1976 Built / 129,000 m 3 Moss Containment 2.5 bcm / year Dubai Near Shore (Existing Pier) Over jetty LNG transfer HP arms on pier Closed Loop
West Java
Mejillones Petrobras- VT1 Escobar Bahia Blanca Golar Operational / Committed Other Industry Operational / Committed Locations where further projects have been proposed Source: Golar LN G Energy
A Fast Track Solution to Address A Urgent Need West Java urgently requires sources of gas and the FSRU is low cost and can be rapidly deployed versus other alternatives. Strong GDP growth driving gas demand in power and non-power sectors
1,800 1,600 1,400 1,200 d f 1,000 c m m 800
600 400 200 0 2000
2002
2004
2006
West Java Contracted & Committed
2008
2010
2012
Total W est Java Demand
2014
2016
2018
2020
Keys to Successful FSRU Projects GAS OFFTAKER(S)
PROJECT PROJECT DEVELOPMENT DEVELOPMENT CAPABILITY CAPABILITY
SITING
DEFINITION
• The Gas Offtaker – Commitment underpins project; Willingness to pay international LNG prices • Full Chain Project Development Capability Golar Spirit FSRU LNG Sourcing + FSRU The – world’s 1st FSRU conversion
+ Downstream Infrastructure + Gas Sales
• Siting of Vessel – Infrastructure requirements / Environmental conditions • Project Functional Requirements Definition – Regas Rate / Vaporization / Storage / Availability / Permitting / Emissions • A Clear Mandate / Strong Support Base – Clear project drivers / Support of government and/or strong energy partner
SUPPORT
Designed Specific to Project Requirements Golar Freeze FSRU
• 1977 Built / 125,000 m 3 • Moss Containment • 5.0 bcm / year • Offshore • Side by Side LNG transfer
West Java FSRU Project Highlights • First FSRU in Asia • First LNG import terminal in Indonesia • Charter with Nusantara Regas – 60% Pertamina / 40% PGN • Conversion scope ~ to Golar Freeze FSRU • Contract Term - Approximately 11 Years • Contract Value - $500M USD • 15 km offshore Muara Karang, Jakarta Bay
Golar Khannur FSRU
Complex Execution – Partner(s) are Key Vent Mast
Nitrogen Gens Air System Upgrade Low Voltage Switchboard HV/LV Transformer in Engine Room
Loading Arms
Intank pumps Vent K.O. Drum (not visible)
Suction Drum
Regasification Trains
Mooring Hooks
Export Manifold Minimum Send Out Compressor Metering
Turbo Generators
Seawater Pumps
High Integrity Protective Pressure System (HIPPS) Chain Stoppers High Voltage Switchboard
Seawater Discharge
And New Innovative Floating Solutions Floating Power Generation Plant Gas fired power plant incl. heat recovery
LNG loading arms for transfer of LNG from carriers