START START up preparation Schedule
BALANCE OF PLANT CW pumps A , B , C Pump and motor coupling work. CT makeup water filling line dummy removing in CT Forebay. Cooling tower system filling ACW header lines manways closing work. CW header lines manways closing work. ACW System charging Air compressors temporary cooling water lines connections removing work. Cooling Water circuit charging Instrument air compressor normalisation CO2 system checks - CCR, PCC#1A&1B Gas skid-1 & 2 normalisation Side Stream filter normalisation SWAS Coolers & Chiller Units normalisation
GAS TURBINE GT-1A combustion chamber and diffuser visual inspection. GT-1A combustion chamber and diffuser visual inspection. GT-1A & GT-1B Generator Dehumidifiers hoses connections removing and dummy's re fixing work. Put GT-1A on turning gear GT-1A complete check up GT-1B complete check up GT-1A Water Wash GT-1B Water Wash All NG valves stroke checking at GT skid IGV operation & Compressor shut off valves operation STEAM TURBINE STG turning gear Condenser hotwell makeup
CEP-A & B Pump and motor coupling work. STG condenser hot well man way closing work. Condensate circuit normalisation CEP Pumps trial run STG MOVs & Pnematic Control valves stroke checks Steam Bypass system valves stroke checking STG generator dehumidifier hose connections removing and dummy's re fixing work. Governing oil pumps trial & ST control and stop valves stroke checks STG LP Turbine casing front & Rear manways closing work after silicagel trays removal. HRSG HRSG#1A HP/IP/LP/CPH/Deaerator HP/IP/LP/CPH/Deaerator circuit N2 venting and normalisation HRSG-1A Flue gas path silica gel removing,Guillotine removing,Guillotine Damper, Weather damper HRSG-1A Control valves stroke checks HRSG-1A All MOVs Open/Close test HRSG-1A Deaerator top side vent lines NRV gates fixing work. HRSG-1A HP drum (BFP-1A side) man way gasket replacement work. HRSG-1A Weather damper area putty removing and cleaning work. HRSG-1A Diverter damper & Guillotine dampers man ways closing work.
31
30
29
28
27
26
25
24
23
22
21
31
30
29
28
27
26
25
24
23
22
21
CEP-A & B Pump and motor coupling work. STG condenser hot well man way closing work. Condensate circuit normalisation CEP Pumps trial run STG MOVs & Pnematic Control valves stroke checks Steam Bypass system valves stroke checking STG generator dehumidifier hose connections removing and dummy's re fixing work. Governing oil pumps trial & ST control and stop valves stroke checks STG LP Turbine casing front & Rear manways closing work after silicagel trays removal. HRSG HRSG#1A HP/IP/LP/CPH/Deaerator HP/IP/LP/CPH/Deaerator circuit N2 venting and normalisation HRSG-1A Flue gas path silica gel removing,Guillotine removing,Guillotine Damper, Weather damper HRSG-1A Control valves stroke checks HRSG-1A All MOVs Open/Close test HRSG-1A Deaerator top side vent lines NRV gates fixing work. HRSG-1A HP drum (BFP-1A side) man way gasket replacement work. HRSG-1A Weather damper area putty removing and cleaning work. HRSG-1A Diverter damper & Guillotine dampers man ways closing work. HRSG-1A Guillotine damper locking to be done after opening the damper. HRSG-1A Chemical dosing pumps discharge lines dummies removing work. HRSG-1A HP start up pump coupling guard f ixing work. HRSG#1A filling HP BFP-1A1 & 1A2 pumps and motors coupling work. HP BFP-1A1 Pump suction strainer fixing work. HRSG-1A HP/IP/LP start up pumps and CPH RCP Pumps trial HRSG-1A HP/IP/LP BFPs trial HRSG-1A Furnace Bottom dummy fixing work.
HP BFP-1B1 & 1B2 pumps and motors coupling work. 1B HP/IP/LP/CPH/Deaerator HP/IP/LP/CPH/Deaerator circuit N2 venting and normalisation HRSG-1B Flue gas path silica gel removing,Guillotine removing,Guillotine Damper, Weather damper
HRSG-1B Diverter damper & Guillotine dampers man ways closing work. HRSG-1B Chemical dosing pumps discharge lines dummies removing work. HRSG-1B Weather damper area putty removing and cleaning work. HRSG-1B Control valves stroke checks HRSG-1B Deaerator top side vent lines NRV gates fixing work. HRSG-1B All MOVs Open/Close test HRSG-1B HP start up pump coupling guard fixing work. HRSG#1B filling HRSG-1B HP/IP/LP start up pumps and CPH RCP Pumps trial HRSG-1B HP/IP/LP BFPs trial HRSG-1B Furnace Bottom dummy fixing work.
ELECTRICAL SYSTEM GT#1A stator water circuit normalisation
CEP-A & B Pump and motor coupling work. STG condenser hot well man way closing work. Condensate circuit normalisation CEP Pumps trial run STG MOVs & Pnematic Control valves stroke checks Steam Bypass system valves stroke checking STG generator dehumidifier hose connections removing and dummy's re fixing work. Governing oil pumps trial & ST control and stop valves stroke checks STG LP Turbine casing front & Rear manways closing work after silicagel trays removal. HRSG HRSG#1A HP/IP/LP/CPH/Deaerator HP/IP/LP/CPH/Deaerator circuit N2 venting and normalisation HRSG-1A Flue gas path silica gel removing,Guillotine removing,Guillotine Damper, Weather damper HRSG-1A Control valves stroke checks HRSG-1A All MOVs Open/Close test HRSG-1A Deaerator top side vent lines NRV gates fixing work. HRSG-1A HP drum (BFP-1A side) man way gasket replacement work. HRSG-1A Weather damper area putty removing and cleaning work. HRSG-1A Diverter damper & Guillotine dampers man ways closing work. HRSG-1A Guillotine damper locking to be done after opening the damper. HRSG-1A Chemical dosing pumps discharge lines dummies removing work. HRSG-1A HP start up pump coupling guard f ixing work. HRSG#1A filling HP BFP-1A1 & 1A2 pumps and motors coupling work. HP BFP-1A1 Pump suction strainer fixing work. HRSG-1A HP/IP/LP start up pumps and CPH RCP Pumps trial HRSG-1A HP/IP/LP BFPs trial HRSG-1A Furnace Bottom dummy fixing work.
HP BFP-1B1 & 1B2 pumps and motors coupling work. 1B HP/IP/LP/CPH/Deaerator HP/IP/LP/CPH/Deaerator circuit N2 venting and normalisation HRSG-1B Flue gas path silica gel removing,Guillotine removing,Guillotine Damper, Weather damper
HRSG-1B Diverter damper & Guillotine dampers man ways closing work. HRSG-1B Chemical dosing pumps discharge lines dummies removing work. HRSG-1B Weather damper area putty removing and cleaning work. HRSG-1B Control valves stroke checks HRSG-1B Deaerator top side vent lines NRV gates fixing work. HRSG-1B All MOVs Open/Close test HRSG-1B HP start up pump coupling guard fixing work. HRSG#1B filling HRSG-1B HP/IP/LP start up pumps and CPH RCP Pumps trial HRSG-1B HP/IP/LP BFPs trial HRSG-1B Furnace Bottom dummy fixing work.
ELECTRICAL SYSTEM GT#1A stator water circuit normalisation
HP BFP-1B1 & 1B2 pumps and motors coupling work. 1B HP/IP/LP/CPH/Deaerator HP/IP/LP/CPH/Deaerator circuit N2 venting and normalisation HRSG-1B Flue gas path silica gel removing,Guillotine removing,Guillotine Damper, Weather damper
HRSG-1B Diverter damper & Guillotine dampers man ways closing work. HRSG-1B Chemical dosing pumps discharge lines dummies removing work. HRSG-1B Weather damper area putty removing and cleaning work. HRSG-1B Control valves stroke checks HRSG-1B Deaerator top side vent lines NRV gates fixing work. HRSG-1B All MOVs Open/Close test HRSG-1B HP start up pump coupling guard fixing work. HRSG#1B filling HRSG-1B HP/IP/LP start up pumps and CPH RCP Pumps trial HRSG-1B HP/IP/LP BFPs trial HRSG-1B Furnace Bottom dummy fixing work.
ELECTRICAL SYSTEM GT#1A stator water circuit normalisation GTG#1A H2 filling GTG#1B stator water circuit normalisation GTG#1B H2 filling STG stator water circuit normalisation STG H2 filling All SWITCHGEARS & MCCs inspection
Cylinders requirement
GT#1A GT#1B STG Total
H2
100 100 100 260
CO2
20 20 20 60 OPS MMD
100 100 100 260
GT#1A GT#1B STG Total
20 20 20 60 OPS MMD
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
SR NO
CRITICAL INDENTS DETAILS FOR SPAR MATERIAL DESCRIPTION INDENT DETAILS
1 Raw water Feed pump-A spare parts 2 ACW Pump-B spare parts
MECH/300/2011,Dt 2-1-2011 MECH/16/2012,Dt 2-5-2012
3 STG Lube oil Servo Prime 32 4 ServoPrime 46 (GT Lube oil)
MECH/86/2011,Dt 8-8-2011 Indent to be raised for 2100Ltr
5 GTs Coalescer pads 6 CT Fan-16 Gear box spares
MECH/128/2012,Dt 27-11-2012 MECH/23/2012,Dt 19-5-2012
7 SWAS Chiller unit compressor-1 to be procured. MECH/15/2012,Dt 2-5-2012 8 Hyspin AWS 32SC lube oil for HP BFPs 9 Air compressor-B spare parts 10 GT-1B Turbine blades as per the indent.
MECH/20/2012,Dt 18-5-2012 MECH/130/2012,Dt 30-11-2012 MECH/149/2011,Dt 8-12-2011
SR NO
CRITICAL INDENTS DETAILS FOR SPAR MATERIAL DESCRIPTION INDENT DETAILS
1 Raw water Feed pump-A spare parts 2 ACW Pump-B spare parts
MECH/300/2011,Dt 2-1-2011 MECH/16/2012,Dt 2-5-2012
3 STG Lube oil Servo Prime 32 4 ServoPrime 46 (GT Lube oil)
MECH/86/2011,Dt 8-8-2011 Indent to be raised for 2100Ltr
5 GTs Coalescer pads 6 CT Fan-16 Gear box spares
MECH/128/2012,Dt 27-11-2012 MECH/23/2012,Dt 19-5-2012
7 SWAS Chiller unit compressor-1 to be procured. MECH/15/2012,Dt 2-5-2012 8 Hyspin AWS 32SC lube oil for HP BFPs 9 Air compressor-B spare parts 10 GT-1B Turbine blades as per the indent.
MECH/20/2012,Dt 18-5-2012 MECH/130/2012,Dt 30-11-2012 MECH/149/2011,Dt 8-12-2011
11 HRSG HP MSSV Spares
MECH/167A,168 & 169/,Dt 22-42010
Fabric Expansion bellow of size 12 6100X6100X525mm, For HRSG-1A FG inlet duct MECH/9/2012,Dt 16-4-2012 Fabric Expansion bellow of size 6100X6100X525mm, For HRSG-1B DD bypass stack duct.
13 STG Vaccum pump spares
MECH/8/2012,Dt 16-4-2012
14 NON Sparking tools as per the indent
MECH/37/2012,Dt 4-6-2012 MECH/83A,83B/2012,Dt 16-82012 & 14-8-2012
15 GT Prefilters 16 Gaskets for GT Prefilters
MECH/148/2013,Dt 7-1-2013 MECH/145/2013,Dt 7-1-2013
17 GT Fine(F9) & Pre(F7) Filters
MECH/30/2012,Dt 29-5-2012
TECHNICIANS REQUIRED FOR PLANT MAINTENANCE ACTIVITIES SR No
Worker Designation
Existing Manpower
1 2 3 4 5
Millwright Fitter Fitter Asst Fitter welder Gas Cutter
6 7 8 9
Rigger Crane Operator Scaffolder HVAC Technician TOTAL MEMBERS
1 Nil 2 2 Nil 1 1 Nil Nil 7
ES PROCUREMENT REMARKS
CRITICALITY Required for Plant start-up Required for Plant start-up
Out of 20 barrels,only 15 nos were received.
Required for Plant start-up Required for Plant start-up Not Required for Plant startup,during plant running must be made available Required for Plant start-up
Indent was earlier kept on hold by Komaraiah sir. Out of 6 barrels,only 2 nos were received.
These spares are pending since too long.
Required for Plant start-up Required for Plant start-up Required for Plant start-up Required for Plant start-up Not Required for Plant startup,during plant running must be made available It is better to replace this bellow before plant startup.As it was earlier replaced partially and the remaining area has some minor damages.Subjected to material availability,job will be taken up. Not Required for Plant startup,during plant running must be made available Not Required for Plant startup,during plant running must be made available Required for Plant start-up
F9- 785 nos(2sets),F7- 1570 nos(4sets)
Required Manpower
2 3 4 1 1 1 Nil 1 1 14
MECHANICAL INDENTS FOR TH INDENT NO.
INDENT DATE
Mech-205/11-12
19.03.12
Mech-202/11-12
12.03.12
Mech-201/11-12
12.03.12
Mech-195/11-12
28.02.12
SERVO GEM EPO Grease
QUANTIT Y ORDERE D 20 Kgs.
M12 Gr.8.8 Nuts
300 Nos.
M12 8.8 Gr.washers
800 Nos.
M12X65mm long 8.8 Gr.Bolts Split AC Compressor, Model No. AW 1500F F15 Z0 4H 3237 R-22, 230Volts, 50 Hz - RLA - 7.8, LRA-51 (TECHUMSEH)
200 Nos.
DESCRIPTION
CEP Expansion Bellow both ends fixed Flanges, Size: DN450, Type: 1101 Installation (shipping length: 300mm)
1 No.
2 Nos.
STG Vacuum Pumps Plate Heat Exchanger spares. Plates and Gaskets (Make: FUNKE), Type: FP-14-31-1-N, S.No.504383 Filter Element 2.5 microns (HC 8300 fkz 16z)
2 Nos.
Filter Element 5 microns (HC 8300 fkz 16z)
2 Nos.
GT Diffusion Burner Ignition Gas Line Connector Gate Valves, 4", 600 / 300 Class, 30bar pr., Buttweld, ON/OFF MOV Operated Valve CW Side Stream Filter Strainers (Model No. VAG 39),
8 Nos.
Mech-190/11-12
15.02.12
Mech-189/11-12
15.02.12
Mech-188/11-12
13.02.12
Mech-184/11-12
10.02.12
Mech-177/11-12
17.01.12
Mech-173/11-12
09.01.12
Mech-172/11-12
06.01.12
Mech-171/11-12
06.01.12
Mech-170/11-12
06.01.12
Mech-168/11-12
29.12.11
GT Potential Replacement Material (List attached)
As per list
Mech-166/11-12
28.12.11
Pre Filters Holding Latch (Spring type)
500 Nos.
Mech-163/11-12
27.12.11
Mech-157/11-12
15.12.11
Mech-156/11-12
15.12.11
Combustion Chamber Cone GT Re-assembly mandatory material Major overhaul (list attached) Insert / Comp
Mech-155/11-12
15.12.11
MECH-151B / 1112
10.12.11
1 No.
1 No.
300 Nos. 3 Flow Rate: 124 M / Hr., Design Temp: 50 Deg.C Synthetic Oilimpregnated Coalescer Pad, Size: 1720mm 36 Nos. X 3200 x 25mm thk Synthetic Oilimpregnated Coalescer Pad, Size: 24000mm 12 Nos. X 3200 x 25mm thk Auxiliary Systems Re-assembly Mandatory material for As per list Major Overhaul (List attached) Auxiliary Systems spare parts for Minior Inspection & day As per list to day (List attached) Auxiliary Systems Potential replacement material for Major As per list Overhaul (List attached)
GTG Secondry Air Damper Blind Plate Seal Ring GT Re-assembly material Major overhaul (list attached)
1 No. As per List 8 Nos. 2 No. As per List
Spacer Sleeve (Inlet)
1 No.
Spacer Sleeve (Outlet)
1 No.
Spacer Sleeve
1 No.
Spacer Sleeve
1 No.
Spacer Bush
1 No.
Adaptor Sleeve
1 No.
Lubrication Ring
2 Nos.
Bearing Nut
1 No.
Shaft
1 No.
Impeller
5 Nos.
MECH-151A / 1112
10.12.11
Mech-146/11-12
05.12.11
Mech-144/11-12
12.12.11
Mech-142/11-12
02.12.11
Flat Gasket
4 Nos.
Flat Gasket
1 No.
O Ring
1 No.
O Ring
2 Nos.
O Ring
2 Nos.
O Ring
4 Nos.
O Ring
2 Nos.
Wearing Ring
10 Nos.
Splash Ring
2 Nos.
Oil Thrower
1 No.
Stage Sleeve
4 Nos.
Shaft Protection Sleeve (Inlet)
1 No.
Shaft Protection Sleeve (Outlet) Port Glass, Type: SGC-3008 (Containing Cushion Gasket, Gauge Glass, packing strip, Mica Gasket, Protect Gasket, Sealing Gasket) Pilot Valve recommended Spare Parts, Make: ARGUS, Type: FKK-79, Material: SS / SS-SS-TFE, Pressure: 36
1 No.
0
bar at 26 C, Size: PN-40, DN-40, S.No.791225, Fabr.No.: 116942003 Skid Mounted Motorized Hydro Test Pump, Max.Pressure: 300 to 350 Kg./CM2, Capacity: 110 LPH, Complete with presure relief and setting valve, Pressure Gaauge, NRV, Needle Valve along with accessories like Hydraulic Hose etc.
12 Nos.
2 Sets
1 Unit
1" Flanged Safety Relief Valve, Flange PCD: 85mm, Mech-133/11-12
Mech-129/11-12
MECH-123-C / 1112
10.11.11
29.10.11
31.10.11
No.Holes: 4 Nos., Size: 14mm, Set Pressure: 10 Kg/cm Medium Compressed Air, Make: Fluid Tech Valves
2
1 No.
M15B CH Plate Gasket NBRP CO, A-Type
45 Nos.
M15B CH Plate Gasket NBRP CO, BA-Type
45 Nos.
M15B2 EP 1 316/0.6/HT/NBRP CO RI
1 No.
M15B2 EP 2 316/0.6/HT/NBRP CO RI
1 No.
M15B2 CH PL 2 316/0.6/HT/NBRP CO RI
4 Nos.
M15B2 CH PL 2 316/0.6/HT/NBRP CO RI
6 Nos.
Line Shaft
1 No.
Shaft Coupling
2 Nos.
HX.HD.Bolt with Nut
8 Nos.
Gasket
1 No.
Disch Case Bearing
1 No.
HX.HD.Bolt with Nut
4 Nos.
Inter Bowl
7 Nos.
Bowl Bush
7 Nos.
Impeller Lock Collet
7 Nos.
Impeller
7 Nos.
HX.HD.Cap Screw
21 Nos.
Brg.Inter Bowl
7 Nos.
Pump Shaft
1 No.
Sand Cap
1 No.
Allen Set Screw
2 Nos.
Brg.Suction
1 No.
HX.HD.Cap Screw
3 Nos.
Mech-123-B / 1112
MECH-123-A / 1112
MECH-122C / 1112
31.10.11
31.10.11
15.10.11
Pipe Plug
1 No.
Adjusting Nut
1 No.
Allen Set Screw
1 No.
Water Slinger
1 No.
Packing Gland
1 No.
Packing Box
1 No.
Stud Bolt with Nut
6 Nos.
Gasket
1 No.
Packing Box Bush
1 No.
Top Shaft Sleeve
1 No.
HX.HD.Cap Screw
12 Nos.
HX.HD.Bolt with Nut
8 Nos.
Bearing Spider
1 No.
Line Shaft Brg.
1 No.
Line Shaft Sleeve
1 No.
Gib Key
1 No.
Top Shfat Bus
1 No.
Wearing Ring For Impeller
7 Nos.
Brg. Retainer
1 No.
Gasket
2 Nos.
Spring Loading Grease Cup Assy
1 No.
Water Seal Ring
1 No.
Packing Pieces
8 Nos.
Stud Bolt with Nut
2 Nos.
Top Shaft
1 No.
Line Shaft Sleeve
1 No.
Line Shaft
1 No.
Shaft Coupling
2 Nos.
HX.HD. Bolt with Nut
8 Nos.
Gasket
1 No.
Disch Case Bearing
1 No.
Hx.HD. Bolt with Nut
12 Nos.
Inter Bowl
7 Nos.
Bowl Bush
7 Nos.
Impeller Lock Collet
7 Nos.
Impeller
7 Nos.
HX.HD.Cap Screw
84 Nos.
BRG. Inter Bowl
7 Nos.
Pump Shaft
1 No.
Sand Cap
1 No.
Allen Set Screw
2 Nos.
BRG. Suction
1 No.
HX.HD. Cap Screw
6 Nos.
Pipe Plug
1 No.
Adjusting Nut
1 No.
Allen Set Screw
1 No.
Water Slinger
1 No.
Packing Gland
1 No.
Packing Box
1 No.
Stud Bolt with Nut
8 Nos.
-
12
MECH-122a / 1112
MECH-121C / 1112
MECH-121B / 1112
15.10.11
15.10.11
15.10.11
15.10.11
Gasket
1 No.
Packing Box Bush
1 No.
Top Shaft Sleeve
1 No.
Stud Bolt with Nut
8 Nos.
HX.HD. Bolt with Screw
12 Nos.
HX.HD. Bolt with Nut
8 Nos.
Bearing Spider
1 No.
Wearing Ring Impeller
7 Nos.
BRG Retainer
1 No.
Gasket
1 No.
Spring Loading Grease Cup Assy
2 Nos.
Watear Seal Ring
1 No.
Packing Pieces
4 Nos.
Stud Bolt with Nut
2 Nos.
HX.HD. Bolt with Nut
8 Nos.
Thrust Stand Assy
1 No.
HX.HD. Bolt with Nut
4 Nos.
Top Shaft
1 No.
Line Shaft Brg.
4 Nos.
Line Shaft Sleeve
4 Nos.
Line Shaft
4 Nos.
Pump Shaft Coupling
1 No.
Gasket
1 No.
HX.HD.Bolt with Nut
8 Nos.
Pump Shaft
1 No.
BRG Inter Bowl
7 Nos.
Impell Lock Collect
7 Nos.
Impeller
7 Nos.
Inter Bowl
7 Nos.
Sand Cap
1 No.
HX.HD.Cap Screw
6 Nos.
Strainer B/T
1 No.
Suction BRG
1 No.
HX.HD. Bolt with Nut
4 Nos.
Stud Bolt with Nut
2 Nos.
Packing Gland
1 No.
Water Seal Ring
1 No.
Packing PCS
4 Nos.
Grease Cut Assy. With NRV
1 No.
Packing Box
1 No.
Packing Box Bush
1 No.
Top Shaft Sleeve
1 No.
Gasket
1 No.
Stud Bot with Nut
4 Nos.
HX.HD.Cap Screw
8 Nos.
Bearing Spider
4 Nos.
Impeller Wearing Ring
7 Nos.
BRG BRG Retainer
4 Nos.
HX.HD Bolt with Nut
32 Nos.
Top Shaft
1 No.
MECH-121A / 1112
Mech-118/11-12
Mech-117/11-12
Mech-108/11-12
15.10.11
02.06.11
13.10.11
18.10.11
Allen Set Screw
2 Nos.
Gasket
2 Nos.
HX.HD Bolt cap Screw
6 Nos.
Water Slinger Assy
1 No.
Thrust Stand Assy.
1 No.
HX.HD.Bot with Nut
4 Nos.
HX.HD Bolt with Nut
4 Nos.
Packing end ring for Pump Model: PN-M16A
8 Nos.
Packing for Pump Model: PN-M16A
8 Sets
Ball for Pump Model: PN-M16A
4 Nos.
Ball Guide for pump Model: PN-M16A
4 Nos.
Plunger for Pump Model: PN-M16A
2 Nos.
Packing end ring for Pump Model: PN-K16A
8 Nos.
Packing for Pump Model: PN-K16A
8 Sets
Ball for Pump Model: PN-k16A
4 Nos.
Ball Guide for pump Model: PN-K16A
4 Nos.
Plunger for Pump Model: PN-K16A
2 Nos.
HYSPIN AWS 32 SC Lube Oil
1200 Ltrs.
PALL Filter Element - RO50480 YL60
8 Nos.
pall Coreless Filter Element B>= 1000 12 ©
8 Nos.
Mech-96/11-12
24.08.11
Mech-86/11-12
08.08.11
Servo Prime-32 Lube Oil
20 Barrels
Mech-85/11-12
08.08.11
Reo Lube (OMTI-46) Control Oil
5 Barreks
Mech-76/11-12
Seat Ring for 300 Class Cast Steel Gate Valve of Size: 250mm
1 No.
Disc for 300 Class Cast Steel Gate Valve of Size: 250mm
1 No.
Stem for 300 Class Cast Steel Gate Valve of Size: 250mm
1 No.
29.07.11 Bonnet Gasket for 300 Class Cast Steel Valve of Size: 250mm 1 1/2" schedule 80 CPVC Pipe
Mech-75/11-12
Mech-72/11-12
27.07.11
26.07.11
1 No. 100 Mtrs.
2" CPVC Socket Tee Schedule 80
4 Nos.
1 1/2 x 2" Socket Reducer Sch 80
4 Nos.
1 1/2" 90 Deg Socket Elbow sch 80
10 Nos.
1 1/2" straight couplings Sch.80
20 Nos.
1 1/2" CPVC Pipe Flange Sch.80
10 Nos.
2" Schedule 80 CPVC Pipe
50 Mtrs.
3" CPVC Socket Tee Schedule-80
4 Nos.
1 1/2" CPVC Socket Tee Schedule-80
4 Nos.
2x3" Socket Reducer Sch.80
4 Nos.
2" 90Deg. Socket Elbow Sch.80
10 Nos.
2" Strainght Coupling Sch.80
20 Nos.
2" CPVC Pipe Flange Sch.80
20 Nos.
3" Sch.80 CPVC Pipe
50 Mtrs.
3" 90 Deg. Socket Elbow Sch.80
20 Nos.
3" straight Coupling Sch.80
30 Nos.
3" CPVC Pipe Flange Sch.80
20 Nos.
CPVC Solvent Cement - 500 Ml. Gasket Set according DGSLV-560398 suitable for Valve with Order No.760499
2 Nos. 2 Nos.
Mech-58/11-12
04.07.11
Mech-51/11-12
15.06.11
Mech-47/11-12
07.06.11
Mech-43/11-12
06.06.11
Mech-41/11-12
Mech-36/11-12
Mech-24/11-12
Mech-20/11-12
Mech-14/11
03.06.11
31.05.11
10.05.11
10.05.11
14.04.11
Valve Ball suitable for Valve with Order No. 760499 Bellow Sealved Valve DN-15 both side external threaded with 1/4 inch hole and 8mm outer pipe PA type fitting, Union thread is 36x2mm pitch HP BFP Balance Disc Seat (Counter Balancing Disc)
2 Nos.
3 Nos.
Inproseal (Item No. IS1), Material: EN1982 : CuSn12
1 No.
6 Nos.
Inproseal (Item No. IS2), Material: EN1982 : CuSn12 1 No. 42X6.6M Wire Rope Sling. Both side soft eye. Eye length 2 Nos. is 650mm, capapcity: 175000 Kgs. Servo 320 Gear Oil 220 Ltrs. GR-140 Gear Oil
100 Ltrs.
General Oil GR-90
100 Ltrs.
General Grease
50 Kgs.
Servo Grease MP
50 Kgs.
Servo Coat 120 Grease
100 Kgs.
Servomesh SP 320 Gear Grease
50 Kgs.
Servo Friz - 68 Oil
50 Ltrs.
O-Ring for sleeve in Viton, Part No.7
2 Nos.
O-Ring for Seal face in Viton, Part No. 1.2
2 Nos.
O-Ring for Seat in Viton, Part No.3
2 Nos.
O-Ring for Gland Plate in Viton, Part No.5
2 Nos.
Set of Screws, {Part No. 1.6 (1 Set = 2 Nos.), Part No. 12a (1 Set = 2 Nos., Part No. 12b (1 Set = 4 Nos.)}
2 Sets
Set of Spring Sleeve in 1.4401 (1 Set = 8 Nos.), Part No.1.7 Set of Springs in 1.4401 (1 Set = 8 Nos.), Part No.1,5
2 Sets
Seal Face in Buko 03+1.4162, Part No.1
2 Nos.
Seat in Buka 22, Part No.2
2 Nos.
Shaft (Part No. 210.01)
2 Nos.
Impeller (Part No. 230.01)
2 Nos.
Bearing NU 308 (Part No. 320.01)
2 Nos.
Bearing 7308 BECBP (Part No. 320.02)
2 Nos.
Gasket (Part No. 400.02)
2 Nos.
Gasket (Part No. 400.03)
2 Nos.
O-Ring (Part No. 412.01)
2 Nos.
O-Ring (Part No. 412.02)
2 Nos.
Throat Bush (Part No. 456.01)
2 Nos.
Wear Ring Stationary (Part No. 502.01)
2 Nos.
Impeller Wear Ring (Part No. 502.01)
2 Nos.
Constant Level Oiler (Part No. 638.01)
2 Nos.
Gasket (Part No. 400.10)
2 Nos.
Gasket (Part No. 400.05)
4 Nos.
Circlip (Part No.932.01)
2 Nos.
Gasket-Gland in PTFE, P.No.5 Set of Set Screws in 1.4401 (1 Set = 6 Nos.), P.No. 1.6, 12b & 14
1 Nos.
Set of O-Rings in EPDM (1 Set=3 Nos.). P.Nos.7, 3, & 12
2 Sets
Sleeve in SS316, P.No.6
1 No.
Set in Buka22, P.No.2
1 No.
2 Sets
1 Set
Mech-13/11
Mech-12/11
Mech-06/11
14.04.11
14.04.11
07.04.11
Rotory Head Assembly in Buko 03 + 1.4462 includes P.Nos.1.1 to 1.7 Gasket-Gland in PTFE, P.No.5 Set of Set Screws in 1.4401 (1 Set = 6 Nos.), P.No. 1.6, 12b & 14
2 Nos.
Set of O-Rings in EPDM (1 Set=3 Nos.). P.Nos.7, 3, & 12
4 Sets
Pumping Ring in 1.4401, P.No.13
2 Nos.
Sleeve in SS361, P.No.6
2 Nos.
Set in Buka 22, P.No.2 Rotory Head Assembly in Buko 03 + 1.4462 includes P.Nos.1.1 to 1.7 Gasket-Gland in PTFE, P.No.5 Set of Set Screws in 1.4401 (1 Set = 6 Nos.), P.No. 1.6, 12b & 14
4 Nos.
05.04.11
1 Nos. 1 Set
Sleeve in SS316, P.No.6
1 No.
Seat in Buka22, P.No.2 Rotory Head Assembly in Buko 03 + 1.4462 includes P.Nos.1.1 to 1.7 CW Pump Spares, Make: Kirloskar
1 No.
1 Set
Assembly body Seals
2 Sets
1 No.
1 set
Assembly Seals Inner Seat
2 Sets
Assembly Stuffing Box packing
1 set
Metall bellow
1 set 2 Sets
Assmbly Inner Set 05.04.11
4 Nos.
2 Sets
Assembly body Seals Mech-001/11
2 Sets
Set of O-Rings in EPDM (1 Set=3 Nos.). P.Nos.7, 3, & 12
Assmbly Inner Set Mech-002/11
1 No.
1 set
Assembly Seals Inner Seat
2 Sets
Assembly Stuffing Box packing
1 set
Metall bellow
1 set
MECHANICAL INDENTS FOR TH INDENT NO.
INDENT DATE
Mech-168/12-13
11.02.13
Mech-167/12-13
30.03.13
Mech-166/12-13
11.02.13
Mech-164/12-13
09.02.13
DESCRIPTION
QUANTIT Y ORDERE D 30 Mtrs.
20 NB CS Pipe SCH-40 Multi-layer Expansion Bellow Fabric to withstand operating 12 Mtrs. temp 750 Deg, Make: Hi-Tech Aluminized Fiber Glass Tape, 4" X 1mm X 30 Mtrs, Item 1 No. Code: HT-ALGL, Make: Hi-Tech Silicon Glue Tube 3 Nos. 8 Mtrs. Long Gas Cooled Tig Torch, Model: GC-20, Make: 1 No. SAP 1" GI Pipe SCH 40 both side threaded 100 Mtrs. 1" Female Threded Brass NRV #800
1 No.
1" GI Threded Union 80 NB CS Gate Valve #150 Flange type, Make: AUDCO / VALTECH
1 No. 2 Nos.
Mech-158/12-13
Mech-152/12-13
06.02.13
22.01.13
100 NB CS Gate Valve #150, Flange type, Make: AUDCO / VALTECH 150NB CS Gate Valve #150, Flange type, Make: AUDCO / VALTECH Filter Element UE 219 AP08H (MAH 580), F 137155, Make: PALL Filter Element (040417), Make: BOLL & KRICH, Length of the Filter Element: 510mm, Material of Construction: Wire Mesh Steel (SS), Micron Rating of Filter: 12 Microns
2 Nos. 2 Nos. 2 Nos.
4 Nos.
Mech-150/12-13
21.01.13
Mech-148/12-13
07.01.13
Mech-145/12-13
07.01.12
Oil Mist Separator Filter Tubes (Filter type: FF2166.30012) Pre Filters type CAM-FLOW X MGT-7 (CFSS-F7-592 / 592 / 640-10-25) Gaskets for Pre-Filters
Mech-134/12-13
08.12.12
EP-2 Grease, Make: Castrol
60 Kgs.
HP Piston Rings - 2480035851
4 Nos.
HP Endless Guide Rings - 2480038750
4 Nos.
Filter Element - 910071250
3 Nos.
HP Cusion Plates - 2460065450
30 Nos.
LP Cusion Plates - 2460060450
36 Nos.
Oil Wiper Rings - 2480031350
8 Nos.
Packing Assy.3pcs - 2460102150
6 Nos.
Packing Assy.6pcs - 2460102050
6 Nos.
Packing 1.6th - 2460010750
4 Nos.
Packing 1.6th - 2460010550
4 Nos.
Packing (Cylinder to Valve Assly)-2460011850
24 Nos.
Packing (Cylinder to Valve Assly)-2460021850
16 Nos.
Stud M12x1.75x25L (Cyl to Valve Cover) - 9990364850
30 Nos.
Stud M12x1.5x45L (Cyl to Valve Cover) - 9990363650 Glass Fibre pads, Make: CAMFIL, Size: 620 x 620 x 100mm (Coalerser Pads) Filler W ire UTP A 6170 Co (Size: Ø 1.6 X 1000mm) Filler Wire Thyssen Thermanit 617 (Size: Ø 2.4 X 1000mm) Filler W ire Bohler DMO-IG (Size: Ø 2.4 X 1000mm)
30 Nos.
Mech-130/12-13
Mech-128/12-13
Mech-126/12-13
30.11.12
27.11.12
26.11.12
Filler Wire Bohler CN 16/13 (Size: Ø 2.4 X 1000mm )
46 Nos. 60 Nos. 500 Nos.
780 Nos. 5 Kgs. 5 Kgs. 5 Kgs. 5 Kgs.
UTP 6170 Co. (Size: Ø 3.2 X 350) Electrode
2 Packets
Bohler FOX CN 16/13 (Size: Ø3.2 X 350) Electrode
2 Packets
Bohler DMD kb (Size: Ø 3.25 X 350) Electrode
2 Packets
Stem, MOC: AISI 410
1 No.
Disc, MOC: AISI 410 Stellited
1 No.
Mech-124/12-13
20.11.12
Mech-121/12-13
09.11.12
GI Beam 250X125, Web thk: 8mm
18 Mtrs.
Mech-103/12-13
18.09.12
Servo Mesh SP 460 Oil
210 Ltrs.
Mech-89/12-13
22.08.12
Scoop Tube Shaft for Fluid Coupling, Model: MR 600
1 No.
28mm SS 304L Ferrule Fitting Elebow
32 Nos.
28mm 304L 90 Deg. Ferrule Connector
32 Nos.
28mm SS 304L 3000# Socket weld Union 3/4" NPT male thread X 28mm Ferrule fitting SS 304L Connector
32 Nos. 32 Nos.
Mech-88/12-13
16.08.12
3/4" SS 304L, Pipe U-Clamp 28mm 304L, Pipe OD:28mm, ID: 24mm, thk: 2.015mm
Mech-75/12-13
Mech-63/12-13
26.07.12
04.06.12
Mech-50/12-13
Mech-43/12-13
Mech-37/12-13
Mech-36/12-13
Mech-35/12-13
Mech-32/12-13 -
-
07.07.12
05.07.12
12.06.12
04.06.12
02.06.12
02.06.12
02.06.12
120 Mtrs.
1/2" SS 304L Ferrule 90 Deg. Elbow (One side male NTP Thread) 25NB, SW, 3000#, CS Equal Tee with one side BSP Thread Servo Gem EP0 Grease
20 Kgs.
Lube Oil Filter Element
4 Nos.
Fuel Oil Filter
2 Nos.
Element and Ring
2 Nos.
Coolant Additive
1 No.
O-Ring Set
2 Nos.
Engine Lube Oil Pepremium Blue SAE 15W40 Mech-52/12-13
80 Nos.
16 Nos. 6 Nos.
210 Ltrs.
High Focus Torch Lights
1 No.
EP-2 Lubrication Grease
60 Kgs.
Toothed Gear for Flud Coupling, Model: Mr 600
2 Nos.
Gear Rack for Fluid Coupling, Model MR 600
2 Nos.
Spring for Flud Coupling Model: MR 600
2 Nos.
Scoop Tube for Fluid Coupling, Model: MR 600
2 Nos.
Servo System 68 Oil
210 Ltrs.
Castrol 20/40 Oil
50 Ltrs.
Servo Press 68 Oil
210 Ltrs.
Servo System 220 Oil
100 Ltrs.
Shaft - S821145001
1 No.
Impeller & Shaft Shrink fitted
1 No.
Gland Packing - 1551000011
1 Set
Lock Ring - 1440000001
1 No.
Key - 140000004
1 No.
O-Ring - 1960000063
2 Nos.
Distribution Ring - 1922000001
1 No.
Flat Gasket - 1940000130
2 Nos.
Floating DE - 1493000002
2 Nos.
Shaft Seal Ring - 1530000008
2 Nos.
Rolling Contact Bearing SKF 32313 B / Q / U2 / CL7A
1 No.
Rolling Contact Bearing SKF 32312 BJ2 / QCL /7C
1 No.
Rolling Contact Bearing SKF 32024 X D720
1 No.
Rolling Contact Bearing SKF 32224 J2
1 No.
Rolling Contact Bearing SKF 32315/Q
2 Nos.
Bevel Pinion Shaft L ZY 290, 0/3, 22
1 No.
Rolling Contact Bearing 32313 B /Q/U2/CL7A
1 No.
Rolling Contact Bearing 32312 BJ2/1CL7C
1 No.
Rolling Contact bearing 32024 XD720
1 No.
Rolling Contact Bearing 32224 J2
1 No.
Pinion Shaft RP 250, 0/3, 53
1 No.
Bevel Gear R ZY 290, 0/3. 15
1 No.
Rolling Contact Bearing 32315 /Q
2 Nos.
Frame / Bearing Housing High Efficiency F9 Fine Filters CGT-HF-P-F9592x592x292-01
1 No. 785 Nos.
.
Mech-29/12-13
.
29.05.12
Pre Filters Type: CAM-Flow XMGT-7 (CFSS-F7592X592X640-10-25) Cam Vane 3X5 along with Holding Strips Cam Vane 3X4 along with Holding Strips Holding Strips 3X5 and 3X4
Mech-24/12-13
Mech-23/12-13
Mech-16/12-13
21.05.12
19.05.12
12.12.12
Shaft Seal 065x085x08 CRW1-R 25420
64 Nos.
Rolling Contact Bearing 32313 BD 720
8 Nos.
Rolling Contact Bearing 32312 BD 720
8 Nos.
Shhaft 135X0684
2 Nos.
Gear Wheel LP 250, 0/3, 53
2 Nos.
Shaft Seal 120x150x12, CRW 1-R 47250
32 Nos.
Rolling Contact bearing 32024 XD720
8 Nos.
Rolling Contact Bearing 32224 X 720
8 Nos.
Pinion Shaft RP 250, 0/3, 53
2 Nos.
Bevel Gear R ZY 290, 0/3. 15
3 Nos.
Rolling Contact Bearing 32315 D720
8 Nos.
Impeller Seal Ring (AL.BRONZE AB1)
2 Nos.
Impeller Key (SSA276 TP 410)
1 No.
Pump Shaft (SS A276 TP 410)
1 No.
Pump Line Shaft ( SS A276 TP 410)
2 Nos.
Shaft Sleeve (SS A276 TP 410)
2 Nos.
Head Shaft (SS A276 TP 410)
1 No. Each 2 Sets Each 2 Sets Each 3 Sets 3 Nos.
Gasket Sets
Mech-09/12-13
16.04.12
Water Deflector (Neoprene Rubber) Chiller Unit Compressor Unit, Model No.: KCG 554 HAE D512 SR No: EWK 2836 05F, 400V, 50 Hz, 3P, LRA44-R22, Kirloskar Copeland Ltd., Karad, India Fabric Expansion Bellow, Size: 6100X6100X525mm to withstand for hot flue gas temperature of 850 Deg.C M12X65mm, 8.8 Gr Bolts & Nuts with Washer
Mech-08/12-13
16.04.12
Fabric Expansion Bellow, Size: 6100X6100X350mm to withstand for hot flue gas temperature of 850 Deg.C M12X65mm, 8.8 Gr Bolts & Nuts with Washer Fabric element assly, Material: UFV-100 (as per attached Drawing)
Mech-06/12-13
5 Sets Each 10 Sets
2 Nos.
Cutless Buss (Bronge + NITRLE RUB.)
02.05.12
3 Sets
Pressure Sealed Bonnet NRV, Size: 200mm, 1500 Class, Body Material: ASTM A216 GR WCB, Butt Weld ends, Sch120, Make: AUDCO Bevel Pinion Shaft L ZY 290, 0/3, 22
Bush (THORDON)
Mech-15/12-13
1570 Nos.
10.04.12 Dome seal, Materia: DS-CR (as per attached Drawing)
1 No.
1 No. 26 Mtrs length X 1 No. 450 Nos. 26 Mtrs length X 2 Nos. 450 Nos. 26 Mtrs length X 0.350 Mtrs. Width As per attached Drawing
Fabric element assly, Material: UFV-100 (as per attached Drawing) Mech-01/12-13
02.04.12 Dome seal, Materia: DS-CR (as per attached Drawing)
20 Mtrs length X 0.350 Mtrs. Width X 2 As per attached Drawing
MECHANICAL INDENTS FOR TH INDENT NO.
INDENT DATE
DESCRIPTION
Manual Steel Strapping Tool, Item Code: HMT-19-32, Strap Gauge Range (0.023 to 0.031), Strap Width Range: Mech-49/13-14
Mech-44/13-14
Mech-42/13-14
Mech-28/13-14
Mech-18/13-14
16.10.13
23.09.13
07.09.13
16.07.13
03.06.13
QUANTIT Y ORDERE D
1 No.
1
5/8" to 1 /4" Steel Strap Roll, W idth: 2mm, Thickness: 0.6mm
200 Mtrs.
GI Packing Clips to suit 25mm wide Steel Strap 216 Coal Tar Epoxy Coating with its recommended Thinner, Color: Black Enamel Black Paint (Berger)
100 Nos. 3000 Ltrs.
Thinner
130 Ltrs.
ETCH Primer
40 Ltrs.
Signal Red Paint (Berger)
650 Ltrs.
40 Ltrs.
Impeller, Part No.8
5 Nos.
Impeller Lock Collet, Part No.9
6 Nos.
BRG. Inter Bowl, Part No.10
6 Nos.
Pump Shaft, Part No.11
1 No.
Line Shaft, Part No.16
3 Nos.
Line Shaft Sleeve, Part No.17
4 Nos.
Line Shaft BRG, Part No.18
4 Nos.
Bearing Retainer, Part No.20
4 Nos.
Top Shaft Sleeve, Part No.27
2 Nos.
Top Shaft, Part No.44
1 No.
Line Shaft Coupling, Part No.47
2 Nos.
Impeller Wearing Ring, Part No.50
4 Nos.
Casing Wearing Ring - 51
4 Nos.
Impeller
1 No.
Bearing Sleeve
2 Nos.
Wear Ring - Casing - 001
2 Nos.
Wear Ring - Stuffing Box - 002
2 Nos.
Shaft Sleeve - 021
2 Nos.
Water Seal Cage - 028
1 No.
Shaft - 050
1 No.
Gasket - A01
2 Nos.
Gasket - A02
2 Nos.
Gasket - A03
2 Nos.
Gasket - A09
2 Nos.
Gasket - N/A
2 Nos.
Packing - A30
2 Nos.
Gasket - A60
4 Nos.
Gasket - A61
2 Nos.
Oil Seal - PE - A66
2 Nos.
Ball Bearing - A67
2 Nos.
Roller Bearing - A68
2 Nos.
Angular Contact Ball Bearing - A69
2 Nos.
Oil Seal - ME - A70
2 Nos.
Constant Level Oiler - A71
2 Nos.
Lock Washer - A72
2 Nos.
KSB MAKE WK 65/3 PUMP
Mech-17/13-14
Mech-14/13-14
15.05.13
07.05.13
Casing Wearing Ring - 1502
3 Nos.
Gland - 1452
2 Nos.
Gland Packing Set - 1461
4 Sets
SP Sleeve Suction - 1524
2 Nos.
SP Sleeve Discharge - 1524
2 Nos.
Spacer Sleeve Suction - 1525.01
2 Nos.
Stage Sleeve - 1521
4 Nos.
Splash Ring - 1507
2 Nos.
Oil Seal Set - 1421
6 Sets
Constant Level Oiler - 1638
2 Nos.
Impeller - 1230
3 Nos.
Spacer Sleeve Discharge - 1525.02
2 Nos.
Shaft - 1210
2 Nos.
Set of Gasket & O-Ring - NA
2 Sets
KSB MAKE WK 65/4 PUMP
Casing Wearing Ring - 1502
3 Nos.
Gland - 1452
2 Nos.
Gland Packing Set - 1461
4 Sets
SP Sleeve Suction - 1524
2 Nos.
SP Sleeve Discharge - 1524
2 Nos.
Spacer Sleeve Suction - 1525.01
2 Nos.
Stage Sleeve - 1521
4 Nos.
Splash Ring - 1507
2 Nos.
Oil Seal Set - 1421
6 Sets
Constant Level Oiler - 1638
2 Nos.
Impeller - 1230
3 Nos.
Spacer Sleeve Discharge - 1525.02
2 Nos.
Shaft - 1210
2 Nos.
Set of Gasket & O-Ring - NA
2 Sets
LP Piston, 2480030150
1 No.
LP Piston Rod 2480030250
1 No.
HP Piston Rod 2480035250
1 No.
Crosshead Nut 2460030450
2 Nos.
Piston Washer 2480030550
2 Nos.
Main Bearing Set 2460032250 & 2460032350
3 Sets
Big End Bearing Assy (CR Bearing) 2460032450
2 Sets
Connection Rod Bushings 950030300
2 Sets
Pin 950036600
2 Sets
Oil Seal 2410110550
2 Nos.
Mech-13/13-14
Mech-12/13-14
07.05.13
06.05.13
Mech-11/13-14
06.05.13
Mech-10/13-14
06.05.13
Mech-09/13-14
07.05.13
Spider 9992701011
2 Nos.
Lift Washer 2460071250
20 Nos.
Circlip 2460061150
10 Nos.
Assly of 3-Piece packing 2480102150
12 Nos.
Assly of 6-Piece packing 2480102050
12 Nos.
5H66 Crank Shaft 1 Assy
1 No.
5H46 Aluminum Piston
6 Nos.
Conn Rod Assy 5H
6 Nos.
Valve Plate 5H
3 Nos.
Main BRG Pump End 5H66
1 No.
Main BRG S.E. for 5H66
1 No.
Pair of Con Rod BRG for 5H
6 Nos.
5H CYL Sleeve
6 Nos.
Piston Pin 1"
6 Nos.
Comp Ring 5H46/66
12 Nos.
Oil Ring 5H
6 Nos.
Dis Valv Guid Assy
6 Nos.
SV Disc 5H
6 Nos.
Gasket Set 5H60/66
1 No.
Oil Relif Valve Asy 5H
1 No.
SV Spring 5H
36 Nos.
Pin Valve Lifter 5H
24 Nos.
Valve Lifter Pin Spring
24 Nos.
DV Seal Lock Washer
18 Nos.
Oil Pump Bush M/C 5h/5F
1 No.
Oil Pump Package 1 5H40/46/66/86
1 No.
SE BRG Washer 5H
1 No.
Thrust Washer 5H
1 No.
PE BRG Washer 5H
1 No.
Oil Filter Screen 5H
1 No.
Nylock Nuts
8 Nos.
Lock Ring 5H Piston Pin
12 Nos.
Suction Strainer Assy.
1 No.
Cranckcase Heater 6"
1 No.
Bush Con Rod 5H Carboline Multibond 2000 Primer Chlorinated Rubber Paint (Dark Grey Color) Carboline Multibond 2001 MID Chlorinated Rubber Paint (Dark Grey Color) Carboline Multibond 3000 Finish Chlorinated Rubber Paint (Dark Violet Color) Thiiner #25
6 Nos.
20 Ltrs.
Island Green Epoxy Paint (Code No.207)
160 Ltrs.
Epoxy Paint Thinner
25 Ltrs.
Island Green Epoxy Paint (Code No.207)
45 Ltrs.
Paint Brushes - 3"
10 Nos.
Red Oxide Paint
150 Ltrs.
Enamel Black Paint - 800
150 Ltrs.
Thinner
40 Ltrs.
Wire Brushes
20 Nos.
Rough Emery Papers
20 Nos.
40 Ltrs. 40 Ltrs. 40 Ltrs.
E YEAR 2011-12 INDENT FOR SYSTEM
NATURE OF INDENT
PRIORITY
HRSG
Gen
7 Days
BOP
Prop. General
REMARKS
Immediate As instructed by the GM (O&M) sent to HO requireme on 14.03.12 nt
STG
Gen
4 Days
HOLD by CGM
STG
Prop
15 Days
Sent to HO on 14.03.12
STG
Prop
15 Days
Sent to HO on 27.02.12
GT / STG / BOP
Prop
15 Days
Sent to HO on 07.03.12
GTG
Prop
1 Week
Sent to HO by CGM on 15.02.2012
STG
General
7 Days
Sent to HO on by 06.03.12
BOP
Prop
7 Days
Sent to HO on 27.03.2012
GT
General
ASAP
Sent to HO on 10.01.2012
GTG
Prop.
ASAP
Sent to HO on 25.01.12
GTG
Prop.
ASAP
Sent to HO on 25.01.12
GTG
Prop.
ASAP
Sent to HO on 25.01.12
GTG
Prop.
2 Months
Sent to HO on 05.01.2012
GTG
Prop.
1 Week
Sent to HO on 31.12.11
GTG
Prop
1 Month
Sent to HO on 25.01.12
GTG
Prop
ASAP
Sent to HO on 31.12.11
GTG
Prop
ASAP
Sent to HO on 16.12.11
GTG
Prop.
ASAP
Sent to HO on 31.12.11
BOP
Prop
1 Month
Sent to HO on 07.06.12
BOP
Prop
1 Month
BOP
Prop
25 Days
Sent to HO on 01.08.12
GTG
Prop
15 Days
Sent to HO on10.02.12
BOP
General
30 Days
Sent to HO on 03.02.12
BOP
General
Urgent
KGPL / Doc-257 (11-12) / Mech-133 (11-12) / 211, dt.26.11.11 cancelled and Docket sent to HO on 06.03.2012
BOP
Prop
30 Days
Sent to HO on 07.11.11
BOP
Prop
30 Days
Sent to HO on 28.12.11
BOP
Prop
30 Days
BOP
Prop
30 Days
BOP
Prop
30 Days
Sent to HO on 28.12.11
BOP
Prop
30 Days
BOP
Prop
30 Days
BOP
Prop
30 Days
Sent to HO on 28.12.11 BOP
Prop
30 Days
BOP
Prop
30 Days
BOP
Prop
25 Days
Sent to HO on 29.10.11
BOP
Prop
25 Days
BOP
Prop
15 Days
Sent to HO on 25.11.11
STG
Prop
15 Days
Sent to HO on 01.12.11
STG
Proprietory
7 Days
STG
Proprietory
7 Days
Sent to HO on 16.08.11
HRSG-1A
Proprietor 15 Days y
Sent to HO on 12.09.11
BOP
General
1 Month
Sent to HO on 22.08.11
GTG
Prop
15 Days
Sent to HO on 27.07.2011
GTG
General
10 Days
Sent to HO on 12.09.11
BOP
Prop
15 Days
Sent to HO on 12.09.11
HRSGs
Prop
25 Days
Sent to HO on 27.08.11
BOP
General
10 Days
Sent to HO on 12.09.11
BOP / GT / ST
General
1 Week
Sent to HO on 22.06.11
BOP
General
1 Week
Sent to HO on 22.06.11
HRSGs
Prop
25 Days
Sent to HO 18.05.11
HRSG- 1A & 1B
Prop
25 Days
Sent to HO on 23.07.11
HRSG
Prop
25 Days
Sent to HO
HRSG
Prop
25 Days
Sent to HO
HRSG
Prop
25 Days
Sent to HO
BOP
Prop
1 Month
Sent to HO on 25.06.11
GTG
PROP
1 Month
Sent to HO on 16.04.2011
GTG
PROP
1 Month
Sent to HO on 16.04.2011
E YEAR 2012-13 INDENT FOR SYSTEM
NATURE OF INDENT
PRIORITY
REMARKS
BOP
General
15 Days
Hold by GM
HRSG / GTs
Prop
15 Days
Hold by GM
BOP
Prop
15 Days
Hold by GM
BOP
General
5 Days
Hold by GM
STG / BOP
GT / STG / BOP
General
15 Days
Sent to HO on 08.03.2013
Sent to HO on 06.02.2013
Sent to HO on 06.02.2013
GT
Prop
At earliest
Sent to HO on 24.01.2013
GTG
Prop
1 Month
Sent to HO on 08.04.2013
GT's
Prop
At earliest
Sent to HO on 08.01.2013
BOP
Prop
2 Days
Sent to H.O. on 24.12.2012
BOP
Prop
15 Days
Docket sent to 03.01.2013
GT
Prop
15 Days
Sent to HO on 08.12.2012
GT
Prop
7 Days
Sent to HO on 08.12.12
BOP
Prop
15 Days
BOP
General
15 Days
BOP
General
1 Week
Sent to HO on 21.09.12
HPBFPs
Prop
30 Days
Sent to HO on 11.10.12
BOP
General
15 Days
Sent to HO on 22.10.12
BOP
General
7 Days
Sent to H.O. on 24.12.2012
EDG
Prop
1 Week
Sent to HO on 16.08.2012
STG /
General
1 Day
HRSG BOP
Prop
25 Days
Sent to HO on 11.10.12
BOP
General
10 Days
Sent to HO on 16.06.2012
STG
Prop
30 Days
Sent to HO on 11.06.2012
BOP
General
5 Days
Local cash purchased on 07.07.12 Sent to H.O. on 09.07.2012 & 24.12.12
Sent to HO on 07.06.12
BOP
Prop
At earliest
BOP
Prop
10 Days
Sent to HO on 11.06.2012
Sen to HO on 31.05.12 GTG
Prop
ASAP
30 Days
Spare Gaskets were arranged for NRV. No need to procure entire NRV by AGM (O&M) on 26.11.12.
BOP
Prop
BOP
Prop
BOP
Prop
1 Month
Sent to HO on 14.12.2012
BOP
General
14 Days
HOLD by CGM
BOP
General
Immediate requireme nt
Sen to HO on 20.04.12
BOP
General
Immediate requireme nt
Sen to HO on 20.04.12
BOP
General
10 Days
Sent to HO on16.05.2012
Sent to HO on 01.08.2012 Immediatel KGPL / Doc-346 (12-13) / Mech-28 (12-13) / y 263, dt.22.01.13
BOP
General
10 Days
Sent to HO on16.05.2012
REMARKS
E YEAR 2013-14 INDENT FOR SYSTEM
NATURE OF INDENT
PRIORITY
BOP
Prop.
5 Days
BOP
General
15 Days
Sent to HO on 26.09.2013
ASAP
Sent to HO on 26.09.2013
BOP BOP
General BOP BOP
BOP (Service Water Pump)
BOP / CCR HVAC
Prop.
Prop.
Sent to HO 23.08.2013
1 Month
Sent to HO on 27.06.2013
ys em
GT-1A . GT-1B / STG Seal Oil Pumps
Prop.
1 Month
Sent to HO on 31.05.2013
BOP / Air Compress or Spares
Prop.
1 Month
Sent to HO on 27.06.2013