_______________________________________________________
Installation
Section 2
____ __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ _
S____ ub -____ s____ ec t____ io____ n____ P____ ag e __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ __ 2_._1_______H__a_r__d_w a_r_e c_h ck 2/2 _ __ ___ ___ __e ___ ___________________________________________________________________________ _ _____________________________________________________________________________________________________________________________________________________________________________
2_._2_______C__o__n_n e_c_t_i_o n__s_______________________________________________________________________________ 2/4 __ _ ___ __ _ 2_._2 I_n_s__t_a__ll_i_n__g__t_h__e__s t_w__a__r_e__k__e__y_____________________________________________________________2_ /4 __ _ __-_1 ___ __o __f_ 2_._2 C n_e io t_o__m in o_w r_s__o__u__r_c_e___________________________________________________2_ /4 _ __ __-_2 ___ __o __n__ __c __t_ __n ___ ___a__ ___p__ ___e__ 2_._2 n_e in h_e 1_7 e_r_m a_l__t_o__t_h P__L__C_______________________________2_ /5 _ __ __-_3 ___C __o __n__ __c __t_ __g ___t_ ___F __T __X ___4 __ __-_2 __0 ___t_ ___i_n__ __e ___ 2_._2 n_e in h_e 0_7 h_e __ _ __-_4 ___C __o __n__ __c __t_ __g ___t_ ___F __T __X ___5 __ ___t_e __r_m __i_n __a __l_t_o ___t_ ___P __L __C ____________________________________2_ /5 2_._2 n_e in h_e P__S__/_2__o ti_b__l_e__P e__P __ _ __-_5 ___C __o __n__ __c __t_ __g ___t_ ___I_B __M ____ __r__c_o __m ___p __a__ __C ___t_o ___t_h__ __L __C ______________________2 _ /6 _____________________________________________________________________________________________________________________________________________________________________________
2_._3_______So Sof a_r_e In all ati io n____________________________________________________________________ 2/8 _ __ ___f_t_w ___ __Ins ___s __t_al __l_at ___ ___ _ 2_._3 P__r_e__li_m p_s_________________________________________________________________________2 /8 __ _ __-_1 ___ ___in __a __r_y __s __t_e__ __ 2_._3 In ll_a__t_io p_r__o_c__e__d_u 2_ /8 __ _ __-_2 ___ __s __t_a__ __n ___ __r_e ____________________________________________________________________ __ _ _________________________________________________________________________________________________________
2_._4_______P__L_7 s_______________________________________________________________________________2/10 _ __ __-_3 __F __i_l_e__ ___ This section ends on page
2/10
____ __ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ___ _ 2/1
A
A ___________________________________________________________________________
2.1
Hardware Check
_________________________________________________________________________________________________________________________
To use PL7-3 software, you need the following hardware : • An FTX 417-20, an FTX 507 terminal or an IBM PS/2 or compatible PC (see Section 1.2 for required configuration), equipped with the OS/2 operating system and the X-TEL or MINI X-TEL software workshop. • A terminal / PLC connecting cable, in the case of an FTX 417-20 or FTX 507 terminal. • A terminal / PLC connection assembly in the case of an IBM PS/2 or compatible PC, composed of : - An RS 232C / current loop converter - A converter / micro-computer connecting cable with a 9-pin connector - A converter / micro-computer connecting cable with a 25-pin connector - A converter / PLC connecting cable. • A PL7-3 software pack comprising : - Four 3 1/2" diskettes - A software key - The PL7-3 V5 reference manual TXT DR PL7 3 V5E - The OFB diagnostic manual TXT DM FBD V4E - This manual TXT DM PL7 3 V5E.
___________________________________________________________________________ 2/2
Installation
2
___________________________________________________________________________
Terminal
Terminal/PLC connection assembly
Software pack
FTX 417-20
T FTX CB 7 4
Diskettes
FTX 507
T FTX CB 7 5
Software key
TSX TAC 03 TSX CTC 00 TE approved IBM PS/2 or compatible PC
Converter/PLC cable
TSX TE 01 RS232/CL converter
Documentation TXT DR PL7 3 V5E TXT DM PL7 3 V5E TXT DM FBD V4E
TSX CTC 01 Converter/microcomputer cable
TSX CTC 02 Converter/microcomputer cable
TSX SCC 02 Software key support
___________________________________________________________________________ 2/3
A
A ___________________________________________________________________________
2.2
Connections
_________________________________________________________________________________________________________________________
The connections specific to the terminal (monitor, keyboard, mouse, printer) are described in the manufacturer's documentation. This section theref ore describes only the installation of the software key and the following connections : • The connection of the terminal to the main power source. • The connection of the terminal to the PLC.
_________________________________________________________________________________________________________________________
2.2-1 Installing the software key Install the software key in the empty slot in the software key support. This operation must be done with the terminal powered down. Note The software key contains the right of use necessary to access the PL7-3 software. The Key Manager delivered with the software workshop allows this right of use to be transferred to the master key. This makes the PL7-3 software key unusable and it can therefore be removed, thus freeing the corresponding slot on the software key support.
_________________________________________________________________________________________________________________________
2.2-2 Connection to the main power source Before making any connections to the main power source, check that each of the elements of the system is correctly adjusted to operate on your mains power voltage (220V or 110V). Then, observing the precautions indicated in the manufacturers' document ation, connect the various elements to the main power source : • Terminal • RS232/current loop converter • PLC.
___________________________________________________________________________ 2/4
Installation
2
___________________________________________________________________________ 2.2-3 Connecting the FTX 417-20 terminal to the PLC This connection requires the T FTX CB 7 4 connecting cable
T FTX CB 7 4 Mains _________________________________________________________________________________________________________________________
2.2-4 Connecting the FTX 507 terminal to the PLC This connection requires the T FTX CB 7 5 connecting cable
Serial link connector
T FTX CB 7 5
25-pin parallel link connector
Mains
___________________________________________________________________________ 2/5
A
A ___________________________________________________________________________ 2.2-5 Connecting the IBM PS/2 or compatible PC to the PLC This connection requires the TSX TAC 03 connection kit and is performed in three steps : 1 1 Checking the configuration of the TSX TE 01 converter
The converter is normally adjusted at the factory, however it is advisable to check the positions of the switches and jumpe rs : • Remove the cover from the case by inserting a screwdriver in one of the slots on the side of the case and turning it until the cover can be lifted off. • Check that the positions of the 13 switches and the 4 jumpers are correct (see the diagram below). • Set switch S4 to the required voltage : 110V or 220V. X7 1 2
Front panel
3 X6
1 2
3 X5
1 2
3
Top view case open
S1
S2
1
1
S3 3 4
1
3
X4 1 2
3
2 3 4
2
5
2
4
IMPORTANT The connection may be damaged i f these settings are not correct, or if an y other type of converter is used.
___________________________________________________________________________ 2/6
Installation
2
___________________________________________________________________________ 2 2 Connecting the PLC programming port to the converter
This connection uses the TSX CTC 00, wired as shown below : 1
•
2
•
3
•
4
•
5
•
OV
6
•
-REC
7
•
-EMI
8
•
+12V
9
•
+REC
+EMI
Red
• 1
R+
White
• 2
R-
White
• 3
T+
Blue
• 4
T-
• 5
9-pin connector on PLC programming port
“LINE CONNECTION” 5-pin screw terminal on the converter
3 3 Connecting the converter to the computer
This connection uses the TSX CTC 01 or TSX CTC 02 cable connected between the 9-pin or 25-pin "serial link" connector on the computer and the 25-pin connector (“V24/ RS-232 C CONNECTION”) on the converte r.
IBM PS/2
Mains Software key support Mains
TSX CTC 00
TSX CTC 02
Converter Mains
___________________________________________________________________________ 2/7
A
A ___________________________________________________________________________
2.3
Software Installation
_________________________________________________________________________________________________________________________
2.3-1 Preliminary steps Before installing the PL7-3 software on the hard disk, it is recommended that you : • Read the license and guarantee certificates concerning the restrictions that apply to copying and installing the software. • Make back-up copies of the original installation diskettes and use the back-up copies to work with, so as to avoid accidental damage to the originals. IMPORTANT The PL7-3 diskettes are delivered set to the "write protect" position, which should not be altered.
_________________________________________________________________________________________________________________________
2.3-2 Installation procedure The following operations must be carried out before installing the PL7-3 software: 1 • Check that the X-TEL or MINI X-TEL software workshop is already installed (refer to the corresponding instruction manual). Should this be the case, continue installing PL7-3. Otherwise you must install the software workshop first (refer to the corresponding instruction manu al). 2 • Close all ongoing sessions (refer to the corresponding instruction manual ).
___________________________________________________________________________ 2/8
Installation
2
___________________________________________________________________________ Installing PL7-3 software • • • •
Start a full-screen OS/2 session, Insert PL7-3 diskette No. 1 in the disk drive, Identify the drive containing the diskette (a: or b:) and press
, After the new prompt (for example : [a:\] or [b:\]), enter the commandinstall and press , • Follow the procedure displayed on the screen : replace diskette No.1 by diskette No.2 when requested to do so and then press , • When the installation is complete, insert the Grafcet OFB disk in the disk drive, then enter the command install and press , • When the installation is complete, install the OFBs in the PL7-DIAG family in the same way (refer to the corresponding instruction manual).
Note If PL7-3 already exists on the station where PL7-3 GLD or PL7-3 GLT is being installed, a warning message is displayed. Installation can then be interrupted by pressing on the keyboard. The same is also true when installing PL7-3, if PL7-3 GLD or PL7-3 GLT already exist on the station.
Important Under OS/2 2.1, if the screen display under PL7-3 has been altered, reinstall the X-TEL or MINI X-TEL software workshop using the command : install FIX21
At the end of installation, reinitialise the work station using the command : .
___________________________________________________________________________ 2/9
A
A ___________________________________________________________________________
2.4
PL7-3 Files
_________________________________________________________________________________________________________________________
PL7-3 files are identified b y a name of 8 characters maximum, followed by a suffix of 3 characters which indicates the type of file. They are stored in the various sub-directori es of the software workshop. The application and modular documentation files are stored by the station under the PL7_3 sub-directory : APP PL7_3
APPLI
MOD
xxx.APP xxx.IOC
application description I/O configuration
xxx.BIN
PL7-3 application binary file
xxx.DAT xxx.XR1 to xxx.XR4 xxx.TIT xxx.DES xxx.CA1 to xxx.CA8 xxx.NET xxx.COM xxx.CRT xxx.DOC xxx.SYM xxx.MRK
data storage cross-references cross-references title page general information I/O wiring (racks 0/1) I/O wiring (racks E/F) network information program comments documentation cartridge documentation printed in a file table of mnemonics V3 (binary) marker for cross-references
xxx.MOD xxx.LAD xxx.LIT xxx.GR7 xxx.CST xxx.OBC xxx.OBM
table of modules Ladder source archive (1) Literal source archive (2) Grafcet source archive constant word source archive OFB constant word source archive OFB constant word source archive (elementary module level) documentation menu table of V4 mnemonic symbols (ASCII) module comments V4 macro-modules V5 macro-modules data screen program address
xxx.CDE xxx.SCY xxx.COM xxx.MCR xxx.M5M xxx.DDA xxx.DPR PL7-3 also manages the following files : xxx.TMP temporary file xxx.BAK back-up file xxx.OFB OFB file (in system space only).
(1) Except PL7-3 GLT (2) Except PL7-3 GLD ___________________________________________________________________________ 2/10