This manual is a guide and basic reference for personnel whose duties require the use of rigging. It is intended for use in training and as a reference manual for field operations. It covers…Descripción completa
Riggung
JSA Lifting & Rigging
Full description
rigging
Descripción completa
INGENIERIA DE MANIOBRAS DE MONTAJE
RiggungFull description
INGENIERIA DE MANIOBRAS DE MONTAJE
Rigging Procedure
Doc. No. : Rev. No. :
RMDJV-PJ74-HIRADC-SUBC-03 1
HAZARD IDENTFICATION, RISK ASSESSMENT AND DETERMINING CONTROL FORM Likelihood
1
2
3
4
Prepared by
5
Verified by
1. Mohd Suffian Mohamad Shiger
Severity 5
5
10
15
20
25
2. Syamaizar Namrun
4
4
8
12
16
20
3. Ahmad Syurki Ramli
3
3
6
9
12
15
4. Dzul Fadhli Kasa
2
2
4
6
8
10
5. Jaikisan
1
1
2
3
4
5
Project Manager/ Chairman
JOB TITLE : HOISTING & RIGGING
Activities
R/NR
Hazard
Bad Weather Hoisting and Rigging
Most Likely (5) Possible (4) Conceivable (3) Remote (2) Inconceivable (1)
R
Heavy wind Machine/ Tools failure Soft/ Uneven earth
Stop work Hoisting and rigging checklist To park crane at firm earth and use padding
1
3
3
(L)
1
4
4
(L)
1
4
4
(L)
Current Risk Control
LIKELIHOOD The most likely result of the hazard / event being realized Has a good chance of occurring and is not unusual (within 5 years) Might be occur at sometime in future (within 5-10 years) Has not been known to occur after 10 years Is practically impossible and has never occurred
Catastrophic (5) Fatal (4) Serious/Major (3) Minor (2) Negligible (1)
Risk
Type of Control
SEVERITY Numerous fatalities, irrecoverable property damage and productivity Approximately one single fatality and major property damage if hazards is realized Non fatal injury, permanent disability Disabling but not permanent injury Minor abrasions, bruises, cut, first aid type injury
CONTROL Further Action / Control
PIC (Due Date)
RISK = LIKELIHOOD X SEVERITY 1-4
: LOW RISK