PROYECTO: "REMODELACION CASA "
PRESUPUESTO DE ACTIVIDADES UND.
CANT.
VR. UNT.
VR. TOTAL
1.1
1 LOCALIZACION Y REPLANTEO
PRELIMINARES
M2
10 100
$ 1,100.00
$ 110,000
1.2
CERRAMIENTO PROVISIONAL
ML
80
$ 4,500.00
$ 360,000
1.3
DEMOLICION DE MUROS
M2
50
$ 5,000.00
$ 250,000
1.4
RETIRO DE ESCOMBROS
M3
20
$ 7,991.67
MAMPOSTERIA Y ACABADOS
2 2.1
MUROS EN BLOQUE H-10
2.3
$ 159,833
$ 879,833.33
SUBTOTAL
UND. M2
CANT. 25
$ 25,000.00
VR. TOTAL 625,000
FRISOS MUROS
M2
29.5
$ 15,000.00
442,500
2.5
CIELO RASO EN DRY WALL
M2
8
$ 75,000.00
600,000
2.6
ESTUCO Y PINTURA INTERIOR
M2
12
$ 15,000.00
180,000
2.9
PISOS BAÑOS CERAMICA ANTIDESLIZANTE
M2
10
$ 35,000.00
350,000
PARED BAÑOS EN CERAMICA
M2
8
$ 32,000.00
2.10
SUBTOTAL
TOTAL COSTO DIRECTO Administración (15%) Imprevistos (2%) Utilidad (3%) TOTAL A.I.U. (20%) SUBTOTAL A.I.U (20%) + COSTO DIRECTO
COSTO TOTAL PROYECTO
VR. UNT.
256,000
$ 2,453,500.00
3,333,333 500,000 66,667 100,000 666,667 4,000,000
4,000,000
SUBANALISIS DE MANOS DE OBRA POR FUNCIONES AYUDANTE
%/K
VALOR
JORNAL SUB DE TRANS. PRES. SOCIALES
0.850
SALARIO DIARIO
SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA
55,000 551,900 469,115 1,021,015
30.000 30.000 0.125
VR TOTAL
1.000 1,833 18,397 15,637
496,900
34,034
1,021,015 551,900 4,254
OFICIAL
JORNAL SUB DE TRANS. PRES. SOCIALES
55,000.000 0.850
SALARIO DIARIO
SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA MAESTRO
SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA AUX. RESIDENTE
SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA CONTRAMAESTRO
1.700 496,900.000 1,833 29,991 25,492 55,483
30.000 30.000 0.125 %/K JORNA JOR NAL L
VALOR
1,664,501 899,730 6,935 VR TOTAL 3.00 3.000 0 49 496, 6,90 900. 0.00 000 0
0.000 0.850 30.000 30.000 0.125 %/K JORNA JOR NAL L
VALOR
49,690.000 42,236.500 91,926.500 ### ### 11,490.813 VR TOTAL 2.50 2.500 0 49 496, 6,90 900. 0.00 000 0
0.000 0.850 30.000 30.000 0.125 %/K
VALOR
41,408.333 35,197.083 76,605.417 ### ### 9,575.677 VR TOTAL
SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA TOPOGRAFO
SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA RESIDENTE
SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA
JORNA JOR NAL L 55,000.000 0.850 30.000 30.000 0.125 %/K JORNA JOR NAL L
VALOR
2.00 2.000 0 496, 496,90 900. 0.00 000 0 1,833.333 34,960.000 29,716.000 64,676.000 ### ### 8,084.500 VR TOTAL 3.00 3.000 0 49 496, 6,90 900. 0.00 000 0
0.000 0.850 30.000 30.000 0.125 %/K JORNA JOR NAL L
VALOR
49,690.000 37,267.500 86,957.500 ### ### 10,869.688 VR TOTAL 5.00 5.000 0 49 496, 6,90 900. 0.00 000 0
0.000 0.850
30.000 30.000 0.125 CELADOR DIURNO / HERRAMENT %/K JORNA JOR NAL L SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA
0.850
PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES.
0.850
VALOR 0.000
30.000 30.000 0.125 CELADOR NOCTURNO %/K VALOR JOR JORNA NAL L (REC (RECAR ARGO GO NOCT NOCTUR URNO NO 35 35%) %) 1.62 1.620 0 496, 496,90 900. 0.00 000 0 SUB DE TRANS. 55,000.000
30.000 30.000
82,816.667 70,394.167 153,210.833 ### ### 19,151.354 VR TOTAL 1.20 1.200 0 49 496, 6,90 900. 0.00 000 0 0.000 19,876.000 16,894.600 36,770.600 ### 596,280.000 4,596.325 VR TOTAL 26,8 26 ,832 32.6 .600 00 1,833.333 28,665.933 24,366.043 53,031.977 ### 859,978.000
VR HORA
0.125
6,628.997
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS LOCALIZACION Y REPLANTEO MATERIALES
UND
CANT
ITEM
UNIDAD
FECHA
1.1
M2
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO 100.00
V/TOTAL 100.00
TOTAL EQUIPO TRANSPORTE
CANT.
UNID.
KM.
PRECIO/KM
VR TOTAL
V/UNITARIO 579.72 214.67
V/TOTAL 579.72 429.34
TOTAL TRANSPORTE MANO DE OBRA TOPOGRAFO AYUDANTE
UND CANT JORNAL JORNAL 1.00 49,690.00 JORNAL 2.0016,563.33
% PREST. 37,267.50 15,637.17
RENDIMIENTO 150.00 150.00 TOTAL MANO OBRA
1,009.06
TOTAL COSTO DIRECTO
1,109
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS DESCAPOTE MATERIALES
UND
CANT
ITEM
UNIDAD
FECHA
1.2
M2
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
V/UNITARIO 100.00
V/TOTAL 200.00
TOTAL EQUIPO TRANSPORTE
CANT.
UNID.
KM.
PRECIO/KM
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND JORNAL JORNAL
CANT 1.00 1.00
JORNAL 2 8, 1 5 8 16,563
% PREST. 25,492 15,637.17
RENDIMIENTO 16.00 16.00
VR TOTAL
0.00 V/UNITARIO 3,353.13 2,012.53
V/TOTAL 3,353.13 2,012.53
TOTAL MANO OBRA
5,365.66
TOTAL COSTO DIRECTO
5,566
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VALLA INFORMATIVA DE 5.00 X 2,8 MTS MATERIALES VALLA INFORMATIVA DE 5.00 X 2,8 MTS
UND UND
ITEM
UNIDAD
FECHA
1.3
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 1,400,000.00
CANT 1.000
VR UNIT 1,400,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR ANDAMIOS
UND
RENDIMIENTO DIA
1,400,000.00 V/UNITARIO 0.25
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL
CANT. 0.65
UNID. KM/TON
KM. 154.000
26,100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28,158 JORNAL 1. 1.00 16,563 JORNAL 1.00
% PREST. 25,492 15,637.17
RENDIMIENTO 1.00 1.00
V/TOTAL 2,100.00 6,000.00 24,000.00
VR TOTAL 80,080.00 80,080.00
V/UNITARIO 53,650.02 32,200.50
V/TOTAL 25,493.35 15,638.17
TOTAL MANO OBRA
41,131.52
TOTAL COSTO DIRECTO
1,547,312
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CAMPAMENTO E INSTALACIONES PROVISIONALES 40 M2 MATERIALES BISAGRA COBRIZADA 3" CONCRETO 2000 PSI AMARRE PARA TEJA PORTACANDADO NEGRO No. 4 PUNTILLA 2" CON CABEZA ACERO TABLA CHAPA .30x.025x3 MTS ORDINARIA LAMINA DE ZINC VARA DE CLAVO 6 METROS.
UND UND M3 UND UND LB KG ML M2 ML
CANT 12.00 0.40 90.00 4.00 5.00 5.00 70.00 40.000 18.00
ITEM
UNIDAD
FECHA
1.4
GLOBAL
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00 0.05 0.00 0.00 0.05 0.10 0.10 0.00 0.10
VR TOTAL 54,000.00 132,012.83 45,000.00 9,280.00 11,550.00 27,852.22 346,500.00 320,000.00 65,340.00
VR UNIT 4,500.00 314,316.25 500.00 2,320.00 2,200.00 5,064.04 4,500.00 8,000.00 3,300.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
1,011,535.05 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL
CANT. 1.20
UNID. KM/TON
KM. 154.000
2,500.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL JORNAL 1.00 49,690.00 28,158 JORNAL 1. 1.00 16,563 JORNAL 3.00
% PREST. 42,236.50 25,492 15,637.17
RENDIMIENTO 0.50 0.50 0.50
V/TOTAL 2,500.00
VR TOTAL 147,840.00 147,840.00
V/UNITARIO 183,853.00 107,300.03 64,401.00
V/TOTAL 183,853.00 107,300.03 193,203.00
TOTAL MANO OBRA
484,356.03
TOTAL COSTO DIRECTO
1,646,231
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CERRAMIENTO PROVISIONAL MATERIALES TELA EN FIBRA PARALES , MADERA , PUNTILLA, ALAMBRE Y DEMAS INSUMOS
ITEM
UNIDAD
FECHA
1.5
ML
SEPTIEMBRE DE 2010
UND M2
CANT 1.000
VR UNIT 2,750.00
DESPERDICIO % 0.05
VR TOTAL 2,887.50
GLOBAL
1.00
2,500.00
0.10
2,750.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
5,637.50 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL
CANT. 0.60
UNID. KM/TON
KM. 1.000
800.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28,158 JORNAL 1.00 16,563 JORNAL 2.00
% PREST.
25,492 15,637.17
RENDIMIENTO 125.00 125.00
V/TOTAL 800.00
VR TOTAL 480.00 480.00
V/UNITARIO 429.20 257.60
V/TOTAL 429.20 515.21
TOTAL MANO OBRA
944.41
TOTAL COSTO DIRECTO
7,862
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE MAMPOSTERIA DE BAÑOS Y DUCHAS, DEMOLICION MURO CERRAMIENTO EXISTENTE MATERIALES
UND
CANT
ITEMS
UNIDAD
FECHA
1.6 - 6.1
M2
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO
V/TOTAL 200.00
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO TOTAL EQUIPO
TRANSPORTE
CANT.
UNID.
KM.
200.00 PRECIO/KM
VR TOTAL
V/UNITARIO 3,832.14 2,300.04
V/TOTAL 3,832.14 2,300.04
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28,158 JORNAL 1. 1 .00 16,563 JORNAL 1.00
% PREST. 25,492 15,637.17
RENDIMIENTO 14.00 14.00 TOTAL MANO OBRA
6,132.18
TOTAL COSTO DIRECTO
6,332
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE ENCHAPES PARED MATERIALES
UND
CANT
ITEM
UNIDAD
FECHA
1.7
M2
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO
V/TOTAL 200.00
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO TOTAL EQUIPO
TRANSPORTE
CANT.
UNID.
KM.
200.00 PRECIO/KM
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28,158 JORNAL 1. 1 .00 16,563 JORNAL 1.00
% PREST.
25,492 15,637.17
RENDIMIENTO 11.00 10.00
VR TOTAL
0.00 V/UNITARIO 4,877.27 3,220.05
V/TOTAL 4,877.27 3,220.05
TOTAL MANO OBRA
8,097.32
TOTAL COSTO DIRECTO
8,297
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE PISO INTERIOR MATERIALES
UND
CANT
ITEM
UNIDAD
FECHA
1.8
M2
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO
V/TOTAL 200.00
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO TOTAL EQUIPO
TRANSPORTE
CANT.
UNID.
KM.
200.00 PRECIO/KM
VR TOTAL
V/UNITARIO 4,877.27 3,577.83
V/TOTAL 4,877.27 3,577.83
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28,158 JORNAL 1. 1 .00 16,563 JORNAL 1.00
% PREST. 25,492 15,637.17
RENDIMIENTO 11.00 9.00 TOTAL MANO OBRA
8,455.11
TOTAL COSTO DIRECTO
8,655
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS RETIRO DE ESCOMBROS MATERIALES
UND
ITEM
UNIDAD
FECHA
1.9 - 6.4
M3
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO
V/TOTAL 400.00
CANT
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO TOTAL EQUIPO
TRANSPORTE VOLQUETA
CANT. 0.20
UNID. KM KM/TON
KM. 12.000
400.00 PRECIO/KM 5,000.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28 , 1 5 8 JORNAL 1. 1.00 16,563 JORNAL 2.00
% PREST. 25 , 4 92 15,637.17
RENDIMIENTO 8.00 8.00
VR TOTAL 12,000.00 12,000.00
V/UNITARIO 6,706.25 4,025.06
V/TOTAL 6,706.25 8,050.13
TOTAL MANO OBRA
14,756.38
TOTAL COSTO DIRECTO
27,156
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS EXCAVACION EN MATERIAL COMUN MATERIALES
UND
ITEM
UNIDAD
FECHA
1.10 - 6.2
M3
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO
V/TOTAL 200.00
CANT
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO TOTAL EQUIPO
TRANSPORTE
CANT.
UNID.
KM.
200.00 PRECIO/KM
VR TOTAL
V/UNITARIO 13,412.50 12,880.20
V/TOTAL 13,412.50 12,880.20
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL 28,158 JORNAL 1. 1 .00 16,563 JORNAL 1.00
% PREST. 25,492 15,637.17
RENDIMIENTO 4.00 2.50 TOTAL MANO OBRA
26,292.70
TOTAL COSTO DIRECTO
26,493
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS EXCAVACION PARA CAISSONS CAISSONS (2 - 5 METROS DE PROFUNDIDAD) MATERIALES
UND
CANT
ITEM
UNIDAD
FECHA
1.11
M3
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO 14,000.00 12,000.00
V/TOTAL 7,000.00 6,000.00 600.00
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR
UND DIA DIA
RENDIMIENTO 2.00 2.00 TOTAL EQUIPO
TRANSPORTE TRANSPORTE ENTIBADO
CANT. 0.30
UNID. KM/TON
KM. 154.000
13,600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL JORNAL 1. 1.00 49,690.00 28,158 JORNAL 1. 1 .00 16,563 JORNAL 1.00
% PREST. 42,236.50 25,492 15,637.17
RENDIMIENTO 11.00 10.00 1.50
VR TOTAL 36,960.00 36,960.00
V/UNITARIO 8,356.95 5,365.00 21,467.00
V/TOTAL 8,356.95 5,365.00 21,467.00
TOTAL MANO OBRA
35,188.96
TOTAL COSTO DIRECTO
85,749
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS EXCAVACION PARA CAISSONS ( 5 - 8 METROS DE PROFUNDIDAD) MATERIALES
UND
ITEM
UNIDAD
FECHA
1.12
M3
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO 14,000.00 12,000.00
V/TOTAL 7,000.00 6,000.00 600.00
CANT
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR
UND DIA DIA
RENDIMIENTO 2.00 2.00 TOTAL EQUIPO
TRANSPORTE TRANSPORTE ENTIBADO
CANT. 0.30
UNID. KM/TON
KM. 154.000
13,600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 11.00 10.00 1.00
VR TOTAL 36,960.00 36,960.00
V/UNITARIO 8,356.95 5,365.00 32,200.50
V/TOTAL 8,356.95 5,365.00 32,200.50
TOTAL MANO OBRA
45,922.46
TOTAL COSTO DIRECTO
96,482
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS RELLENO EN MATERIAL COMUN MATERIALES
UND
ITEM
UNIDAD
FECHA
1.13 - 6.3
M3
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
V/UNITARIO
V/TOTAL 600.00
CANT
VR UNIT
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO TOTAL EQUIPO
TRANSPORTE
CANT.
UNID.
KM.
600.00 PRECIO/KM
VR TOTAL
V/UNITARIO 13,412.50 8,050.13
V/TOTAL 13,412.50 8,050.13
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 4.00 4.00 TOTAL MANO OBRA
21,462.63
TOTAL COSTO DIRECTO
22,063
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS RELLENO CON MATERIAL SELECCIONADO MATERIALES RECEBO SELECCIONADO
UND M3
ITEM
UNIDAD
FECHA
1.14
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 21,600.00
CANT 1.200
VR UNIT 18,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA VIBROCOMPACTADOR A GASOLINA HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 25.00
21,600.00 V/UNITARIO 90,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE RECEBO
CANT. 0.15
UNID. KM/TON
KM. 12.000
3,800.00 PRECIO/KM 3,000.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 25.00 25.00
V/TOTAL 3,600.00 200.00
VR TOTAL 5,400.00 5,400.00
V/UNITARIO 2,146.00 1,288.02
V/TOTAL 2,146.00 1,288.02
TOTAL MANO OBRA
3,434.02
TOTAL COSTO DIRECTO
34,234
PROYECTO: "CONSTRUCCION "CONSTRUCCI ON CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS SUB - BASE GRANULAR BAJO PAVIMENTO e= 12 CM MATERIALES SUB - BASE GRANULAR BAJO PAVIMENTO e= 12 CM
UND M3
ITEM
UNIDAD
FECHA
1.15
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 66,000.00
CANT 1.200
VR UNIT 55,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA VIBRO - COMPACTADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 25.00
66,000.00 V/UNITARIO 90,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE BASE GRANULAR
CANT. 0.15
UNID. KM/TON
KM. 12.000
4,100.00 PRECIO/KM 3,000.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 25.00 25.00 3.00
V/TOTAL 3,600.00 500.00
VR TOTAL 5,400.00
5,400.00 V/UNITARIO 3,677.06 2,146.00 10,733.50
V/TOTAL 3,677.06 2,146.00 10,733.50
TOTAL MANO OBRA
16,556.56
TOTAL COSTO DIRECTO
92,057
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS SUELO CEMENTO RELLENO CAISSONS MATERIALES SUELO SELECCIONADO CEMENTO PORTLAND TIPO 1
UND M3 KG
ITEM
UNIDAD
FECHA
1. 16
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.05
VR TOTAL 8,820.00 3,444.00
CANT 1.200 8.00
VR UNIT 7,000.00 410.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA VIBRO - COMPACTADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 15.00
12,264.00 V/UNITARIO 90,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE SUELO SELECCIONADO TRANSPORTE CEMENTO
CANT. 0.15 0.002
UNID. KM/TON KM/TON
KM. 12.000 154.00
6,150.00 PRECIO/KM 3,000.00 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 30.00 30.00 4.00
V/TOTAL 6,000.00 150.00
VR TOTAL 5,400.00 184.80 5,584.80
V/UNITARIO 3,064.22 1,788.33 8,050.13
V/TOTAL 3,064.22 1,788.33 8,050.13
TOTAL MANO OBRA
12,902.68
TOTAL COSTO DIRECTO
36,901
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS SOLADOS, CONCRETO 2000 PSI MATERIALES CONCRETO 2000 PSI
UND M3
ITEM
UNIDAD
FECHA
2.1 - 6.8
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.03
VR TOTAL 12,949.83
CANT 0.040
VR UNIT 314,316.25 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
12,949.83 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.002 0.002
UNID. KM/TON KM/TON
KM. 154.00 12.000
300.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 12.00 12.00
V/TOTAL 300.00
VR TOTAL 184.80 72.00 256.80
V/UNITARIO 4,470.83 2,683.38
V/TOTAL 4,470.83 2,683.38
TOTAL MANO OBRA
7,154.21
TOTAL COSTO DIRECTO
20,661
PROYECTO: "CONSTRUCCION "CONSTRUCCI ON CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VIGA DE AMARRE DE 0,2 X O,15 M 3000 PSI MURO FRONTAL MATERIALES CONCRETO 3000 PSI MADERA ROLLISA TABLA 3 MTS PUNTILLA DE 2"
UND M3 ML ML LB
ITEM
UNIDAD
FECHA
2.2 - 6.11
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.10 0.10 0.05
VR TOTAL 11,125.99 556.60 785.40 246.71
CANT 0.03 0.22 0.170 0.08
VR UNIT 353,206.00 2,300.00 4,200.00 2,937.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
12,714.70 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.040 0.020
UNID. KM/TON KM/TON
KM. 154.00 12.000
300.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 4.00 4.00
V/TOTAL 300.00
VR TOTAL 4,928.00 720.00 5,648.00
V/UNITARIO 13,412.50 8,050.13
V/TOTAL 13,412.50 8,050.13
TOTAL MANO OBRA
21,462.63
TOTAL COSTO DIRECTO
40,125
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VIGA DE AMARRE DE 0,2 X 0,15 M 3000 PSI MURO FRONTAL MATERIALES CONCRETO 3000 PSI MADERA ROLLISA TABLA 3 MTS PUNTILLA DE 2"
UND M3 ML ML LB
ITEM
UNIDAD
FECHA
2.3 - 6.11
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.10 0.10 0.05
VR TOTAL 5,563.78 704.55 1,377.20 585.93
CANT 0.0150 0.30 0.40 0.19
VR UNIT 353,256.00 2,135.00 3,130.00 2,937.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
8,231.46 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.040 0.020
UNID. KM/TON KM/TON
KM. 154.00 12.000
300.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 4.00
V/TOTAL 300.00
VR TOTAL 4,928.00 720.00 5,648.00
V/UNITARIO 17,883.34 8,050.13
V/TOTAL 17,883.34 8,050.13
TOTAL MANO OBRA
25,933.46
TOTAL COSTO DIRECTO
40,113
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ANTEPISO EN CONCRETO 2500 PSI, 8 CM MATERIALES CONCRETO 2500 PSI
UND M3
ITEM
UNIDAD
FECHA
2.4
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 29,523.17
CANT 0.080
VR UNIT 351,466.25 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
29,523.17 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.015 0.015
UNID. KM/TON KM/TON
KM. 154.00 12.000
100.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 9.00 9.00
V/TOTAL 200.00
VR TOTAL 1,848.00 540.00 2,388.00
V/UNITARIO 5,961.11 3,577.83
V/TOTAL 5,961.11 3,577.83
TOTAL MANO OBRA
9,538.95
TOTAL COSTO DIRECTO
41,550
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PAVIMENTO RIGIDO EN PAVICRETO MR - 41 , E= 16 CM MATERIALES PAVICRETO MR - 41
UND M3
ITEM
UNIDAD
FECHA
2.5
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 63,840.00
CANT 0.160
VR UNIT 380,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA
UND
RENDIMIENTO
63,840.00 V/UNITARIO
HERRAMIENTA MENOR
600.00 TOTAL EQUIPO
TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.080 0.080
UNID. KM/TON KM/TON
KM. 154.00 12.000
600.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
V/TOTAL
UND CANT JORNAL % PREST. JORNAL 1. 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 25.00 25.00 8.00
VR TOTAL 9,856.00 2,880.00 12,736.00
V/UNITARIO 3,677.06 2,146.00 4,025.06
V/TOTAL 3,677.06 2,146.00 4,025.06
TOTAL MANO OBRA
9,848.12
TOTAL COSTO DIRECTO
87,024
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS COLUMNETAS MURO FRONTAL 15 X 20 MATERIALES CONCRETO 3000 PSI
UND M3
ITEM
UNIDAD
FECHA
2.6
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 11,867.72
CANT 0.032
VR UNIT 353,206.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA FORMALETA HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 2.00
11,867.72 V/UNITARIO 5,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.010 0.010
UNID. KM/TON KM/TON
KM. 154.00 12.000
2,650.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 5.00 5.00 4.00
V/TOTAL 2,500.00 150.00
VR TOTAL 1,232.00 360.00 1,592.00
V/UNITARIO 18,385.30 10,730.00 8,050.13
V/TOTAL 18,385.30 10,730.00 8,050.13
TOTAL MANO OBRA
37,165.43
TOTAL COSTO DIRECTO
53,275
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CONCRETO CICLOPEO BAJO ZAPATAS MATERIALES CONCRETO 2500 PSI PIEDRA MEDIA ZONGA
UND M3 M3
ITEM
UNIDAD
FECHA
2 . 7 - 6 .7
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.05
VR TOTAL 202,971.62 16,537.50
CANT 0.550 0.45
VR UNIT 351,466.00 35,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 6.00
219,509.12 V/UNITARIO 45,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO Y PIEDRA ZONGA
CANT. 0.100 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000
7,700.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 6.00 5.00 5.00
V/TOTAL 7,500.00 200.00
VR TOTAL 12,320.00 3,600.00 15,920.00
V/UNITARIO 15,321.08 10,730.00 6,440.10
V/TOTAL 15,321.08 10,730.00 12,880.20
TOTAL MANO OBRA
38,931.29
TOTAL COSTO DIRECTO
282,060
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ZAPATAS CONCRETO 3000 PSI MATERIALES CONCRETO 3000 PSI
UND M3
ITEM
UNIDAD
FECHA
2.8 - 6.5
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 381,992.29
CANT 1.030
VR UNIT 353,206.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 8.00
381,992.29 V/UNITARIO 45,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.100 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000
5,825.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 7.00 7.00 4.60
V/TOTAL 5,625.00 200.00
VR TOTAL 12,320.00 3,600.00 15,920.00
V/UNITARIO 13,132.36 7,664.29 7,000.11
V/TOTAL 13,132.36 7,664.29 14,000.22
TOTAL MANO OBRA
34,796.86
TOTAL COSTO DIRECTO
438,534
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS COLUMNAS Y VIGAS CONCRETO 3000 PSI MATERIALES CONCRETO 3000 PSI PUNTILLA 2" CON CABEZA TABLA .30x.025x3 ORDINAR ANDAMIO TUBULAR (SECC.) MORDAZAS EN PLATINA CON CUÑA ALQUILADAS PARALES
UND M3 LB ML
ITEMS
UNIDAD
FECHA
2.9 - 6.9 - 6.10 - 6.12 - 6.13
M3
SEPTIEMBRE DE 2010
CANT 1.00 1.00 3.00 DD
UN UN
5.00 4.00 3.00
VR UNIT 351,466.00 2,937.00 13,500.00 1,500.00 1,500.00 1,000.00
DESPERDICIO % 0.05 0.05 0.10 0.00 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR
UND DIA
RENDIMIENTO 8.00
433,173.15 V/UNITARIO 45,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.100 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000
UND CANT JORNAL % PREST. JORNAL 1. 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 7.00 7.00 4.60
V/TOTAL 5,625.00 200.00 5,825.00
PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
VR TOTAL 369,039.30 3,083.85 44,550.00 7,500.00 6,000.00 3,000.00
VR TOTAL 12,320.00 3,600.00 15,920.00
V/UNITARIO 13,132.36 7,664.29 7,000.11
V/TOTAL 13,132.36 7,664.29 14,000.22
TOTAL MANO OBRA
34,796.86
TOTAL COSTO DIRECTO
489,715
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CONCRETO CAISSONS CON IMPERMEABILIZANTE ( 2 A 8 MTS DE PROFUNDIDAD) MATERIALES CONCRETO 3000 PSI TABLA .30x.025x3 ORDINAR MORDAZAS EN PLATINA CON CUÑA ALQUILADAS (24 IMPERMEABILIZANTE
UND M3 ML UN UN
ITEM
UNIDAD
FECHA
2.10
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.10 0.00 0.00
VR TOTAL 369,039.30 44,550.00 6,000.00 60,000.00
CANT 1.00 3.00 4.00 3.000
VR UNIT 351,466.00 13,500.00 1,500.00 20,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA FORMALETA METALICA CAISSONS VIBRADOR HERRAMIENTA MENOR
UND DIA DIA
RENDIMIENTO 0.60 8.00
479,589.30 V/UNITARIO 25,000.00 45,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO Y FORMALETA METALICA TRANSPORTE ARENA Y TRITURADO
CANT. 0.100 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000
48,091.67 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 5.00 5.00 4.00
V/TOTAL 41,666.67 5,625.00 800.00
VR TOTAL 12,320.00 3,600.00 15,920.00
V/UNITARIO 18,385.30 10,730.00 8,050.13
V/TOTAL 18,385.30 10,730.00 16,100.25
TOTAL MANO OBRA
45,215.55
TOTAL COSTO DIRECTO
588,817
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MESONES EN CONCRETO 60 CM X 8 CM MATERIALES CONCRETO 3000 PSI FORMALETA PUNTILLA DE 2"
UND M3 GL LB
ITEM
UNIDAD
FECHA
2.11
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00 0.00 0.00
VR TOTAL 14,058.64 14,000.00 1,468.50
CANT 0.040 1.00 0.50
VR UNIT 351,466.00 14,000.00 2,937.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
29,527.14 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.010 0.010
UNID. KM/TON KM/TON
KM. 154.00 12.000
400.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 5.00 5.00
V/TOTAL 400.00
VR TOTAL 1,232.00 360.00 1,592.00
V/UNITARIO 10,730.00 6,440.10
V/TOTAL 10,730.00 12,880.20
TOTAL MANO OBRA
23,610.20
TOTAL COSTO DIRECTO
55,129
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ALFAJIAS EN CONCRETO MATERIALES ALAMBRE NEGRO Cal. 18 CONCRETO 2500 PSI DURMIENTE ORDINARIO 4Mx.04x.04 LISTON EN AMARILLO 8 x.2.2 x3
UND KG M3 ML ML
ITEM
UNIDAD
FECHA
2.12
ML
SEPTIEMBRE DE 2010
CANT 0.90 0.012 0.37 2.00
VR UNIT 3,800.00 351,466.00 9,000.00 2,590.00
DESPERDICIO % 0.00 0.05 0.10 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
17,209.47 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.007 0.007
UNID. KM/TON KM/TON
KM. 154.00 12.000
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 8.00 8.00
V/TOTAL 200.00 200.00
PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
VR TOTAL 3,420.00 4,428.47 3,663.00 5,698.00
VR TOTAL 862.40 252.00 1,114.40
V/UNITARIO 6,706.25 4,025.06
V/TOTAL 6,706.25 4,025.06
TOTAL MANO OBRA
10,731.31
TOTAL COSTO DIRECTO
29,255
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS DINTELES EN CONCRETO H= 10 CM MATERIALES CONCRETO 3000 PSI TABLA PUNTILLA DE 2"
UND M3 GLOBAL GL
ITEM
UNIDAD
FECHA
2.13
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.10 0.05
VR TOTAL 4,649.90 9,240.00 246.71
CANT 0.01 0.80 0.08
VR UNIT 351,466.00 11,000.00 2,937.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
14,136.60 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.006 0.006
UNID. KM/TON KM/TON
KM. 154.00 12.000
MANO DE OBRA OFICIAL AYUDANTE
200.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE
RNILLO PTA BROCA EXTRAPL. EXTRAPL. EST 8 x 1/2" ( 13m UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 10.00 10.00
V/TOTAL 200.00
VR TOTAL 739.20 216.00 955.20
V/UNITARIO 5,365.00 3,220.05
V/TOTAL 5,365.00 3,220.05
TOTAL MANO OBRA
8,585.05
TOTAL COSTO DIRECTO
23,877
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ACERO DE REFUERZO 60000 PSI MATERIALES ACERO SEGUETA ALAMBRE NEGRO No 18
UND
ITEM
UNIDAD
FECHA
2.14 - 6.6
KG
SEPTIEMBRE DE 2010
CANT KG
UND
1.00 0.50
KG
0.03
VR UNIT DESPERDICIO % 3,000.00 0.10 550.00 0.00 3,800.00 0.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA
UND
RENDIMIENTO
VR TOTAL 3,300.00 302.50 125.40 3,727.90
V/UNITARIO
V/TOTAL
PRECIO/KM 800.00
VR TOTAL 739.20
TOTAL EQUIPO TRANSPORTE TRANSPORTE ACERO
CANT. 0.006
UNID. KM/TON
KM. 154.00 TOTAL TRANSPORTE
MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 200.00 200.00
739.20 V/UNITARIO 268.25 161.00
V/TOTAL 268.25 161.00
TOTAL MANO OBRA
429.25
TOTAL COSTO DIRECTO
4,896
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VIGAS AEREAS ESTRUCTURA SOPORTE CUBIERTA 0,25 X 0,30 0,30 MATERIALES CONCRETO 3000 PSI TABLA 3 MTS PUNTILLA DE 2"
UND M3 GL GL
ITEM
UNIDAD
FECHA
2.15 - 612 - 6.13
M3
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.10 0.05
VR TOTAL 370,866.30 52,800.00 4,725.00
CANT 1.00 3.00 1.00
VR UNIT 353,206.00 16,000.00 4,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA FORMALETA
UND DIA
RENDIMIENTO 2.00
428,391.30 V/UNITARIO 5,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO
CANT. 0.100 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000
2,500.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00 2.00
V/TOTAL 2,500.00
VR TOTAL 12,320.00 3,600.00 15,920.00
V/UNITARIO 30,642.17 17,883.34 16,100.25
V/TOTAL 30,642.17 17,883.34 32,200.50
TOTAL MANO OBRA
80,726.01
TOTAL COSTO DIRECTO
527,537
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ANDEN EN ADOQUIN MATERIALES ADOQUINES ARENA
UND
ITEM
UNIDAD
FECHA
2.16
M2
SEPTIEMBRE DE 2010
CANT M2 M3
1.000 0.02
VR UNIT DESPERDICIO % 30,000.00 0.05 25,000.00 0.05 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
VR TOTAL 31,500.00 525.00 32,025.00
V/UNITARIO
V/TOTAL 300.00
PRECIO/KM 800.00 3,000.000
VR TOTAL 6,160.00 3,600.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE ADOQUIN TRANSPORTE ARENA
CANT. 0.050 0.100
UNID. KM/TON KM/TON
KM. 154.00 12.000 TOTAL TRANSPORTE
MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 25.00 25.00
9,760.00 V/UNITARIO 2,146.00 1,288.02
V/TOTAL 2,146.00 1,288.02
TOTAL MANO OBRA
3,434.02
TOTAL COSTO DIRECTO
45,219
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MALLA M - 262 ( 7 mm/ 0,15) MATERIALES MALLA M - 262 ( 7 mm/ 0,15)
UND M2
ITEM
UNIDAD
FECHA
2.17
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 6,600.00
CANT 1.000
VR UNIT 6,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
6,600.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MALLA ACERO
CANT. 0.010
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 120.00 120.00
V/TOTAL 100.00
VR TOTAL 1,232.00 1,232.00
V/UNITARIO 447.08 268.34
V/TOTAL 447.08 268.34
TOTAL MANO OBRA
715.42
TOTAL COSTO DIRECTO
8,647
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MUROS EN BLOQUE H - 10 MATERIALES LADRILLO BLOQUE H - 10 MORTERO
UND UND M3
ITEM
UNIDAD
FECHA
3.1
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.00
VR TOTAL 14,162.50 8,250.00
CANT 12.500 0.03
VR UNIT 1,030.00 250,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
22,412.50 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE LADRILO H - 10
CANT. 0.010
UNID. KM/TON
KM. 154.00
300.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 24.00 24.00
V/TOTAL 300.00
VR TOTAL 1,232.00 1,232.00
V/UNITARIO 2,235.42 1,341.69
V/TOTAL 2,235.42 1,341.69
TOTAL MANO OBRA
3,577.10
TOTAL COSTO DIRECTO
27,522
PROYECTO: "CONSTRUCCION "CONSTRUCCI ON CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MUROS EN LADRILLO A LA VISTA MURO FRONTAL TIPO HOLLMAN MATERIALES LADRILLO A LA VISTA MORTERO
UND UND M3
ITEM
UNIDAD
FECHA
3.2 - 6.14
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.00
VR TOTAL 47,850.00 12,500.00
CANT 58.000 0.05
VR UNIT 750.00 250,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
60,350.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE LADRILO HOLLMAN
CANT. 0.020
UNID. KM/TON
KM. 154.00
300.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 20.00 24.00
V/TOTAL 300.00
VR TOTAL 2,464.00 2,464.00
V/UNITARIO 2,682.50 1,341.69
V/TOTAL 2,682.50 1,341.69
TOTAL MANO OBRA
4,024.19
TOTAL COSTO DIRECTO
67,138
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS FRISOS MUROS MATERIALES MORTERO
UND M3
ITEM
UNIDAD
FECHA
3.3 - 6.15
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 4,400.00
CANT 0.02
VR UNIT 250,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA REGLA DE TOLUA HERRAMIENTA MENOR
UND UND
RENDIMIENTO 500.00
4,400.00 V/UNITARIO 90,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA
CANT. 0.010 0.010
UNID. KM/TON KM/TON
KM. 154.00 12.000
280.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 9.00 10.00
V/TOTAL 180.00 100.00
VR TOTAL 1,232.00 360.00 1,592.00
V/UNITARIO 5,961.11 3,220.05
V/TOTAL 5,961.11 3,220.05
TOTAL MANO OBRA
9,181.16
TOTAL COSTO DIRECTO
15,453
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS FRISOS IMPERMEABILIZADOS BAÑOS ( INCLUYE DILATACIONES) MATERIALES MORTERO 1:3 SIKA-1
UND M3 KG
ITEM
UNIDAD
FECHA
3.4
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 4,070.00 1,936.00
CANT 0.015 0.16
VR UNIT 250,000.00 11,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA REGLA DE TOLUA HERRAMIENTA MENOR
UND UND
RENDIMIENTO 500.00
6,006.00 V/UNITARIO 90,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA
CANT. 0.010 0.010
UNID. KM/TON KM/TON
KM. 154.00 12.000
280.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 9.00 10.00
V/TOTAL 180.00 100.00
VR TOTAL 1,232.00 360.00 1,592.00
V/UNITARIO 5,961.11 3,220.05
V/TOTAL 5,961.11 3,220.05
TOTAL MANO OBRA
9,181.16
TOTAL COSTO DIRECTO
17,059
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CIELO RASO EN DRY WALL MATERIALES CINTA PAPEL ( 76.2 ) Mt VINILTEX BASE AGUA MASILLA SUPERMASTIC USG PERFIL CANAL CAL.26 ( 90 mm ) PERFIL OMEGA Cal 26 2.44 Mt. PLACA PANEL REY 12. 7mm RH ( 2.44 x 1.22 ) TORNILLO AUTOPERFORANTE EST. 7/16 " TORNILLO AUTOPERFORANTE YESO 6 x1 TORNILLO PTA BROCA EXTRAPL. EST 8 x 1/2" ( 13mm )
ITEM
UNIDAD
FECHA
3. 5
M2
SEPTIEMBRE DE 2010
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
GLOBAL
1.00
65,000.00
0.10
71,500.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA EQUIPO ELECTRICO PERFORACION
UND UND
RENDIMIENTO 5.00
71,500.00 V/UNITARIO 5,000.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE CIELO RASO DRY WALL
CANT. 0.005
UNID. KM/TON
KM. 154.00
1,000.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 30.00 30.00 30.00
V/TOTAL 1,000.00
VR TOTAL 616.00 616.00
V/UNITARIO 3,064.22 1,788.33 1,073.35
V/TOTAL 3,064.22 1,788.33 2,146.70
TOTAL MANO OBRA
6,999.25
TOTAL COSTO DIRECTO
80,115
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ESTUCO Y PINTURA INTERIOR MATERIALES ESTUCO , PINTURA Y LIJA
UND GLOBAL
ITEM
UNIDAD
FECHA
3.6
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 9,975.00
CANT 1.000
VR UNIT 9,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
9,975.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESTUCO Y PINTURA
CANT. 0.005
UNID. KM/TON
KM. 154.00
300.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 23.00 23.00
V/TOTAL 300.00
VR TOTAL 616.00 616.00
V/UNITARIO 2,332.61 1,400.02
V/TOTAL 2,332.61 2,800.04
TOTAL MANO OBRA
5,132.65
TOTAL COSTO DIRECTO
16,024
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PINTURA EXTERIOR VINILO KORAZA SOBRE PAÑETE MATERIALES PINTURA PARA EXTERIORES
UND GAL
ITEM
UNIDAD
FECHA
3.7
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 6,160.00
CANT 0.080
VR UNIT 70,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
6,160.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE PINTURA
CANT. 0.005
UNID. KM/TON
KM. 154.00
500.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 24.00 24.00
V/TOTAL 500.00
VR TOTAL 616.00 616.00
V/UNITARIO 2,235.42 1,341.69
V/TOTAL 2,235.42 2,683.38
TOTAL MANO OBRA
4,918.79
TOTAL COSTO DIRECTO
12,195
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MORTERO DE NIVELACION 4 CM MATERIALES MORTERO DE NIVELACION 4 CM
UND M3
ITEM
UNIDAD
FECHA
3.8
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 13,750.00
CANT 0.050
VR UNIT 250,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
13,750.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA
CANT. 0.010 0.010
UNID. KM/TON KM/TON
KM. 154.00 12.000
300.00 PRECIO/KM 800.00 3,000.000
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 300.00
VR TOTAL 1,232.00 360.00 1,592.00
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 4,293.40
TOTAL MANO OBRA
7,870.07
TOTAL COSTO DIRECTO
23,512
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PISOS BAÑOS CERAMICA ANTIDESLIZANTE MATERIALES CERAMICA PEGACOR
UND M2 KG
ITEM
UNIDAD
FECHA
3.9
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 24,200.00 5,500.00
CANT 1.000 2.00
VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
29,700.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR
CANT. 0.020
UNID. KM/TON
KM. 154.00
600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 600.00
VR TOTAL 2,464.00 2,464.00
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 4,293.40
TOTAL MANO OBRA
7,870.07
TOTAL COSTO DIRECTO
40,634
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PARED BAÑOS EN CERAMICA MATERIALES CERAMICA PEGACOR
UND M2 KG
ITEM
UNIDAD
FECHA
3.10
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 24,200.00 5,500.00
CANT 1.000 2.00
VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
29,700.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR
CANT. 0.015
UNID. KM/TON
KM. 154.00
600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 25.00 25.00
V/TOTAL 600.00
VR TOTAL 1,848.00 1,848.00
V/UNITARIO 2,146.00 1,288.02
V/TOTAL 2,146.00 2,576.04
TOTAL MANO OBRA
4,722.04
TOTAL COSTO DIRECTO
36,870
PROYECTO: "CONSTRUCCION "CONSTRUCCI ON CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ESQUINEROS EN ALUMINIO MATERIALES ESQUINERA , CEMENTO BLANCO
UND GL
ITEM
UNIDAD
FECHA
3.11
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 5,280.00
CANT 1.000
VR UNIT 4,800.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
5,280.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE
CANT.
UNID.
KM.
V/TOTAL 100.00 100.00
PRECIO/KM
VR TOTAL
V/UNITARIO 1,788.33 1,073.35
V/TOTAL 1,788.33 2,146.70
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 30.00 30.00 TOTAL MANO OBRA
3,935.03
TOTAL COSTO DIRECTO
9,315
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PISOS INTERIOR ( CERAMICA 30.5 X 30.5 INCLUYE BOQUILLA COLOR) DURO PISO O SIMILAR TRAFICO PESADO MATERIALES CERAMICA PEGACOR
UND M2 KG
ITEM
UNIDAD
FECHA
3.12
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 24,200.00 5,500.00
CANT 1.000 2.00
VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
29,700.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR
CANT. 0.015
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 100.00
VR TOTAL 1,848.00 1,848.00
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 4,293.40
TOTAL MANO OBRA
7,870.07
TOTAL COSTO DIRECTO
39,518
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS GUARDAESCOBAS EN CERAMICA H = 10 CMS MATERIALES CERAMICA PEGACOR
UND M2 KG
ITEM
UNIDAD
FECHA
3.13
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 8,800.00 2,750.00
CANT 1.000 1.00
VR UNIT 8,000.00 2,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
11,550.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR
CANT. 0.006
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2.00 16,563 15,637.17
RENDIMIENTO 40.00 40.00
V/TOTAL 100.00
VR TOTAL 739.20 739.20
V/UNITARIO 1,341.25 805.01
V/TOTAL 1,341.25 1,610.03
TOTAL MANO OBRA
2,951.28
TOTAL COSTO DIRECTO
15,340
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PUERTAS METALICAS MATERIALES PUERTA Metalica lamina cold rolled cal.18 panel ANTICORROSIVO ANTICORROSIVO Sobre lamina llena THINER
UND m2 GAL GAL
ITEM
UNIDAD
FECHA
3.14
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00 0.10 0.05
VR TOTAL 70,000.00 440.00 1,942.50
CANT 1.00 0.01 0.10
VR UNIT 70,000.00 40,000.00 18,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
72,382.50 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE PUERTA
CANT. 0.070
UNID. KM/TON
KM. 154.00
600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 5.00 5.00
V/TOTAL 600.00
VR TOTAL 8,624.00 8,624.00
V/UNITARIO 10,730.00 6,440.10
V/TOTAL 10,730.00 12,880.20
TOTAL MANO OBRA
23,610.20
TOTAL COSTO DIRECTO
105,217
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PORTON METALICO ENTRADA PRINCIPAL MATERIALES PORTON METALICO
UND UND
ITEM
UNIDAD
FECHA
3.15
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 2,120,000.00
CANT 1.000
VR UNIT 2,120,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
2,120,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE PORTON METALICO
CANT. 0.600
UNID. KM/TON
KM. 154.00
400.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1 .00 16,563 15,637.17
RENDIMIENTO 0.30 0.30 0.30
V/TOTAL 400.00
VR TOTAL 73,920.00 73,920.00
V/UNITARIO 306,421.67 178,833.39 107,335.00
V/TOTAL 306,421.67 178,833.39 107,335.00
TOTAL MANO OBRA
592,590.06
TOTAL COSTO DIRECTO
2,786,910
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VENTANAS METALICAS MATERIALES VENTANA Metalica lamina cold rolled cal.18 panel ANTICORROSIVO Sobre lamina llena THINER
UND m2 GL GAL
ITEM
UNIDAD
FECHA
3.16
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00 0.10 0.10
VR TOTAL 55,000.00 4,400.00 8,140.00
CANT 1.00 0.10 0.40
VR UNIT 55,000.00 40000 18,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
67,540.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE VENTANA METALICA
CANT. 0.070
UNID. KM/TON
KM. 154.00
500.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 500.00
VR TOTAL 8,624.00 8,624.00
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 2,146.70
TOTAL MANO OBRA
5,723.37
TOTAL COSTO DIRECTO
82,387
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VIDRIOS VENTANAS Y PUERTAS 4 MM
ITEM
UNIDAD
FECHA
3.17
M2
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
VIDRIO 4 m.m. , INSUMOS, INSUMOS, ELEMENTOS DE FIJACION, SILICONA, TORNILLOS
M2
1.000
21,300.00
0.10
23,430.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
23,430.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE VIDRIOS
CANT. 0.040
UNID. KM/TON
KM. 154.00
500.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 6.00 6.00
V/TOTAL 500.00
VR TOTAL 4,928.00 4,928.00
V/UNITARIO 8,941.67 5,366.75
V/TOTAL 8,941.67 5,366.75
TOTAL MANO OBRA
14,308.42
TOTAL COSTO DIRECTO
43,166
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
PINTURA EXTERIOR GRADERIAS MATERIALES ESMALTE THINER
UND GL GALON
ITEM
UNIDAD
FECHA
3.18
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 5,445.00 4,070.00
CANT 0.11 0.20
VR UNIT 45,000.00 18,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
9,515.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESMALTE Y THINER
CANT. 0.003
UNID. KM/TON
KM. 154.00
600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 40.00 40.00
V/TOTAL 600.00
VR TOTAL 369.60 369.60
V/UNITARIO 1,341.25 805.01
V/TOTAL 1,341.25 805.01
TOTAL MANO OBRA
2,146.26
TOTAL COSTO DIRECTO
12,631
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS ESPEJOS PARA BAÑOS PUBLICOS 3 MM MATERIALES ESPEJOS CRISTAL DE 4 m.m.INCOLORO MATERIALES, INSUMOS
UND M2 GLOBAL
ITEM
UNIDAD
FECHA
3.19
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10 0.10
VR TOTAL 57,200.00 11,000.00
CANT 1.00 1.00
VR UNIT 52,000.00 10,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
68,200.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESPEJOS
CANT. 0.018
UNID. KM/TON
KM. 154.00
600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 12.00 12.00
V/TOTAL 600.00
VR TOTAL 2,217.60 2,217.60
V/UNITARIO 4,470.83 2,683.38
V/TOTAL 4,470.83 2,683.38
TOTAL MANO OBRA
7,154.21
TOTAL COSTO DIRECTO
78,172
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PINTURA EN ESMALTE CARPINT. METALICA PUERTAS, VENTANAS, REJAS CERRAMIENTO. MATERIALES LIJA, ANTICORROSIVO, ESMALTE, THINER
UND GLOBAL
ITEM
UNIDAD
FECHA
3.20
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 23,100.00
CANT 1.05
VR UNIT 22,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
23,100.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE ESMALTE Y THINER
CANT. 0.003
UNID. KM/TON
KM. 154.00
600.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 32.00 32.00
V/TOTAL 600.00
VR TOTAL 369.60 369.60
V/UNITARIO 1,676.56 1,006.27
V/TOTAL 1,676.56 1,006.27
TOTAL MANO OBRA
2,682.83
TOTAL COSTO DIRECTO
26,752
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PUNTO HIDRAULICO PVC DE 1/2" PRESION MATERIALES tubo, limpiador, soldadura, accesorios, regata
UND GL
ITEM
UNIDAD
FECHA
4.1
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 28,350.00
CANT 1.00
VR UNIT 27,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
28,350.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE
CANT. 0.001
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 100.00
VR TOTAL 123.20 123.20
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 2,146.70
TOTAL MANO OBRA
5,723.37
TOTAL COSTO DIRECTO
34,297
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PUNTO HIDRAULICO DE PVC 1" PRESION MATERIALES tubo, limpiador, soldadura, accesorios, regata
UND GL
ITEM
UNIDAD
FECHA
4.2
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05
VR TOTAL 30,450.00
CANT 1.00
VR UNIT 29,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
30,450.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE
CANT. 0.001
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 100.00
VR TOTAL 123.20 123.20
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 2,146.70
TOTAL MANO OBRA
5,723.37
TOTAL COSTO DIRECTO
36,397
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS TUBERIA PVC DE 1/2" PRESION MATERIALES TUBERIA, ACCESORIOS
UND UND
ITEM
UNIDAD
FECHA
4.3
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 6,193.00
CANT 1.00
VR UNIT 5,630.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
6,193.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA
CANT. 0.003
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 60.00 60.00
V/TOTAL 100.00
VR TOTAL 369.60 369.60
V/UNITARIO 894.17 536.68
V/TOTAL 894.17 536.68
TOTAL MANO OBRA
1,430.84
TOTAL COSTO DIRECTO
8,093
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
TUBERIA PVC DE 3/4" PRESION MATERIALES TUBERIA, ACCESORIOS
UND UND
ITEM
UNIDAD
FECHA
4.4
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 7,480.00
CANT 1.00
VR UNIT 6,800.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
7,480.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA
CANT. 0.003
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 40.00 40.00
V/TOTAL 100.00
VR TOTAL 369.60 369.60
V/UNITARIO 1,341.25 805.01
V/TOTAL 1,341.25 805.01
TOTAL MANO OBRA
2,146.26
TOTAL COSTO DIRECTO
10,096
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
TUBERIA PVC DE 1" PRESION MATERIALES TUBERIA, ACCESORIOS
UND UND
ITEM
UNIDAD
FECHA
4.5
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 10,230.00
CANT 1.00
VR UNIT 9,300.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
10,230.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA
CANT. 0.003
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 40.00 40.00
V/TOTAL 100.00
VR TOTAL 369.60 369.60
V/UNITARIO 1,341.25 805.01
V/TOTAL 1,341.25 805.01
TOTAL MANO OBRA
2,146.26
TOTAL COSTO DIRECTO
12,846
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS TUBERIA PVC DE 1 Y 1/4" PRESION MATERIALES TUBERIA, ACCESORIOS
UND UND
ITEM
UNIDAD
FECHA
4.6
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 12,650.00
CANT 1.00
VR UNIT 11,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
12,650.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA
CANT. 0.003
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 55.00 55.00
V/TOTAL 100.00
VR TOTAL 369.60 369.60
V/UNITARIO 975.45 585.46
V/TOTAL 975.45 585.46
TOTAL MANO OBRA
1,560.92
TOTAL COSTO DIRECTO
14,681
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS TUBERIA PVC DE 1 Y 1/2" PRESION MATERIALES TUBERIA, ACCESORIOS
UND UND
ITEM
UNIDAD
FECHA
4.7
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 15,400.00
CANT 1.00
VR UNIT 14,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
15,400.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA
CANT. 0.003
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 35.00 35.00
V/TOTAL 100.00
VR TOTAL 369.60 369.60
V/UNITARIO 1,532.86 920.01
V/TOTAL 1,532.86 920.01
TOTAL MANO OBRA
2,452.87
TOTAL COSTO DIRECTO
18,322
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS TUBERIA PVC DE 2" PRESION MATERIALES TUBERIA, ACCESORIOS
UND UND
ITEM
UNIDAD
FECHA
4.8
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 16,720.00
CANT 1.00
VR UNIT 15,200.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
16,720.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA
CANT. 0.003
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 35.00 35.00
V/TOTAL 100.00
VR TOTAL 369.60 369.60
V/UNITARIO 1,532.86 920.01
V/TOTAL 1,532.86 920.01
TOTAL MANO OBRA
2,452.87
TOTAL COSTO DIRECTO
19,642
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MEDIDOR ROSCADO DE 1/2" CON CAJA CONCRETO Y TAPA METALICA MATERIALES
UND
MEDIDOR ROSCADO DE 1/2" BAR METERS ACCESORIOS, VALVULA DE CORTE 1/2" CAJA DE CONCRETO CON TAPA METALICA
UND UND UND
ITEM
UNIDAD
FECHA
4.9
UND
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
CANT
VR UNIT
1.00 1.00 1.00
48,000.00 65,000.00 65,000.00
0.00 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
178,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 100.00 100.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
48,000.00 65,000.00 65,000.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
209,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MEDIDOR ROSCADO DE 3/4" CON CAJA CONCRETO Y TAPA METALICA MATERIALES MEDIDOR ROSCADO DE 3/4" BAR METERS ACCESORIOS, VALVULA DE CORTE 3/4" CAJA DE CONCRETO CON TAPA METALICA
UND UND UND UND
ITEM
UNIDAD
FECHA
4.10
UND
SEPTIEMBRE DE 2010
CANT 1.00 1.00 1.00
VR UNIT 55,000.00 65,000.00 65,000.00
DESPERDICIO % 0.00 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
185,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 100.00 100.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
VR TOTAL 55,000.00 65,000.00 65,000.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
216,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS MEDIDOR ROSCADO DE 1" CON CAJA CONCRETO Y TAPA METALICA MATERIALES MEDIDOR ROSCADO DE 1" BAR METERS ACCESORIOS, VALVULA DE CORTE 1" CAJA DE CONCRETO CON TAPA METALICA
UND UND UND UND
ITEM
UNIDAD
FECHA
4.11
UND
SEPTIEMBRE DE 2010
CANT 1.00 1.00 1.00
VR UNIT 85,000.00 72,000.00 65,000.00
DESPERDICIO % 0.00 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
222,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 100.00 100.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
VR TOTAL 85,000.00 72,000.00 65,000.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
253,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
MEDIDOR ROSCADO DE (1 Y 1/2)" CON CAJA CONCRETO Y TAPA METALICA MATERIALES MEDIDOR ROSCADO DE (1 Y 1/2)" BAR METERS ACCESORIOS, VALVULA DE CORTE (1 Y 1/2)" CAJA DE CONCRETO CON TAPA METALICA
UND UND UND UND
ITEM
UNIDAD
FECHA
4.12
UND
SEPTIEMBRE DE 2010
CANT 1.00 1.00 1.00
VR UNIT 92,000.00 89,000.00 65,000.00
DESPERDICIO % 0.00 0.00 0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
246,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 100.00 100.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
VR TOTAL 92,000.00 89,000.00 65,000.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
277,797
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS VALVULA DE CORTE RED WHITE DE 2" MATERIALES
UND
VALVULA RED WHITE DE 2" ACCESORIOS CAJA DE CONCRETO CON TAPA METALICA
UND
ITEM
UNIDAD
FECHA
4.13
UND
SEPTIEMBRE DE 2010
DESPERDICIO %
VR TOTAL
CANT
VR UNIT 1.00
UND
1.00
UND
1.00
217,000.00 0.00 12,000.00 55,000.00 0.00
0.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
284,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 100.00 100.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
217,000.00 12,000.00 55,000.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
315,797
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
PUNTO DE PVC 2" SANITARIO MATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 2"
ITEM
UNIDAD
FECHA
5.1
UND
SEPTIEMBRE DE 2010
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
GL
1.00
46,500.00
0.05
48,825.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
48,825.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.008
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 7.00 7.00
V/TOTAL 100.00
VR TOTAL 985.60 985.60
V/UNITARIO 7,664.29 4,600.07
V/TOTAL 7,664.29 4,600.07
TOTAL MANO OBRA
12,264.36
TOTAL COSTO DIRECTO
62,175
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PUNTO DE PVC 3" SANITARIO MATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 3"
ITEM
UNIDAD
FECHA
5.2
UND
SEPTIEMBRE DE 2010
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
GL
1.00
58,000.00
0.05
60,900.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
60,900.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.008
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 7.00 7.00
V/TOTAL 100.00
VR TOTAL 985.60 985.60
V/UNITARIO 7,664.29 4,600.07
V/TOTAL 7,664.29 4,600.07
TOTAL MANO OBRA
12,264.36
TOTAL COSTO DIRECTO
74,250
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
PUNTO DE PVC 4" SANITARIO MATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 4"
ITEM
UNIDAD
FECHA
5.3
UND
SEPTIEMBRE DE 2010
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
GL
1.00
83,000.00
0.05
87,150.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
87,150.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.008
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 7.00 7.00
V/TOTAL 100.00
VR TOTAL 985.60 985.60
V/UNITARIO 7,664.29 4,600.07
V/TOTAL 7,664.29 4,600.07
TOTAL MANO OBRA
12,264.36
TOTAL COSTO DIRECTO
100,500
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
TUBERIA DE PVC 2" SANITARIA MATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LÍQUIDA TUBO PVC SANITARIO 2`` Pavco UNIÓN SANITARIA 2`` PVC
UND un GALON ml un
ITEM
UNIDAD
FECHA
5.4
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.05 0.10 0.00
VR TOTAL 10.50 1,050.00 12,650.00 1,840.00
CANT 0.02 0.02 1.00 0.16
VR UNIT 500.00 50,000.00 11,500.00 11,500.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
15,550.50 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.009
UNID. KM/TON
KM. 154.00
50.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 25.00 25.00
V/TOTAL 50.00
VR TOTAL 1,108.80 1,108.80
V/UNITARIO 2,146.00 1,288.02
V/TOTAL 2,146.00 1,288.02
TOTAL MANO OBRA
3,434.02
TOTAL COSTO DIRECTO
20,143
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
TUBERIA DE PVC 3" SANITARIA MATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LÍQUIDA TUBO PVC SANITARIO 3`` Pavco UNIÓN SANITARIA 3`` PVC
UND un GALON ml un
ITEM
UNIDAD
FECHA
5.5
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.05 0.10 0.00
VR TOTAL 10.50 1,050.00 19,800.00 2,080.00
CANT 0.02 0.02 1.00 0.16
VR UNIT 500.00 50,000.00 18,000.00 13,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
22,930.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.009
UNID. KM/TON
KM. 154.00
50.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 28.00 28.00
V/TOTAL 50.00
VR TOTAL 1,108.80 1,108.80
V/UNITARIO 1,916.07 1,150.02
V/TOTAL 1,916.07 1,150.02
TOTAL MANO OBRA
3,066.09
TOTAL COSTO DIRECTO
27,155
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
TUBERIA DE PVC 4" SANITARIA MATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LÍQUIDA TUBO PVC SANITARIO 4`` Pavco UNIÓN SANITARIA 4`` PVC
UND un GALON ml un
ITEM
UNIDAD
FECHA
5.6
ML
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.05 0.10 0.00
VR TOTAL 10.50 1,050.00 28,930.00 2,400.00
CANT 0.02 0.02 1.00 0.16
VR UNIT 500.00 50,000.00 26,300.00 15,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
32,380.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.045
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 20.00 20.00
V/TOTAL 100.00
VR TOTAL 5,544.00 5,544.00
V/UNITARIO 2,682.50 1,610.03
V/TOTAL 2,682.50 1,610.03
TOTAL MANO OBRA
4,292.53
TOTAL COSTO DIRECTO
42,317
PROYECTO: "CONSTRUCCION "CONSTRUCCIO N CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
CAJA DE INSPECCION DE 80 X 80 CMS MATERIALES CONCRETO 2,000 PSI LADRILLO PRECOCIDO COMUN 12x24x6 Dep. MORTERO ALAMBRE NEGRO Cal. 18 CEMENTO GRIS ACERO DE REFUERZO
UND M3 UN M3 KG KG KG
ITEM
UNIDAD
FECHA
5.7
UND
SEPTIEMBRE DE 2010
CANT 0.08 75.90 0.05 0.08 6.00 4.14
VR UNIT DESPERDICIO % 314,316.00 0.05 800.00 0.10 250,000.00 0.05 3,800.00 0.00 420.00 0. 0.05 4,000.00 0.10 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
127,485.54 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.100
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 1.00 1.00
V/TOTAL 500.00 500.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
VR TOTAL 26,402.54 66,792.00 13,125.00 304.00 2,646.00 18,216.00
VR TOTAL 12,320.00 12,320.00
V/UNITARIO 53,650.02 32,200.50
V/TOTAL 53,650.02 64,401.00
TOTAL MANO OBRA
118,051.02
TOTAL COSTO DIRECTO
258,357
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS SANITARIO CONVENCIONAL ACUACER CON GRIFERIA MATERIALES PEGACOR BLANCO SANITARIO ACUACER Blanco. Ref. 30038
UND kg un
ITEM
UNIDAD
FECHA
5.8
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.00
VR TOTAL 2,500.00 248,850.00
CANT 1.00 1.00
VR UNIT 2,500.00 237,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
251,350.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
200.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 200.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
283,247
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
SANITARIO DE FLUXOMETRO MATERIALES SANITARIO (TAZA) ACCESORIOS MENORES, REGATA FLUXOMETRO GRIVAL DE PALANCA
UND GL GL GL
ITEM
UNIDAD
FECHA
5.9
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00 0.00 0.00
VR TOTAL 220,000.00 15,000.00 550,000.00
CANT 1.00 1.00 1.00
VR UNIT 220,000.00 15,000.00 550,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
785,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
500.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 2.00 2.00
V/TOTAL 500.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 26,825.01 16,100.25
V/TOTAL 26,825.01 16,100.25
TOTAL MANO OBRA
42,925.26
TOTAL COSTO DIRECTO
831,505
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS LAVAMANOS DE COLGAR ACUACER CON GRIFERIA MATERIALES PEGACOR BLANCO LAVAMANOS CON GRIFERÍA UNA LLAVE GRIVAL
UND kg un
ITEM
UNIDAD
FECHA
5.10
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.00
VR TOTAL 2,625.00 95,000.00
CANT 1.00 1.00
VR UNIT 2,500.00 95,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
97,625.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.021
UNID. KM/TON
KM. 154.00
300.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00
V/TOTAL 300.00
VR TOTAL 2,587.20 2,587.20
V/UNITARIO 17,883.34 10,733.50
V/TOTAL 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
129,129
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS DUCHAS, INCLUYE GRIFERÍA GRIVAL MATERIALES PEGACOR BLANCO DUCHA PRISMA SENCILLA GRIVAL OTROS INSUMOS, REGATA, MORTERO INCLUYE GRIFERIA GRIVAL UNA LLAVE
UND kg un GL UN
ITEM
UNIDAD
FECHA
5.11
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.05 0.00 0.05 0.00
VR TOTAL 1,837.50 41,000.00 5,250.00 35,000.00
CANT 0.70 1.00 1.00 1.00
VR UNIT 2,500.00 41,000.00 5,000.00 35,000.00 TOTAL MATERIALES
EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
81,250.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.004
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 7.00 7.00
V/TOTAL 100.00
VR TOTAL 492.80 492.80
V/UNITARIO 7,664.29 4,600.07
V/TOTAL 7,664.29 4,600.07
TOTAL MANO OBRA
12,264.36
TOTAL COSTO DIRECTO
94,107
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS
REJILLAS DE 3X2 PARA SIFONES DE PISO MATERIALES REJILLAS 3X2 EN ALUMINIO
UND UN
ITEM
UNIDAD
FECHA
5.12
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 4,500.00
CANT 1.00
VR UNIT 4,500.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
4,500.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.004
UNID. KM/TON
KM. 154.00
50.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 30.00 30.00
V/TOTAL 50.00
VR TOTAL 492.80 492.80
V/UNITARIO 1,788.33 1,073.35
V/TOTAL 1,788.33 1,073.35
TOTAL MANO OBRA
2,861.68
TOTAL COSTO DIRECTO
7,904
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS REJILLAS DE 4X3 4X3 PARA SIFONES DE PISO MATERIALES REJILLAS 4X3 EN ALUMINIO
UND UN
ITEM
UNIDAD
FECHA
5.13
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 8,000.00
CANT 1.00
VR UNIT 8,000.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
8,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.002
UNID. KM/TON
KM. 154.00
50.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 2 5,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 35.00 35.00
V/TOTAL 50.00
VR TOTAL 246.40 246.40
V/UNITARIO 1,532.86 920.01
V/TOTAL 1,532.86 920.01
TOTAL MANO OBRA
2,452.87
TOTAL COSTO DIRECTO
10,749
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CERCHAS PRINCIPALES ( EN ELEMENTOS RECTANGULARES) MATERIALES CERCHAS PRINCIPALES SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
UND UND KG GLN GLN UND
ITEM
UNIDAD
FECHA
8.1
ML
SEPTIEMBRE DE 2010
CANT 1.00 0.30 0.04 0.02 0.20
VR UNIT DESPERDICIO % 780,000.00 0.00 12,000.00 0.10 40,000.00 0.05 15,000.00 0.05 2,000.00 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 10.00 20.00 3.00
786,375.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.200
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 3. 3.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00 3.00
V/TOTAL 500.00 2,500.00 433.33 3,433.33
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
VR TOTAL 780,000.00 3,960.00 1,680.00 315.00 420.00
VR TOTAL 24,640.00 24,640.00
V/UNITARIO 30,642.17 17,883.34 10,733.50
V/TOTAL 30,642.17 17,883.34 32,200.50
TOTAL MANO OBRA
80,726.01
TOTAL COSTO DIRECTO
895,174
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CERCHA - RIOSTRA MATERIALES CERCHAS RIOSTRA SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
UND UND KG GLN GLN UND
ITEM
UNIDAD
FECHA
8.2
ML
SEPTIEMBRE DE 2010 VR TOTAL 240,000.00 3,960.00 1,680.00 315.00 420.00
CANT 1.00 0.30 0.04 0.02 0.20
VR UNIT DESPERDICIO % 240,000.00 0.00 12,000.00 0.10 40,000.00 0.05 15,000.00 0.05 2,000.00 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 10.00 20.00 3.00
246,375.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.160
UNID. KM/TON
KM. 154.00
3,433.33 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND JORNAL JORNAL JORNAL
CANT 1. 1.00 1.00
JORNAL 49,690.00 28,158 3. 3.00
16,563
% PREST. 42,236.50 25 2 5,492 15,637.17
RENDIMIENTO 2.00 2.00
V/TOTAL 500.00 2,500.00 433.33
VR TOTAL 19,712.00 19,712.00
V/UNITARIO 45,963.25 26,825.01
2.00
16,100.25
V/TOTAL 45,963.25 26,825.01 48,300.75
TOTAL MANO OBRA
121,089.01
TOTAL COSTO DIRECTO
390,609
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CORREA TIPO (EN PERFIL 100 X 50 X 2 MM) MATERIALES CORREA TIPO (EN PERFIL 100 X 50 X 2 MM) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
UND UND KG GLN GLN UND
ITEM
UNIDAD
FECHA
8.3
ML
SEPTIEMBRE DE 2010
CANT 1.00 0.30 0.04 0.02 0.20
VR UNIT 61,000.00 12,000.00 40,000.00 15,000.00 2,000.00
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 10.00 20.00 3.00
67,375.00 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.160
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 5.00 5.00 5.00
V/TOTAL 500.00 2,500.00 433.33 3,433.33
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
VR TOTAL 61,000.00 3,960.00 1,680.00 315.00 420.00
VR TOTAL 19,712.00
19,712.00 V/UNITARIO 18,385.30 10,730.00 6,440.10
V/TOTAL 18,385.30 10,730.00 6,440.10
TOTAL MANO OBRA
35,555.40
TOTAL COSTO DIRECTO
126,076
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS TIRANTES ( PLATINA 2" E= 1/8" ) MATERIALES TIRANTES ( PLATINA 2" E= 1/8" ) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
UND UND KG GLN GLN UND
ITEM
UNIDAD
FECHA
8.4
ML
SEPTIEMBRE DE 2010 VR TOTAL 18,000.00 660.00 420.00 157.50 420.00
CANT 1.00 0.05 0.01 0.01 0.20
VR UNIT 18,000.00 12,000.00 40,000.00 15,000.00 2,000.00
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 50.00 50.00 3.00
19,657.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.044
UNID. KM/TON
KM. 154.00
1,533.33 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 20.00 20.00 20.00
V/TOTAL 100.00 1,000.00 433.33
VR TOTAL 5,420.80 5,420.80
V/UNITARIO 4,596.33 2,682.50 1,610.03
V/TOTAL 4,596.33 2,682.50 1,610.03
TOTAL MANO OBRA
8,888.85
TOTAL COSTO DIRECTO
35,500
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CONTRAVIENTOS ( CABLE METALICO DIAM=3/8" INCLUYE SUJETADORES) FY MAYOR O IGUAL A 7000 KG/CM2
ITEM
UNIDAD
FECHA
8 .5
ML
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
CONTRAVIENTOS ( CABLE METALICO DIAM=3/8" INCLUYE SUJETADORES) FY MAYOR O IGUAL A 7000 KG/CM2
UND
1.00
16,000.00
0.00
16,000.00
KG GLN GLN UND
0.05 0.01 0.01 0.20
12,000.00 40,000.00 15,000.00 2,000.00
0.10 0.05 0.05 0.05
SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 50.00 50.00 3.00
17,657.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.055
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1. 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 20.00 20.00 20.00
V/TOTAL 100.00 1,000.00 433.33 1,533.33
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
660.00 420.00 157.50 420.00
VR TOTAL 6,776.00 6,776.00
V/UNITARIO 4,596.33 2,682.50 1,610.03
V/TOTAL 4,596.33 2,682.50 1,610.03
TOTAL MANO OBRA
8,888.85
TOTAL COSTO DIRECTO
34,856
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PLATINAS DE APOYO DE CERCHA ( INCLUYE ANCLAJES) E= 3/8" A= 0,3375 M2
ITEM
UNIDAD
FECHA
8.6
UN
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
PLATINAS DE APOYO DE CERCHA ( INCLUYE ANCLAJES) E= 3/8" A= 0,3375 M2
UND
1.00
220,000.00
0.00
220,000.00
KG GLN GLN UND
0.30 0.01 0.01 0.60
12,000.00 40,000.00 15,000.00 2,000.00
0.10 0.05 0.05 0.05
SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 10.00 20.00 2.00
225,797.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.100
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 2. 2.00 16,563 15,637.17
RENDIMIENTO 3.00 3.00 2.00
V/TOTAL 500.00 2,500.00 650.00 3,650.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
3,960.00 420.00 157.50 1,260.00
VR TOTAL 12,320.00 12,320.00
V/UNITARIO 30,642.17 17,883.34 16,100.25
V/TOTAL 30,642.17 17,883.34 32,200.50
TOTAL MANO OBRA
80,726.01
TOTAL COSTO DIRECTO
322,494
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( EN MENSULA INCLUYE ANCLAJES) E= 3/8" A= 500 CM2
ITEM
UNIDAD
FECHA
8.7
UN
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
PLATINA PARA FIJACION DE CONTRAVIENTOS ( EN MENSULA INCLUYE ANCLAJES) E= 3/8" A= 500 CM2
UND
1.00
90,000.00
0.00
90,000.00
KG GLN GLN UND
0.20 0.01 0.01 0.40
12,000.00 40,000.00 15,000.00 2,000.00
0.10 0.05 0.05 0.05
2,640.00 420.00 157.50 840.00
SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 10.00 20.00 2.00
94,057.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.055
UNID. KM/TON
KM. 154.00
3,650.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 5.00 3.00 3.00
V/TOTAL 500.00 2,500.00 650.00
VR TOTAL 6,776.00 6,776.00
V/UNITARIO 18,385.30 17,883.34 10,733.50
V/TOTAL 18,385.30 17,883.34 10,733.50
TOTAL MANO OBRA
47,002.14
TOTAL COSTO DIRECTO
151,486
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS CONTRAVIENTOS ( CENTRO CERCHA ) E= 3/8" A= 125 CM2
ITEM
UNIDAD
FECHA
8.8
UN
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
PLATINA PARA FIJACION DE CONTRAVIENTOS ( CENTRO CERCHA ) E= 3/8" A= 125 CM2
UND
1.00
95,000.00
0.00
95,000.00
KG GLN GLN UND
0.20 0.01 0.01 0.40
12,000.00 40,000.00 15,000.00 2,000.00
0.10 0.05 0.05 0.05
2,640.00 420.00 157.50 840.00
SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 20.00 35.00 2.00
99,057.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.055
UNID. KM/TON
KM. 154.00
2,328.57 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 4.00 4.00 4.00
V/TOTAL 250.00 1,428.57 650.00
VR TOTAL 6,776.00 6,776.00
V/UNITARIO 22,981.63 13,412.50 8,050.13
V/TOTAL 22,981.63 13,412.50 8,050.13
TOTAL MANO OBRA
44,444.25
TOTAL COSTO DIRECTO
152,606
PROYECTO: "CONSTRUCCION "CONSTRUCCION CIUDADELA CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS CONTRAVIENTOS ( EXTREMO CERCHA ) E= 3/8" A= 390 CM2
ITEM
UNIDAD
FECHA
8.9
UN
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
PLATINA PARA FIJACION DE CONTRAVIENTOS ( EXTREMO CERCHA ) E= 3/8" A= 390 CM2
UND
1.00
145,000.00
0.00
145,000.00
KG GLN GLN UND
0.20 0.01 0.01 0.40
12,000.00 40,000.00 15,000.00 2,000.00
0.10 0.05 0.05 0.05
SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 20.00 35.00 2.00
149,057.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.055
UNID. KM/TON
KM. 154.00
UND
CANT
MAESTRO
JORNAL
1. 1 .00
OFICIAL AYUDANTE
JORNAL 1.00 JORNAL 1. 1.00
JORNAL 49,690.00 28,158 16,563
V/TOTAL 250.00 1,428.57 650.00 2,328.57
PRECIO/KM 800.00
TOTAL TRANSPORTE
MANO DE OBRA
2,640.00 420.00 157.50 840.00
VR TOTAL 6,776.00 6,776.00
% PREST.
RENDIMIENTO
V/UNITARIO
V/TOTAL
42,236.50
3.00
30,642.17
30,642.17
17,883.34 10,733.50
17,883.34 10,733.50
25 2 5,492 15,637.17
3.00 3.00 TOTAL MANO OBRA
59,259.01
TOTAL COSTO DIRECTO
217,421
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS PLATINAS DE APOYO POSTERIOR DE CERCHA E= 3/8" A= 0,09 M2 (0,30 X 0,30)
ITEM
UNIDAD
FECHA
8.10
UN
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
PLATINAS DE APOYO POSTERIOR DE CERCHA E= 3/8" A= 0,09 M2 (0,30 X 0,30)
UND
1.00
70,000.00
0.00
70,000.00
KG GLN GLN UND
0.40 0.05 0.01 0.40
12,000.00 40,000.00 15,000.00 2,000.00
0.10 0.05 0.05 0.05
5,280.00 2,100.00 157.50 840.00
SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)
UND DIA DIA DIA
RENDIMIENTO 20.00 35.00 2.00
78,377.50 V/UNITARIO 5,000.00 50,000.00 1,300.00
TOTAL EQUIPO
V/TOTAL 250.00 1,428.57 650.00 2,328.57
TRANSPORTE
CANT.
UNID.
KM.
PRECIO/KM
VR TOTAL
TRANSPORTE MATERIALES
0.045
KM/TON
154.00
800.00
5,544.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 2 5,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 5.00 3.00 3.00
5,544.00 V/UNITARIO 18,385.30 17,883.34 10,733.50
V/TOTAL 18,385.30 17,883.34 10,733.50
TOTAL MANO OBRA
47,002.14
TOTAL COSTO DIRECTO
133,252
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS TEJA TERMOACOUSTIC E= 0,27 MM ( SUMINISTRO E INSTALACION) INCLUYE TORNILLOS DE FIJACION
ITEM
UNIDAD
FECHA
8.11
M2
SEPTIEMBRE DE 2010
MATERIALES
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
TEJA TERMOACOUSTIC E= 0,27 MM ( SUMINISTRO E INSTALACION) INCLUYE TORNILLOS DE FIJACION
UND
1.00
36,000.00
0.00
36,000.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA
UND
ANDAMIO TUBULAR HERRAMIENTA MENOR
RENDIMIENTO DIA
36,000.00 V/UNITARIO
2.00
2,300.00
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.050
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1. 1 .00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 2.00 16,563 15,637.17
RENDIMIENTO 40.00 40.00 40.00
1,150.00 300.00 1,450.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
V/TOTAL
VR TOTAL 6,160.00 6,160.00
V/UNITARIO 2,298.16 1,341.25 805.01
V/TOTAL 2,298.16 1,341.25 1,610.03
TOTAL MANO OBRA
5,249.44
TOTAL COSTO DIRECTO
48,859
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS LIMPIEZA GENERAL DE LA OBRA MATERIALES INSUMOS DE ASEO
UND GL
ITEM
UNIDAD
FECHA
9.1
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 2,420.00
CANT 1.00
VR UNIT 2,200.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
2,420.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.010
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1.00 16,563 15,637.17
RENDIMIENTO 100.00 100.00
V/TOTAL 100.00
VR TOTAL 1,232.00 1,232.00
V/UNITARIO 536.50 322.01
V/TOTAL 536.50 322.01
TOTAL MANO OBRA
858.51
TOTAL COSTO DIRECTO
4,611
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS INCRUSTACIONES PARA FIGURA FIGURA BALON EN MARMOL DE LA REGION MATERIALES MARMOL DE LA REGION
UND M2
ITEM
UNIDAD
FECHA
6.16
M2
SEPTIEMBRE DE 2010
DESPERDICIO % 0.10
VR TOTAL 99,000.00
CANT 1.00
VR UNIT 90,000.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
99,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MARMOL
CANT. 0.200
UNID. KM/TON
KM. 12.00
500.00 PRECIO/KM 3,000.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 5.00 5.00 5.00
V/TOTAL 500.00
VR TOTAL 7,200.00 7,200.00
V/UNITARIO 18,385.30 10,730.00 6,440.10
V/TOTAL 18,385.30 10,730.00 6,440.10
TOTAL MANO OBRA
17,170.10
TOTAL COSTO DIRECTO
123,870
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS SILLETERIA PLASTICA PARA GRADERIAS MATERIALES SILLAS, TORNILLOS, INSUMOS
UND GLOBAL
ITEM
UNIDAD
FECHA
7.1
UND
SEPTIEMBRE DE 2010
DESPERDICIO % 0.00
VR TOTAL 28,000.00
CANT 1.00
VR UNIT 28,000.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
28,000.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
100.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 15.00 15.00
V/TOTAL 100.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 3,576.67 2,146.70
V/TOTAL 3,576.67 2,146.70
TOTAL MANO OBRA
5,723.37
TOTAL COSTO DIRECTO
36,903
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS CERRAMIENTO METALICO EN ANGULO Y MALLA PARA LOS CUATRO LADOS DE LAS GRADERIAS MATERIALES MALLA CERRAMIENTO Eslab.Cal.12 2 1/2 Y LIJA TUBO GALVANIZADO 2" ANGULO 1,5" x 1,5"x 3/16 SOLDADURA ANTICORROSIVO Y WASH PRIMER THINER
UND M2 ML ML KG GALON GALON
ITEM
UNIDAD
FECHA
7.2
ML
SEPTIEMBRE DE 2010
CANT 0.82 0.83 3.00 0.40 0.15 0.10
VR UNIT 40,000.00 25,000.00 15,000.00 18,000.00 40,000.00 15,000.00
DESPERDICIO % 0.10 0.10 0.10 0.10 0.10 0.10
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
124,575.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.055
UNID. KM/TON
KM. 154.00
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 5.00 3.00 3.00
V/TOTAL 500.00 500.00
PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
VR TOTAL 36,080.00 22,825.00 49,500.00 7,920.00 6,600.00 1,650.00
VR TOTAL 6,776.00 6,776.00
V/UNITARIO 18,385.30 17,883.34 10,733.50
V/TOTAL 18,385.30 17,883.34 10,733.50
TOTAL MANO OBRA
28,616.84
TOTAL COSTO DIRECTO
160,468
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"
MUNICIPIO DE
ANALISIS DE PRECIOS UNITARIOS REJILLA PARA CANALETA DE AGUAS LLUVIAS EXISTENTE MATERIALES HIIERRO 5/8", ANGULOS, BISAGRAS, SOLDADURA. SOLDADURA. OTROS INSUMOS
ITEM
UNIDAD
FECHA
7.3
ML
SEPTIEMBRE DE 2010
UND
CANT
VR UNIT
DESPERDICIO %
VR TOTAL
UND
1.00
27,000.00
0.10
29,700.00
TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR
UND
RENDIMIENTO
29,700.00 V/UNITARIO
TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES
CANT. 0.025
UNID. KM/TON
KM. 154.00
300.00 PRECIO/KM 800.00
TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE
UND CANT JORNAL % PREST. JORNAL 1.00 49,690.00 42,236.50 JORNAL 1.00 28,158 25 25,492 JORNAL 1. 1.00 16,563 15,637.17
RENDIMIENTO 6.00 6.00 6.00
V/TOTAL 300.00
VR TOTAL 3,080.00 3,080.00
V/UNITARIO 15,321.08 8,941.67 5,366.75
V/TOTAL 15,321.08 8,941.67 5,366.75
TOTAL MANO OBRA
29,629.50
TOTAL COSTO DIRECTO
62,710
PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIV ETAPA DEL MUNICIPIO MUNICIPIO DE MALAGA" ANALISIS DE PRECIOS UNITARIOS EXCAVACION PARA CAISSONS ( 8 - 9 METROS DE PROFUNDIDAD) MATERIALES
UND
CANT
ITEM
UNIDAD
1.12.1
M3
VR UNIT
SPERDICIO
TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR
UND DIA DIA
RENDIMIENTO V/UNITARIO 2.00 14 14,000.00 2.00 12,000.00 TOTAL EQUIPO
TRANSPORTE TRANSPORTE ENTIBADO
CANT. 0.30
UNID. KM/TON
KM. 154.000
PRECIO/KM 800.00
TOTAL TRANSPORTE ANO DE OBR UND MAESTRO JORNAL OFICIAL JORNAL AYUDANTE JORNAL
CANT 1.00 1.00 1.00
JORNAL % PREST. RENDIMIENTO V/UNITARIO 49,690.00 42,236.50 11.00 8,356.95 28,158 25,492 10.00 5,365.00 16,563 15,637.17 0.75 42,933.04 TOTAL MANO OBRA
TOTAL COSTO DIRECTO
PRIMERA
FECHA
OCTUBRE DE 2011 VR TOTAL
V/TOTAL 7,000.00 6,000.00 600.00 13,600.00 VR TOTAL 36,960.00 36,960.00 V/TOTAL 8,356.95 5,365.00 42,933.04 56,655.00
107,215