PERFORACIÓN CON LODO AIREADO FASES 30” Y 24’’
CAMPO ITAU, POZO ITU - 4D EQUIPO DLS - 153
ENERO DE 2013
Secure DrillingTM Services
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Reporte Final de Perforación con Lodo Aireado (SDTMS) Fases 30” y 24” Pozo ITU - 4D
Prepared by: Julio Rejas Salazar Operations Supervisors Weatherford Secure Drilling TM Services
Revised by: Johann Schroeder - FOM Bolivia Weatherford Secure Drilling TM Services & Juan Ignacio Hechem Operations & Applications Engineer Weatherford Secure Drilling TM Services Approved by: Alfredo Miguel Kaintz Engineering Manager ABC Weatherford Secure Drilling TM Services Authorized by: Eduardo Duran - CBUM ABC Weatherford Secure Drilling TM Services
Preparado para: Sr. JOSE PEPE VALLE Sr. PASCUAL SANDAGORDA
Enero del 2013
- PETROBRAS Energía Bolivia - PETROBRAS Energía Bolivia
2013 Copyright All Rights Reserved
Page 2 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
TABLA DE CONTENIDO 1
INTRODUCCIÓN
2
OBJETIVOS GENERALES
3
4
2.1
Objetivos de la Técnica de Perforación con Lodo Aireado.
2.2
Objetivos secundarios
2.3
Objetivos de QHSE
DATOS GENERALES DEL POZO 3.1
Coordenadas de Superficie
3.2
Secuencia estratigráfica
RESUMEN GENERAL DEL POZO 4.1
Topes de formación reales atravesados en fase 30” y 24”
4.2
4.2 Desarrollo del Estado Mecánico del Pozo.
4.3
4.3 Curva de Avance de Perforación hasta la fase 24’’
5
DESCRIPCION DE LA TECNICA DE “AIR DRILLING’’
6
DESARROLLO DE LA PERFORACIÓN FASE 30” 6.1
Estado Inicial del Pozo y Pruebas de Presión
6.2
Resumen de Operaciones
Datos numéricos Grafica con parámetros de inyección fase 30’’ Distribución de tiempos fase 30’’ en etapa de perforación
6.2.1
viaje de perforación, tramo 82.5 m a 109 m.
6.2.2
Segundo viaje de perforación, tramo 109 m a 350 m.
6.2.3
Tercer viaje de perforación, tramo 350 m a 550 m.
6.2.4
Cuarto viaje de perforación, tramo 550 m a 671 m.
6.2.5
Quinto viaje de perforación, tramo 671 m a 754 m.
6.2.6
Sexto viaje de perforación, tramo 754 m a 808 m.
6.2.7
Carrera de Acondicionamiento, (12 y 13.12.2012).
6.2.8
Bajada de Casing 26’’, (14.12.2012).
6.2.9
Análisis de ROP durante la perforación de la etapa de 30”
6.2.10
Determinación de los Parámetros de Inyección.
Enero del 2013
2013 Copyright All Rights Reserved
Page 3 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
DESARROLLO DE LA PERFORACIÓN EN LA ETAPA DE 24” 7.1
Estado Inicial del Pozo y Pruebas de Presión
7.2
Resumen Operacional
Datos numéricos de la fase 24” Grafico con los Parámetros de Inyección para Fase 24’’ Distribución de tiempos en Fase 24’’ 7.1.1
Primer viaje de perforación, tramo 806.5 a 833m.
7.2.2
Segundo viaje de perforación, tramo 833 m a 971 m.
7.2.3
Tercer viaje de perforación, tramo 971 m a 1022m.
7.2.4
Cuarto viaje de perforación, tramo 1022 m a 1130 m.
7.2.5
Quinto viaje de perforación, tramo 1130 m a 1165 m.
7.2.6
Sexto viaje de perforación, tramo 1165 m a 1259 m.
7.2.7
Séptimo viaje de perforación, tramo 1259 m a 1351 m.
6.2.8
Octavo viaje de perforación, tramo 1351 m a 1544 m.
6.2.9
Noveno viaje de perforación, tramo 1544 m a 1560 m.
6.2.10 Decimo viaje de perforación, tramo 1560 m a 1617 m. 6.2.11 Decimo primero viaje de perforación, tramo 1617 m a 1668 m. 6.2.12 Decimo segundo viaje de perforación, tramo 1668 m a 1716 m. 7.2.13 Determinación de Parámetros de Inyección, Fase 24”. 7.2.14 Análisis de ROP durante la Perforación de la Etapa de 24”
8
DESCRIPCION DE EQUIPOS UTILIZADOS EN LA PERFORACION CON AIRE 8.1 El sistema de compresión e inyección de aire: Compuesto por: 8.1.1 5 Compresores Sullair
8.2
8.2.4
3 Booster Ariel
8.2.6
Patín de inyección
El sistema de control de flujo: Compuesto por: 8.2.1 Cabeza Rotativa 8.2.2
Separadores Atmosféricos Verticales
Enero del 2013
2013 Copyright All Rights Reserved
Page 4 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
9.
P&ID
10.
LAYOUT- EQUIPOS DE INYECCION DE AIRE
11.
LAYOUT- ATERRAMIENTO ELECTRICO EQUIPOS INYECCON DE AIRE
12.
FOTO PANORAMICA DEL POZO ITU-4D
13.
PERSONAL INVOLUCRADO
14.
RECOMENDACIONES
15.
CONCLUSIONES
Enero del 2013
2013 Copyright All Rights Reserved
Page 5 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
1
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
INTRODUCCIÓN
El pozo ITU-4D, en sus fases de 30” y 24’’ fue perforado empleando la técnica de Underbalance Drilling, con la tecnología de Secure DrillingTM Services (SDTMS), mediante la inyección de aire en directa al sistema de circulación. Se utiliza esta técnica por los antecedentes en pozos vecinos (SAL-15, ITU-X2, ITU-X1A), los cuales presentaron pérdidas importantes de fluido durante la perforación del paquete de arenas superficiales de baja presión Tarija, Chorro, Tupambi, perteneciente al periodo Geológico Carbonífero.
La Fase de 30’’ de diámetro inicia en 82.5 m alcanzando 808 m de profundidad, en un periodo de 28 días que comprende desde el 15/oct. al 11/nov. de 2012. Al finalizar la fase se realiza un viaje de acondicionamiento del pozo y luego baja Casing de 26” sin inconvenientes durante la maniobra.
La Fase de 24’’ de diámetro se inicia a 806.5 m alcanzando 1716 m, tomando un periodo de 53 días que comprende desde el 16/nov. de 2012 al 07/ene del 2013. En 1716 m de profundidad Petrobras decide quitar la inyección de aire y continuar perforando la fase en forma convencional hasta 2006 m según programa inicial de perforación de pozo ITU-4D.
A lo largo de la perforación con lodo aireado se destaca que: en la fase 30” se observan ROP`s variables (desde 2.5 mph a 0.80 mph), las pérdidas de fluido de perforación son bajas (de 50 BPD a 70 BPD). En la fase de 24’’ no se registro perdida de fluido, ROP´s bajos en promedio de 1.15 mph. El equipo de Weatherford SDTMS trabajó en coordinación con el personal de Petrobras, para dar cumplimiento al programa de perforación del pozo, procedimientos operativos, de seguridad y de medio ambiente.
Al final del informe se incluye una serie de conclusiones y recomendaciones, que pueden servir como punto de partida para planificar y optimizar el desarrollo de futuras operaciones a llevarse a cabo en el campo ITAU.
Enero del 2013
2013 Copyright All Rights Reserved
Page 6 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
2
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
OBJETIVOS GENERALES
El objetivo para el pozo ITU-4D fue perforar el paquete Carbonífero en 3 fases: 1ra fase 36’’ de diámetro hasta 80 m de profundidad forma convencional (para entubar Casing de 32’’), 2da fase en 30’’ de diámetro hasta 800 m de profundidad con inyección de aire (para entubar Casing de 26”) y 3ra fase en 24” de diámetro hasta 2006 m de profundidad con inyección de aire (para entubar Casing de 20”). Con el propósito de aislar las formaciones del Carbonífero y permitir perforar las siguientes fases con fluido de mayor densidad.
El objetivo principal de la aplicación de esta técnica de Perforación con fluido aireado, es reducir las pérdidas de circulación que se puedan presentar durante la perforación de las fases mencionadas, también disminuir los Tiempos No Productivos (NPT) y como objetivo secundario incrementar el régimen de perforación (ROP).
Perforar manteniendo una Densidad Equivalente de Circulación promedio de 4.0-7.0 ppg para no comprometer
la estabilidad de las paredes del pozo, además mantener los caudales de
circulación dentro del rango de operación del motor de fondo.
Estos objetivos fueron modificados durante el proceso de perforación concluyendo la fase de 30” a 806.5 m y fase 24” a 1716 m de profundidad (aclarando que la fase de 24” se continúa perforando en forma convencional a partir de los 1716 m de profundidad)
2.1
Objetivos de la Técnica de Perforación Gasified Liquids o con Lodo Aireado. El pozo ITU-4D es perforado en sus fases de 30” y 24”’ haciendo el uso de la técnica de Underbalance Drilling con el equipamiento y tecnología de Secure DrillingTM Services (SDTMS), utilizando un fluido compuesto por dos fases, esto se obtiene inyectando aire a través de la sarta de perforación al sistema circulación.
Para lograr el objetivo, se utiliza un fluido bifásico cuya fase gaseosa se compone de Aire atmosférico comprimido y los caudales necesarios para producir intencionalmente que las presiones anulares alcancen valores sub-hidrostáticos, todo esto con el fin de reducir las pérdidas de circulación, pegas de la sarta por presión diferencial e incrementar el régimen de perforación (ROP); sin comprometer la limpieza ni estabilidad en el pozo abierto.
Enero del 2013
2013 Copyright All Rights Reserved
Page 7 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
2.2
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Objetivos secundarios
Manejar la densidad equivalente de circulación adecuada, reduciendo las pérdidas, sin generar o favorecer el posible colapso de la formación, teniendo en cuenta la limpieza y estabilidad del pozo abierto.
Mantener la circulación del sistema para tener continuidad en el desarrollo de la perforación.
Evitar, en lo posible, influjos de agua salobre que podrían ocasionar corrosión sobre la sarta de perforación y cañería de revestimiento.
Priorizar la seguridad del personal, en la boca de pozo, desviando hacia el venteo cualquier influjo de gas que pueda presentarse mediante la utilización de un sistema cerrado para el manejo y separación de fluidos en superficie.
Reducir los riesgos operativos que pudieran resultar en tiempos no productivos para la operación (NPT).
2.3 Objetivos de QHSE Ejecutar la operación cumpliendo con las normas, políticas de calidad y seguridad de Weatherford y del cliente (Petrobras), evitando incidentes. Alcanzar tanto los estándares de Petrobras como los de Weatherford, referentes a seguridad y control del medio ambiente.
Brindar seguridad al personal, reducir el impacto ambiental mediante la utilización de un sistema cerrado de manejo y separación de fluidos en superficie por el uso del cabezal rotativo. Realizar los análisis de riesgo de cada operación, a través de reuniones pre-operativas, instructivas y de procedimientos, informando a todo el personal involucrado en cada operación.
Dar cumplimiento a los puntos anotados en el DWOP Y PRE-SPUD MEETING realizados con todas las compañías involucradas previo al inicio de los trabajos.
Enero del 2013
2013 Copyright All Rights Reserved
Page 8 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
3
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
DLS - 153
DATOS GENERALES DEL POZO Datos del Pozo Nombre: Clasificación:
ITU
Número:
Pozo de Desarrollo
4D
Equipo:
Campo:
DLS-153 ITAU
Ubicación del Pozo Departamento:
Tarija
Provincia:
Gran Chaco
Objetivo del Pozo El pozo ITU-4D forma parte del plan de desarrollo del Campo ITAU, este Pozo es el primer Pozo de desarrollo con objetivo Devónico (formación Huamampanpa) y se espera obtener caudal inicial de producción de 53 MMscd de gas
3.1
Coordenadas de Superficie
COORDENADAS SISTEMA UTM Zt = 1.555,2 m
Zr = 1.563,6 m
DATUM PSAD 1956
DATUM EGS-1984
X = 414.222,81 m
X = 414.069,18 m
Y = 7.5591.541,81 m
Y = 7.5591.167,78 m
Enero del 2013
2013 Copyright All Rights Reserved
Page 9 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
3.2
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
DLS - 153
Secuencia estratigráfica
Fuente: programa general del pozo
4 4.1
RESUMEN GENERAL DEL POZO Topes de formación reales atravesados en fase 30” y 24”
Formación
Datos de Geología
Fm. Tarija-Chorro Fm. Itacuami (tope) Fm Tupambi (tope)
(Aflorante) 1720 m 1742 m
Enero del 2013
2013 Copyright All Rights Reserved
Page 10 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
4.2
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Desarrollo del Estado Mecánico del Pozo. El diagrama del estado mecánico sub-superficial del pozo ITU-4D, muestra la profundidad de las fases, profundidad de asentamiento y diámetro de cada uno de los Casing.
o c i t i n o t n e b o d o l , Ø " 6 3 e s a F
CSG 32"OD, 250.5 #/ft, X‐56 Conn. Tramo 0‐82.5 m
o d a e r i a o c i t i n Øt o "n 0 e 3b eo sd ao Fl
Fase 30"; CSG 26"OD, 202 #/ft, X‐56 Conn. Tramo 82.5‐806.5 m
o d a e r i a o c i t i n Øt o "n 4 e 2b eo sd ao Fl
Fase 24"; CSG 20"OD, 154.3 #, X‐56 Conn. Tramo 806.5‐1716 m
Enero del 2013
2013 Copyright All Rights Reserved
Page 11 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
4.3
Customer:
Bolivia
Rig:
PETROBRAS BOLIVIA
DLS - 153
Curva de Avance de Perforación hasta la fase 24’’
La grafica muestra el avance vs tiempo de la perforación del pozo desde el inicio hasta los 1716 m de profundidad. 0 CSG 36" @ 84 m 100 CSG 32" @ 82.5 m
200
Fase 30'' 808 m MD (11/11/2012)
300 400 500 600 700 Zapato CSG 26" @ 1344m
PROFUNDIDAD [m]
800 900 1000
De 961 m se perforo sin Inyeccion de aire hasta los 1246 m
1100
Fase 24'' 1716 m MD (07/01/2013)
1200 1300 1400 1500 1600 Zapato CSG 20" @ 2006 m
1700 1800 1900 2000 0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
TIEMPO DE PERFORACIÓN [Dias]
Enero del 2013
2013 Copyright All Rights Reserved
Page 12 of 87
110
115
120
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
5
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
DESCRIPCION DE LA TECNICA DE “AIR DRILLING’’
En los últimos tiempos los fluidos gasificados han predominado en operaciones de perforación Bajo Balance; los líquidos base normalmente son: agua de baja viscosidad ó petróleo crudo, este último gasificado con Nitrógeno ó gas natural. Estas aplicaciones son empleadas en pozos tanto horizontales como verticales. Perforar en desbalance hace que se evite las pérdidas de fluido por tanto previene a menudo el daño sobre la formación por invasión de fluidos y facilita los trabajos de estimulación, reduciendo además el costo total del pozo en especial desde las perdidas tanto de químicos como de tiempos no productivos, aun cuando los costos de perforación sean mayores con los equipos adicionales que se requieren al momento de perforar. Las presiones de circulación pueden ser controladas ajustando la relación de
caudales de
inyección de gas-líquido. Normalmente se generan presiones diferenciales entre el fluido de formación y el anular, en el rango de 250 psi a 500 psi. Este diferencial de presión es típico en fluidos gasificados, sin embargo pueden presentarse algunos problemas de inestabilidad en el pozo. Estos fluidos gasificados permiten perforar formaciones productoras
en desbalance
disminuyendo daños que se puede causar a las mismas. Los fluidos gasificados tienen otros beneficios adicionales sobre el uso de la perforación con gas seco ó niebla, ya que proveen cierto grado de atenuación a las vibraciones de la sarta. La perforación direccional con gases secos ó niebla a menudo provocan fallas en herramientas direccionales y de los sistemas de MWD. Las fallas por vibración de las herramientas direccionales al perforar con fluidos aireados/gasificados se reducen, además los componentes de la sarta tienden a mostrar menor desgaste erosivo de lo que se observa cuando se perfora con gas seco.
Otro factor importante al utilizar fluido gasificado es que permite una mejor limpieza del pozo por las propiedades del líquido base. Para este fin, el requerimiento de velocidades anulares de aproximadamente 100 a 200 ft/min, en fluidos de baja viscosidad y pozos de gran diámetro, puede ser difícil obtener. En ese caso, la viscosidad del líquido base deberá incrementarse para poder obtener la adecuada capacidad de transporte de los recortes de formación.
Enero del 2013
2013 Copyright All Rights Reserved
Page 13 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
6
DESARROLLO DE LA PERFORACIÓN FASE 30”
6.1
Estado Inicial del Pozo y Pruebas de Presión
Rig:
DLS - 153
Personal de Weatherford SDTMS llega al pozo ITU-4D el 06 de octubre del 2012. A partir de esta fecha se procede a recibir, ubicar y montar todos los equipos necesarios para la perforación con inyección de aire. El equipo solicitado por el cliente es el siguiente: paquete de compresión e inyección de aire, separadores verticales atmosféricos, cabezal rotativo Modelo Williams IP-9000. El 15 de octubre del 2012 se realizan las pruebas del sistema de compresión, línea de inyección en 3’’ de diámetro fig. 200 y sistema de control de flujo, quedando listo el equipo de perforación con lodo aireado a partir de esta fecha.
Inicialmente se baja arreglo convencional (sarta lisa) con trépano tricono 30” de insertos a rotar cemento y perforar 26.5 m de pozo nuevo.
6.2
Resumen de Operaciones Total perforado en la fase 30” con lodo aireado fue de 683 m (de 125 m a 808 m), en 25 días que comprende del 18/oct. al 11/dic. del 2012. Se realizan 6 viajes de perforación (incluido el viaje en forma convencional), un viaje de acondicionamiento del pozo, luego se baja el Casing 20’’ sin inconvenientes asentando el zapato a 806.5 m de profundidad, 2 cambios de elementos de sello en Bearing de cabeza rotativa. Toda la fase se perfora con parámetros controlados manteniendo Densidad Equivalente de Circulación de 6.50-7.80 lpg, con caudales de 650-700 gpm y una tasa de inyección de aire de 500-1450 scfm, teniendo en cuenta que el volumen equivalente en el fondo de pozo se encuentre dentro del rango de operación del motor, además realizar la limpieza del pozo abierto. El tiempo de atraso (Lag Time) para la profundidad final de la fase se encuentra aproximadamente 116 min de acuerdo a resultados del programa de simulación de flujo multifásico (WellFlo).
Las pérdidas de fluido de perforación fueron mínimas entre 50 a 70 bpd durante la perforación de la fase. Enero del 2013
2013 Copyright All Rights Reserved
Page 14 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Las conexiones de sondeo de perforación se realizan de manera húmeda, significa: cortar inyección de aire, desplazar el aire de la sarta con líquido, sacar bomba y realizar la conexión. Para reiniciar: inicia con bombeo, inyección de aire y circula hasta alcanzar los parámetros previos a la maniobra.
Durante la perforación con lodo aireado, personal de la Compañía de Lodos aplica anticorrosivo al fluido de perforación y mantiene el PH para eliminar la corrosión de la tubería por presencia de oxígeno y otros agentes, dado el caso.
Según registro de reportes diarios del pozo, el lodo perdido en el periodo de perforación en fase 30” fue 2029 Bbl, en acondicionamiento de pozo 21 Bbl y en la cementación 0 Bbl; haciendo un total de lodo perdido en la fase de 30’’ de 2050 Bbl.
Los viajes de la sarta de perforación se realiza coordinado y según procedimiento de la empresa perforadora Drilling Logistics & Service(DLS).
La siguiente tabla es un resumen de las corridas en el programa WellFlo que se consideraron para generar la gráfica de parámetros de la fase 30’’:
Datos numéricos
Prof. [m] 109 125 250 300 350 400 450 500 550 600 650 700 750 775 808
Enero del 2013
Aire [scfm] ‐ 700 880 880 950 1150 1300 1300 1350 1100 1100 1100 1400 1400 1450
Lodo [gpm] 650 650 650 650 700 650 680 700 700 700 700 700 600 650 600
ECD [ppg] 8.70 6.80 6.75 6.85 6.98 6.70 6.55 6.70 6.72 7.20 7.26 7.33 6.95 700 6.95
2013 Copyright All Rights Reserved
Page 15 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Grafica con parámetros de inyección fase 30’’
Enero del 2013
2013 Copyright All Rights Reserved
Page 16 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Distribución de tiempos fase 30’’ en etapa de perforación
Enero del 2013
2013 Copyright All Rights Reserved
Page 17 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
6.2.1 Primer viaje de perforación, tramo 82.5 m a 109 m. Una vez instalado con soldadura el Casing 32” con la cabeza rotativa (Bowl 36’’), en el cabezal del pozo y armado la Línea de Flote, se procede a armar el ensamble de fondo convencional con trépano tricono 30” de dientes con 3 boquilla (30/32), 1 boquilla (24/32); bajan sarta hasta 67 m de profundidad encuentran tope de cemento, donde se inicia a rotar cemento y accesorios del zapato flotador hasta 84 m con: 500 gpm, 120 psi, 50 rpm, 10K lbs de peso sobre el trépano, con sarta en el fondo se bombea 40 Bbl de bache viscoso, al retorno se observa recortes de cemento semiduro, cemento duro y cantidad moderada de recortes.
Continúan perforando pozo nuevo en 30” de diámetro hasta 109 m de profundidad con los siguientes parámetros: 630-680 gpm, 200 -270 psi, 60-65 rpm, 8-15k lbs de peso, 1.5 mph.
Concluido el tramo y con sarta en el fondo, se circula bache viscoso (de limpieza) hasta observar lodo limpio de recortes al retorno, lanzan totco. Luego realizan viaje a superficie del la sarta de perforación sin problemas.
En superficie realizan las mediciones de desgaste al trepano, horas trepano = 21.5, registro totco = 0.75° a 107 m.
Al perforar este tramo se observaran fuertes vibraciones de la sarta de perforación y pérdidas mínimas de lodo a formación.
Este tramo se perforo con fluido monofásico (liquido) densidad 8.8 lpg con el objetivo de hacer espacio para que el motor de fondo quede fuera del zapato del Casing 32’’en el siguiente viaje, ya que, a partir de esta profundidad se perforara utilizara motor de fondo en el ensamble.
Litología, según el reporte de geología al final del tramo perforado tenemos 70% limolita y 30% de arenisca.
Lodo, según reporte del químico la densidad se mantiene en 8.8 lpg con PV=17 cp., YP=16 lbs/100ft2. Las pérdidas registradas durante el tramo perforado fueron 66 Bbl.
Enero del 2013
2013 Copyright All Rights Reserved
Page 18 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
A continuación se muestra la gráfica con parámetros de inyección y el ensamblaje de fondo(BHA) utilizado en el viaje.
Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 19 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
Rig:
PETROBRAS BOLIVIA
Geometría del ensamble de fondo
BHA N°:
3
FECHA:
15-Oct-12
POZO:
ITU-4
EQUIPO:
ARCHER - 153 Item
3 HWDP 5 7/8"
DRILL COLLAR 8"
XO
TREPANO N° 2 TIPO SERIE T.F.A. (in2)
BIT TRICONICO DIENTES 30"
2
BIT SUB (c/Valv.)
3
DC 11"
4 5 6
XO
7
DC 9 1/2
8 9
109,00
Prof. Salida (m):
PW6059
Avance (m):
25,00
Hrs. Trépano (hrs):
20,74
2,512 0-0-NO-A-E-I-NO-BHA
Descripción
1
84,00
Prof. Entrada (m):
XR+VEC 3x30 - 1x24
BOQ IADC DULL GRADDING:
DIÁMETRO 30"
SMITH
MARCA
Serie PW6059 J-6703
1,21
ROP (m/hr):
49,78
ROP (min/m):
97x1000
REV. TOTAL X 1000 OD in
ID in
30 11
Long (m)
Long. Total
0,80
0,8
1,30
2,1
7536008
10 15/16
3 1/16
8,70
10,8
DC 11"
14127
10 13/16
3 1/16
9,29
20,09
DC 11"
193007
10 7/8
3
8,95
29,04
NJ-16442-1
10 7/8
3
1,16
30,2
12091
9 7/16
3
8,86
39,06
DC 9 1/2
A-22960
9 3/16
3
9,15
48,21
DC 9 1/2
BS-1873
9 1/2
3
9,37
57,58
N807
9 1/16
3 1/16
0,95
58,53
O5980269
7 15/16
3
9,39
67,92
10
XO
11
DC 8"
12
DC 8"
A29611
7 7/8
3
9,36
77,28
13
DC 8"
C51254
8
3
9,04
86,32
14
XO
N847752
7 7/8
2 7/8
0,83
87,15
15
HWDP 5 7/8"
32814N
6 15/16
16
HWDP 5 7/8"
90211
17
HWDP 5 7/8"
90230N
4
9,35
96,5
7
4
9,35
105,85
7
4
9,33
115,18
DRILL COLLAR 9 1/2"
XO
DRILL COLLAR 11"
BIT SUB
0
BIT TRIC 30"
0 0 0 0 0 0 0 0 0 0 0 0 0 #¡REF! #¡REF!
LONG. TOTAL BHA
115,18
Enero del 2013
2013 Copyright All Rights Reserved
Page 20 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.2
Bolivia
Customer:
PETROBRAS BOLIVIA
Segundo viaje de perforación, tramo 109 m a 350 m. Con pozo adecuado para bajar sarta direccional, se inicia el armado del ensamblaje de fondo(BHA), que consiste en: trépano trícono 30’’OD de insertos con 3 boquillas (28/32”) y 1 Boquilla (21/32”), motor de fondo 11 1/2” camisa estabilizadora 29 7/8’’OD, 2 estabilizadores con cuchillas espirales 29 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y DP Heavy Weight 5 7/8’’, estas últimas utilizadas como tubería de transición entre el arreglo rígido con Drill Pipe 5 7/8” OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo incluido el trépano, se inicia a bajar sarta a fondo de pozo. En 83 m encuentran resistencia, por tanto, se continúa bajando con rotación y circulación de 350 gpm de lodo, 200 psi presión de bomba, 20 rpm TD hasta 109 m.
Inician a perforar pozo nuevo de 109 m a 125 m en forma convencional con parámetros: 650 gpm, 450 psi, 50 rpm, 10-12k lbs de peso sobre el trepano.
Levantan sarta a 120 m, una vez realizada la reunión de seguridad operacional se procede a instalar el Bearing Assembly en cabeza rotativa y alineación del retorno de fluido al sistema de perforación con aire.
Se circula lodo hasta generar niveles de trabajo en separadores atmosféricos. Luego se inicia inyección de aire al pozo a través de la sarta de perforación, una vez homogenizado el sistema se baja repasando hasta fondo de pozo.
Sarta direccional en el fondo y parámetros normalizados se inicia a perforar pozo de 125 m a 350 m, manteniendo caudales de inyección entre 500-950 scfm de aire, 650-670 gpm de líquido, 650-700 psi presión de inyección, 7.52-6.80 lpg de densidad equivalente de circulación, 10-24k lbs de peso sobre el trépano, 30-45 rpm del Top Drive.
Previo a realizar conexiones y en puntos de alto torque se bombea bache viscoso para ayudar con la limpieza del pozo, asimismo se hacen variaciones en caudales de inyección y parámetros de perforación con la intención de normalizar la perforación.
Con sarta en el fondo, se desplaza con líquido el aire del interior de la
sarta de
perforación, preparan y lanzan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 21 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Se inicia a sacar sarta con stripping a través de la goma de cabeza rotativa de 350 m a 180 m, a esta profundidad se procede a retirar el Bearing Assembly de cabeza rotativa, luego continúan viaje del arreglo de fondo hasta superficie.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 100.43, av = 241 m, ROP = 2.40 mph, lectura del totco = 1.75° a 338 m.
Litología, según reporte de geología en todo el tramo perforado se observa: arenisca y limolita con porcentajes variables, para 350 m registran 80% arena y 20% limolita.
Lodo, según reporte del químico la densidad se mantiene en 8.8 lpg con PV= 16-15 cp., YP=16-14 lbs/100ft2. Las pérdidas registradas durante el tramo perforado fueron 271 Bbl.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo (BHA) utilizado en este viaje. Grafica con parámetros de Inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 22 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
Rig:
PETROBRAS BOLIVIA
Geometría del BHA (ensamble de fondo):
BHA N°: FECHA:
EQUIPO:
XO
DRILL COLLAR 8"
PW5729
SERIE
3x28 - 1x24
BOQ 2
2,246
T.F.A. (in ) IADC DULL GRADDING:
ARCHER - 153 Item
GO4BODVEC
TIPO
ITU-4
7-6-BT-A-E-4-CT-HR.
Descripción
Serie
DRILL COLLAR 9 1/2"
109,00
Prof. Salida (m):
350,00
Avance (m):
241,00
Hrs. Trépano (hrs):
100,43
ROP (m/hr):
2,40
ROP (min/m):
25,00 861
REV. TOTAL X 1000 OD in
ID in
30
BIT TRICONO INSERTOS 30"
PW5729
2
MOTOR FONDO
FD115079
11 1/2
3
FLOAT SUB (w/valve)
FS1997
11 1/4
4
STB 29 7/8"
FS0226
11
5
SHOCK SUB
SS28275A
6
DC 11" (corto)
Long (m)
Long. Total
0,80
0,80
9,72
10,52
0,65
11,17
3 3/16
2,52
13,69
11 1/4
3
6,64
20,33
11
3 1/4
2,94
23,27 25,79
7
STB 29 7/8"
FS0223
11
3 1/16
2,52
8
DC 11"
7536008
10 15/16
3 1/16
8,70
34,49
9
DC 11"
14127
10 13/16
3 1/16
9,29
43,78
193007
10 7/8
3
8,95
52,73
NJ-16442-1
10 7/8
3
1,16
53,89
12 DC 9 1/2
12091
9 7/16
3
8,86
62,75
13 DC 9 1/2
A-22960
9 3/16
3
9,15
71,90
14 DC 9 1/2
BS-1873
9 1/2
3
9,37
81,27
15 DRILLING JAR
DAH2006
9 3/8
3
9,96
91,23
11 XO
16 XO XO
Prof. Entrada (m):
1
10 DC 11" DRILLING JAR
DIÁMETRO 30"
SMITH
MARCA
17-Oct-12
POZO:
HWDP 5 7/8"
TREPANO N° 3
4
17 DC 8"
N807
9 1/16
3 1/16
0,95
92,18
O5980269
7 15/16
3
9,39
101,57
7 7/8
3
9,36
110,93
3
9,04
119,97
7 7/8
2 7/8
0,83
120,80
6 15/16
4
9,35
130,15
90211
7
4
9,35
139,50
23 HWDP 5 7/8"
90230N
7
4
9,33
148,83
DRILL COLLAR 11"
24 HWDP 5 7/8"
32809N
7
4
9,35
158,18
Chock Sub
25 HWDP 5 7/8"
32818N
6 15/16
4
9,30
167,48
26 HWDP 5 7/8"
32815N
7
4
9,38
176,86
DRILL COLLAR 11"
STB 29 7/8"
18 DC 8"
A29611
19 DC 8"
C51254
20 XO
N847752
21 HWDP 5 7/8"
32814N
22 HWDP 5 7/8"
8
STB 29 7/8" F SUB
0
Motor Fondo
0 0
BIT TRIC 30"
#¡REF!
LONG. TOTAL BHA
DHM RATIO = 0,138 rev/gal
176,86
Enero del 2013
2013 Copyright All Rights Reserved
Page 23 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.3
Bolivia
Customer:
PETROBRAS BOLIVIA
Tercer viaje de perforación, tramo 350 m a 550 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano trícono 30’’ OD de insertos con 3 boquillas (28/32”), 1 boquilla (21/32”), motor de fondo 11 1/2” camisa estabilizadora 29 7/8’’OD, 2 estabizadores con cuchillas espirales 29 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas como tubería de transición entre el arreglo rígido con DP 5 7/8” OD, XT-57 Conexión.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo incluido el trépano, se inicia a bajar sarta a fondo de pozo. En 163 m de profundidad observan resistencia de 2k lbs obligando a levantar sarta a 150 m
Con sarta de perforación a 150 m, una vez realizada la reunión de seguridad se procede a instalar Bearing Assembly en cabeza rotativa y alineación del retorno hacia el sistema de perforación con aire; luego continúan viaje de 150 a 350 m repasando con rotación e inyección de 700-950 scfm de aire, 600-650 gpm de líquido, 650 psi presión en Stand-pipe, 6.96 lpg de densidad equivalente de circulación, 3-6k lbs de peso sobre el trépano, 40 rpm del Top Drive. En el repaso se observo torques altos en diferentes profundidades y mínima perdida de lodo.
Sarta direccional en el fondo y parámetros normalizados se inicia a perforar pozo de 350 m a 550 m, manteniendo caudales de inyección entre 950-1350 scfm de aire, 650-700 gpm de líquido, 800-1000 psi presión de inyección, 7.00-6,70 lpg de densidad equivalente de circulación, 10-20k lbs de peso de sobre el trépano, 30-50 rpm del Top Drive. En el tramo perforado se alcanza a observar perdidas de lodo hasta 10 bph y torques puntuales hasta 15k lbsf-ft. Con el objetivo de reducir las perdidas parciales de lodo se bombean baches con obturante de 30 lpb de concentración y baches de limpieza de 270-280 segundos de viscosidad, además de realizar variaciones en la relación aire-liquido y maniobrar sarta de perforación hasta normalizar paramentos y continuar perforando.
A 550 m de profundidad, con 93.47 horas de trabajo del trépano deciden realizar viaje a superficie para su reemplazo. Prepara el pozo para dicha maniobra. Enero del 2013
2013 Copyright All Rights Reserved
Page 24 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Bombea bache viscoso y circula tiempo de atraso, observando en zarandas regular cantidad de recortes, luego se desplaza con líquido el aire del interior de la sarta y lanzan Totco.
Inicia a sacar sarta con stripping a través de la goma de cabeza rotativa RCD de 550 m a 150 m, profundidad en la cual se retira el Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie sin resistencia.
En superficie realizan mediciones de desgaste del trépano, estabilizadores y motor de fondo: horas de trépano = 93.47, av = 200 m, ROP = 2.14 mph, lectura del totco=1° a 538 m
Litología, según registro de geología en todo el tramo perforado se observa: arenisca, limolita y diamictita. Para 550 m 10% arena y 90% limolita.
Lodo, según reporte del químico la densidad se mantiene en 8.8-8.9 lpg con PV=18-36 cp, YP=15-24 lbs/100 ft2, las pérdidas registradas en el tramos perforado fueron de 547 Bbl
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo (BHA) utilizado en este viaje. Grafica con parámetros de Inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 25 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
Geometría del BHA (ensamble de fondo)
BHA N°:
TREPANO N° 4
5
FECHA:
23-Oct-12
POZO: EQUIPO:
GO4BODVEC
SERIE
PW6941 3x28 - 1x24 2
T.F.A. (in ) IADC DULL GRADDING:
ARCHER - 153 Item
TIPO BOQ
ITU-4
DIÁMETRO 30"
SMITH
MARCA
Descripción
2,246 7-8-BT-A-F-4-CT-HR Serie
Prof. Entrada (m):
350,00
Prof. Salida (m):
550,00
Avance (m):
200,00
Hrs. Trépano (hrs):
93,47
ROP (m/hr):
2,14
ROP (min/m):
28,04
OD in
ID in
30
0,80 10,52
0,65
11,17
2,52
13,69
3
6,64
20,33
11
3 1/4
2,94
23,27
FS0223
11 1/8
3
2,52
25,79
7536008
10 15/16
3 1/16
8,70
34,49 43,78
BIT TRICONO INSERTOS 30" (N)
PW6941
XO
2
MOTOR FONDO (N)
FD115081
11 1/2
3
FLOAT SUB (w/valve)
FS1997
11 1/4
4
STB 29 7/8" (N)
FS-0222
11 1/8
3
5
SHOCK SUB
SS28275A
11 1/4
6
DC 11" (corto)
BS225
7
STB 29 7/8" (U)
8
DC 11"
9
DC 11"
10 DC 11" 11 XO DRILL COLLAR 9 1/2"
XO
STB 29 7/8" DRILL COLLAR 11"
Chock Sub STB 29 7/8" F SUB
14127
10 13/16
3 1/16
9,29
7493004
10 7/8
3
9,00
52,78
1644-2
9 5/8
3
1,17
53,95
12 DC 9 1/2
12091
9 7/16
3
8,86
62,81
13 DC 9 1/2
A-22960
9 3/16
3
9,15
71,96
14 DC 9 1/2
BS-1873
9 1/2
3
9,37
81,33
15 DRILLING JAR
DAH2006
9 3/8
3
9,96
91,29
N807
9 1/16
3 1/16
0,95
92,24
17 DC 8"
O5980269
7 15/16
3
9,39
101,63
18 DC 8"
A29611
7 7/8
3
9,36
110,99
19 DC 8"
C51254
3
9,04
120,03
20 XO
N847752
7 7/8
2 7/8
0,83
120,86
21 HWDP 5 7/8"
32814N
6 15/16
4
9,35
130,21
22 HWDP 5 7/8"
90211
7
4
9,35
139,56
16 XO DRILL COLLAR 11"
Long. Total
9,72
1
DRILLING JAR
Long (m) 0,80
HWDP 5 7/8"
DRILL COLLAR 8"
807
REV. TOTAL X 1000
8
23 HWDP 5 7/8"
90230N
7
4
9,33
148,89
24 HWDP 5 7/8"
32809N
7
4
9,35
158,24
25 HWDP 5 7/8"
32818N
6 15/16
4
9,30
167,54
26 HWDP 5 7/8"
32815N
7
4
9,38
176,92
Motor Fondo
0
BIT TRIC 30"
0 DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
176,92
Page 26 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.4
Bolivia
Customer:
PETROBRAS BOLIVIA
Cuarto viaje de perforación, tramo 550 m a 671 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano trícono 30’’OD de insertos con 3 boquillas (28/32”) y 1 boquilla (21/32”), motor de fondo 11 1/2” camisa estabilizadora 29 7/8’’OD, 2 estabilizadores con cuchillas espirales 29 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas como tubería de transición entre el arreglo rígido y DP 5 7/8” OD, XT-57 conexión.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo incluido el trépano, se inicia a bajar sarta a fondo de pozo según procedimiento de la empresa DLS. En 281 m de profundidad observan resistencia de 15-30k lbs obligando a levantar sarta a 274 m.
Con sarta de perforación a 274 m, luego de realizar la reunión de seguridad se procede a instalar Bearing Assembly en cabeza rotativa y alineación del retorno hacia el sistema de perforación con aire; a continuación bajan de 274 a 550 m repasando con rotación e inyección de 500 scfm de aire, 600 gpm de líquido, 600 psi presión en Stand pipe, 7.84 lpg de densidad equivalente de circulación, 40 rpm del Top Drive. En el repaso se observa torques altos en diferentes profundidades.
Sarta direccional en el fondo y parámetros normalizados se inicia a perforar pozo de 550 m a 671 m, manteniendo caudales de inyección entre 600-1100 scfm de aire, 700 gpm de líquido, 690-860 psi presión de inyección, 7.90-7.15 lpg de densidad equivalente de circulación, 18-20k lbs de peso sobre el trépano, 40 rpm del Top Drive. En el tramo perforado las pérdidas son mínimas.
Con el objetivo de mejorar la limpieza se bombea baches de 270 segundos de viscosidad.
A 671m de profundidad, con 81.80 horas de trabajo del trépano deciden realizar viaje a superficie para su reemplazo.
Preparan el pozo para dicha maniobra: bombean bache viscoso, circulan tiempo de atraso observando en el retorno regular cantidad de recortes, luego se desplaza con líquido el aire del interior de la sarta y lanzan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 27 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa(RCD) de 550 m a 178 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie sin resistencia.
En superficie efectúan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 81.80, av = 121 m, ROP =1.48 mph, lectura 655 m del totco=0.5°.
Litología, según registro de geología en todo el tramo perforado se observa: arenisca, limolita y a partir de 580 m aparece diamictita. Para 670 m 100% diamictita.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV=29-25 cp, YP=30-29 lbs/100 ft2, las pérdidas registradas en el tramos perforado fueron de 273 Bbl
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo (BHA) utilizado en este viaje.
Grafica con parámetros de Inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 28 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
Geometría del ensamble de fondo
BHA N°:
TREPANO N° 5
6
FECHA:
MARCA TIPO
29-Oct-12
POZO:
SERIE BOQ
ITU-4
EQUIPO:
T.F.A. (in2) IADC DULL GRADDING:
ARCHER - 153 Item
Descripción
DIÁMETRO 30"
SMITH GO4BODVEC PW6818 3x28 - 1x24 2,246 6-8-BT-A-E-1-CT-PR Serie
Prof. Entrada (m):
550,00
Prof. Salida (m):
671,00
Avance (m):
121,00
Hrs. Trépano (hrs):
81,80
ROP (m/hr):
1,48
ROP (min/m):
40,56 707
REV. TOTAL X 1000 OD in
ID in
30
Long (m)
Long. Total
0,80
0,80
10,93
11,73
1
BIT TRICONO INSERTOS 30" (N)
PW6818
HWDP 5 7/8"
2
MOTOR FONDO (N)
FD115011
3
FLOAT SUB (w/valve)
FS1997
11 1/4
XO
4
STB 29 7/8" (N)
FS225
11 1/16
3
5
SHOCK SUB (N)
29128H
11 1/4
3
6,77
21,65
6
DC 11" (corto)
3 1/4
2,94
24,59 27,11
DRILL COLLAR 8"
BS225
11 1/2
11
0,65
12,38
2,50
14,88
7
STB 29 7/8" (N)
FS-0221
11 1/8
3
2,52
XO
8
DC 11"
7536008
10 15/16
3 1/16
8,70
35,81
DRILLING JAR
9
DC 11"
7493004
10 7/8
3
9,00
44,81
O8826
10 15/16
3 1/16
8,89
53,70
NJ-16442-2
9 5/8
3
1,17
54,87
12 DC 9 1/2
A-22960
9 3/16
3
9,15
64,02
13 DC 9 1/2
BS-1873
9 1/2
3
9,37
73,39
14 DC 9 1/2
O1-1138C
9 1/2
3 1/16
8,81
82,20
H94283
9 1/2
3
10,06
92,26
N807
9 1/16
3 1/16
0,95
93,21
10 DC 11" 11 XO DRILL COLLAR 9 1/2"
XO
15 DRILLING JAR (N) 16 XO
DRILL COLLAR 11"
17 DC 8"
O5980269
7 15/16
3
9,39
102,60
18 DC 8"
A29611
7 7/8
3
9,36
111,96
3
9,04
121,00
2 7/8
0,83
121,83
8
19 DC 8"
C51254
20 XO
N847752
7 7/8
21 HWDP 5 7/8"
32814N
6 15/16
4
9,35
131,18
22 HWDP 5 7/8"
90211
7
4
9,35
140,53
23 HWDP 5 7/8"
90230N
7
4
9,33
149,86
24 HWDP 5 7/8"
32809N
7
4
9,35
159,21
STB 29 7/8"
25 HWDP 5 7/8"
32818N
6 15/16
4
9,30
168,51
F SUB
26 HWDP 5 7/8"
32815N
7
4
9,38
177,89
STB 29 7/8" DRILL COLLAR 11"
Chock Sub
Motor Fondo
0
BIT TRIC 30"
0
DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
177,89
Page 29 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.5
Bolivia
Customer:
PETROBRAS BOLIVIA
Quinto viaje de perforación, tramo 671 m a 754 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano trícono de insertos 30’’ OD con 3 boquillas (28/32”), 1 boquilla (21/32”), motor de fondo 11 1/2” camisa estabilizadora 29 7/8’’OD, 2 estabilizadores con cuchillas espirales 29 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas transición entre el arreglo rígido y DP 5 7/8” OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo inician viaje a fondo del pozo perforado. En 154 m de profundidad observan resistencia de 15-20k lbs obligando a levantar sarta a 148 m.
Con sarta de perforación a 148 m, se realiza reunión de seguridad, instalación de Bearing Assembly en cabeza rotativa y alineación del retorno hacia el sistema de perforación con aire; luego continúan viaje repasando los tramos de 148 a 177 m, 190 a 227 m, 643 a 671 m con rotación e inyección de 600 scfm de aire, 600 gpm de líquido, 600 psi presión en Stand pipe, 6.88 lpg de densidad equivalente de circulación, 35-40 rpm del Top Drive. En el repaso se observan torques de 10-15k lbs en diferentes profundidades.
Con sarta direccional en el fondo y parámetros normalizados se inicia a perforar pozo de 671 m a 754 m, manteniendo caudales de inyección entre 600-1400 scfm de aire, 700-600 gpm de líquido, 700-900 psi presión de inyección, 7.29-6.92 lpg de densidad equivalente de circulación, 20-28k lbs de peso sobre el trépano, 40 rpm del Top Drive. En 728 m se observa pérdida total de lodo por esta razón se bombea bache sellante de 20 lpb de concentración y agregando masivamente obturante de granulometría mixta + bentonita al sistema hasta observar retorno estable de lodo en zarandas.
Una vez controlado la pérdida de lodo hacia formación bajan sarta a fondo y continúan perforando hasta 754 m con: 600 gpm, 1400 scfm, 700 psi, 6.92 lpg ECD, 25-28k lbs, 40 rpm, 5-7K lbf-ft. A 754 m de profundidad, con 77.44 horas de trabajo del trépano deciden realizar viaje a superficie para su reemplazo.
Prepara el pozo para dicha maniobra: Bombea bache viscoso y circula tiempo de atraso observando en zarandas regular cantidad de recortes, luego se desplaza el aire con líquido Enero del 2013
2013 Copyright All Rights Reserved
Page 30 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
del interior de la sarta y lanzan Totco.
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa(RCD) de 754 m a 202 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa, luego continúan viaje del arreglo de fondo hasta superficie sin resistencia, el viaje se realiza según procedimiento de la empresa perforadora DLS.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 77.44, av=83 m, ROP=1.07 mph, Lectura 739 m del totco=0.5°.
Litología, según registro de geología en todo el tramo perforado se observa diamictita con baja presencia de arenisca. Para 754 m 100% diamictita.
Lodo, según reporte del químico la densidad se mantiene en 8.8 lpg con PV=24-15 cp.,YP=20-19 lbs/100 ft2, las pérdidas registradas en el tramo perforado fueron de 694 Bbl
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje. Grafica con parámetros de Inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 31 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del ensamble de fondo
BHA N°: FECHA:
DRILLING JAR
SERIE BOQ T.F.A. (in2) IADC DULL GRADDING:
ARCHER - 153 Item
DRILL COLLAR 8"
TIPO
ITU-4
EQUIPO:
XO
MARCA
3-Nov-12
POZO:
HWDP 5 7/8"
TREPANO N° 6
7
Descripción
DRILL COLLAR 11"
Chock Sub STB 29 7/8" F SUB
2,246 6-4-BT-A-E-3-WT-HR Serie
83,00
Hrs. Trépano (hrs):
77,44
ROP (m/hr):
1,07
ROP (min/m):
55,98 669
REV. TOTAL X 1000 OD in
ID in
30
2
MOTOR FONDO (N)
FD115078
11 1/2
3
FLOAT SUB (w/valve) (N)
NLT-S0032
11 1/4
4
STB 29 7/8" (N)
FS-0222
11 1/8
5
SHOCK SUB (U)
29128H
11 1/4
6
DC 11" (corto)
7
STB 29 7/8" (N)
FS-0223
8
DC 11"
7536008
9
DC 11"
7493004 O8826 NJ-16442-2
12 DC 9 1/2
Long (m)
Long. Total
0,80
0,80
9,75
10,55
3
0,77
11,32
3
2,52
13,84
6,77
20,61
3 1/4
2,94
23,55
11 1/8
3
2,52
26,07
10 15/16
3 1/16
8,70
34,77
10 7/8
3
9,00
43,77
10 15/16
3 1/16
8,89
52,66
9 5/8
3
1,17
53,83
A-22960
9 3/16
3
9,15
62,98
13 DC 9 1/2
BS-1873
9 1/2
3
9,37
72,35
14 DC 9 1/2
O1-1138C
9 1/2
3 1/16
8,81
81,16
H94283
9 1/2
3
10,06
91,22
15 DRILLING JAR (U) 16 XO
STB 29 7/8"
3x28 - 1x24
754,00
Avance (m):
PW6814
17 DC 8" DRILL COLLAR 11"
PW6814
671,00
Prof. Salida (m):
BIT TRICONO INSERTOS 30" (N)
11 XO
XO
GO4BODVEC
Prof. Entrada (m):
1
10 DC 11"
DRILL COLLAR 9 1/2"
DIÁMETRO 30"
SMITH
BS225
11
3
N807
9 1/16
3 1/16
0,95
92,17
O5980269
7 15/16
3
9,39
101,56
18 DC 8"
A29611
7 7/8
3
9,36
110,92
19 DC 8"
C51254
8
3
9,04
119,96
20 XO
N847752
7 7/8
21 HWDP 5 7/8"
32814N
6 15/16
2 7/8 4
0,83
120,79
9,35
130,14
22 HWDP 5 7/8"
90211
7
4
9,35
139,49
23 HWDP 5 7/8"
90230N
7
4
9,33
148,82
24 HWDP 5 7/8"
32809N
7
4
9,35
158,17
25 HWDP 5 7/8"
32818N
6 15/16
4
9,30
167,47
26 HWDP 5 7/8"
32815N
7
4
9,38
176,85
Motor Fondo
0
BIT TRIC 30"
0
LONG. TOTAL BHA
DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
176,85
Page 32 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.6
Bolivia
Customer:
PETROBRAS BOLIVIA
Sexto viaje de perforación, tramo 754 m a 808 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano trícono de insertos 30’’ OD con 3 boquillas (24/32”) y 1 boquilla (32/32”), motor de fondo 11 1/2” camisa estabilizadora 29 7/8’’OD, 2 estabilizadores con cuchillas espirales 29 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y DP 5 7/8” OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo inician viaje a fondo del pozo perforado. En 731m se instala Bearing Assembly en cabeza rotativa y alineación del circuito hacia el sistema de perforación con aire. Luego se inicia circular el sistema con inyección de líquido y aire hasta normalizar parámetros.
Con sarta direccional en el fondo y parámetros normalizados se inicia a perforar pozo de 754 m a 808 m, manteniendo caudales de inyección entre 1200-1450 scfm de aire, 650600 gpm de líquido, 700-730 psi presión de inyección, 7.00-6.95 lpg de densidad equivalente de circulación, 16-26k lbs de peso sobre el trépano, 40 rpm del Top Drive. En el tramo perforado continúan las perdidas mínimas de lodo.
A 808 m de profundidad, con 49.90 horas de trabajo del trépano deciden realizar viaje a superficie por conclusión de fase de 30”.
Se prepara el pozo para dicha maniobra: bombea bache viscoso y circula reciprocando sarta tiempo de atraso, al retorno en zarandas se observa regular cantidad de recortes, luego se desplaza con líquido el aire del interior de la sarta, lanzan Totco.
Inicia a sacar sarta con stripping a través de la goma de cabeza rotativa RCD de 754 m a 205 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie, en 738 m se maniobra herramienta por encontrar resistencia.
En superficie realizan mediciones de desgaste del trépano, estabilizadores y motor de fondo: horas del trépano = 49.90, av=54 m, ROP=1.08 mph, lectura 739 m del totco=0.5°.
Litología, según registro de geología en todo este tramo perforado se observa: 100% diamictita. Enero del 2013
2013 Copyright All Rights Reserved
Page 33 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Lodo, según reporte del químico la densidad se mantiene en 8.8 lpg con PV=22-17 cp, YP=28-19 lbs/100 ft2, las pérdidas de lodo registrado fue de 178 Bbl
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje.
Grafica con parámetros de Inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 34 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
Geometría del ensamble de fondo
FECHA:
DRILLING JAR
SERIE BOQ T.F.A. (in2) IADC DULL GRADDING:
ARCHER - 153 Item
DRILL COLLAR 8"
TIPO
ITU-4
EQUIPO:
XO
MARCA
8-Nov-12
POZO:
HWDP 5 7/8"
TREPANO N° 7
8
BHA N°:
Descripción
DRILL COLLAR 11"
STB 29 7/8" DRILL COLLAR 11"
Chock Sub
5218831 3x24 - 1x32 2,111 2-3-WT-A-E-I-NO-TD Serie
754,00
Prof. Salida (m):
808,00
Avance (m):
54,00
Hrs. Trépano (hrs):
49,90
ROP (m/hr):
1,08
ROP (min/m):
55,44 442
REV. TOTAL X 1000 OD in
ID in
90
Long (m)
Long. Total
0,60
0,60
10,65
11,25
BIT TRICONO 30" (N)
5218831
2
MOTOR FONDO
FD115008
3
FLOAT SUB (w/valve)
NLT-S0032
11 1/4
3
0,77
12,02
4
STB 29 7/8" C/anilla para TOTCO
FS-225
11 1/8
3
2,50
14,52
5
SHOCK SUB (U)
29128H
6,77
21,29
6
DC 11" (corto)
3 1/4
2,94
24,23
7
STB 29 7/8"
FS-0222
11 1/8
3
2,52
26,75
8
DC 11"
7536008
10 15/16
3 1/16
8,70
35,45
9
DC 11"
7493004
10 7/8
3
9,00
44,45
O8826
10 15/16
3 1/16
8,89
53,34
BS225
10 DC 11"
11 1/4 11
3
NJ-16442-2
9 5/8
3
1,17
54,51
12 DC 9 1/2
A-22960
9 3/16
3
9,15
63,66
13 DC 9 1/2
BS-1873
9 1/2
3
9,37
73,03
14 DC 9 1/2
O1-1138C
9 1/2
3 1/16
8,81
81,84
H94283
9 1/2
3
10,06
91,90
N807
9 1/16
3 1/16
0,95
92,85
17 DC 8"
O5980269
7 15/16
3
9,39
102,24
18 DC 8"
A29611
7 7/8
3
9,36
111,60
19 DC 8"
C51254
8
3
9,04
120,64
20 XO
N847752
7 7/8
2 7/8
0,83
121,47
21 HWDP 5 7/8"
32814N
6 15/16
4
9,35
130,82
22 HWDP 5 7/8"
90211
7
4
9,35
140,17
23 HWDP 5 7/8"
90230N
7
4
9,33
149,50
24 HWDP 5 7/8"
32809N
4
9,35
158,85
15 DRILLING JAR (U) XO
VG-30MDX
Prof. Entrada (m):
1
11 XO DRILL COLLAR 9 1/2"
DIÁMETRO 30"
BAKER
16 XO c/ anilla de corrosion
7
STB 29 7/8"
25 HWDP 5 7/8"
32818N
6 15/16
4
9,30
168,15
STB 29 7/8"
26 HWDP 5 7/8"
32815N
7
4
9,38
177,53
F SUB Motor Fondo
0
BIT TRIC 30"
0 DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
177,53
Page 35 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.7
Bolivia
Customer:
PETROBRAS BOLIVIA
Carrera de Acondicionamiento, (12 y 13.12.2012).
Preparan ensamble de fondo (convencional), que cosiste en: trépano trícono 30’’ de insertos (usado) sin boquillas, NEAR Bit Stabilizer (float valve), 2 estabilizadores con cuchillas espirales 29 7/8’’OD, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight Drill Pipe, estas últimas utilizadas de transición entre el arreglo rígido y la tubería de perforación DP 5 7/8’’OD. El arreglo no lleva motor de fondo ni Shock Sub.
En 83 m encuentran resistencia de 15-20k lbs, situación que obliga a maniobrar la sarta repetidas veces intentando pasar, sin éxito. Conectan Top Drive, alinean bomba y bajan de 83 m a 133 m con circulación y rotación.
Con sarta en 133 m de profundidad se instala Bearing Assembly en cabeza rotativa, luego continua bajando hasta fondo del pozo perforado (808 m). En el viaje a fondo se observa resistencia de 14 a 20k lbs en los tramos 133-277 m, 460-628 y 744-808 m, los cuales obligan a repasar con rotación e inyección de aire hasta eliminar por completo resistencias en los puntos: 135, 139, 141, 144, 146, 147, 149, 152, 206, 220, 258, 272, 481, 488, 511, 518, 524, 525.
Los parámetros de perforación y caudales de inyección durante esta operación fueron variables en el orden: 500-650-1000-1400 scfm, 500-600 gpm, 350-530-650 psi presión de inyección, 7.56, 7.32, 7.60, 7.72, 7.33, 7.11, 7.02 lpg de densidad equivalente de circulación, 40-60 rpm TD, 3-6k lbf-ft de torque.
Una vez circulado en fondo el bache de 270 segundos de viscosidad hasta observar retorno en zarandas limpio de recortes, se corta inyección de aire y desplaza con líquido toda la capacidad de la sarta. Se inicia a sacar sarta en stripping a través de la goma de cabeza rotativa de 808 m a 162 m, en esta profundidad se retira el Bearing Assembly de cabeza rotativa y continúan sacando sarta hasta superficie sin inconvenientes.
En superficie evalúan el desgaste al trepano y estabilizadores. Lodo perdido en el viaje fue 21 Bbl.
Enero del 2013
2013 Copyright All Rights Reserved
Page 36 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
A continuación se muestra el ensamble de fondo(BHA) utilizado en viaje de acondicionamiento.
Geometría del arreglo de fondo
BHA N°:
9
FECHA:
12-Nov-12
POZO:
ITU-4
EQUIPO:
HWDP 5 7/8"
XO
DRILL COLLAR 8"
XO
DRILLING JAR
DRILL COLLAR 9 1/2"
ARCHER - 153
TREPANO N° 2 2R MARCA
DRILL COLLAR 11"
STB 29 7/8"
DRILL COLLAR 11"
STB 29 7/8"
Prof. Entrada (m):
808,00
TIPO
XR+UEC
Prof. Salida (m):
754,00
SERIE
SPW6059
Avance (m):
-54,00
Hrs. Trépano (hrs):
77,44
S/Boq.
BOQ T.F.A. (in2) IADC DULL GRADDING:
Descripción Item 1 BIT TRICONO 30" (U), Acondicionamiento pozo 2
STB 29 7/8" (N) (w/valve)
3
DC 11" (corto)
4
STB 29 7/8"
5
DC 11"
0-0-NO-A-E-I-NO-BHA Serie SPW6059
ROP (m/hr):
-0,70
ROP (min/m):
-86,04
OD in
ID in
FS-0224 BS225 226
669
REV. TOTAL X 1000
11
3 1/4
11
14127
10 4/5
221
11 1/16
3 3 1/16
Long (m) 0,80
Long. Total
2,66
3,46
2,94
6,40
0,80
2,50
8,90
9,29
18,19
3
2,52
20,71
3 1/16
8,70
29,41
3
9,00
38,41
3 1/16
1,10
39,51
3
9,37
48,88
6
STB 29 7/8"
7
DC 11"
7536008
8
DC 11"
7493004
9
XO
16442-1
10 DC 9 1/2
BS-1873
9 1/2
11 DC 9 1/2
A-22960
9 3/16
3
9,15
58,03
12 DC 9 1/2
O1-1138C
9 1/2
3 1/16
8,81
66,84
H94283
9 1/2
3
10,06
76,90
N807
9 1/16
3 1/16
0,95
77,85
15 DC 8"
O5980269
7 15/16
3
9,39
87,24
16 DC 8"
A29611
7 7/8
3
9,36
96,60
17 DC 8"
C51254
3
9,04
105,64
18 XO
N847752
7 7/8
2 7/8
0,83
106,47
19 HWDP 5 7/8"
32814N
6 15/16
4
9,35
115,82
20 HWDP 5 7/8"
90211
7
4
9,35
125,17
21 HWDP 5 7/8"
90230N
7
4
9,33
134,5
22 HWDP 5 7/8"
32809N
7
4
9,35
143,85
23 HWDP 5 7/8"
32818N
6 15/16
4
9,30
153,15
24 HWDP 5 7/8"
32815N
7
4
9,38
162,53
13 DRILLING JAR (U) XO
DIÁMETRO 30" SMIT
14 XO
11 10 7/8
8
DRILL COLLAR 11"
NB STB (c/float valve)
0 BIT TRIC 30"
0
LONG. TOTAL BHA
DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
162,53
Page 37 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
6.2.8
Customer:
Bolivia
PETROBRAS BOLIVIA
Bajada de Casing 26’’, (14.12.2012).
Instalan piso de enganche secundario, desconecta brida 8’’ (salida lateral Bowl 36’’), con la ayuda de equipo de oxicorte se libera caño 32’’ con el Bowl 36’’. Acondicionan piso de perforación y Weatherford (TRS) arma equipo y accesorios para bajada de Casing 26’’.
Una vez realizada la reunión de seguridad operacional se inicia a bajar Casing 26’’, 202 #/ft, X-56, XLF conexión, según procedimiento de bajada de cañería.
A 806.5 m asientan el Flow Shoe 26’’, Durante bajada de Casing llenan cada pieza con Fill Up Tool, observando desplazamiento normal.
Se procede al desmontaje del equipo de bajada de Casing, la Compañía Schlamberger prepara y baja arreglo con Stinger, a continuación arman accesorios superficiales para realizar la cementación.
6.2.9
Análisis de ROP durante la perforación de la etapa de 30” Nro. TREPANO 30”OD
MARCA
MODELO TIPO
TFA [pulg2]
2 3 4 5 6 7
BAKER, tric
XR+VEC
2,512 2,246 2,460 2,460 2,460 2,111
BAKER, tric GO4BODVEC BAKER, tric GO4BODVEC BAKER, tric GO4BODVEC BAKER, tric GO4BODVEC BAKER, tric
VG-30MDX
PRUFUNDIDAD ENTRADA [m] SALIDA [ m]
82.5 109 350 550 671 754
METROS PERFORADOS
HORAS ACUMULADAS
ROP’s [MPH]
25 241 200 121 83 54
20,74 100,43 93,47 81,80 77,44 49,00
1,21 2,40 2,14 1,48 1,07 1,10
109 350 550 671 754 808
De la tabla podemos decir: para la fase 30” todos los trépanos son tricono de insertos, y en cuanto rendimiento vemos que los 2 últimos trépanos tienen menor ROP en esto tuvo que ver la parte formacional en donde predomino la diamictita.
Ahora tenemos de experiencia de la perforación con lodo aireado de pozos (SAL-15, SAL17, SBL-7, SBL-8. SAL-16) haciendo el uso de trépanos tricono en fase 24”, y nuestros ROP fueron mucho mejores.
Enero del 2013
2013 Copyright All Rights Reserved
Page 38 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
6.2.10 Determinación de los Parámetros de Inyección. En la siguiente tabla se muestra los caudales de inyección de líquido, aire, densidad equivalente de circulación y la profundidad respectiva: FASE 30'' VIAJE #1 (conv.)
DIAS
PROFUNDIDAD [m]
AIRE [scfm]
LODO [gpm]
15-Oct
67
-
500
-
84
-
500
-
-
16-Oct
88
-
630
-
-
100
-
670
-
-
17-Oct 18-Oct
109
-
680
-
-
119
-
650
-
-
125
-
650
-
-
138
500
650
7,52
784
140
500
650
7,51
778
152
500
630
7,50
759
158
700
650
6,97
825
160
750
650
6,86
838
170
750
650
6,85
824
180
750
650
6,86
830
190
750
650
6,88
827
200
800
650
6,79
836
210
800
650
6,81
831
220
800
650
6,84
827
230
800
650
6,85
823
240
850
650
6,80
859
250
880
650
6,75
834
269
880
650
6,77
830
270
880
650
6,80
827
280
880
650
6,83
824
290
880
650
6,85
820
300
880
650
6,86
817
310
880
650
6,88
814
320
880
650
6,91
811
325
950
650
6,88
823
330
980
670
6,83
847
340
980
670
6,86
844
350
980
670
6,88
841
82.5-109 m
VIAJE #2 109-350 m
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
Enero del 2013
2013 Copyright All Rights Reserved
ECD
[lpg]
ELV [gpm] -
Page 39 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location: FASE 30'' Continuación VIAJE #3
DIAS
24-Oct
350-550 m 25-Oct
26-Oct
27-Oct
28-Oct
PROFUNDIDAD [m]
Customer:
AIRE [scfm]
LODO [gpm]
PETROBRAS BOLIVIA
ECD
[lpg]
ELV [gpm]
360
950
700
6,98
861
370
950
700
7,00
858
380
1100
700
6,76
883
390
1100
650
6,75
833
400
1150
650
6,68
840 846
410
1200
650
6,63
420
1200
670
6,68
861
430
1200
670
6,70
858
440
1200
670
6,72
856
445
1250
650
6,63
843
450
1300
680
6,56
880
460
1300
680
6,58
877
470
1300
700
6,62
893
480
1300
700
6,65
890
490
1300
700
6,67
888
500
1300
700
6,69
885
510
1350
700
6,63
891
520
1350
700
6,65
888
530
1300
700
6,75
878
540
1300
700
6,77
876
550
1350
700
6,72
881
VIAJE #4
29-Oct
350-440
500
600
7,84
repasan
550-671 m
30-Oct
475-550
500
600
7,84
repasan
560
800
700
7,93
775
565
800
700
7,15
800
570
1100
700
7,14
840
580
1100
700
7,15
838
590
1100
700
7,17
837
600
1100
700
7,19
835
610
1100
700
7,20
833
31-Oct
1-Nov
620
1100
700
7,22
832
630
1100
700
7,23
830 829
640
1100
700
7,24
650
1100
700
7,26
827
2-Nov
660
1100
700
7,27
826
670
1100
700
7,29
825
VIAJE # 5
3-Nov
148-177
600
600
7,29
repasan
671-754 m
4-Nov
5-Nov 6-Nov 7-Nov
VIAJE #6
Enero del 2013
190-267
600
600
7,29
repasan
743-671
1100
700
7,29
repasan
680
1100
700
7,30
823
690
1100
700
7,31
822
700
1100
700
7,33
821
710
1200
680
7,20
812
720
1200
680
7,22
810
730
1400
600
6,92
756
740
1400
600
6,94
754
750
1400
600
6,95
753
8-Nov
754
1400
550
6,92
circulan
9-Nov
731-754
1200
600
-
repasan
754-808 m
Bolivia
760
1400
650
7,00
800
770
1400
650
7,01
798
780
1400
600
6,99
748
10-Nov
790
1450
600
6,95
753
800
1450
600
6,93
753
11-Nov
808
1450
600
6,95
753
2013 Copyright All Rights Reserved
Page 40 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
7
DESARROLLO DE LA PERFORACIÓN EN LA ETAPA DE 24”
7.1
Estado Inicial del Pozo y Pruebas de Presión Una vez concluida la cementación del Casing 26’’, Personal de Weatherford SDTMS inicia los trabajos de montaje de la cabeza rotativa y acondicionado de la línea de flote, para dicho trabajo se cuenta con la ayuda de soldadura para el pegue del caño conductor con el cabezal de 30” al Casing 26” en el contra pozo y armado de la línea de flote en diámetro de 8’’-ANSI 150.
El día 16 de noviembre 2012 se realizan las pruebas de circulación del cabezal y línea de flote; quedando habilitado el sistema de perforación con lodo aireado para la fase de 24” a partir de la fecha.
Inicialmente se baja arreglo convencional (sarta lisa) con trépano tricono 24” de insertos a rotar cemento, estando con sarta a 762 m se realiza los trabajos de centrado del pozo sujetando con tensores del cabezal y también alinearon del mástil colocando lainas.
El objetivo con este arreglo de fondo es rotar cemento, accesorios de cementación y perforar 25 m de pozo nuevo.
Las conexiones o agregados de tiros de perforación se realizaron de manera húmeda, es decir, cortar inyección de aire, desplazar el aire de la sarta con solo líquido, sacar bomba y realizar el agregado de un nuevo tiro a la sarta de perforación. Para reiniciar: colocar primero la bomba de lodo, luego aire y circular hasta normalizar los parámetros previos a la maniobra.
Durante el tiempo que se perfora la fase, personal de la compañía de lodos aplicó químicos para proteger de posible corrosión de la tubería.
Según reportes diarios del Químico no se registro perdida de lodo a lo largo de toda la etapa de 24” (806.5-1716) m.
Enero del 2013
2013 Copyright All Rights Reserved
Page 41 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.2
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Resumen Operacional Total perforado en fase 24’’ con lodo aireado fue de 598 m (de 833-961 m y 1246-1716 m) en 32 días que comprende del 19 al 22/nov. y 11/dic. al 07/ene, se realizaron 12 viajes de perforación incluido los 4 viajes convencionales, 3 cambios de elementos de sello en Bearing de cabeza rotativa. En el periodo de perforación con lodo aireado los parámetros de inyección promedios son: Densidad Equivalente de Circulación de 6,78 lpg a 7.93 lpg, con caudales de 500 gpm a 800 gpm de liquido y una tasa de inyección de aire de 600 scfm a 1800 scfm, teniendo en cuenta que el volumen equivalente se encuentre dentro del rango de operación del motor de fondo, también considerando la estabilidad de las paredes y limpieza de pozo abierto. El tiempo de atraso para la profundidad final de la fase es aproximadamente de 126 min, resultados obtenidos del programa de simulación de fluido multifásico (Wellflo).
En esta fase no se registran pérdidas de lodo durante la perforación, la variación en la relación de los caudales de inyección y los cambios en los parámetros de perforación se hicieron con la finalidad de mejorar el ROP. La profundidad final perforada en la fase con lodo aireado fue de 1716 m. En adelante continúan perforando la fase con fluido monofásico (lodo base agua) hasta completar el programa de 2006 convencionalmente… Datos numéricos de la fase 24”
Enero del 2013
Prof. [m]
[scfm]
[gpm]
ECD [ppg]
806.6 833 900 961 1000 1100 1150 1200 1246 1300 1350 1400 1500 1600 1716
0 600 600 600 0 0 0 0 1000 1500 1800 1600 1800 1700 1600
500 650 650 650 800 850 850 850 800 780 800 850 850 780 800
8,90 7,93 7,95 7,99 8,90 8,90 9,00 9,00 7,75 7,15 7,75 7,09 6,98 7,10 7,94
2013 Copyright All Rights Reserved
Page 42 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Grafico con los Parámetros de Inyección para Fase 24’’
En la grafica observamos que los espacios vacios en la línea roja nos indica que se perforó sin inyecto aire al pozo.
Enero del 2013
2013 Copyright All Rights Reserved
Page 43 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Distribución de tiempos en Fase 24’’
El análisis de tiempos, solo toma en cuenta los 32 días que se perforo con inyección de aire (lodo aireado).
Enero del 2013
2013 Copyright All Rights Reserved
Page 44 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.1.1
Bolivia
Customer:
PETROBRAS BOLIVIA
Primer viaje de perforación, tramo 806.5 a 833m. Luego de instalación y prueba de flujo realizado a la cabeza rotativa (bowl 30”) y Línea de Flote, proceden a armar ensamblaje de fondo (sarta liso) con trépano tricóno 24’’OD de dientes con 3 boquillas (24/32”) y 1 boquilla (32/32”), Bit Sub 11”, Spiral Drill Collar 11’’, Spiral Drill Collar 9 ½’’, Spiral Drill Collar 8’’ y Heavy Weight Drill Pipe 5 ½’’, aestas últims utilizadas de transición entre el arreglo rígido y tubería de perforación DP 5 7/8”OD Realizada la prueba de flujo en superficie del motor de fondo, inician a bajar sarta según procedimiento de viaje de la empresa DLS. Con sarta en 762 m de profundidad realizan trabajos de centrado del mástil, luego continúan bajando hasta 802 m en donde encuentran tope de cemento. Se inicia a rotar cemento y accesorios del zapato flotador hasta 808 m con: 550 gpm, 350 psi, 50 rpm, 18-26k lbs de peso sobre el trépano.
A continuación perforan pozo nuevo en 24” de 808 m a 833 m con los siguientes parámetros: 500-550 gpm, 300-350 psi, 40-60 rpm, 18-26k lbs de peso, 0.85 mph.
Concluido el tramo y con sarta en el fondo reciprocando, se circula bache 270 segundo de viscosidad hasta observar lodo limpio de recortes en zarandas, paran bomba y largan Totco, luego sacan sarta a superficie.
Al perforar este tramo se realizaron variaciones en los parámetros de perforación y maniobran herramienta con el objetivo de mejorar el bajo ROP.
Este tramo se perforo con arreglo de fondo convencional y fluido monofásico (liquido) densidad 8.9 lpg con el objetivo de adecuar pozo en 24” para que el motor de fondo quede fuera del zapato del Casing 26”, ya que, a partir del siguiente viaje se perforara con motor de fondo en el ensamble.
En superficie realizan mediciones de desgaste al trépano, estabilizadores, horas del trépano = 29.5, avance = 25 m, ROP = 0.85 m/hr. Lectura de Totco 0° a 831 m.
Litología, según el reporte de geología en el tramo perforado tenemos 100% arenisca.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV=14 cp., YP=29 lbs/100ft2. No registran pérdidas durante el tramo perforado. Enero del 2013
2013 Copyright All Rights Reserved
Page 45 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
A continuación se muestra la gráfica con parámetros de inyección y el ensamblaje de fondo(BHA) utilizado en el viaje.
Grafica parámetros de Inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 46 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
Geometría del arreglo de fondo
BHA N°:
10
FECHA:
16-Nov-12
POZO:
ITU-4
EQUIPO:
ARCHER - 153
TREPANO N° 8 TIPO
VG-03MDX
SERIE
6080556 3 x 24 - 1x32
BOQ 2
T.F.A. (in ) IADC DULL GRADDING:
Descripción Item 1 BIT TRICONO INSERTOS 24" (N)
6 HWDP 5 7/8"
XO
3 DRILL COLLAR 8"
XO
2
BIT SUB (N)
3
DC 11"
DIÁMETRO 24" BAKER
MARCA
2,111 0-1-WT-G-3-4-NO-BHA
Prof. Entrada (m):
808,00
Prof. Salida (m):
833,00
Avance (m):
25,00
Hrs. Trépano (hrs):
29,50
ROP (m/hr):
0,85
ROP (min/m):
70,80 106
REV. TOTAL X 1000
Serie 6080556
OD in 24
439
10 13/16
O8828
10 7/8
ID in
3
Long (m) 0,54
Long. Total 0,54
0,86
1,40
9,08
10,48
4
DC 11"
A41277
10 15/16
3 1/8
9,32
19,80
5
DC 11"
7493007
10 7/8
3 1/8
8,94
28,74
6
XO
38704
10 3/4
3
0,86
29,60
7
DC 9 1/2
A22940
9 7/16
3
9,47
39,07
8
DC 9 1/2
T101
9 3/8
3 1/8
9,14
48,21
9
DC 9 1/2
3 1/8
8,86
57,07
12091
9 1/2
10 XO
67952
9 1/4
11 DC 8"
15801
7 13/16
12 DC 8"
O2980302
7 7/8
13 DC 8"
A1061
7 7/8
14 XO
94775/7
7 13/16
2 15/16
0,85
86,42
15 HWDP 5 7/8"
32817
6 3/4
4 1/16
9,27
95,69
3
0,9
57,97
9,28
67,25
3
9,26
76,51
3 1/16
9,06
85,57
3 1/8
16 HWDP 5 7/8"
90225N
6 15/16
4 1/16
9,35
105,04
3 DRILL COLLAR 9 1/2" 17 HWDP 5 7/8"
90241N
6 15/16
4 1/16
9,36
114,40
18 HWDP 5 7/8"
32812N
6 13/16
4 1/16
9,32
123,72
19 HWDP 5 7/8"
32823
6 13/16
4 1/16
9,28
133,00
20 HWDP 5 7/8"
32822N
6 7/8
4 1/16
9,24
142,24
XO
3 DRILL COLLAR 11"
BIT SUB (c/valv.) BIT TRIC 24"
0 0
LONG. TOTAL BHA
Enero del 2013
2013 Copyright All Rights Reserved
142,24
Page 47 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.2.2
Bolivia
Customer:
PETROBRAS BOLIVIA
Segundo viaje de perforación, tramo 833 m a 971 m. Con pozo adecuado para bajar sarta con motor de fondo, se inicia el armado del ensamblaje de fondo(BHA), que consiste en: trépano trícono 24”OD de insertos con 3 boquillas (24/32”) y 1 (32/32”), Bit Sub, motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y DP Heavy Weight 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y tubería de perforación DP 5 7/8”OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, se inicia a bajar sarta a fondo de pozo. En 808 m encuentran resistencia, conectan Top Drive con 15 rpm y 20k lbs de peso intentan pasar, sin éxito. Intentan con circulación de 600 gpm, 10-20 rpm, logrando pasar y llegar repasando hasta fondo pozo (833 m).
Levanta sarta a 815 m, realiza reunión de seguridad operacional, y se procede a instalar el Bearing Assembly en cabeza rotativa, alineación del retorno de fluido al sistema de perforación con aire, luego se inicia la circulación del pozo con 600 scfm, 650 gpm de liquido, una vez homogeniza el sistema se baja repasando hasta fondo de pozo (833 m) con circulación y rotación.
Sarta direccional fondo con motor de fondo y parámetros normalizados se inicia a perforar pozo de 833 m a 961m, manteniendo caudales de inyección de 600-650 scfm, 600 gpm de líquido, 650-700 psi presión de inyección, 7.10-7.99 lpg de densidad equivalente de circulación, 20-32k lbs de peso sobre el trépano, 40-50 rpm del Top Drive.
Previo a realizar conexiones y en puntos de alto torque se bombea bache viscoso para ayudar con la limpieza del pozo, tamboem se hacen variaciones en caudales de inyección y parámetros de perforación con la intención de mejora ROP.
Con sarta en el fondo (961 m), pozo normalizado Petrobras decide continuar perforando sin aire, debido a la falta de diesel para continuar operando los equipos de inyección.
Perforan de 961m a 971 m con fluido monofásico, observan torques puntuales 18k lbsf-ft , maniobrar herramienta y varían paramentaros para superar torque y mejorar bajo ROP. En 964 m se procede a retirar bearing de la cabeza rotativa. Enero del 2013
2013 Copyright All Rights Reserved
Page 48 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
A 971 m de profundidad, con 75.83 horas de trabajo del trépano deciden realizar viaje a superficie para su reemplazo.
Con sarta reciprocando en el fondo, bombea bache de 250 segundos de viscosidad y circulan hasta observar en zarandas lodo limpio de recortes, largan Totco y proceden a sacar sarta a superficie según.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas trépano = 75.83, av = 138 m, ROP = 1.82 mph, lectura 876 m del Totco=0.5°.
Litología, según reporte de geología en todo el tramo perforado se observa que predomina arenisca, en menor porcentaje limolita, para 970 m registran 100% arenisca.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV = 10-15 cp., YP = 15-16 lbs/100ft2. No se registran pérdidas de lodo durante el tramo perforado.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje. Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 49 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del arreglo de fondo BHA N°:
11
FECHA:
18-Nov-12
POZO:
ITU-4
EQUIPO:
XO
3 DC 8"
XO
DRILL JAR
SERIE T.F.A. (in2)
Descripción
3 DC 11"
2,111 1-1-WT-A-F-1/8-CT-PR
Serie
Prof. Entrada (m):
833,00
Prof. Salida (m):
971,00
Avance (m):
138,00
Hrs. Trépano (hrs):
75,83
ROP (m/hr):
1,82
ROP (min/m):
32,97 650
REV. TOTAL X 1000 OD in
ID in
24
Long (m)
Long. Total
0,55
0,55
0,30
0,85
1
BIT TRICONO BAKER (N)
2
BIT SUB (N)
NLT-S0672
3
11 1/2" MOTOR FONDO (N)
FD115080
11 1/2
4
FLOAT SUB (w/valve)
FS1997
11 1/4
5
STB 23 7/8" (N)
FS-169
11
3
2,39
13,63
6
SHOCK SUB (N)
29127H
11 1/4
3
6,77
20,40
7
DC 11" (corto)
O2-1307-1
10 7/8
2,35
22,75
8
STB 23 7/8" (N)
FS-181
11 1/16
9
DC 11"
O8828
10 7/8
10 DC 11"
A41277
10 15/16
3 1/8
9,32
43,49
11 DC 11"
7493007
10 7/8
3 1/8
8,94
52,43
5218594
10 7/8
3 7/16 3
3 1/4 3 3
9,74
10,59
0,65
11,24
2,34
25,09
9,08
34,17
12 XO
38704
10 3/4
3
0,86
53,29
13 DC 9 1/2
A22940
9 7/16
3
9,47
62,76
14 DC 9 1/2
T101
9 3/8
3 1/8
9,14
71,90
15 DC 9 1/2
12091
9 1/2
3 1/8
8,86
80,76
DHA-02964
9 1/2
3
10,08
90,84
67952
9 1/4
3
0,90
91,74 101,02
17 XO
XO
5218594 3x24 - 1x32
BOQ
16 DRILL JAR (N) 3 DC 9 1/2"
DIÁMETRO 24" BAKER
VG-03MDX
TIPO
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 9 MARCA
18 DC 8"
15801
7 13/16
3 1/8
9,28
19 DC 8"
O2980302
7 7/8
3
9,26
110,28
20 DC 8"
A1061
7 7/8
3 1/16
9,06
119,34
21 XO
94775/7
7 13/16
2 15/16
0,85
120,19
22 HWDP 5 7/8"
32812
6 3/4
4 1/16
9,39
129,58
23 HWDP 5 7/8"
90225N
6 15/16
4 1/16
9,35
138,93
24 HWDP 5 7/8"
90241N
6 15/16
4 1/16
9,36
148,29
25 HWDP 5 7/8"
32812N
6 13/16
4 1/16
9,32
157,61
26 HWDP 5 7/8"
32823
6 13/16
4 1/16
9,28
166,89
27 HWDP 5 7/8"
32822N
6 7/8
4 1/16
9,24
176,13
STB 23 7/8" (N)
DC 11" (corto)
SHOCK SUB STB 23 7/8" (N)
FLOAT SUB (c/valv.)
MOTOR FONDO
0
BIT SUB
0
BIT TRIC 24"
DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
176,13
Page 50 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.2.3
Bolivia
Customer:
PETROBRAS BOLIVIA
Tercer viaje de perforación, tramo 971 m a 1022m. Perforado en forma convencional (sin aire)
7.2.4
Cuarto viaje de perforación, tramo 1022 m a 1130 m. Perforado en forma convencional (sin aire), Trepano hibrido “kymera”
7.2.5
Quinto viaje de perforación, tramo 1130 m a 1165 m. Perforado en forma convencional (sin aire)
7.2.6
Sexto viaje de perforación, tramo 1165 m a 1259 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano trícono 24’’OD de insertos con 3 boquillas (24/32”) y 1 (32/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y tubería de perforación 5 7/8”
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado. En 1147 m, último tiro conectado al Top Drive bajan repasando con rotación y circulación de 700 gpm, 660 psi, 40 rpm hasta 1165 m.
Sarta direccional con motor de fondo y parámetros de perforación normalizados inician a perforar pozo de 1165 m a 1246 m en forma convencional, con: 850 gpm de líquido, 10401100 psi presión de stand pipe, 9.0 lpg densidad de lodo, 20-45k lbs de peso de sobre el trépano, 30-40 rpm del Top Drive, no registran pérdidas de lodo.
Con sarta a 1246 m se instala Bearing Assembly en cabeza rotativa según procedimiento de Weatherford (SDS), inmediatamente se inicia inyección de 800 gpm, 1000-1100 scfm, 7.75 lpg de densidad equivalente de circulación. Una vez homogenizado el sistema se perfora de 1246 m a 1259 m con lodo aireado.
Continúan bombeando baches de 270 segundos de viscosidad para eliminar los torques puntuales, además se espera mejorar el ROP con el re-inicio de la inyección de aire
A 1259 m de profundidad, con 92.42 horas de trabajo del trépano decide realizar viaje a superficie para su reemplazo. Enero del 2013
2013 Copyright All Rights Reserved
Page 51 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Prepara el pozo para dicha maniobra: bombea bache viscoso, circulan tiempo de atraso observando en zarandas regular cantidad de recortes, luego se desplaza con líquido el aire del interior de la sarta y lanzan Totco.
Inicia a sacar sarta con stripping a través de la goma de cabeza rotativa(RCD) de 1259 m a 300 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa, luego continua viaje del arreglo de fondo hasta superficie sir resistencia.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas trépano = 92.42, av = 94 m, ROP = 1.02 mph, lectura del totco=1.25° 1244 m.
Litología, según registro de geología en todo el tramo perforado se observa: arenisca, limonita y diamictita en porcentajes variables. Para 1258 m 80% arenisca y 20% diamictita.
Lodo, según reporte del químico la densidad se mantiene en 9,00 lpg con PV = 15 cp, YP = 21 lbs/100 ft2, no registran pérdidas.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje. Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 52 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
Rig:
PETROBRAS BOLIVIA
Geometría del arreglo de fondo BHA N°:
15
FECHA:
7-Dic-12
POZO: EQUIPO:
ITU-4
XO
3 DC 8"
XO
SERIE T.F.A. (in2)
Descripción
STB 23 7/8" (N)
Serie
1.259,00
Avance (m):
94,00
Hrs. Trépano (hrs):
92,42
ROP (m/hr):
1,02
ROP (min/m):
58,99 829
REV. TOTAL X 1000 OD in
ID in
24
Long (m)
Long. Total
0,55
0,55
0,30
0,85
9,72
10,57
0,65
11,22
3 1/16
2,43
13,65
3
6,64
20,29
10 7/8
3 1/4
2,35
22,64
FS-210
11 1/4
3 1/16
2,46
25,10
7493007
10 7/8
3 1/8
8,94
34,04
10 DC 11"
43120
11 1/16
3
9,35
43,39
11 DC 11"
8826
10 7/8
3
8,89
52,28
2
BiIT SUB
NLT-S0672
10 7/8
3
MOTOR FONDO 11 1/2"
FD115082
11 1/2
4
FLOAT SUB (w/valve) (N)
FS-1997
11 1/4
5
STB 23 7/8" (N) (c/anilla Totco)
FS-209
11 1/4
6
SHOCK SUB (U)
28275
11 1/4
7
DC 11" (corto)
O2-1307-1
8
STB 23 7/8" (N)
9
DC 11"
5219893
3
3
9,43
61,71
16442-2
10 7/8
3
1,17
62,88
14 DC 9 1/2
A22940
9 7/16
3
9,47
72,35
15 DC 9 1/2
T101
9 3/8
3 1/8
9,14
81,49
12091
9 1/2
3 1/8
94283H
9 1/2
43124
11
3 7/16
13 XO
8,86
90,35
3
10,08
100,43
3
0,90
101,33
18 XO
67952
9 1/4
19 DC 8"
15801
7 13/16
3 1/8
9,28
110,61
20 DC 8"
O2980302
7 7/8
3
9,26
119,87
A1061
7 7/8
3 1/16
9,06
128,93
94775/7
7 13/16
2 15/16
0,85
129,78
23 HWDP 5 7/8"
32812
6 3/4
4 1/16
9,39
139,17
24 HWDP 5 7/8"
90225N
6 15/16
4 1/16
9,35
148,52
25 HWDP 5 7/8"
90241N
6 15/16
4 1/16
9,36
157,88
26 HWDP 5 7/8"
32812N
6 13/16
4 1/16
9,32
167,20
27 HWDP 5 7/8"
32823
6 13/16
4 1/16
9,28
176,48
28 HWDP 5 7/8"
32822N
6 7/8
4 1/16
9,24
185,72
21 DC 8" 22 XO
4 DC 11"
3-4-WT-A-F-4-CL-HR
1.165,00
Prof. Salida (m):
BIT TRICONO INSERTOS 24" (N)
16 DC 9 1/2
XO
2,111
Prof. Entrada (m):
1
17 DRILL JAR (U) 3 DC 9 1/2"
5219893 3x24 - 1x32
BOQ
12 DC 11" DRILL JAR
DIÁMETRO 24" BAKER
VG-O3MDX
TIPO
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 12 MARCA
DC 11" (corto)
SHOCK SUB STB 23 7/8" (N)
FLOAT SUB (c/valv.)
MOTOR FONDO
BIT 24"
0 DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
185,72
Page 53 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.2.7
Bolivia
Customer:
PETROBRAS BOLIVIA
Séptimo viaje de perforación, tramo 1259 m a 1351 m. Arman el nuevo arreglo de fondo (BHA) que consiste en: trépano trícono 24”OD de insertos con 3 boquillas (24/32”) y 1 boquilla (32/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y tubería de perforación 5 7/8”OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado según procedimiento de la empresa DLS, el último tiro bajan repasando con rotación y circulación hasta tocar fondo perforado.
Levanta sarta a 1244 m, realiza reunión de seguridad operacional, y se procede a instalar el Bearing Assembly en cabeza rotativa, alineación del retorno de fluido al sistema de perforación con aire.
Sarta direccional con motor de fondo y parámetros normalizados inician a perforar pozo de 1259 m a 1351 m, manteniendo caudales de inyección entre 1400-1800 scfm de aire, 780800 gpm de líquido, 900-1140 psi presión de inyección, 7.23-6.78 lpg de densidad equivalente de circulación, 35-50k lbs de peso sobre el trépano, 40-55 rpm del Top Drive.
Con el objetivo de mejorar la limpieza y eliminar los torques puntuales continúan bombeando baches de 270 segundos de viscosidad. En el viaje se observa fuertes vibraciones de la sata de perforación.
En 1337 m se observa fuga en la salida lateral de la cabeza rotativa en brida de cañería de 8”, situación que obligo a parar la inyección de aire y repara fuga con soldadura.
A 1351 m de profundidad, con 75.55 horas de trabajo del trépano decide realizar viaje a superficie para su reemplazo.
Prepara el pozo para dicha maniobra: bombean bache de 270 segundos de viscosidad y circula tiempo de atraso observando en zarandas mínima cantidad de recortes, luego se desplaza el aire con líquido del interior de la sarta, lanzan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 54 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa(RCD) de 1351 m a 1292 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa, luego continúan sacando arreglo de fondo hasta superficie, el viaje se realiza según procedimiento de la empresa perforadora DLS.
Se observa sobretensión de 10k lbs al pasar el estabilizador superior por el zapato de Casing 32”.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 75.55, av = 92 m, ROP =1.22 mph, lectura del totco=1.5° 1335 m
Litología, según registro de geología en el tramo perforado se observa: arenisca, limolita y diamictita con porcentajes variables. Para 1350 m 100% diamictita.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV = 12 cp, YP = 23-18 lbs/100 ft2, no registran pérdidas de lodo.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje. Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 55 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del ensamble de fondo
16
BHA N°: FECHA:
12-Dic-12
POZO: EQUIPO:
ITU-4
XO
3 DC 8"
XO
DRILL JAR 9 1/2"
VG-O3MDX
TIPO SERIE
5220377 3x24 - 1x32
BOQ 2
T.F.A. (in )
Descripción
4 DC 11"
5-6-WT-A-E-3-NO-PR
Serie
1.259,00
Prof. Salida (m):
1.351,00
Avance (m):
92,00
Hrs. Trépano (hrs):
75,55
ROP (m/hr):
1,22
ROP (min/m):
49,27 897
REV. TOTAL X 1000 OD in
ID in
24
Long (m)
Long. Total
0,54
0,54
0,30
0,84
10,89
11,73
0,65
12,38
3
2,34
14,72
3
6,77
21,49
2,35
23,84
BIT TRICONO INSERTOS 24" (N)
2
Bit Sub
NLT-S0672
10 7/8
3
MOTOR FONDO 11 1/2"
FD115011
11 1/2
4
FLOAT SUB (w/valve) (U)
FS-1997
11 1/4
3
5
STB 23 7/8" (N) (c/anilla Totco)
FS-181
11 1/16
6
SHOCK SUB (N)
V78537
11 1/4
7
DC 11" (corto)
O2-1307-1
10 7/8
8
STB 23 7/8" (N)
FS-169
11
3
2,39
26,23
9
DC 11"
7493007
10 7/8
3 1/8
8,94
35,17
5220377
3 7/16
3 1/4
10 DC 11"
43120
11 1/16
3
9,35
44,52
11 DC 11"
8826
10 7/8
3
8,89
53,41
12 DC 11"
43124
3
9,43
62,84 64,01
11
13 XO
16442-2
10 7/8
3
1,17
14 DC 9 1/2
A22940
9 7/16
3
9,47
73,48
15 DC 9 1/2
T101
9 3/8
3 1/8
9,14
82,62
12091
9 1/2
3 1/8
DHA02964
9 1/2
16 DC 9 1/2
3
91,48 101,57
18 XO
67952
9 1/4
15801
7 13/16
20 DC 8"
O2980302
7 7/8
3
9,26
121,01
21 DC 8"
A1061
7 7/8
3 1/16
9,06
130,07
23 HWDP 5 7/8"
3
8,86 10,09
19 DC 8"
22 XO XO
2,111
Prof. Entrada (m):
1
17 DRILL JAR 3 DC 9 1/2"
DIÁMETRO 24" BAKER
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 13 MARCA
3 1/8
0,90
102,47
9,28
111,75
94775/7
7 13/16
2 15/16
0,85
130,92
32812
6 3/4
4 1/16
9,39
140,31
24 HWDP 5 7/8"
90225N
6 15/16
4 1/16
9,35
149,66
25 HWDP 5 7/8"
90241N
6 15/16
4 1/16
9,36
159,02
26 HWDP 5 7/8"
32812N
6 13/16
4 1/16
9,32
168,34
27 HWDP 5 7/8"
32823
6 13/16
4 1/16
9,28
177,62
28 HWDP 5 7/8"
32822N
6 7/8
4 1/16
9,24
186,86
STB 23 7/8" DC 11" (corto)
SHOCK SUB
STB 23 7/8" FLOAT SUB (c/valv.)
MOTOR FONDO
BIT 24"
0 DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
186,86
Page 56 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.2.8
Bolivia
Customer:
PETROBRAS BOLIVIA
Octavo viaje de perforación, tramo 1351 m a 1544 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano hibrido (kymera) 24” con 6 boquillas (18/32”) y 3 boquillas (20/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y tubería de perforación 5 7/8”OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado.
Con sarta a 1323 m de profundidad, realiza reunión de seguridad operacional, y se procede a instalar el Bearing Assembly en cabeza rotativa, alineación del retorno de fluido al sistema de perforación con aire e inician a circular y homogenizar el sistema con: 1500 scfm, 850 gpm, 1300 psi, 40 rpm.
Sarta direccional con motor de fondo y parámetros normalizados se inicia a perforar pozo de 1351 m a 1544 m, manteniendo caudales de inyección entre 1500-1800 scfm de aire, 850-900 gpm de líquido, 1160-1280 psi presión de inyección, 7.16-7.06 lpg de densidad equivalente de circulación, 30-45k lbs de peso sobre el trépano, 40-50 rpm del Top Drive.
Se bombea baches de 270 segundos de viscosidad: previo a realizar conexiones y cuando se observa torques altos para asegurar la limpieza de recortes en el fondo del pozo, además de maniobrar herramienta.
En 1413 m se observa fuga en la salida lateral de la cabeza rotativa en brida de cañería de 8”, situación que obligó a parar la inyección de aire y reparar fuga con soldadura.
A 1544 m de profundidad, con 101.96 horas de trabajo del trépano deciden hacer viaje a superficie para su reemplazo del mismo.
Prepara el pozo para dicha maniobra: bombean bache de 270 segundos de viscosidad y circula tiempo de atraso observando en zarandas mínima cantidad de recortes, luego se desplaza el aire con líquido del interior de la sarta, lanzan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 57 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Inicia a sacar sarta con stripping a través de la goma de cabeza rotativa(RCD) de 1544 m a 788 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continúan viaje del arreglo de fondo hasta superficie.
Se observa sobretensión 20k lbs en tramo 1390-1384 m obligando a conectar Top Drive y realiza back reaming, igualmente se observa sobretensión 10k lbs al pasar el estabilizador superior por el zapato de Casing 32” se realiza maniobras de la herramienta.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo. Horas del trépano = 101.96, av = 193 m, ROP=1.89 mph. Lectura del totco=1° 1528 m.
Litología, según registro de geología en el tramo perforado se observa: arenisca, limolita y diamictita con porcentajes variables. Para 1544 m 70% diamictita, 30% limolita.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV=12-13 cp, YP = 18-15 lbs/100 ft2, no registran pérdidas de lodo.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje. Grafica con parámetros de inyección
Geometría del ensamble de fondo Enero del 2013
2013 Copyright All Rights Reserved
Page 58 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
17
BHA N°: FECHA:
17-Dic-12
POZO: EQUIPO:
ITU-4
6 HWDP 5 7/8"
XO
3 DC 8"
XO
DRILL JAR 9 1/2"
1.544,00
Prof. Salida (m):
SERIE
7030315
Avance (m):
193,00
Hrs. Trépano (hrs):
101,96
6x18 - 3x20 2
T.F.A. (in )
Descripción
ROP (m/hr):
1,89
3-8-WT-G-F-6-CL-HR
ROP (min/m):
31,70
0-8-WT-S-X-6-CT-HR
REV. TOTAL X 1000
2,411
Serie
OD in
BIT KYMERA HP633X 24" (N)
2
MOTOR FONDO 11 1/2"
FD115080
11 1/2
7030315
ID in
750 Long (m)
24
1
Long. Total
0,64
0,64
11,45
12,09
3
FLOAT SUB (w/valve) (U)
FS-1997
11 1/4
3
0,65
12,74
4
STB 23 7/8" (N) (c/anilla p/ Totco)
FS-172
11 1/16
3
2,15
14,89
5
SHOCK SUB (U)
V-78537
11 1/4
3
6,77
21,66
6
DC 11" (corto)
BS-225
10 15/16
3 1/4
2,94
24,60
FS-180
11 1/16
3
2,30
26,90
8827
10 15/16
3 1/16
9,08
35,98
14127
10 7/8
3 1/16
9,22
45,20
3 1/16
8,92
54,12
3 1/16
9,31
63,43
7
STB 23 7/8" (N)
8
DC 11"
9
DC 11"
11
10 DC 11"
7493004
11 DC 11"
A41277
10 15/16
12 XO
J-16442-1
11 1/16
3 1/16
1,09
64,52
13 DC 9 1/2
01-1138C
9 1/4
3 1/16
8,82
73,34
14 DC 9 1/2
A22960
9 1/4
9,16
82,50
15 DC 9 1/2
BS-1873
9 1/2
3
9,31
91,81
9 1/2
807
3 1/8 3
10,09
101,90
9
3 1/16
0,95
102,85
DHA-02964
18 DC 8"
A29611
7 15/16
3
9,36
112,21
19 DC 8"
5980269
7 15/16
3
9,39
121,60
20 DC 8"
C51254
130,64
21 XO
J17317
22 HWDP 5 7/8"
4 DC 11"
1.351,00
HP-633X
17 XO
XO
Prof. Entrada (m):
TIPO
16 DRILL JAR 3 DC 9 1/2"
DIÁMETRO 24" BAKER
BOQ
Rig:
PETROBRAS BOLIVIA
TREPANO N° 14 MARCA
ARCHER - 153 IADC DULL GRADDING: Item
Customer:
Bolivia
190242N
3 1/16
9,04
8 1/8
8
3 1/16
1,18
131,82
7
4
9,34
141,16
23 HWDP 5 7/8"
32814N
7
4
9,33
150,49
24 HWDP 5 7/8"
32813N
7
4
9,35
159,84
25 HWDP 5 7/8"
32818
6 7/8
4
9,3
169,14
26 HWDP 5 7/8"
90211
6 15/16
4
9,35
178,49
27 HWDP 5 7/8"
7-19030
6 7/8
4
9,34
187,83
STB 23 7/8"
DC 11" (corto)
SHOCK SUB STB 23 7/8"
F. SUB (c/valv.)
MOTOR FONDO
BIT 24"
0 DHM RATIO = 0,078 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
187,83
Page 59 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
7.2.9
Bolivia
Customer:
PETROBRAS BOLIVIA
Noveno viaje de perforación, tramo 1544 m a 1560 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano tricono 24”OD con 3 boquillas (28/32”) y 1 boquilla (24/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y tubería de perforación 5 7/8”OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado.
Con sarta a 1518 m de profundidad, una vez realizada la reunión de seguridad operativa, se instala Bearing Assembly en cabeza rotativa, se alinea el retorno hacia el sistema de perforación con aire y se continúa bajando de 1518 m a 1544 m con rotación y circulación de 1300 scfm, 700 gpm, 700 psi, 30 rpm.
Sarta direccional con motor de fondo y parámetros normalizados se inicia a perforar pozo nuevo de 1544 m a 1560 m, manteniendo caudales de inyección entre 1300-1450 scfm de aire, 700 gpm de líquido, 870-1000 psi presión de inyección, 7,38-7,21lpg de densidad equivalente de circulación, 20-30k lbs de peso sobre el trépano, 30 rpm del Top Drive.
Se continúa bombeando baches de 270 segundos de viscosidad previo a realizar conexiones y en puntos de alto torque para asegurar la limpieza de recortes en el fondo del pozo, además de maniobrar herramienta y realizar cambios en parámetros de perforación. A pesar de estas variaciones de los parámetros no se logra mejorar el ROP.
A 1560 m de profundidad, con solo 20.62 horas de trabajo del trépano, deciden hacer viaje a superficie para reemplazo del mismo por bajo ROP.
Prepara el pozo para dicha maniobra: bombean bache de 270 segundos de viscosidad y circula tiempo de atraso observando en zarandas mínima cantidad de recortes, luego se continúa bombeando líquido hasta desplazar todo el aire del interior de la sarta.
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa RCD de 1560 m a 796 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie sin observar resistencia. Enero del 2013
2013 Copyright All Rights Reserved
Page 60 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 20.62, av = 20 m, ROP = 0.68 mph.
Litología, según registro de geología en el tramo perforado se observa: arenisca, limolita y diamictita con porcentajes variables. Para 1560 m 40% arenisca, 30% diamictita y 30 limolita.
Lodo, según reporte del químico la densidad se mantiene en 9.0 lpg con PV=8 cp, YP=1416 lbs/100 ft2, no registran pérdidas de lodo.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje.
Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 61 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del ensamble de fondo BHA N°:
18
FECHA:
23-Dic-12
POZO: EQUIPO:
ITU-4
XO
3 DC 8"
TIPO SERIE BOQ T.F.A. (in2)
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 15 MARCA
Descripción
DIÁMETRO 24" Security
EBXT02RC 11917332 3x28 - 1x24 2,246 2-3-WT-G-E-1-NO-PR
Serie
Prof. Entrada (m):
1.544,00
Prof. Salida (m):
1.560,00
Avance (m):
16,00
Hrs. Trépano (hrs):
20,62
ROP (m/hr):
0,78
ROP (min/m):
77,33 171
REV. TOTAL X 1000 OD in
ID in
24
1
BIT Tricono EBXT02RC 24" (N)
11917332
2
Bit sub
NLT50661
11 1/4
2
MOTOR FONDO 11 1/2"
FD115008
11 1/2
3
FLOAT SUB (w/valve) (U)
NLT-S0032
11
4
STB 23 7/8" (N) (c/anilla p/ Totco)
FS-210
11 5/16
5
SHOCK SUB (N)
28275
11 1/4
6
DC 11" (corto)
BS-225
10 15/16
7
STB 23 7/8" (N)
FS-209
11 5/16
8
DC 11"
8827
10 15/16
9
DC 11"
14127
10 7/8 11
3 1/16
Long (m)
Long. Total
0,57
0,57
0,20
0,77
10,65
11,42
3
0,78
12,20
2 15/16
2,43
14,63
3
6,64
21,27
3 1/4
2,94
24,21
2 15/16
2,43
26,64
3 1/16
9,08
35,72
3 1/16
9,22
44,94
3 1/16
8,92
53,86
9,31
63,17
10 DC 11"
7493004
11 DC 11"
A41277
10 15/16
3 1/16
12 XO
J-16442-1
11 1/16
3 1/16
1,09
64,26
XO
13 DC 9 1/2
01-1138C
9 1/4
3 1/16
8,82
73,08
14 DC 9 1/2
A22960
9 1/4
DRILL JAR 9 1/2"
15 DC 9 1/2
BS-1873
9 1/2
16 DRILL JAR
3 DC 9 1/2"
XO
4 DC 11"
9 3/8
DHA-2006
17 XO
807
9
3 1/8
9,16
82,24
3
9,31
91,55
3
9,97
101,52
3 1/16
0,95
102,47
18 DC 8"
A29611
7 15/16
3
9,36
111,83
19 DC 8"
5980269
7 15/16
3
9,39
121,22
20 DC 8"
C51254
21 XO
J17317
8 8 1/8
3 1/16
9,04
130,26
3 1/16
1,18
131,44
22 HWDP 5 7/8"
190242N
7
4
9,34
140,78
23 HWDP 5 7/8"
32814N
7
4
9,33
150,11
24 HWDP 5 7/8"
32813N
7
4
9,35
159,46
25 HWDP 5 7/8"
32818
6 7/8
4
9,30
168,76
26 HWDP 5 7/8"
90211
6 15/16
4
9,35
178,11
27 HWDP 5 7/8"
7-19030
6 7/8
4
9,34
187,45
STB 23 7/8"
DC 11" (corto)
SHOCK SUB STB 23 7/8"
FLOAT SUB (c/valv.)
MOTOR FONDO
BIT SUB
BIT 24"
0 DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
187,45
Page 62 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
7.2.10 Decimo viaje de perforación, tramo 1560 m a 1617 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano tricono 24”OD de insertos con 3 boquillas (24/32”) y 1 boquilla (32/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y DP 5 7/8” OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado.
Con sarta a 1528 m de profundidad, una vez realizada la reunión de seguridad operativa, se instala Bearing Assembly en cabeza rotativa, alineación del retorno hacia el sistema de perforación con aire y se continúa bajando de 1528 m a 1560 m con rotación y circulación de 1600 scfm, 700 gpm, 980 psi, 40 rpm, 4-6k lbf-ft torque. Sarta direccional con trépano 24’’OD en el fondo y parámetros normalizados se inicia a perforar pozo de 1560 m a 1617 m, manteniendo caudales de inyección entre 1700-1800 scfm de aire, 700-780 gpm de líquido, 1000-1100 psi presión de inyección, 7.18-7.10 lpg de densidad equivalente de circulación, 30-42k lbs de peso, 40-50 rpm del Top Drive.
Se continúa bombeando baches de 270 segundos de viscosidad previo a realizar conexiones y en puntos de alto torque para asegurar la limpieza de recortes en el fondo del pozo, además de maniobrar herramienta y realizar cambios en parámetros de perforación. A pesar de estas variaciones de los parámetros no se logra mejorar ROP.
Durante el tramo perforado se observa vibración de la sarta de perforación con ligero incremento de presión de bomba.
A 1617 m de profundidad, con solo 59.07 horas de trabajo del trépano deciden hacer viaje a superficie para reemplazo del mismo por bajo ROP.
Prepara el pozo para dicha maniobra: bombean bache de 270 segundos de viscosidad y circula tiempo de atraso observando en zarandas mínima cantidad de recortes, luego se continúa bombeando líquido hasta desplazar todo el aire del interior de la sarta, largan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 63 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa RCD de 1617 m a 800 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie, se observa resistencia puntual 10k lbs al pasar el estabilizador superior por el zapato de 32”OD.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 59.07, av = 57 m, ROP = 0.96 mph, lectura Totco 1° a 1602 m.
Litología, según registro de geología en el tramo perforado se observa: arenisca, limolita y diamictita con porcentajes variables. Para 1616 m 10% arenisca, 60% diamictita, 30 limolita.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV=8-10 cp, YP=15-17 lbs/100 ft2, no registran pérdidas de lodo.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje.
Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 64 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del ensamble de fondo BHA N°:
19
FECHA:
25-Dic-12
POZO: EQUIPO:
ITU-4
XO
3 DC 8"
XO
DRILL JAR 9 3/8"
GV-03MDX
TIPO
5220911
SERIE
3x24 - 1x32
BOQ 2
T.F.A. (in )
Descripción
XO
4 DC 11"
STB 23 7/8"
2,111 3-6-WT-G-E-I-NO-PR
Serie
Prof. Salida (m): Avance (m):
57,00
Hrs. Trépano (hrs):
59,07
ROP (m/hr):
0,96
ROP (min/m):
62,18 595
REV. TOTAL X 1000 OD in
ID in
24
BIT Tricono 24" (N)
2
Bit sub
NLT50661
11 1/4
3
MOTOR FONDO 11 1/2" (U)
FD115008
11 1/2
NLT-S0032
5220911
1.560,00 1.617,00
Prof. Entrada (m):
1
3 1/16
Long (m)
Long. Total
0,55
0,55
0,20
0,75
10,65
11,40 12,18
4
FLOAT SUB (w/valve) (U)
11
3
0,78
5
STB 23 7/8" (U) (c/anilla p/ Totco)
FS-210
11 5/16
2 15/16
2,43
14,61
6
SHOCK SUB (U)
28275
11 1/4
3
6,64
21,25
7
DC 11" (corto)
BS-225
10 15/16
3 1/4
2,94
24,19
8
STB 23 7/8" (U)
FS-209
11 5/16
2 15/16
2,43
26,62
9
DC 11"
8827
10 15/16
3 1/16
9,08
35,70
10 DC 11"
14127
10 7/8
3 1/16
9,22
44,92
11 DC 11"
7493004
3 1/16
8,92
53,84
12 DC 11"
A41277
10 15/16
3 1/16
9,31
63,15
13 XO
J-16442-1
11 1/16
3 1/16
1,09
64,24
14 DC 9 1/2
01-1138C
9 1/4
3 1/16
8,82
73,06
15 DC 9 1/2
A22960
9 1/4
3 1/8
9,16
82,22
16 DC 9 1/2
BS-1873
9 1/2
3
9,31
91,53
17 DRILL JAR (U) 3 DC 9 1/2"
DIÁMETRO 24" BAKER
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 16 MARCA
11
9 3/8
DHA-2006
18 XO
807
9
3
9,97
101,50
3 1/16
0,95
102,45
19 DC 8"
A29611
7 15/16
3
9,36
111,81
20 DC 8"
5980269
7 15/16
3
9,39
121,20
21 DC 8"
C51254
3 1/16
9,04
130,24
22 XO
J17317
8 1/8
3 1/16
1,18
131,42
8
23 HWDP 5 7/8"
190242N
7
4
9,34
140,76
24 HWDP 5 7/8"
32814N
7
4
9,33
150,09
25 HWDP 5 7/8"
32813N
7
4
9,35
159,44
26 HWDP 5 7/8"
32818
6 7/8
4
9,30
168,74
27 HWDP 5 7/8"
90211
6 15/16
4
9,35
178,09
28 HWDP 5 7/8"
7-19030
6 7/8
4
9,34
187,43
DC 11" (corto)
SHOCK SUB STB 23 7/8"
FLOAT SUB (c/valv.)
MOTOR FONDO
BIT SUB BIT 24"
0 DHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
187,43
Page 65 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
7.2.11 Decimo primero viaje de perforación, tramo 1617 m a 1668 m. Arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano 24”OD de insertos con 4 boquillas (24/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y DP 5 7/8” OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado.
Con sarta a 1557 m de profundidad, una vez realizada la reunión de seguridad operativa, se instala Bearing Assembly en cabeza rotativa, alineación del retorno hacia el sistema de perforación con aire y se continúa bajando de 1557m a 1617 m con rotación y circulación de 700 gpm, 1000 psi, 30 rpm, 3-5k lbf-ft torque. Sarta direccional con trépano 24’’OD en el fondo y parámetros normalizados se inicia a perforar pozo de 1617 m a 1668 m, manteniendo caudales de inyección entre 1700-1900 scfm de aire, 700-780 gpm de líquido, 1000-1300 psi presión de inyección, 7.22-7.06 lpg de densidad equivalente de circulación, 30-45k lbs de peso, 40-50 rpm del Top Drive.
Se continúa bombeando baches de 270 segundos de viscosidad previo a realizar conexiones y en puntos de alto torque para asegurar la limpieza de recortes en el fondo del pozo, además de maniobrar herramienta y realizar cambios en parámetros de perforación. A pesar de estas variaciones de los parámetros no se logra mejorar ROP.
Durante el tramo perforado se observa vibración de la sarta de perforación con ligero incremento de presión de bomba.
A 1668 m de profundidad, con 72.99 horas de trabajo del trépano deciden hacer viaje a superficie para reemplazo del mismo por bajo ROP.
Prepara el pozo para dicha maniobra: bombea bache de 270 segundo de viscosidad y circula tiempo de atraso observando en zarandas mínima cantidad de recortes, luego se continúa bombeando líquido hasta desplazar todo el aire del interior de la sarta, largan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 66 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa RCD de 1617 m a 798 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie, se observa resistencia puntual 10k lbs al pasar el estabilizador superior por el zapato de 32”OD.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 72.99, av = 51 m, ROP = 0.70 mph., lectura Totco 2° a 1652 m.
Litología, según registro de geología en el tramo perforado se observa: limolita y diamictita en porcentajes variables.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV=8-10 cp, YP = 16 lbs/100 ft2, no registran pérdidas de lodo.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo(BHA) utilizado en este viaje.
Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 67 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del ensamble de fondo
BHA N°:
20
FECHA:
29-Dic-12
POZO: EQUIPO:
ITU-4
XO
3 DC 8"
SERIE
DRILL JAR 9 3/8"
51,00 72,99
T.F.A. (in2)
1,767
ROP (m/hr):
0,70
ROP (min/m):
85,87
Descripción
1
BIT Tricono Inserto 24" (N)
2
MOTOR FONDO 11 1/2" (N)
2-5-WT-A-E-1-RG-PR
Serie PW0262 FD115082
REV. TOTAL X 1000 OD in
ID in
24 11 1/2
525 . Long (m)
Long. Total
0,56
0,56
11,46
12,02
3
FLOAT SUB (w/valve) (N)
FS2035
11
3
0,69
12,71
4
STB 23 7/8" (N) (c/anilla p/ Totco)
FS-181
11 1/16
3
2,34
15,05
5
SHOCK SUB (N)
29129
11 1/4
3
6,77
21,82
6
DC 11" (corto)
BS-225
10 15/16
3 1/4
2,94
24,76
7
STB 23 7/8" (N)
FS-169
11
3
2,39
27,15
8
DC 11"
8827
10 15/16
3 1/16
9,08
36,23
9
DC 11"
14127
10 7/8
3 1/16
9,22
45,45
3 1/16
8,92
54,37
7493004
11
A41277
10 15/16
3 1/16
9,31
63,68
12 XO
J-16442-1
11 1/16
3 1/16
1,09
64,77
13 DC 9 1/2
01-1138C
9 1/4
3 1/16
8,82
73,59
14 DC 9 1/2
A22960
9 1/4
3 1/8
9,16
82,75
BS-1873
9 1/2
3
9,31
92,06
DHA-2006
9 3/8
3
9,97
102,03
11 DC 11"
9
3 1/16
0,95
102,98
18 DC 8"
A29611
7 15/16
3
9,36
112,34
19 DC 8"
5980269
7 15/16
3
9,39
121,73
20 DC 8"
C51254
3 1/16
9,04
130,77
17 XO
807
21 XO
J17317
22 HWDP 5 7/8"
4 DC 11"
1.668,00
Avance (m): Hrs. Trépano (hrs):
16 DRILL JAR (U)
XO
1.617,00
Prof. Salida (m):
4x24
15 DC 9 1/2
3 DC 9 1/2"
PW0262
Prof. Entrada (m):
BOQ
10 DC 11" XO
DIÁMETRO 24" SMITH
GO4BOD-8CPS
TIPO
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 17 MARCA
190242N
8 8 1/8
3 1/16
1,18
131,95
7
4
9,34
141,29
23 HWDP 5 7/8"
32814N
7
4
9,33
150,62
24 HWDP 5 7/8"
32813N
7
4
9,35
159,97
25 HWDP 5 7/8"
32818
6 7/8
4
9,30
169,27
26 HWDP 5 7/8"
90211
6 15/16
4
9,35
178,62
27 HWDP 5 7/8"
7-19030
6 7/8
4
9,34
187,96
STB 23 7/8"
DC 11" (corto)
SHOCK SUB STB 23 7/8"
FLOAT SUB (c/valv.)
MOTOR FONDO
BIT 24"
0 DHM RATIO = 0,078 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
187,96
Page 68 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
7.2.12 Decimo segundo viaje de perforación, tramo 1668 m a 1716 m. Preparan y arman el nuevo ensamblaje de fondo(BHA) que consiste en: trépano 24”OD de insertos con 4 boquillas (24/32”), motor de fondo 11 1/2” camisa estabilizadora 23 7/8’’OD, 2 estabilizadores con cuchillas espirales 23 7/8’’OD, Shock Sub 11 ½”, Drill Collar 11’’, Drill Collar 9 ½’’, Drilling Jar 9 ½’’, Drill Collar 8’’ y Heavy Weight DP 5 7/8’’, estas últimas utilizadas de transición entre el arreglo rígido y tubería de perforación 5 7/8”OD.
Una vez realizadas las pruebas de flujo en superficie del motor de fondo, inician viaje a fondo del pozo perforado.
Con sarta a 1625 m de profundidad, una vez realizada la reunión de seguridad operativa, se instala Bearing Assembly en cabeza rotativa, alineación del retorno hacia el sistema de perforación con aire y se continúa bajando de 1625 m a 1668 m con rotación y circulación de 650 gpm, 700 psi, 50 rpm, 4-6k lbf-ft torque. Sarta direccional con trépano 24’’OD en el fondo y parámetros normalizados se inicia a perforar pozo nuevo de 1668 m a 1716 m, manteniendo caudales de inyección entre 2000-1600 scfm de aire, 700-600 gpm de líquido, 850-1100 psi presión de inyección, 6.78-7.64 lpg de densidad equivalente de circulación, 30-45k lbs de peso, 45-50 rpm del Top Drive.
Se continúa bombeando baches de 270 segundos de viscosidad previo a realizar conexiones y en puntos de alto torque para asegurar la limpieza de recortes en el fondo del pozo, además de maniobrar herramienta y realizar cambios en parámetros de perforación. A pesar de estas variaciones de los parámetros no se logra mejorar ROP.
Durante el tramo perforado se observa vibración de la sarta de perforación con ligero incremento de presión de bomba.
A 1716 m de profundidad, con solo 70.10 horas de trabajo del trépano deciden hacer viaje a superficie para reemplazo del mismo por bajo ROP.
Prepara el pozo para dicha maniobra: bombean bache de 270 segundos de viscosidad y circula tiempo de atraso observando en zarandas mínima cantidad de recortes, luego se continúa bombeando líquido hasta desplazar todo el aire del interior de la sarta, largan Totco. Enero del 2013
2013 Copyright All Rights Reserved
Page 69 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Inician a sacar sarta con stripping a través de la goma de cabeza rotativa RCD de 1716 m a 799 m, profundidad en la cual se retira Bearing Assembly de cabeza rotativa y continua viaje del arreglo de fondo hasta superficie, se observa resistencia puntual 10k lbs al pasar el estabilizador superior por el zapato de 32”OD.
En superficie realizan mediciones de desgaste al trépano, estabilizadores y motor de fondo: horas del trépano = 70.10, av = 48 m, ROP = 0.68 mph, lectura Totco 2° a 1701 m.
Litología, según registro de geología en el tramo perforado se observa: diamictita y lutita en porcentajes variables, para 1716 m 90% diamictita y 10% lutita.
Lodo, según reporte del químico la densidad se mantiene en 8.9 lpg con PV = 9 cp, YP = 14 lbs/100 ft2, no registran pérdidas de lodo.
A continuación se muestra la gráfica con parámetros de inyección y el ensamble de fondo (BHA) utilizado en este viaje.
Grafica con parámetros de inyección
Enero del 2013
2013 Copyright All Rights Reserved
Page 70 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
Geometría del ensamble de fondo BHA N°:
21
FECHA:
3-Ene-13
POZO:
ITU-4
EQUIPO:
XO
3 DC 8"
GO4BOD-8CPS
TIPO SERIE
PR9500
DRILL JAR 9 1/2"
4 DC 11"
1.716,00
Avance (m):
48,00 70,10
Hrs. Trépano (hrs):
T.F.A. (in2)
1,767
ROP (m/hr):
0,68
ROP (min/m):
87,63
Descripción
1
BIT Tricono Inserto 24" (N)
2
MOTOR FONDO 11 1/2" (N)
3-6-WT-A-F/1-4-RG-PR.
Serie PR9500 FD115011
REV. TOTAL X 1000 OD in
ID in
24 11 1/2
663 . Long (m)
Long. Total
0,57
0,57
10,89
11,46
3
FLOAT SUB (w/valve) (U)
FS2035
11
3
0,69
12,15
4
STB 23 7/8" (N) (c/anilla p/ Totco)
FS-172
11 1/16
3
2,16
14,31
5
SHOCK SUB (U)
29129
11 1/4
3
6,77
21,08
6
DC 11" (corto)
BS-225
10 15/16
3 1/4
2,94
24,02
7
STB 23 7/8" (N)
FS-180
11 1/16
3
2,30
26,32
8
DC 11"
8827
10 15/16
3 1/16
9,08
35,40
9
DC 11"
14127
10 7/8
3 1/16
9,22
44,62
3 1/16
8,92
53,54
10 DC 11"
7493004
11
A41277
10 15/16
3 1/16
9,31
62,85
12 XO
J-16442-1
11 1/16
3 1/16
1,09
63,94
13 DC 9 1/2
01-1138C
9 1/4
3 1/16
8,82
72,76
14 DC 9 1/2
A22960
9 1/4
3 1/8
9,16
81,92
15 DC 9 1/2
BS-1873
9 1/2
3
9,31
91,23
41983J
9 1/2
3
10,23
101,46
9
3 1/16
0,95
102,41
18 DC 8"
A29611
7 15/16
3
9,36
111,77
19 DC 8"
5980269
7 15/16
3
9,39
121,16
20 DC 8"
C51254
3 1/16
9,04
130,20
21 XO
J17317
3 1/16
1,18
131,38
17 XO
XO
1.668,00
Prof. Salida (m):
4x24
16 DRILL JAR (N) 3 DC 9 1/2"
Prof. Entrada (m):
BOQ
11 DC 11"
XO
DIÁMETRO 24" SMITH
ARCHER - 153 IADC DULL GRADDING: Item
6 HWDP 5 7/8"
TREPANO N° 18 MARCA
807
8 8 1/8
22 HWDP 5 7/8"
190242N
7
4
9,34
140,72
23 HWDP 5 7/8"
32814N
7
4
9,33
150,05
24 HWDP 5 7/8"
32813N
7
4
9,35
159,40
25 HWDP 5 7/8"
32818
6 7/8
4
9,30
168,70
26 HWDP 5 7/8"
90211
6 15/16
4
9,35
178,05
27 HWDP 5 7/8"
7-19030
6 7/8
4
9,34
187,39
STB 23 7/8"
DC 11" (corto)
SHOCK SUB STB 23 7/8"
FLOAT SUB (c/valv.)
MOTOR FONDO
BIT 24"
0 DHM RDHM RATIO = 0,138 rev/gal
Enero del 2013
2013 Copyright All Rights Reserved
LONG. TOTAL BHA
187,39
Page 71 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
PETROBRAS BOLIVIA
7.2.13 Determinación de Parámetros de Inyección, Fase 24”.
FASE 24''
DIAS
PROFUNDIDAD [m]
AIRE [scfm]
ECD [lpg]
ELV [gpm]
VIAJE #1 (conv.)
16-Nov
806.5-833 m
17-Nov 18-Nov
833
-
550
8,9
-
VIAJE #2
19-Nov
840
600
650
7,10
841
850
600
650
7,20
882
20-Nov
860
600
650
7,93
834
870
600
650
7,93
852
880
600
650
7,94
887
833-971 m
21-Nov
22-Nov
802-806.5
-
500
8,9
-
828
-
550
8,9
-
890
600
650
7,95
899
900
600
650
7,95
825 853
910
600
650
7,96
920
600
600
7,97
818
930
600
600
7,97
893
940
600
650
7,98
801
961
600
650
7,99
809
650
8,9
971 VIAJE #3 (conv.) 971-1022 m
23-Nov 24-Nov 25-Ene
26-Nov
Bajando BHA 980
650
8,9
990
790
8,9
1000
800
8,9
1010
800
8,9
27-Nov
1020
800
8,9
VIAJE #4 (conv.)
28-Nov
1022
800
8,9
1022-1130 m
29-Nov
1030
800
9,0
Bit=Kymera
30-Nov
1096
800
9,0
1-Dic
1110
800
9,0
2-Dic
1127
850
9,0
Av=108 m
3-Dic
1130
850
9,0
VIAJE #5 (conv.)
4-Dic
1144
850
9,0
1130-1165 m
5-Dic
1158
850
9,0
6-Dic
1165
850
9,0
VIAJE #6
7-Dic
1176
850
9,0
1165-1259 m
8-Dic
1209
850
9,0
9-Dic
1231
850
9,0
10-Dic
1246
850
9,0
11-Dic
1250
1000
800
7,75
893
1259
1100
780
7,23
904
VIAJE #7
12-Dic
Bajando BHA
1259-1351 m
13-Dic
1270
1400
780
7,23
900
1280
1400
780
7,23
900
1290
1500
780
7,14
907
1300
1500
780
7,15
905
1310
1600
750
7,02
883
1320
1600
750
7,02
883
1330
1600
750
7,03
882
1337
1800
800
6,87
885
1340
1650
780
7,02
915
1351
1800
800
6,78
949
14-Dic
15-Dic
16-Dic
Enero del 2013
LODO [gpm]
2013 Copyright All Rights Reserved
Page 72 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location: FASE 24'' Continuación
DIAS
PROFUNDIDAD [m]
VIAJE #8
17-Dic
Bajando BHA
1351-1544 m
18-Dic
Customer:
PETROBRAS BOLIVIA
AIRE [scfm]
LODO [gpm]
ECD [lpg]
ELV [gpm]
1360
1550
850
7,11
981
Bit=Kymera
1370
1550
850
7,14
979
Av=193 m
1380
1550
850
7,14
978
1390
1600
850
7,09
978
1400
1600
850
7,09
978
1410
1600
850
7,11
976
1420
1600
850
7,11
976
19-Dic
20-Dic
21-Dic 22-Dic
VIAJE # 9
VIAJE #10
1440
1600
850
7,14
971
1450
1600
850
7,14
971
1460
1600
850
7,16
969
1470
1650
850
7,02
974
1475
1700
850
6,97
977
1480
1750
850
6,92
983
1490
1800
850
6,86
985
1500
1800
850
6,98
982
1510
1800
900
7,03
1083 1036
1520
1800
900
7,06
1530
1800
780
6,95
916
1540
1800
900
7,06
1036
23-Dic
1544
1800
800
7,06
1036
24-Dic
1550
1300
700
7.38
780
1555
1400
700
7,21
25-Dic
1560
1450
700
7,27
806
26-Dic
1570
1700
800
7,18
923
1580
1750
800
7,12
827
27-Dic
1590
1800
800
7,10
923
1600
1700
780
7,10
902
28-Dic
1610
1700
780
7,10
902
1615
1700
780
7,10
902 1020
1544-1560 m
1560-1617 m
VIAJE #11
29-Dic
1617-1668 m
30-Dic
Bajando BHA 1620
1700
900
7,22
1630
1750
800
7,09
923
31-Dic
1640
1900
900
7,04
1032
1645
1500
800
7,35
1050
1-Ene
1650
1500
800
7,04
909
1660
1500
800
7,27
906
1665
1600
800
7,17
884
1668
1700
800
7,06
929
2-Ene VIAJE #12
3-Ene
1670
1900
700
6,78
834
1668-1716 m
4-Ene
1680
2000
600
6,64
749
1690
2000
600
6,64
749
1695
2000
600
6,58
746
1700
2000
600
6,60
745
5-Ene 6-Ene
Enero del 2013
Bolivia
1705
2000
600
6,60
745
1710
1800
650
6,87
778
1716
1600
800
7,64
913
2013 Copyright All Rights Reserved
Page 73 of 87
Rig:
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
Rig:
PETROBRAS BOLIVIA
7.2.14 Análisis de ROP durante la Perforación de la Etapa de 24 pulgadas.
Weatherford (SDTMS), prestó servicio de suministro de aire para perforar la etapa de 24” con fluido aireado, desde el inicio de la perforación de la etapa, y después de haber perforado el cemento, zapato del revestimiento de 30” y 25 m de pozo nuevo con el primer trepano tricono 24”OD.
Para la etapa de 24 pulgadas, se prestó servicio de inyección de aires desde el día 19.11.12 al 22.11.12 y 11.12.12 al 07.01.13 (32 días) desde 833 hasta 1716 m (598 m).
En el grafico se registran los valores de ROP’s obtenidos para la operación, por trepano usado y por día de perforación. Se puede observar que fueron utilizadas un total de 11 trépanos, habiéndose usado el #1 en dos ocasiones (al inicio de la etapa y posteriormente entre el 4 y 6 de diciembre).
Otro aspecto que se registra gráficamente es la perforación llevada a cabo con inyección y sin inyección de aire. Inicialmente con el trepano #1 se perfora el cemento, zapato flotador y 25 m de pozo nuevo de forma convencional. Luego se baja arreglo con el trepano #2 y se perfora con inyección de aire hasta 961 m. Posteriormente, problemas de orden logístico (por falta de diesel) hicieron que la operación de perforación continuara de forma convencional desde el día 22 de noviembre hasta el 10 de diciembre de 2012, cuando Enero del 2013
2013 Copyright All Rights Reserved
Page 74 of 87
DLS
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
nuevamente se reinició la perforación con fluido aireado a los 1246 m.
A continuación, de la TABLA se puede observar que los mejores valores de ROP se lograron obtener mediante el uso de fluido aireado de perforación en combinación con el trepano de 24” #7 (Baker – Modelo HP633X- Tipo hibrido). En el registro de parámetros hora a hora se logró tener valores máximos de 4.4 mph (día 18 de Diciembre-2012 de 11:00 a 12:00; metros de 1361.7 a 1366.1 m; y de 21:00 a 22:00 hrs perforando de 1390.4 a 1394.8 m). De igual forma, se logró perforar el mayor numero de metros acumulados (193 m usando fluido aireado contra 108 m perforados con el mismo tipo de trepano #4 pero de forma convencional sin uso de aire). En cuanto a horas de duración del trepano, también se logró alcanzar el mayor número de horas con este tipo de trépano hibrido, y utilizando fluido aireado (101.96 horas de perforación) TREPAN O 24” #
MARCA
MODELO TIPO
TFA
PROFUNDIDA D ENTRADA-m
PROFUNDIDA D SALIDA-m
MTS PERFORADO S
1
BAKER
833
25 (sin aire)
29.50
0.85
BAKER
2.111 ” 2.111 ”
808
2
VG‐03MDX‐ TRICONICO. VG‐03MDX‐ TRIC.
833
971
75.83
1.82
3
BAKER
1022
70.98
0.72
BAKER
1022
1130
108 (sin aire)
92.94
1.16
1
BAKER usada BAKER
2.111 ” 2.237 ” 2.111 ” 2.111 ”
971
4
VG‐03MDX‐ TRICONICO. HP633X‐ HIBRIDO VG‐03MDX‐ TRICONICO. VG‐03MDX‐ TRIC.
138 (con aire) 51 (sin aire)
1130
1165
35 (sin aire)
49.28
0.71
1165
1259
94 (sin aire)*
92.42
1.02
VG‐03MDX‐ TRICONICO. HP633X‐ HIBRIDO
2.111 ” 2.411 ”
1246 1259
1259 1351
13(con aire) 92 (con aire)
16 75.55
0.81 1.22
1351
1544
101.96
1.89
EBXT02RC TRICONICO VG‐03MDX‐ TRICONICO. G04BOD‐ 8CPS – TRICONICO G04B‐8CPS‐ TRICONICO
2.246 ” 2.111 ” 1.767 ”
1544
1560
193 (con aire) 16 (con aire)
20.62
0.78
1560
1617
57 (con aire)
59.07
0.96
1617
1668
51 (con aire)
72.99
0.70
1.767
1668
1696
35.35
1696 1700 1716
1700 1716 1724
28 (con aire)** 4(sin aire) 16(con aire) 8 (sin aire)***
0.85‐ 0.79 0.50 0.54 0.86
5
6
BAKER
7
BAKER
8 9
SECURIT Y BAKER
10
SMITH
11
SMITH
12
SMITH
G04BOD‐ 8CPS – TRICONICO
1.767 ”
HORAS ACUMULADA S
8.00 29.86 9.28
ROP’ s MPH
Medición de ROP’s promedio con respecto a tipo de trépanos de 24” Enero del 2013
2013 Copyright All Rights Reserved
Page 75 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Los trépanos del tipo tricono, mostraron que no son los mejores para el tipo de formación perforada (diamictita). * Con el trepano #5, perforando a 1246 m sin aire, el promedio de la ROP es 0.62 mph. Cuando se reinicia inyección de aire al lodo, se observó incremento de la ROP a 0.81 mph.
** Con el trepano tricono #11 a 1696 m se probó perforar sin inyección de aire hasta 1700 m y se observó una caída en la ROP.
***Con el trepano tricono #12 a partir de 1716 m se continuó la perforación sin inyección de aire, y se pudo observar a partir de ese momento el cambio litológico de la formación.
Enero del 2013
2013 Copyright All Rights Reserved
Page 76 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
8
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
DESCRIPCION DE EQUIPOS UTILIZADOS EN LA PERFORACION CON AIRE, ITU-4D
Los equipos de inyección de aire utilizados en la operación se componen de: 8.1
El sistema de compresión e inyección de aire: Compuesto por el conjunto de compresores y Boosters La aireación del lodo fue lograda usando equipos de compresión adecuados, con capacidad de inyectar aire al pozo generado de la atmósfera a través de una línea, conectada al manifold de Stand Pipe en el taladro, siendo los Boosters los equipos encargados de ecualizar y vencer la presión de circulación de la bomba.
8.1.1 5 Compresores Sullair 1150 scfm/350 psi del tipo tornillo helicoidal, comprimen en dos etapas desde presión atmosférica hasta presión de descarga de 350 psi con capacidad de manejar hasta 1150 scfm, refrigerados a través de un after cooler, equipado con motor Caterpillar Modelo C-15 a diesel 380 BHP potencia a 1800 rpm y arranque eléctrico. 8.2.4
3 Booster Ariel Modelo JGJ/2 reciprocante de 4 cilindros, eleva la presión de su valor de entrada (300-350psi) hasta: Etapa Simple, 3000 scfm a 1000 psi Etapa Doble, 1500 scfm a 1850 psi Refrigerando el flujo del aire en dos intercambiadores de calor en las etapas intermedia y final de compresión, está equipado con un motor Caterpillar, 4 cilindros a diesel.
Enero del 2013
2013 Copyright All Rights Reserved
Page 77 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
8.2.6
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Patín de inyección El flujo de aire es regulado por medio de un estrangulador manual y un medidor de platina fija de orificio (Daniel Senior Orface), instalado aguas abajo del estrangulador en un Meter Run, tomando presiones en una carta a través del equipo registrador Barton. Es en función de estos datos se calculan los caudales de inyección al pozo.
8.2
El sistema de control de flujo: Compuesto por el cabezal rotativo y separadores atmosféricos. 8.2.1
Cabeza Rotativa.- para controlar el flujo de retorno del fluido del perforación en ambas fases fue instalada una cabeza rotativa adaptador (Bowl) soldado a un caño a Casing y una línea de flujo (Flow Line) de 8” para derivar el lodo aireado hacia un conjunto de separadores atmosféricos
El modelo empleado en esta operación, está conformado por el conjunto de rodamientos y el disco adaptador para el Bowl, empleando gomas de 4 7/8” ID de sello pasivo para Drill pipe de 5-7/8”. El disco adaptador es fijado en el Bowl por medio de una abrazadera y el conjunto de rodamientos lubricado por inyección de aceite. Este modelo está diseñado para una presión de 500 psi rotando a 100 rpm.
Cabezal acondicionado a CSG 32” Capacidad dinamico/estático=500 Psi
Enero del 2013
Cabezal acondicionado a CSG 26” Capacidad dinamico/estático=500 Psi
2013 Copyright All Rights Reserved
Page 78 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
8.2.2
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
Separadores Atmosféricos Verticales.- Los separadores fueron alineados en paralelo para mejorar el proceso de separación del aire, el que fue venteado por línea de 8” hacia un tanque de venteo acondicionado para este pROPósito. La entrada y descarga de líquidos tienen línea de 8” ANSI 150.
Tienen una capacidad de 50 Bbl y puede procesar 50 MMSCFD de gas y 30000 BPD de líquido; posee cinco platos deflectores en su interior y está diseñado para variar su nivel respecto del suelo hasta 2.5 m en forma telescópica.
Enero del 2013
2013 Copyright All Rights Reserved
Page 79 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Customer:
Bolivia
Rig:
PETROBRAS BOLIVIA
DLS - 153
A2
9.
P&ID To Top Drive
TOP DRIVE VALVE
STAND PIPE MANIFOLD
SEPARADORES ATMSFERICO (GB-12 &GB17)
1385"-3M
®
RCD 9000 MAWP: 500PSI
GM-R4
PT
PV-8
CV-13
PV-9
PT
GM-R7
GM-R9 4"
2"
CSG 32", 250.5 #/FT, X-56
PI
GM-R3
GM-R8
SBFV-5
F-G-8" - ANSI150-004
PI
PT
GM-R10
GM-R11
4"
2"
2"
GM-R6
GM-R5
GM-R2
GM-R1
MUD PUMPS
KILL LINE
NRV
MP3
BV-17 GV-4
2" fig. 200
GV-1
MP2
ECHOMETER
HU-AI-3"-C-001
GV-2
CM-R2
GV-3
CM-R2
MP1
CV-14 CM-R1 F-PF-8" - ANSI150-001
F-PF-8" - ANSI150-002
SBFV-4
CHV-2 HU-AI-2"-D-002
P
PV-10
2"fig 206
BV-18
POOR BOY
F-PL-8" - ANSI150-003 SB
DISTRIBUIDOR DE ZARANDAS
-3 FV
TANQUE DE SUCCION
TANQUE DE ASENTAMIENTO F-G-8" - ANSI150-004
CHV-1
INJECTION MANIFOLD
TANQUE DE VENTE (AIRE RETORNO)
P T
LP
HP PSVB6
BA-604
P T
BV-13
CV-8
CV-9
SCRUBBER
SCRUBBER
ESD # 2
HP P T
M
ARIEL BOOSTER JGJ/2 2000 PSI/1500 SCFM
P
PSVB5
SCRUBBER
SR T
PSVB6
H-AI -3"-D-009
PSVB6
ESD # 1
ARIEL BOOSTER JGJ/2 2000 PSI/1500 SCFM
T
BV-15
CV-10
P
LP
HP P T
BA-602
H-AI-3"-D-010
HU-AI-3"-C-001
ESD # 2
BV-10
T
P
SCRUBBER
SCRUBBER
P
LP
M
ESD # 1
SR T
BV-11
PSVB5
SCRUBBER
ESD # 2
BV-14
M
CN-12
BA-603
P
PV-4
ARIEL BOOSTER JGJ/2 2000 PSI/1500 SCFM
DOG HOUSE/WARE HOUSE
CABINA DE OFICINA
TANQUE DE DIESEL 35000 Lts
TANQUE DE DIESEL 35000 Lts
ESD # 1
SR T
HU-AI-2"-D-002
PT
DT
ORIFICE PLATE
PSVB5
TT
PV-5
1'' LINEA P/AGUAS CONDENSADA
CV-5
BV-9
BV-8
BV-7
H -AI-3 "-D-008
CV-4
CV-3
CV-2
H -AI-3"-D-006
CV-6
MS-1
AC-1
(AFTERCOOLER)
CV-7
H -AI-3"- D-007 H -AI-3 "-D-002
H -AI-3"- D-004
FLARE
G-2"-A-001 HU-G-2 LINE NUMBER LINE PRESSURE RATING LINE SIZE LINE FLUID LINE TYPE
FIXED CHOKE GATE VALVE BALL VALVE CONTROL VALVE NON RETURN VALVE DEVICE SYMBOLS
MARK H F HU
DESCRIPTION HOSE LINE FLANGED LINE HAMMER UNION LINE
MARK DI SF PF PL G AI N A B C D E
DESCRIPTION DIESEL SOLID FLUIDS PROCESS FLUIDS PROCESS LIQUID PROCESS GAS MIX AIR NITROGEN 15000 psi 10000 psi 5000 psi 2000 psi 500 psi
Enero del 2013
T
P SR
LG
ESD
T
P SR
BV-1 T
P
SCRUBBER
LG
M
ESD
T
P SR
FOSA DE AGUAS ACEITOSAS
BV
AIR COMPRESSOR
BV
AIR COMPRESSOR
LG
CS-620
M
SCRUBBER
P
C-619
BV
AIR COMPRESSOR
BV-2
BV-3 ESD
T
PSVC1 LG P
T
SCRUBBER
LG
M
ESD
P
T
SR
SULLAIR 1150 SCFM @ 150-350 PSI
LG
CS-618-1
BV
M
SCRUBBER
LG
SULLAIR 1150 SCFM @ 150-350 PSI
P SR
P
1/2'' LINEAS P/DIESEL
LINE DESCRIPTION
SAFETY VALVE
SYMBOL DESCRIPTION
T
T
PSVC1
1'' LINEAS P/DIESEL
PLUG VALVE NEEDLE VALVE PRESSURE SAFETY VV MSRV ADJUSTABLE CHOKE
ESD
LG
PSVC2
SULLAIR 1150 SCFM @ 150-350 PSI
LG
P
PSVC4 SULLAIR 1150 SCFM @ 150-350 PSI
M
SCRUBBER
H-DI-1"-E-001
H-AI-3"-D-005
BV-4
T
AIR COMPRESSOR
LG
CS-617-1
BV
PSVC5 SULLAIR 1150 SCFM @ 150-350 PSI
CS-620
AIR COMPRESSOR
BV-5
H-AI-3"-D-003
ESD EMERGENCY SHUTDOWN FR FLOW RECORDER FI FLOW INDICATOR LEVEL GAUGE LG PI PRESSURE INDICATOR PT PRESS. TRANSMITTER PSV PRES. SAFETY VALVE RCV REMOTE CONTROL VALVE TI TEMP. INDICATOR TT TEMP TRANSMITTER DT DIFF. P. TRANSMITTER SP SAMPLE POINT MARK DESCRIPTION DEVICE SYMBOLS
DRAWN DATE
DIESEL SUPPLY
CHECKED RETURN
REFERENCE DRAWINGS
APPROVED
JULIO R.
2013 Copyright All Rights Reserved
PROYECTO CAMPO ITAU P&ID SISTEMA PARA PERFORACION POZO ITU-4D
CUSTOMER
© Weatherford International, Inc. 2011 ALL RIGHT RESERVED This document is copyrighted and whether containing patentable or nonpatentable subject matter, is and comprises the proprietary and confidential information of Weatherford International Inc., and by receiving the document, the recipient's company agree that the document is loaned is confidence with the understanding that neither it nor the informationin it will be reproduced, used or disclosed,in whole or in part for any purpose except the limited purpose for which it is loaded. This document shall be returned to Weatherford international Inc.upon demand.
TITLE
20/11/2011 JORGE I. GUEVARA GERMAN CASTIBLANCO
® Weatherford Latin America
DRAWING No.
REV.
SDS-BLV-ITU 4D-V1
1.3
Page 80 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
10.
Bolivia
Customer:
Rig:
DLS - 153
LAYOUT- EQUIPOS DE INYECCION DE AIRE POZO ITU-4D
Enero del 2013
PETROBRAS BOLIVIA
2013 Copyright All Rights Reserved
Page 81 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
11.
Bolivia
Customer:
Rig:
DLS - 153
LAYOUT- ATERRAMIENTO ELECTRICO EQUIPOS INYECCON DE AIRE POZO ITU-4D
Enero del 2013
PETROBRAS BOLIVIA
2013 Copyright All Rights Reserved
Page 82 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
12.
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
FOTO PANORAMICA DEL POZO ITU-4D
Enero del 2013
2013 Copyright All Rights Reserved
Page 83 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
13. PERSONAL INVOLUCRADO Supervisores Ernesto Barrios Ramon Zuñiga Edgar Medina Guillermo Sanchez Julio Rejas Operadores Dennis Villareal Gonzalo Tavera Ronaldo Castillo Rodrigo Perdoncini Carlos Bazan Ivan Martinez Fernando Suarez Rodrigo Arana Mauricio Quintanilla Coordinador general Johann Schroeder Petrobras Fernando Caballero Omar Salcedo Daniel Uriarte Santos Vargas
Enero del 2013
2013 Copyright All Rights Reserved
Page 84 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
14. RECOMENDACIONES 1. Es importante que en las operaciones de compresión e inyección de aire en zonas con altas temperaturas y elevada cota vertical, se considere un 20% más de equipo de inyección de respaldo para evitar percances operativos.
2. Para
tomar niveles de columna de líquido con Echometer después de terminar la
circulación bifásica, es importante considerar un tiempo de espera y así poder registrar resultados confiables.
Durante viajes, el llenado se hará después de haber tomado el registro de nivel de columna de líquido, caso contrario las señales del pulso acústico pueden presentar ruido excesivo o sencillamente hacer ilegible el resultado. Esto se debe a que el lodo tarda cierto tiempo en llegar hasta el nivel de líquido.
3. Para las maniobras de retirar el Bearing de cabeza rotativa se debe esperar que se separe por completo la fase gaseosa del sistema, el tiempo estará en función de las propiedades de lodo y volúmenes de baches que se bombean al pozo previo a dicha maniobra.
4
Realizar charlas pre-operacionales, de análisis de riesgos y de procedimientos con todo el personal involucrado en la operación para garantizar el cumplimiento del programa de la operación de una forma coordinada, segura y eficiente.
5
Durante la perforación, monitorear continuamente los parámetros de perforación, caudales de inyección, PVT y sólidos en zarandas de manera de llevar el control de la operación.
6
Se recomienda, contar en la oficina de inyección de aire con monitor de los parámetros de perforación para hacer seguimiento comportamiento de los mismos en tiempo real.
7
Las conexiones de tubería se realizaron de manera húmeda con un promedio de tiempo de 30 minutos, para disminuir los tiempos de conexiones se recomienda hacer uso de NRFV en la sarta de perforación.
Enero del 2013
2013 Copyright All Rights Reserved
Page 85 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
15. CONCLUSIONES 1. En fecha 6 de octubre del 2012 se moviliza todo el equipo necesario para la operación, en fecha 07 de enero del 2013 se concluye el servicio de perforación con inyección de aire. En fecha 12 de enero del 2013 dan la orden de desmovilizar, a partir de esta fecha se procede al desmontaje y desmovilización de todo el equipamiento concluyendo el mismo en fecha 17 de enero del 2013. 2. La permanente comunicación entre compañías de servicios y directamente con personal de Petrobras hace que operaciones de estas características resulten exitosas. 3. La fase 30” de diámetro se concluye a 808 m, total perforado con lodo aireado fue de 683 m (de 125 m a 808 m), en 25 días que comprende del 18/oct. al 11/dic. del 2012.
4. La fase 24” de diámetro se concluye con inyección de aire a 1716 m, total perforado con lodo aireado fue de 598 m (de 833-961 m y 1246-1716 m) en 32 días que comprende del 19 al 22/nov. y 11/dic. al 07/ene. del 2013. 5. de profundidad con un ECD de 7.64 lpg de ECD, 800 gpm, 1600 scfm, 1080 psi, los volúmenes se manejaron de teniendo en cuenta el rango de operación del motor de fondo, sin comprometer la limpieza y estabilidad del pozo. 6. Los trépanos del tipo tricono, mostraron que no son los mejores para el tipo de formación perforada (diamictita). 7. Las conexiones de tubería se realizaron de manera húmeda con un promedio de tiempo de 30 minutos
8. Para esta operación en específico, los equipos de compresión e Inyección de Aire incluido la línea de inyección fueron alquilados a ARCHER DLS con la finalidad de cumplir con el servicio ante el cliente. Debido a lo largo de la operación los responsables del funcionamiento hicieron uso de los back-up de manera que no se para en nungun momento la perforación por desperfectos mecánicos.
9.
La Cabeza Rotatoria funcionó de forma correcta brindando la seguridad en boca de pozo que la operación requiere. Los cambios de gomas al Bearing generalmente se realizaron aprovechando los viajes para cambios de trepano.
Enero del 2013
2013 Copyright All Rights Reserved
Page 86 of 87
Reporte Final Operación SDS Fase 30” y 24’’, Pozo ITU-4D
Location:
Bolivia
Customer:
PETROBRAS BOLIVIA
Rig:
DLS - 153
10. La falta de un monitor, donde observar las variaciones de los parámetros de perforación, dentro de la oficina de SDTMS, obligo a que el personal operativo de WFT debiera obtener esta información de las oficinas del Company Man y/o Intergas, para hacer seguimiento del comportamiento de ciertos indicadores importantes para la operación.
Enero del 2013
2013 Copyright All Rights Reserved
Page 87 of 87