1. Ge&e'a( Flame straightening is used for correcting deformations hich occur in elded constructions! "hrin#age in the eld itself and the surrounding material due to cooling occurs in all elding! "hrin#age causes deformation and $uc#ling in the surrounding plate% even at some distance from the elds! &eformation can also stem from thermal stresses created $' rolling or thermal cutting! The e(tent of the deformation is largel' dependent on ho elding is e(ecuted! &istortions are especiall' visi$le on painted or lac)uered surfaces! *t is usuall' impossi$le to stretch areas that have shrun# due to elding! +ne solution is to attempt to shrin# the over,e(tended areas% a -o$ for hich flame straightening has proved to $e suita$le! Flame straightening is particularl' convenient since no e)uipment other than a $lopipe is normall' re)uired! The operator hoever% must $e ell aare of ho the or#piece ill react to heating and ho shrin#age forces can $est $e utilised for straightening! *n contrast to mechanical straightening% the results of flame straightening are not evident until the structure has cooled .
%. P')&*)+(e The principle of flame straightening is $ased on using the hottest flame possi$le .refera$l' +('/Acet'lene for rapid heating of a limited portion of plate to a temperature of appro(! 600 degrees Centigrade% at hich point the plasticit' of the steel has $een su$stantiall' increased! "ince the surrounding material remains cold% the heated parts ill $e restrained during the heating and upset so that the e(cessivel' long parts ill shorten during cooling! The plate ma' also $e restrained $' e(ternal means such as clamps or loads!
Straightening Procedure
DOC NO : EMI-QP-S09 REV. NO : 0
Page : , of 5
hen heat straightening or heat curving methods are used% the ma(imum temperature of heated areas as measured using temperature sensitive cra'ons or other positive means shall not e(ceed 1100F 3600C for )uenched and tempered steel% or 1200F 3650C for other steels! Accelerated cooling of steel a$ove 600F 315C shall $e prohi$ited!
,. S'a)ge&)&g +'o*e/'e !1!
Ma#e sure that the material is car$on and car$on manganese steel .lo strength C 7 0!268!
!2!
9se material tracea$ilit' to chec#!
!!
Chec#ing deviations of profile:s $ending Chec# ith draing re)uirements
!4!
Anal'st hich point should $e applied $' flame heat% put mar# and as# approval from ;C authorities
!5!
Appl' the flame heat to the appointed location until the temperature reaches 500 C , 650 C using a torch
!6!
Ala's
chec#
temperature
$'
temperature
sensitive
cra'ons
.chal#
temperature !&o not allo temperature more than 650 C !Heat measurements should $e made $eteen 5 seconds and 10 seconds after the heating flame has $een removed from the steel! hen chec#ing temperature $' sensitive cra'on% ;C person should $e ithness ( reff : AWSD1.7 sec 7.3.5.2, AWSD1.1 sec.8)
Straightening Procedure !=!
DOC NO : EMI-QP-S09 REV. NO : 0
Page : of 5
>et the material sta' cooled for several minutes . 20 ? 40 minutes until its temperature $elo 20 C ( reff : AWSD1.7 sec 7.3.5.3, AWSD1.1 sec.8)
!@!
Chec# temperature $' sensitive cra'on to ma#e sure the temperature is $elo 20 C% if necessar' cooling ith mist ater% ater spra' or ith com$ination of ater and air should $e alloed ( reff : AWSD1.7 sec 7.3.5.3, AS4458 sec.11.8 )
!!
Chec# result dimension ith original draing re)uirements
!10!
Ta#e approval from ;C to verified the dimension result
!11!
*f necessar' reheat should $e alloed hen the temperature is $elo 120 C ( reff : Seel !"se#$e r%a& % re'a"r ).
!12!
!1!
As# ;C for Authorisation $efore doing the reheating
!14!
Bepeat step
. Qa()2 Co&'o( The Contractor shall provide all the facilities necessar' to ensure preparation and application of straightening! All or#men shall at all times $e under the supervision of an e(perienced supervisor! As part of a ;A/;C program% the a$ove conditions should $e monitored and if needed% recorded!
Straightening Procedure
DOC NO : EMI-QP-S09 REV. NO : 0
Page : 5 of 5
APPENDI3 A : RELATED DOCUMENTS 9nless specified otherise% the latest issues of the folloing documents shall $e deemed to form part of this specification
A"1554!1 DAustralian "tandard "tructural "teel eldingE A"445@ 4 Australian "tandard Manufacture of pressure vesselsE 126=,"",001 D"tructural "pecification For "tructural "teelor# Fa$ricationE A"&1!1 D"tructural elding Code ? "teelE A"&1!= Duide for "trengthening and Bepairing G(isting "tructureE