Overview of Shapath V- Green Building : SHAPATH V
Building orientation
Proper building orientation for best utilization of day light
Glazed north façade to take in Glare free north light.
Use of solar shading devices.
Deep overhangs on east and west
Water Water Conservation Use
Separate grey water line for flushing and landscaping Water efficient fixtures Recycled water for air
conditioning
Material & Resources
®
Chilled water based HVAC system Energy and water meter BTU Meter BMS system Sensor based Lights in common area
Eco-Friendly Climate Control
Improved indoor indoor air quality to enhance the comfort and well being of the occupants
Use of TFA- Treated Fresh air in the HVAC system
Zero use of CFC based refrigerants in new base building HVAC system
of Rain Water Harvesting
Use of Sewage Treatment Plant
Energy efficiency
Use of Fly Ash Bricks which is made from Industrial waste material
Provision
of RMC plant on the site
Waste disposal Provision
of different bins for dry and wet waste at every floor
SHAPATH -V Savings during consumption •
• Environment Control
• •
•
Reduced Footprint & construction cost • • • •
Sourcing local construction material Efficient use of water Water efficient landscaping Use of ash bricks, aluminum, frames, glass , Low VOC Paint and CRI certified Carpeting
•
•
Optimum Use of Day light Maintaining Air Quality • Natural Air Flow • Installation Air Handling Unit • Controlled Air Exhaust • Use of LED and CFL lighting • Water Management • Rain Water Harvesting • Water Efficient Plumbing and Fixtures • Water Treatment and Recycling and minimal Disposal • Grey water reuse in HVAC
Solid Waste Control Strategies • Ingress protection, preventing dust and external elements from entering the building • Separation of non bio degradable disposables Grey water recycling
SHAPATH -V
Technology to reduce Material Input per Unit of Service (M IPS), reduce your ecological footprint
Reduced unwanted heat gain/loss, pay less for power consumed in climate control
Reduced power consumption on artificial illumination, Pay less for power consumed in lighting
Rainwater Harvesting, Pay less for power consumption in water pumping
Treat and reuse of Grey water, Pay less for non drinking water consumption
Reduced garbage disposal, pay less for handling and clean up
SHAPATH -V
Reduced operating costs
Reduced impact on the t he environment
Energy savings: 20 – 20 –30 30 %
Enhanced occupant comfort, safety and health
Water savings: 40 – 40 –50 50 %
Improved Productivity of occupants
Green Features
SHAPATH -V
Low VOC material is used in the common & lobby areas
Rain Water Harvesting ,Water efficient fixtures, Water metering
Zero use of CFC based refrigerants in building HVAC system
1st building to provide Treated Fresh Fresh Air
Sewage Treatment Plant – Plant – Use Use of Recycle water in the flushing, Landscaping & HVAC
IBMS ( Integrated Building Management System)
Walling Material : Recycle material material (Fly Ash Bricks), Frame Frame Structure – Structure – RCC , Double Glazed Glass with Aluminum Aluminum Window
SHAPATH -V
• How Can you make the best use of it •
Guidelines by SAVVY- 5 simple Steps
Checklist
Submit Interior, Fire system, Plumbing and Electrical plans to SIPL for approval.
Obtain approval of HVAC plans from consultant.
Read and sign all attached sheets and agree to abide by the rules.
Obtain ‘Interior ‘Interior Commencement Permission’ Permission ’ from SIPL
SIPL’s designated
Allow periodic inspection by SIPL SIPL team. team.
Design Criteria for HVAC :
SHAPATH -V
Air Handling Unit (AHU) Temperature providing up to 24 o C.
W/Sq.Ft and Equipment Load of 2.0 W/sq. ft. Light Load of 1 W/Sq.Ft Occupancy of 100 Sq. Ft./person. Heat load for one computer is consider as 150 wt Server room load to be calculated separately according to the requirement
Treated eated Fresh Air which is exhausted through toilets. Tr emperature e controller and 2-way Valve with Ceiling Suspended AHU. Temperatur Tapping. The reading on your BTU Meter reading will be compared with Main BTU Meter provided on Chilled Water Tapping. BTU Meter and readings of main BTU Meter will signify total unit consumption.
Air
SHAPATH -V ins ulated Trapdoor must be An acoustic and insulated provided below the AHU and BTU meter in the ceiling Do not remove or displace the AHU installed
equipment like printer, scanner ( heat Electronic equipment like generating equipment ) etc. should not be near thermostat
by savvy without permission use Any kind of split or FCU. FCU. It will Do not use Any Ease of Maintenance and repair Reduction in wasted heat Reduced power bills for Air Cooling
disturb the functioning of AHU in the whole building and affect the billing as billing as well. duct of AHU must be acoustic and The supply duct of thermally insulated
BTU meter and 2-way valve should not be
tampered or damaged TFA duct should be kept open under the ceiling TFA should not have damper and should not be
closed
The distance between supply grill and return
grill must be 1 meter at least dampers should should be Manual or Automatic dampers provided in the cabins to reduce circulation in unoccupied areas closing glass doors should be provided at Self closing glass entrance of the office for better the main entrance of cooling
Additional cost would be applicable to for
additional load requirement apart from design load Keep in mind our standard design criteria for
HVAC ???
HVAC HVAC Billing Bil ling process SHAPATH -V
Fixed cost
Operating cost : Standard Hours
Operating cost : Odd hours (* If applicable)
It include common area airconditioning: - AMC of of centr central al chill chillin ing g syst system em - salary salary and and wage wagess of opera operator torss - exhau xhaust st fans. ans.
It will be metered metered with the BTU BTU meter reading installed in each offices and charged on the basis of: Actual usage for standard operating hours : 9 AM to 9 PM
It will be metered and charged on the basis of : -Actual usage during odd operating hours : 9 PM to 9 AM -It will be higher than the standard working hour charges as the demand will be low during these hours -Reduced if the demand during these hours increases.
This will be charged on the basis of office area
In case of any technical problem in billing, the decision of Sr. MEP engineer would be final and binding to all.
SHAPATH -V
Grill Must be provided in Toilet Door (min. size 6” x 6”) Exhaust Grill Must Exhaust provided not be extension of Exhaust provided in the toilets should not be removed. In case of extension of toilets , exhaust AHU must waterproofing should be done line for the AHU must be extended and proper waterproofing should line marked in Green Green is is connected for Flushing and Flushing and Domestic line is line is Please ensure grey water line marked Maintaining Air Quality Reduced water consumption Water and Energy bill savings Ease of refitting and repair
connected for other domestic purposes Flush or Push Cock for Cock for Flushing, and the flush tank must tank must be retained Make sure not to use Flush or CPVC pipe pipe for alteration. Also, ensure that the diameter of the pipe should Please use UPVC or CPVC not be more than vertical pipe line point in the drainage line Please make sure to provide cleaning point in drill in Toilet wall Please do not drill in
SHAPATH -V Tr Trapdoor apdoor must be provided provided below fire sprinkler main valve in the ceiling Sprinkler Main valve in your office must not be closed All sprinklers must must be below the ceiling level & visible from below
Effective safety system Use Flexible Sprinkler line if you want to change the location of Sprinkler
CFL, LED lights to be used for better performance of HVAC system. Halogen lights are prohibited
Reduced power bills for lighting No additional exhaust load to be connected in the existing exhaust duct like chimney, kitchen
equipment, etc. that exhausts hot air. In such cases it is recommended to install exhaust fan with carbon filter
Emission control Waste heat control
Best Practices in HVAC for AHU Locating the AHU
Please do not change the AHU location unless absolutely necessary.
The AHU will cause some noise. Ideally it should be located in areas of less occupancy expected ( like server room , storage room, pantry etc.)
AHU should be located close to toilet to facilitate efficient drainage.
o
AHU units pulley is design on the base of 70 dg bar and the ducting should be accordingly done to overcome the noise factor
Best Practices For HVAC Work Locating the AHU
Trap Door to be provided in the ceiling below AHU unit.
BTU meter should be installed below the ceiling to facilitate easy visibility.
AHU must be acoustically insulated from all four sides with Glass wool of 40 density.
Best Practices for ducting in HVAC
Ducting must be provided for return air
Supply and return duct must have thermal Insulation
Supply duct must have acoustic insulation with glass wool for at least, first 3 meter distance
TFA duct should not have a damper or lid should not be closed
Minimum Distance between Supply and Return Grill should be 1.00 Mt.
Best Practices For HVAC Work Heat Load CFL, LED lights to be used for better performance of
HVAC system. Halogen lights are strictly prohibited.
Electronic equipment like printer, printer, scanner ( heat generating equipment ) etc. should not be kept near thermostat
Do not connect additional exhaust load (like chimney,
kitchen equipment, etc. which exhausts hot air. )to the existing exhaust duct. If required, than we recommend to install exhaust fan with carbon filter.
Best Practices in For HVAC work- In Toilets
Exhaust Grill Must be Provided in Toilet Door (min. size 6” x 6”)
Mechanical Exhaust provided in toilet should not tampered or removed
Ideally toilet location should not be changed. If absolutely necessary to re-locate toilet, the mechanical exhaust ducting should be extend to the new location
Drain pipe for for AHU should have proper slope minimum 1-1/2 “.
Best Practices in HVAC – Better performance
Self closing door must be provided at main entrance door of office.
Proper insulation along the edges of the door will ensure minimum losses.
Best Practices in for Green building Interior work- Fire
Do not close the main Sprinkler’s Main valve in your office and do not tamper the installed fire line
Trap door must be provided below Main Fire valve
All sprinklers must be below the ceiling level & visible from below.
Ideally, location of fire sprinklers should not be changed. If absolutely necessary, then flexible pipes should be used for the same.
Best Practices in for Green building Interior work
Use of Flush or Push Cock for Flushing is prohibited, and the flush tank must be retained.
Please ensure grey water line marked in Green is connected for Flushing and Domestic Pipe is Connected for other domestic purpose
Water proofing should be proper in case of re-location of toilet, it should be done with Bitumen sample
Best Practices in for Green building Interior work
Please use UPVC or CPVC pipe for Alteration. And also check diameter of pipe should not be more than vertical pipe line.
Please do not drill in Toilet wall without consulting the Site Engineer Engi neer..