2x330MW TPP, Mundra SEZ
Attachment-2 to Doc.No.6785-EL-DSN-633-001
SIZING CALCULATION FOR EQUIPMENT EARTHING S.No
Equipment
Fuse Rating
Earth fault current in kA, (I)
Earth fault current Required Steel conductor size withstand duration, sec (t) in sq.mm (15.76 X I X sqrt(t)
Required minimum conductor size, Selected steel conductor sq.mm size Material
symbol No. of Used leads
Main Earthing Grid 1
Buried in ground
2
Embe Embedd dded ed in Floo Floor/ r/Co Conc ncre rete te Slab Slabs s
3
Exposed Conductors
32 mm dia. Rod
MS
A
75 X10 mm Flat
MS
B
50X10 mm Flat
GS
C
GS GS
A A
Neutral Earthing 4
HV Neutral of Generator Transformer
31.5
5 6 7 8 9
HV Neutral of Station Transformer NGR of Station Transformer NGR of Unit Auxiliary Transformer LV Neutral of Auxiliary Transformer LV Neutral of Lighting Transformer
Enclosure Earthing Generator Transformer Station Transformer Unit Auxiliary Transformer 6. 6.6 kV Switchgear 6.6 kV Motors LT LT Transformers L T B u sd u c t s LT PCC/PMCC LT MCC/DB LT ACB operated Motors Battery Charger /DCDB Local Starters Lighting Mast/Pole Cable Trays Control Panel Junction Boxes Push Button stations 3 Phase Receptacles Structural Steel Columns Steel pipe rack Isolated Phase Bus duct Isolated Phase Bus duct Fence/Gate