200kV protection scheme SLD under Alstom T&D for India project. Control and Relay panel wiring diagram, circuit operation .
Translay Scheme for Feeder Protection
Full description
Full description
salt analysis
this is an european guideline to set the stability test for cosmetic productsDeskripsi lengkap
Full description
Theory of Elastic Stability .used for analysis of structural stability of strucures
hydro
Hydraulics: Stability of Floating Bodies ExperimentFull description
referenceFull description
Archimedes Principle, Bouyancy, & Stability of Floating Bodies
Fluid Mechanics
Certificate of Structural StabilityFull description
Certificate of Structural Stability
Stability testing of REF schemes
Stability tests of REF schemes are done to ensure that all wirings and CT polarities are connected correctly. For the REF protection of a winding, 4 CTs are involved, three phase and one neutral (except for auto transformers where sometimes 6 CTs, 3 phase and 3 neutral may be present). Normally during commissioning time single phase current test sources are available at site. So the test procedure using a single phase current source is shown. The figure below shows a typical REF scheme and setup for performing a single phase stability test (REF stability test).
Fig. 1 : Single phase stability test setup for transformer REF protection scheme
In this case the transformer is a DELTA / STAR transformer with Dyn1 configuration is shown. The REF protection is provided for the star winding (Winding 2). The steps involved in the stability testing are listed below; The sin single phase ase cu current ent sou source is con conn nect ected betw etween een an any on one ph phase ase (“ (“C” phase ase is is > The > >
> >
> > > >
shown in figure) and the neutral near the grounding point. The The cor corresp espond onding ing phase ase to phase ase term erminal inal is temporar oraril ily y shor shortted on the delt elta winding (“BC” in this case). The The stab stabil iliz izin ing g resis esisttor is also also temporar oraril ily y shor shortted (or (or set set to zer zero ohm ohms). s). This This is just just to ensure that continuous currents do not flow through it while testing, as some times the testing process may take quite some time. (It is just a good practice and not mandatory). Inject a current of magnitude of alteast Is*CTR (where “Is” is the relay setting and CTR is the CT ratio). To inje inject ct this cur current ent the sou source shou should ld have ave a minim inimum VA cap capacit acity y of I 2Z, where I is the injected current and Z is the impedance of the transformer in ohms referred to the winding 2 side. Measure the current at Ip, In and Id locations (refer to figure 1). If the CT and wiring connections are correct, Ip should be equal to In and Id should equal to zero (Ip=In and Id=0). Repeat the testing for the other two phases also correspondingly changing the short on winding 1. Remember to remove the temporary shorting after the test is completed.