the duct la&out acce!!
2.0
Check the co#pliance o% t he la&out with the contract drawing
2.1
Check the capacitie! o% the C34! and 5hau!t %an unit!
2.11
Check the location and direction o% the C3 unit and the connection between the unit and re%rigerant pipe! and check the co#pliance o% unit di#en!ion with the %al!e ceiling
2.12
Check the drain line o% the C3 and to be connected to the neare!t 8loor drain
2.1'
Check o% the duct di#en!ion and co#pliance with the %al!e ceiling
2.1*
Check the volu#e da#per! and other acce!!orie! to be indicated in the duct la&out
2.1+
Check o% the location and direction o% the outlet and return 97rill!$ Di%%u!er!$ and Regi!ter! ouver!;including the plenu# boe!
2.1,
2.1/
Check! o% the return air pa!! wa& and the opening above ceiling %or thi! regard
2.1
Check the ei!ting o% the re6uired cro!! !ection! detail!
2.1
Check the ther#o!tat unit! location Check the proper location o% the acce!! panel %or C3 #aintenance
2.2
Check the legend abbreviation
2.1
Check the attached general note! !hall include a detailed in%or#ation! in%or#ation! about the !peci8ication! o% c oncrete rein%orcing rein%orcing !teel u!ed in thi! t&pe o% !tructure ele#ent!
2.21
Drawing! co#pleted and acceptable
2.22
Notes: 1-
The nal approval will be aer he coordinaton drawings o be submi!ed and ge approval from elecromechanical and arctc deparmens
2- This drawings mus be reviewed o be full" conform o pro#ec specicatons $ design drawing.
Check pro"ect na#e$ !ite in%or#ation! !ite ke& plan
2.0'
Check the na#e(logo! o% contractor$ con!ultant$ )M owner
2.0*
Check the !cale o% drawing #u!t be correct and readable
2.0+
Check di#en!ion! and unit! !hould be con!i!tent$ #eticulou! and in accordance with the pro"ect !tandard!
2.0,
Check ae! D di#en!ion!
2.0/
Check re%rigerant pipe !leeve! location
REJECT
Inspection Date NOT FOUND
(Initials)
Coordinate 7 re%rigerant pipe !leeve with up tp roo% re%rigerant pipe !leeve and veri%& the properl& o% their relation!hip
2.0
Check the block out opening! above ceiling %or the duct la&out acce!!
2.0
Check the co#pliance o% the la&out with the contract drawing
2.1
Check the capacitie! o% the C34! and 5hau!t %an unit!
2.11
Check the location and direction o% the C3 unit and the connection between the unit and re%rigerant pipe! and check the co#pliance o% unit di#en!ion with the %al!e ceiling
2.12
Check the drain line o% the C3 and to be connected to the neare!t 8loor drain
2.1'
Check o% the duct di#en!ion and co#pliance with the %al!e ceiling
2.1*
Check the volu#e da#per! and other acce!!orie! to be indicated in the duct la&out
2.1+
Check o% the location and direction o% the outlet and return 97rill!$ Di%%u!er!$ and Regi!ter! ouver!;including the plenu# boe!
2.1,
2.1/
Check! o% the return air pa!! wa& and the opening above ceiling %or thi! regard
2.1
Check the ther#o!tat unit! location Check the proper location o% the acce!! panel %or C3 #aintenance
2.1
Check the ei!ting o% the re6uired cro!! !ection! detail!
2.2
Check the attached general note! !hall include a detailed in%or#ation! about the !peci8ication! o% concrete rein%orcing !teel u!ed in thi! t&pe o% !tructure ele#ent!
2.21
Drawing! co#pleted and acceptable
2.22
Notes: 1-
The nal approval will be aer he coordinaton drawings o be submi!ed and ge approval from elecromechanical and arctc deparmens
2- This drawings mus be reviewed o be full" conform o pro#ec specicatons $ design drawing.
Consultant Remarks
Consultant:
Contractor Engineer
Contractor QA/QC:
Date:
Date:
Date:
Arabian Architecture Supervision
Construcon Supervision Management Manual
Date:
Shop drawing review
Rev.
"oo# HVAC e$ui!%ent&s layout S.D review Checklist
SD.C 1.01
Project Title:
Contract No.
Ref. #
Consultant: Arabian Architecture Supervision
Contractor:
Control #
Building Name
Drawing Ref.
Specied Locaton
Specs Ref.
In Coordination With:
1- Architectural 2- Mechanical
Item
Disposition
Description of Activities ACCEPT
2.01
Check the title block drawing revi!ion
2.02
Check pro"ect na#e$ !ite in%or#ation! !ite ke& plan
2.0'
Check the na#e(logo! o% contractor$ con!ultant$ )M owner
2.0*
Check the !cale o% drawing #u!t be correct and readable
2.0+
Check di#en!ion! and unit! !hould be con!i!tent$ #eticulou! and in accordance with the pro"ect !tandard!
2.0,
Check ae! D di#en!ion!
2.0/
Check re%rigerant pipe !leeve! location
REJECT
Inspection Date NOT FOUND
(Initials)
Coordinate 7 re%rigerant pipe !leeve with up to roo% re%rigerant pipe !leeve and veri%& the properl& o% their relation!hip
2.0
2.0
Check the re%rigerant pipe! la&out to avoid the long di!tance #ore bend! between the A(C unit and the pipe !leeve!
2.1
Check the co#pliance o% the la&out with the contract drawing
2.11
Check the !chedule o% the ACC34! and breaker !witche! Check the location and direction o% the ACC34! unit! and check the co#pliance o% unit location with the parapet height o% arctic relation!hip
2.12
2.1'
check the location o% the breaker !witche! and the po!t
2.1*
Check o% the !i
2.1+
Check the re6uired da#per! and other acce!!orie! to be indicated in the duct la&out
2.1,
Check the ei!ting o% the re6uired cro!! !ection! detail! Check the attached general note! !hall include a detailed in%or#ation! about the !peci8ication! o% concrete rein%orcing !teel u!ed in thi! t&pe o% !tructure ele#ent!
2.1/
Drawing! co#pleted and acceptable
2.1
Notes: 1-
The nal approval will be aer he coordinaton drawings o be submi!ed and ge approval from elecromechanical and arctc deparmens