Electroshock Electroshock (N) Touching hot parts (N) Preparation Ensure everyone is trained and knows the task Ensure relevant vessel /rig personnel are aware of the tasks to be conducted Assess environmental environmental conditions ( weather, wet ground etc.) Ensure worksite is free of obstructions and haards are known /marked Ensure the right tools and e!uipment are at hand "heck the tools and e!uipment before use Ensure ade!uate communications "onfirm location of e!uipment and cable routes with relevant personnel •
eet in$ury (%&) -amage to e!uipment (') -elay in ops (0)
• • • •
•
+ibrations and hiplash (N)
•
lanning of activity pecific 2ask 2ask lan (-+) pecific E!uipment layout (-+) Everyone aware of the task 3 2#2 and '+A. (") Ensure that personnel not involved in operations is kept clear of working area (4"5") ersonnel training (+) -efine roles of personnel on deck and establish positioning during operations (4"5") upervised operations (") "ertified E!uipment (") Ensure all portable tools a re regularl# inspected and maintained (PC) All moving machinery machinery should be guarded guarded as far as possible (4"5") (4"5") Ensure safety devices are not bypassed or removed (operator) Implementation o& Permit to -ork Procedure as appropriate (PC) rotective e!uipment to be worn as per the above (operator) above (operator) 4erify the voltage provided to each e!uipment (operator) Ensure safety devices are maintained as operational and that operators know the location of these devices and how to use them (4") "learly marked and well defined electrical disconnects (4"5") "onsideration given to environmental conditions prior to starting work &o work to be undertaken in adverse weather conditions (")
•
•
•
Emergency esponse lans6 4essel / ig ro$ect incident reporting and investigation procedure "ontingency plan
%parks! ebris (N) $a,ard trip/slips (N)
7.
se o& tools +ake sure that only the ade!uate tools for the $ob are used +ake sure that ade!uate working positions are employed Ensure worksite is left safe and clear
$and Pinching (N)
•
•
•
•
•
Contact ith point# ob*ects! sharp sur&aces (N) Electroshock Electroshock (N) Tripping / severing cables (N) Tripping/slipping/&alling on the same level/ &rom height (N)
Page 0 &rom 1
'imb/torso/head/internal organs in$ury due to fall (%&) #urns, in$ury, death due to electroshock (%&)
• •
• • •
+usculoskeletal disorders (%)
• •
E!uipment loss (')
• •
%ustained / &re'uent ph#sical e&&ort (N)
-amage to e!uipment (')
ropping e'uipment (N)
-elay in ops (0)
•
•
lanning of activity pecific 2ask 2ask lan (-+) pecific E!uipment layout (-+) Everyone aware of the task 3 2#2 and '+A. (") Ensure that personnel not involved in operations is kept clear of working area (4"5") Ensure that a safety perimeter is established (") ersonnel training (+) -efine roles of personnel on deck and establish positioning during operations (4"5") upervised operations (") 2eam work (") "ertified E!uipment (") -efine roles of personnel on deck and establish positioning during operations (4"5") rotective e!uipment to be worn as per the above arness and work vests to be worn for near/over the side works (operator) Ensure all portable tools a re regularl# inspected and maintained (PC)
•
•
•
Emergency esponse lans6 4essel / ig ro$ect incident reporting and investigation procedure "ontingency plan
No.
Etapele activitatii /Job steps
Pericole / Hazards
Impact posibil / Possible impact ypothermia (%&, %)
Masuri de control / Control measures 4isual checks of e!uipment and tools before operations (operator) +ake sure that only the ade!uate tools for the $ob are used (operator) +ake sure that ade!uate working positions are employed (operator) All moving machinery should be guarded as far as possible (4"5") Ensure safety devices are not bypassed or removed (operator) Implementation o& Permit to -ork Procedure as appropriate (PC) "able runs on deck should be identified as a trip haard (") +aintain good housekeeping (operator) 4erify the voltage provided to each e!uipment (operator) 4erify/ confirm that e!uipment/ cables are not under tension while working on them (operator) +aintain good communications (operator) Ensure safety devices are maintained as operational and that operators know the location of these devices and how to use them (4").
• •
Incorrect installation / rigging (2)
-rowning (%&, %) -eath (%&)
e&ective tools (2)
• • • • •
Mutual hindrance C"NT32CT"3 and +essel personnel (N) Man overboard (E)