TOTAL Ikike Field Development Project: (Optimization)
►Client: Total E&P Nigeria Ltd (TEPNG) ►Year: 2013 – 2014 ►Process Engineering verification for works previously done by another contractor taking into account new production profiles for Ikike and Amenam. Project Management Tie-ins to mother platform (Amenam) Process & Safety design Optimisation for all concerned disciplines Multi-discipline 3D CAD computer modelling using PDMS. ►Engineering hours: 52,100 (approx).
Basic Engineering
TOTAL OFON Phase II – Detail Design Engineering
►CLIENT:
Niger Dock
Niger Dock is EPC Contractor for TOTAL
Crestech is Engineering Subcontractor 2 Wellhead Platform topsides 2 steel jackets 2 Interconnecting Bridges ►Year: 2011 – 2016
►Scope:
Process & Safety. Piping Structural (inc weight control) Mechanical E&I design. PDS 3D computer modelling. LS hours (CresTech): 166,053
►Engineering
& Construction Follow-On
ExxonMobil ERHA NORTH FPSO
►CLIENT: ►Year:
Esso E&P Nigeria Ltd (EEPNL)
2012 – 2014
►
Existing Erha FPSO Topsides and subsea system modification. scope: –
►CresTech
Detailed Engineering for brownfield modifications. New Production, Water Injection & Gas Lift Lines. Piping, E&I trays, and expansion of ICSS. Support activities for Procurement, Pre-fabrication & Construction. Interfacing with other EPC Contractors. ►Engineering hours: 70,000 (approx).
PHASE 2 – Detail Design
TOTAL EGINA FPSO :
►CLIENT: ►Year:
Total Upstream Nigeria Ltd (TUPNI)
2009 – 2010
►Scope:
FEED for the 2.3 MMbbl storage FPSO (hull & topsides) Scope shared with two other Nigerian based Engineering Companies CresTech scope included:–
Overall Project Management, Interfaces management, FPSO process & safety design,
All systems definition, Hull engineering and pipe rack design, weight control, 3D model ►CresTech share of Engineering hours: 130,000
FEED
Onshore Asset Gas Management
►CLIENT: ►Year:
Chevron Nigeria Limited
2008-2009
►Scope:
Detailed Design, Procurement Support, Construction & Commissioning Work Packages for 6 onshore platforms (Dibi, Olero, Abiteye, Makaraba, Utonana and Opuekeba) FEED also executed by us (Crestville) in Dec, 2007(Engineering Hours: 35,000) Hours: 80,000
►Engineering
Project – Detail Design
Brass LNG Upstream
►CLIENT:
Nigeria Agip Oil Company (NAOC)
Crestech is Subcontractor to GENESIS Oil & Gas 2006-2007
►Year:
►Scope:
FEED for 2 flow stations modification and 6 new gas pipelines. The flow stations are Clough Creek and Kwale Gas Plant. ►Engineering hours (Crestech): 31,700
Project – FEED
New g as pipeline de tails : Samabri – Idu –OB/OB (40km, 4”) Oshie – OB/OB (46Km, 18”) Clough Creek – Ogbainbiri (30km, 14”) Kolo Creek – Obama – Brass (73km, 36”) Akri – Oguta Wet Gas (8Km, 16”) Oguta – Akri Dry Gas (8Km, 16”)
TOTAL EGINA FPSO OLT : ►CLIENT: NOV NIGERIA OIL & GAS LTD NOV is EPC Contractor for TOTAL Crestech is Engineering Subcontractor
Detailed Engineering and Procurement Support for Egina Oil Loading Terminal. Weather-vaning buoy with internal turret. ► Year: 2013 – Ongoing ► Scope: Process & Safety Piping
►
Structural Mechanical E&I Autodesk Inventor 3D computer modelling Engineering hours : 58,000 hrs
Detailed Design
TOTAL EGINA UMBILICALS :
►CLIENT:
Technip Umbiliclas (DUCO) DUCO is EPC Contractor for TOTAL Crestech is Local Engineering Subcontractor ► Year: 2013 – Ongoing ► Scope: Free Span Analysis for Umbilicals Installation Load Calculations Cathodic Protection design for STIs and Pulling Head Structural Analysis of STIs
Inventor 3D computer modelling of STIs In-country project management & interface management Specification & Procedure Preparation
Manpower Supply ► Engineering hours : 40,000 hrs
Detailed Design
Proposed Shoreline Protection Conceptual
►CLIENT: Shell Nigeria Exploration & Production Company (SNEPCO) ► Year: 2014 – 2015 ► Scope: The design of the berthing facilities in Polaku, Bayelsa State to support a proposed line pipe mill being promoted by NCDMB. Conduct joint site visit(s) with NCDMB/SNEPCO/ investors and any other key stakeholders. Conceptual design which shall form the input to the FEED. Execution of the FEED for shoreline protection, jetty / ramp / hard standing relieving areas. ► Engineering hours: 9,120
Jetty Design in Polaku & FEED
SAPELE FLOWSTATION
►CLIENT:
Seplat Nigeria Limited ► Year: 2015 ► Scope: Determine maximum production capacity achievable from the existing facility, identify
bottlenecks and recommend ways to remove them. Review the conceptual design for existing Sapele flowstation capacity upgrade from SEPLAT to determine its feasibility with respect to shutdown time and provide the process design for the upgrade.
► Engineering
Hours: 2,581 ► (Executed along with Genesis Oil & Gas, Houston, USA)
DEBOTTLENECKING STUDY
TOTAL IKIKE Wellhead
►CLIENT: Total E&P Nigeria Ltd (TEPNG) ► Year: 2013 – 2014 ► Scope: Basic Engineering for a stand alone, unmanned drilling wellhead platform. ► CresTech scope: Project Management Tie-ins to mother platform Process & Safety design Multi-discipline 3D CAD computer modelling using PDMS. ► Engineering hours: 52,100
Platform – FEED
NLNG BVC Expansion Project
►CLIENT: Nigeria Liquefied Natural Gas (NLNG) Limited ► Year: 2013 – 2014 ► IFR completion / project close out March 2014 ► CresTech Scope: Detailed Engineering Design for BVC
Facilities Classrooms, Workshops, Canteen and Office Buildings Architectural and HVAC Scope subcontracted
► Engineering hours (Crestech): 24,744 ► Sub-contracted hours: 3,595
Liquid Treatment Facility (LTF) Phase 1
►CLIENT:
Seplat Nigeria Limited
► Year: 2012 – 2013 ► Scope:
Design, routing of the piping, tubing and cables connecting the process equipment and utilities of the new LTF Phase 1 Facilities.
Post award site survey to identify possible tie-in points (TPs) with the existing Amukpe F/S.
►
Engineering Hours: 6,084
Project – Detail Design
CHEVRON Escravos Gas
►CLIENT: Chevron Nigeria Limited ► Year: 2006-2008 ► Scope:
EGP 3B Brownfield, Stage 1 and stage 2 Brownfield Engineering Design involving the modification of 9 offshore production platforms for gas gathering for the CNL flare-out campaign.
Covering conceptual studies, basic engineering and detailed design. Overall scope shared with TP USA. ► Engineering hours (Crestech): 140,000
Project – Phase 3B