HYDROTEST PROCEDURE OF HEAT EXCHANGER AT SITE
UAE Arbitration Civil Code Procedure with all Articles of Chapter 3
PH: +923157532007 This documents discuss whole process abd procedures of audit with detail, for any query reader can call Umair Ahmed on above number
WELDING PROCEDURE
6325 Commissioning Procedure using craft Terminal
FIBCOM
Log in via ECT
Connect the Cross cable to the Management port of the CMCC card Click on the NM 6300 Extended craft terminal on the Lap top Click add NE, Select NE class, and write NE name in the NM 6300 Extended craft terminal windo
FIBCOM
Following Window will appear
FIBCOM
Log in via ECT
Write down the NE Address from the CMCC card (49000100a082f9846801) Clicking on the NE name the 6325 window will appear Click on the 6325 and insert expected rack and name Write the Rack Name Click on the Rack 0 and insert expected subrack All the cards available in the subrack will be available
FIBCOM
6325 Equipment View will appear
FIBCOM
Adding Equipment Inserting Expected Module into the operational NE STEP-1:- Select Equipment View... in the pop-up menu of the NE icon. The Equipment View window appears.
STEP-2:- Open the pop-up menu in the Subrack title bar of the subrack in which you want to insert a new module, and select Insert Expected Module.
FIBCOM
Adding Equipment cont…. STEP-3:- The Insert Expected Module into [-] Subrack window appears.
FIBCOM
Adding Equipment cont…. STEP-4:- Open the Module Type:, Module Subtype: and Module Slot ID: dropdown lists and select the required values for these attributes. Note: You are only able to place valid modules in valid slots. STEP-5:- Open the Module Usage: drop-down list and select the type of traffic you wish the ports of the module to handle.
FIBCOM
Adding Equipment cont….
FIBCOM
Adding Equipment cont…. STEP-6:- After making your choice for the Module. Click OK. The progress window appears, and the expected module is being inserted in the equipment. If no actual module exists in the slot in the physical NE, a Unit missing alarm is generated . The alarm will automatically cleared when an actual module is inserted in the physical NE.
FIBCOM
Removing an expected Module
To remove the expected module from the operational NE , right click on the module and click remove expected module, that module will be removed as shown in the figure..
FIBCOM
Changing the configuration of a module STEP-1:- Select Equipment View... in the pop-up menu of the NE icon. The Equipment View window appears. STEP-2:- Open the pop-up menu of the module you wish to edit, and select Edit Expected Module....
The Edit Expected Module [--] window appears.
FIBCOM
Changing the configuration of a module cont…. STEP-3:- Open the drop-down list of the attribute you wish to change and select the relevant value.
FIBCOM
Changing the configuration of a module cont…. STEP-4:- If you wish to:
insert an expected transceiver, select the relevant port ID in the Transceivers table, and select the relevant application code in the Application Code drop-down list remove an expected transceiver, select the relevant port ID in the Transceivers table, and select the value in the Application Code drop-down list.
STEP-5:- Click Apply. A progress window appears while the new attribute value is being set. STEP-5:- Click OK. The module attributes has been changed successfully
FIBCOM
Assigning the N SAP address
Path: Element Manager>Equipment>NE address>Click Ok. Enter NSAP address for node > soft reset the NE
FIBCOM
Assigning the NE identification • Path: NE>Edit Label>Click Ok. Enter NE Name for node.
FIBCOM
Creating cross connections ,Termination point and Trail Trace Identifier
. Path: Element management>Traffic Management>Click Ok. Path: Element management>Traffic Management>Click Ok. Make the cross connection through AU4 to VC4
STEP-1:- Select Element Management > Traffic Management... in the popup menu of the NE icon.
The Traffic Management window will appear. STEP-2:-Make the cross connection selecting AU4-1 and VC-4 001 and click connect in cross connection window STEP-3:- Select the AU4-1/ TU12 and go to attributes in the Traffic management STEP-4:- Select the AU4-1/TU12 and go to attributes in the Traffic management and monitor for Alarms Loopback . STEP-4:- Enable Trail Trace Identifier and send aTrace.
FIBCOM
Configuration Cross connections
FIBCOM
Configuration Termination Point
FIBCOM
Configuration Trail Termination Point
FIBCOM
Configuration Synchronization Source
STEP-1:- Select Element Management > Transport> Synchronization in the pop-up menu of the NE icon.
STEP-2:- Select Traffic Port> Configure > Assign Sources>Signal type >click add > Apply STEP-3:- Select Selector B > Configure> select the configure state > Enable STEP-4:- Select Priority for the selected state for STM-1/4 and Apply
FIBCOM
Configuration Synchronization Source
FIBCOM
Verifying the embedded software version STEP-1:- Select Equipment → File Management... in the pop-up menu of the NE icon. The File Management window appears. STEP-2:- Embedded software files can be verified
FIBCOM
Verifying DCN management
STEP-1:- Select Equipment > File Management > OHA and DCN management... in the pop-up menu of the NE icon. The OHA and DCN management window appears. STEP-2:- Select Configure >select port to be configured > select the DCCM/ DCCR byte .
FIBCOM
Resetting NE Causes and Effects:
All current performance data is cleared from its memory. All alarm-log data is also cleared from its memory. If the NE’s NSAP address was changed and this is the first time, since then, that the NE is being reset, the NE will operate with its new NSAP address after this reset.
Note: A reset does not erase the hardware configuration, and traffic is not affected.
You want to change the rack and/or subrack IDs for the NE. For a Tellabs 6325 node, this must be done using the Reset NE window. FIBCOM
Resetting NE cont…. Resetting NE to factory settings:
When you reset an NE to factory settings, the existing configuration, including the NSAP address and the ECC configuration, will be discarded. This reset operation affects current traffic.
Power Reset:
A complete reset of all modules in the NE is performed. The firmware and software is reloaded.
FIBCOM
Resetting NE cont…. How to reset ? STEP-1:-Select Operation and Test → Reset NE... in the pop-up menu of the NE icon. The Reset NE window appears: STEP-2:- Select the desired reset option from the reset window as shown in fig. STEP-3:- Click Reset. The NE has been reset.
FIBCOM
Resetting NE cont….
FIBCOM
Resetting a Module Individual module can be reset instead of whole NE.
Effect of Reset: The configuration of the module will be retained during a reset. Traffic will not be affected. Alarm generation and communication with the management system will not be possible during the reset. Power Reset:-A complete reset of the module is performed. The firmware and software is reloaded.