SAUDI SAU DI ARAMCO ARAM CO ID/P ID - 18-MAY-05 - REV 0 (Standards (Standards Cutoff - August 2004) 2004) SAIC NUMBE R
SAUDI ARA MCO INSPECTION INSPECTION CHECKL CHECKLIS IS Han d l i n g , St o r ag e & Pr Pr es er v at i o n of of FB FB E St eel Ba B ar s P ROJ ECT TITLE
SA IC-Q-1008 WBS / BI / J O NUMBER
EQUIP ME NT ID NUMBER(S)
E QUIP ME NT DE SCRIP TION
LAYOUT DRAWING NUMBER
REV. NO.
SCHEDULED INSPECTION DATE & TIME
ACTUAL INSPECTION DATE & TIME TIME
DATE AP P ROVE D
QR NUMBER
18-May -05
CIVIL -
CONTRACTOR / SUBCONTRACTOR
E QP T CODE
S Y S TEM ID.
P URCHAS E ORDER NUMBE R
PLANT NO.
EC / PMCC / MCC NO. QUANTITY INSP.
MH's MH's SP ENT
TRAVEL TIME
SAUDI ARAMCO USE ONLY SAUDI ARAMCO TIP NUMBER
S AUDI ARAMCO ACTIVITY NUMBER
SAUDI ARAMCO INSPECTION LEVEL
CONTRACTOR INSPECTION LEVEL
ITEM No.
ACCEPTANCE CRITERIA
A
Handling FBE Steel Bars
REFERENCE
A1
All systems for handling coated steel reinforcing bars shall have padded contact contact areas. (ASTM (AS TM A775, Sec. 15.1 15.1))
09-SAMSS-106 Sec. III.B
A2
All bundled bars shall have padding or suitable banding that shall prevent 09-SAMSS-106 damage damage to to the the coating. coating. (ASTM (AS TM A775, Sec. S ec. 15.1) Sec. III.B
A3
All bundles of bars shall be lifted with a strong back, spreader bar, multiple supports, or a platform bridge to prevent bar-to-bar abrasion from sagging bars bars or bundles. bundles. (ASTM (AS TM A775, Sec. S ec. 15.1)
09-SAMSS-106 Sec. III.B
A4
Coated bars shall not be dropped or dragged along in transporting transporting them from storage to their location on site nor while placing them in their final position in the concrete concrete formw formwork. ork. (ASTM (AS TM A775, A 775, Sec. 15.1)
09-SAMSS-106 Sec. III.B
A5
If coated reinforcing steel is to be stored outdoors for more than two months, they shall be protected from direct sunlight, salt spray and weather. (ASTM (AS TM A775, Sec. 15.2)
09-SAMSS-106 Sec. III.B
B
Storing FBE Steel Bars
B1
The The date ate FBE coat coated ed rein reinfo forc rcin ing g stee steell goes goes out outdoor doors s wit witho hout ut prot protec ecttive ive covering shall be recorded on the identification tags tags on the bundled steel. (ASTM A775, Sec. 15.2)
09-SAMSS-106 Sec. III.B
B2
FBE reinforcing steel bars shall be provided with opaque polyethylene sheeting or other suitable protective covering when they are to be stored outdoors outdoors for longer than than 2 months time. (ASTM (AS TM A775, A 775, Sec. 15.2)
09-SAMSS-106 Sec. III.B
B3
The The cove coverring ing shal shalll be secu securred adeq adequ uatel ately y and and allo allow w air air circ circul ulat atio ion n around the bars to minimize condensation under the covering. (ASTM A775, Sec. 15.2)
09-SAMSS-106 Sec. III.B
B4
Coated steel reinforcing bars shall be stored off the ground on protective cribbing cribbing.. (ASTM (AS TM A775, Sec. 15.3) 15.3)
09-SAMSS-106 Sec. III.B
B5
If circumstances require storing coated steel reinforcing bars outdoors for more than two months, protective storage measures shall be implemented to protect the material from sunlight, salt spray and weather exposure. exposure. (ASTM (AS TM A775, Sec. 15.2) 15.2)
09-SAMSS-106 Sec. III.B
C
P reservatio reservation n of FBE FB E Coating on on Steel Bars
C1
The The maxim aximum amount ount repai epairr to dam damaged aged coat coatin ing g shal shalll not not exce exceed ed 2% within any 300mm length of a bar; This does not include bar ends. (ASTM A775, Sec. 11.1)
Page 1 of 2
09-SAMSS-106 Sec. III.B
WORK PERMIT REQUIRED?
PASS
FA IL
N/A
RE-INSP DATE
SAUDI ARAMCO ID/P ID -18-MAY-05 - REV 0 (Standards Cutoff - August 2004) SAIC NUMBER
SAUDI ARA MCO INSPECTION CHECKLIS Handling, Stor age & Pr eservat ion of FBE Steel Bars
DATE APPROVED
SAIC-Q-1008
PROJ ECT TITLE
WBS / BI / J O NUMBER
ITEM No.
ACCEPTANCE CRITERIA
REFERENCE
C2
All damaged areas of coating shall be repaired with patching material. (ASTM A775, Sec. 11.2)
09-SAMSS-106 Sec. III.B
C3
When immersion-type vibrators are used to consolidate concrete around epoxy-coated steel reinforcing bars, the vibrators should be equipped with rubber or nonmetallic vibrator heads. (ASTM A775, Sec. XI.3.15)
09-SAMSS-106 Sec. III.B
C4
When coated bars are mechanically cut the sheared ends shall be coated with patching material. (ASTM A775, Sec. 11.4)
09-SAMSS-106 Sec. III.B
C5
Protective storage measures shall be implemented to protect materials from sunlight, salt spray and weather exposure. (ASTM A775, Sec. 15.2)
09-SAMSS-106 Sec. III.B
C6
FBE coated reinforcement shall not be flame-cut. ACI-301. Para 3.3.2.9:
QR NUMBER
18-May-05
Civil
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
SAES-Q-001 Sec. 4
REMARKS:
REFERENCE DOCUMENTS:
1- 09-SAMSS-106 -- Epoxy Coating of Steel Reinforcing Bars, 31 December 2000 2- SAES-Q-001 -- Criteria for Design for Design and Construction of Concrete Structures, 29 October 2003
Contractor / Thir d-Party
Saudi A ramco
Construction Representative*
PMT Representative
Work is Complete and Ready for Inspection: Name, Initials and Date:
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
Name, Initials and Date:
QC Inspector
PID Representative Performed Inspection
Work / Rework May Proceed
Name, Initials and Date:
Name, Initials and Date:
QC Supervisor
Proponent and Others Quality Record Approved:
Name, Sign and Date:
Name, Organization, Initials and Date:
*Person Responsible for Completion of Quality Work / Test
Y =YES
Page 2 of 2
N =NO F =FAILED