GT series dewatering screen
Operation Manual
Lipu Heavy Industry CO.,LTD
GT series dewatering screen
Preface Thank you for using GT serial dewatering screen of Lipu Heavy Industry Co.,Ltd. Before your installation and using, please read this manual carefully. If you do not comply with the instruction of this manual, there would be some unnecessarily damage to the equipment, personality or property. If there is anything in doubt, please contact us and we will promptly and enthusiastically to support you at all cost. This manual is mainly explaining to structural features, working principle, installation &commissioning, using and maintenance, trouble analysis and elimination, and transport, storage etc. If the appearance chart and other illustration in manual is different from actual products, the actual product is prevail when using. Our company products technology will be continue to innovate and technology instruction would change too if any changes without notice.
Lipu heavy industry co.,ltd
Hotline:400-021-9929
1
Catalog
Manual
CATALOG .................................................................................................................................................................... 2 0
KEY TIPS ............................................................................................................................................................... 3
1
SAFETY INSTRUCTION ..................................................................................................................................... 3 1.0 SUMMARIZE ......................................................................................................................................................... 3 1.1 TRANSPORT AND STORAGE ................................................................................................................................ 4 1.2 INSTALLING AND COMMISSIONING ...................................................................................................................... 4 1.3 USAGE AND MAINTENANCE ................................................................................................................................ 5
2
EQUIPMENT SUMMARIZE ................................................................................................................................ 5 2.0 SUMMARIZE ......................................................................................................................................................... 5 2.1 WORKING PRINCIPLE .......................................................................................................................................... 5 2.2 PRODUCTS SPECIFICATION MODEL AND SIGNIFICANCE..................................................................................... 6
3
STRUCTURE FEATURE .................................................................................................................................... 6 3.0 SUMMERIZE ......................................................................................................................................................... 6 3.1 EXCITER .............................................................................................................................................................. 7 3.2 SCREEN BOX ....................................................................................................................................................... 7 3.3 SCREEN MESH ..................................................................................................................................................... 7 3.4 BRACKETS .......................................................................................................................................................... 7 3.5 DAMPING DEVICE ................................................................................................................................................ 8
4 MAIN TECHNICAL PARAMETER ....................................................................................................................... 8 5 INSTALLING AND COMMISSIONING ................................................................................................................ 8 5.1 EQUIPMENT INSTALLATION ................................................................................................................................. 9 5.2 EQUIPMENT COMMISSIONING .............................................................................................................................. 9 6
EQUIPMENT USAGE AND OPERATION ....................................................................................................... 9 6.1 INSPECTION BEFORE SCREEN MACHINE START-UP ........................................................................................... 9 6.2 HOW TO START&STOP SCREENING MACHINE. ................................................................................................. 10
7
EQUIPMENT MAINTENANCE ........................................................................................................................ 10 7.0 SUMMERIZE ....................................................................................................................................................... 10 7.1 INSPECTION CONTENT ....................................................................................................................................... 10 7.2 WELDING AND GAS CUTTING ON SCREEN BOX ................................................................................................ 11
8
EQUIPMENT TRANSPORT AND STORAGE .............................................................................................. 11 8.1 PORTERAGE ...................................................................................................................................................... 11 8.2 TRANSPORT ...................................................................................................................................................... 12 8.3 STORAGE .......................................................................................................................................................... 12
9
UNPACKING AND INSPECTION ................................................................................................................... 12 9.1 UNPACKING CAUTION ....................................................................................................................................... 12 9.2 INSPECTION CONTENT ....................................................................................................................................... 12
Lipu heavy industry co.,ltd
hotline:400-021-9929
2
GT series dewatering screen
0
key tips 0.1 Please be sure to pay attention to Table0.1 which will appear in different places
of this manual. Table 0.1
Safety and warning
Electric shock hazard that can result in death or serious injury.
Mechanical hurting hazard that can result in death or serious injury.
Hazard warning ,may lead to injury.
STOP
i
May lead to equipment failure or unexpected shutdown.
Operation tips and useful information.
0.2 Comply with provision of this manual is the premise of your personal property
safety, equipment quality assurance and basic operation. 0.3 This manual provide properly installation, usage maintenance and important information of GT series dewatering screen, please take good care of it. 1
Safety instruction The following related to transport storage, installing commissioning, usage and
maintenance of GT series dewatering screen, if ignore these safety instructions may result in personal injury or property(equipment/materials/products)losses. 1.0 Summarize Equipment is under operation: electrified parts, moving parts; Equipment is stopped, electrified parts would be kept in short period of time. Non-professionals can not do following: ——Transport Lipu heavy industry co.,ltd
Hotline:400-021-9929
3
Manual
——Storage ——Installing/commissioning ——Usage ——Maintenance Please read the following information before any equipment operations. ——The draw attached in this manual ——Other random files ——Equipment Logo&sign ——The special provisions and requirements of equipments. ——National and local regulation about safety and accident precaution.
The following situation can cause serious personal injury and material damage: ——Incorrect porterage ——Incorrect installation ——Incorrect usage or operation ——unauthorized removal of necessary safety devices. 1.1 Transport and storage ——Confirming products protection during transporting, checking the packing outer case situation immediately once receive the products, if any damage exists, please notify courier and us immediately, this is the premise of claim during transporting. ——Please strictly follow the instructions about products porterage, or it may cause personal injury and equipment damage.。 ——Equipment long term stored must be strictly following long term storage regulation in manual, you should make enough lubricants or grease in indicated place and take care of rust-proof process. Electric controlling box should be particularly protected based on long term storage. 1.2 Installing and commissioning ——The equipment installation and commissioning should be handled by our company or agent of professional installer. After dismantling packing box, if find any Lipu heavy industry co.,ltd
hotline:400-021-9929
4
GT series dewatering screen
discrepancies of products catalogue, please contact us in time.
——If any abnormal phenomenon(such as vibration, sharp noise, ultra-wide temperature) exists in commissioning process, please stop machine immediately till find the trouble reason and solve it out. 1.3 Usage and maintenance ——The electrified parts, rotating parts is available during equipment operation when stage operation is needed, please be strictly following the instruction regulation to avoid electric shock injury, mechanical injury and falling injury in equipment using process. ——If any abnormal phenomenon(such as vibration, sharp noise, ultra-wide temperature) exists in commissioning process, please stop machine immediately till find the trouble reason and solve it out, and contact us if necessary. ——Equipment maintenance or troubleshooting process may involve electrified parts, gear transmission or mechanical parts removal etc, please be strictly following manual instruction regulation to avoid electric shock injury, mechanical injury or torch(hit)injury. 2
Equipment Summarize
2.0 Summarize GT series dewatering screen is widely used in coal preparation, mineral processing, building materials, construction, electricity and chemical industry products classification purpose, dehydration, tailings recovery. 2.1 Working principle 。GT series dewatering screen has the vibration motor with the same performance parameters as excitation source, when two sets of vibration motor in the same angular velocity do reverse operation, the inertial force produced by an eccentric block in a particular aspect torepeated stack or offset, so as to produce a great shock, driving the screen box along the straight line track to do periodic reciprocating motion, make the materials on screen mesh from input to output to do gradually vibrate, during the vibrating process the part less than the screen hole (water) through the sieve hole falls, the rest from the output falls, so as to achieve the purpose of classification, dehydration. Lipu heavy industry co.,ltd
Hotline:400-021-9929
5
Manual
2.2 Products specification model and significance
Products specification model is based on vibrating screen mesh size preparation, and its meaning is as follow T
G
10
30 Length of screen surface(dm) Width of screen surface(dm) Dewatering screen High frequency
3
Structure feature
i
The illustration of this chapter is only as reference chart of this manual,the actual product is final .
3.0 Summarize GT series dewatering screen is generally consist of exciter, screen box, screen mesh, brackets, damping device and other components(Chart 3-1)
1、exciter
2、screen box
3、damping device
4、screen mesh
5、bracket
Chart 3-1 Lipu heavy industry co.,ltd
hotline:400-021-9929
6
GT series dewatering screen
3.1 Exciter
This machine excitation source is two spindle parallel vibration motor, the two motor reverse rotation, produce the resultant force driving along the straight line screen box track reciprocating motion.
During the Installation or adjustment, maintenance of this department should prevent turning
device wounding !
The vibration motor ’s every end is driven by a main eccentric block and a rotating vice eccentric block made by adjusting the two eccentric block size to change an angle, then adjust the vibration motor excitation force size, and the vibrating amplitude values (see the vibration motor instruction). Two motor four groups of eccentric angles, and the direction of the eccentric on the motor must be identical
weight plate of four eccentric plate must be same to avoid unnecessary losses! After adjustment of auxiliary weight plate, must ensure no unimpeded situation of rotating equipment before start!
3.2 Screen box Cabinet side panel is made from quality blending steel, the central space of two side panel is connected with thick-walled seamless steel pipe, steel pipe ends are connected with box side panel by high-strength rivets forming frame type screen box. This structure can ensure the whole rigidity of screen box more solid, and much more difficult to be cracked and so on. 3.3 Screen mesh This machine has the polyurethane frame screen with’ the high wear-resisting blockingproof performance. According to the actual situation the screen hole size could be used by 0.1 2 mm occasions). 3.4 Brackets Brackets is welded by frame steel, which support the weight of entire screen machine and extra work loading. Adjust the relative height of front-brackets, back-brackets for vibrating screen to Lipu heavy industry co.,ltd
Hotline:400-021-9929
7
Manual
change inclination of screen surface.
If need to adjust the angle of the vibration sieve, only need put pad with different thickness under front-brackets or back-brackets.
After adjustment must ensure that two former and latter brackets have the same level height
3.5 Damping device Because of huge exciting force when vibrating works, adopting spring to separate vibrating screen equipment and bottom bracket ,could effectively reduce the vibrating impact on bottom base. 4 Main technical parameter Chart 4.1
Main technical parameter
Model
Motor power (KW)
Vibrating frequency (r/min)
Sieve diameter (mm)
Capacity (t/h)
Overall dimension (L×W×H)
Weight (T)
GT1030
2×1.5
1450
0.1-2
10-30
3438×1680×2308
2.4
GT1230
2×1.5
1450
0.1-2
15-45
3438×1880×2308
2.55
GT1530
2×2.25
1450
0.1-2
20-60
3438×2180×2398
3
GT1836
2×3.7
1455
0.1-2
30-80
4138×2480×2528
4
( Above parameters are for reference only, it is subjected to change without notice)
5 Installing and commissioning This machine should be installed by professionals! n
Before the installation, should ensure the lifting equipment is
appropriate and these devices should have valid certificates; Never use stranded cable, damage or knotted cable for lifting operation; Never use tools in not good condition or not match completely.
Lipu heavy industry co.,ltd
hotline:400-021-9929
8
GT series dewatering screen
5.1 Equipment installation Firstly install the brackets of screening machine on the top of embedded iron based on construction drawing, then place damping spring on the brackets and using lift equipment to lift screening box whose height should be higher than damping spring by 200mm,and then adjust the relative position of screening box and brackets till two units cope with each other completely, finally place screening box on top of spring slowly. 5.2 Equipment commissioning
STOP
To avoid unnecessary losses, must stop machine to do inspection if there is any emergency and exceptions! Electric wires must be operated by professionals! Two motor must reverse rotation!
(1)After equipment installation, should check fastening condition of all bolts; Check the relative position of screen box, feed chute and discharge chute to ensure no possibility of collision. (2)Check whether electrical wire is correct. ( 3) In four hours of the test run, vibration motor temperature will be gradually raised, and balance. Usually, bearing temperature rise should be less than 40 degrees. If found bearing has a sharp rise in temperature and must stop to check reasons. ( 8) Check all the fastening condition of bolts for screen machine. ( 9) Check whether there is abnormal noise of the screen,. (10)If there is no exception after 8 hours test running, the screen machine installation should be qualified. 6
Equipment usage and operation
6.1 Inspection before screen machine start-up Lipu heavy industry co.,ltd
Hotline:400-021-9929
9
Manual
Operators of screening machine should completely know the structure and working principle of equipment. Before starting screening machine, should make good preparation and check the condition of coupling to ensure screen mesh and other parts are in good condition.
6.2 How to start&stop screening machine. Screening machine is generally used in crushing&screening or washing process, and should be starting&stopping based on idle-load, therefore need to comply with reverse-process starting and along-process stopping. Screen machine starts, need to close knife switch, connect wire with grid, then press start button and one-time starting should be done. Except special circumstance, screen machine is not allowed to stop with mineral products. Usually press stop button to stop running of machine.
7
Equipment maintenance
7.0 Summarize Screening machine maintenance should be operating by professional people who are familiar with all process. Screening machine requires frequent&systematic inspection and maintenance;making equipment in good working condition, reducing downtime and repairing cost to prolong usage time of screening machine. 7.1 Inspection content 1 )Exciter (1)Checking the grease whether added. (2)Checking fastening condition of connection bolts。 (3)When equipment operated, the motor temperature whether too high. 2 )Screen box Lipu heavy industry co.,ltd
hotline:400-021-9929
10
GT series dewatering screen
(1)Checking the accumulation of material, whether form screen box, feeding equipment and discharging equipment collisions. (2)Checking screen surface tightening and wearing condition. (3)Checking whether the screen hole are blocked and the accumulation of material. (4)Checking fastening condition of connection bolts。
(5) When screen operates, check whether products is uniform distribution of screen surface. 3 )Support device (1)Check whether spring be fracture or broken. (2)Check whether products is accumulated around spring. (3)Check whether compression condition of each spring is uniform. (4)Check whether any cracking of weld connection exist. 7.2 Welding and gas cutting on screen box Generally welding and gas cutting is not allowed on screen box directly;Because welding and gas cutting would produce partial stress which would shorten screen box using life. In special circumstance, welding and gas cutting must be aware of follow: (1)As for cracking condition of side plate, must find the exact cracking end, and drill a hole of 5mm to prevent further expansion of cracks (2)When welding, be sure to make screen welding parts on the ground to prevent electricity current run through bearing. ( 3) Welding parts need warm-up in advance. ( 4) Grinding crack into groove shape, then adopt good quality electrodes for welding and make welding crack polished. ( 5) If must have gas cutting holes on screen box, the edge of holes should be polished, or equipment would be damaged because of intent stress. 8
Equipment transport and storage
8.1 Porterage Lipu heavy industry co.,ltd
Hotline:400-021-9929
11
Manual
Because of huge weight of equipment, must do lifting loading, see lifting position of the equipment 8.2 Transport This equipment should be shipped by land and sea transportation. Pay attention to sign on box when land transport,excepting the base, other parts could not be to place upside down, on its side and tilt too much. And also need to take appropriate protective measures to avoid any vibration and impacting of equipment during transport. Comply with relevant ocean transport regulation when shipping by sea. 8.3 Storage Screening machine could not be stored touching ground directly, should place a
wooden beam paving stablely,and the distance from the ground should not be less than 250mm.If store in open, should add rain cover to prevent wind&rain erosion. 9
Unpacking and inspection
9.1 Unpacking caution a) Before unpacking, should be carefully exam the package condition and also whether number, specification model of products is consistent with custom clearing documents; b) When open the package box, should remove the top part firstly, then open the four sides and make equipment out. 9.2 Inspection content a) Documents with products(Generally include: packing list ,instruction etc); b) According to the packing list, check the products content by piece and make the note; c) Check any deformation and scratches exist on device surface because of torching, knocking and severe vibrating etc.
Lipu heavy industry co.,ltd
hotline:400-021-9929
12