Risk Assessment Tables (Guidance for assessing risk)
Risk Tolerability/Acceptance Tolerability/Acceptance Table Risk Rating & Rating Number
Likelihood of Occurrence Regular occurrence within the area of operations to which it refers, with the possibility of being realised once per day/shift. High Likelihood Moderate Likelihood Occasional occurrence with the possibility of being realised once per job/project/contract/month. #nlikely to occur but known to ha"e occurred in the rele"ant industry/operation/type industry/operation/type of work it refers to. Lo" Likelihood $e%erity in'ury( High $e%erity Moderate $e%erity Lo" $e%erity
&ajor !njury/'isablement/atality !njury/'isablement/atality (e.g. amputation, major fracture, poisoning, multiple injuries, occupational cancer or other se"ere life shortening diseases, acute fatal diseases). ost *ime !njury (off work for more than + working days)(lacerations, days)(lacerations, burns, concussions, serious sprains, minor fractures, deafness, dermatitis, asthma, work related upper limb disorders, ill health leading to permanent minor disability). irst id !njury, &edical id *reatment *reatment !njury (return to work after loss of 0 shifts/working days)(e.g. superficial injuries, minor cuts/bruises, eye irritation, headaches, temporary discomfort.
!ntolerable Risk
ork shall not be started or continued until the risk has been reduced. !f it is not possible to reduce the risk e"en with unlimited resources, work shall remain prohibited.
# $ubstantial Risk
ork shall not be started until the risk has been reduced. reduced. $onsiderable d erable resource resourcess may be re%uired re%uired to do this. here here the risk in"ol"es " es work in progress, urgent action shall shall be taken.
) Moderate Risk
$e%erity property/e*uipment( 1roperty/2%uipment 1roperty/2%uipment 'amage costs e-ceeding 345,555. High $e%erity Moderate $e%erity Lo" $e%erity
1roperty/2%uipment 1roperty/2%uipment 'amage costs (direct and indirect) between 345,555 and 34,555. 1roperty/2%uipment 1roperty/2%uipment 'amage costs (direct and indirect) not e-ceeding 34,555.
+ Tolerable Risk
, Lo" Risk
$e%erity en%ironmental( High $e%erity Moderate $e%erity Lo" $e%erity
Remedial Action and Timescale Timescale
ork may proceed but efforts should be made to reduce the risk below below this le"el. *he resources/costs re%uired for pre"ention should be carefully measured measured and limited. limited. Risk reduction measures and remedial action shall be implemented as soon as practicable and within one month as a ma-imum. here the moderate risk (le"el +) in"ol"es high se"erity conse%uen conse%uences, ces, further further assessmen assessmentt may be necessar necessaryy to establish establish the likelihood likelihood more precisely and determine the need for impro"ed control measures. 6o additional costs are re%uired. $onsideration may be gi"en to more cost effecti"e remedial actions or impro"eme impro"ements nts that in"ol"e no additional resources/cost burden. &onitoring is re%uired to ensure that controls are maintained and in place. Risk cceptable. 6o action re%uired. 'ocument findings.
2n"ironmental 2n"ironmental damage is catastrophic and/or in"ol"es prosecution, prosecution, se"ere damage to company image and substantial costs. 2n"ironmental 2n"ironmental damage e-ternal to local area and/or damage to company image and profits. 2n"ironmental damage is local and has minimal e-ternal impact.
Risk Rating & Rating Number Table High High Like Likelih lihoo ood d Mode Modera rate te Lik Likel elih ihoo ood d
Lo" Lo" Likel Likelih ihoo ood d
High $e%erity
!ntolerable risk
# 9ubstantial risk
) &oderate risk
Mode Modera ratte $e%eri %eritty
# 9ubstantial risk
) &oderate risk
+ *olerable risk
) &oderate risk
+ *olerable risk
, ow risk
Lo" $e%erity
Notes- or each ha7ard8 ha7ard8 ,( 2stimate ,( 2stimate ikelihood of Occurrence. +( 2stimate +( 2stimate 9e"erity of potential injury, property damage or en"ironmental damage. )( $ombine )( $ombine estimates to allocate !nitial Risk Rating. #( ssess #( ssess Risk *olerability or cceptance. ( !ntroduce ( !ntroduce $ontrol &easures to reduce risk. .( Reassess .( Reassess re"ised estimates of ikelihood and 9e"erity after controls implemented and allocate new risk rating. ( Reassess ( Reassess Risk *olerability and if acceptable, enter Residual Risk Rating and associated ikelihood and 9e"erity le"els. !f not repeat stages 4:.
Page 1 of 6
Risk Assessment Form Base/Area/Dept/Project: Dubai/MEAP/Operations/Azeri Baku Pipelines Project Activity/Operation/Job: Pre-coissionin!/"ydrotestin!/MEPP# Task/Job Steps
Hazard ;a7ard 'escription and 2ffect for each *ask. 6ote8 dditional ha7ards may arise from interaction with other work.
Initial Risk 1ersonnel / 2%uipment / 2n"ironment at Risk
Assessed by: Date: Controls
Residual Risk
;a7ard ikelihood of Risk ist and describe fully all $ontrols Re%uired. $rossrefers ;a7ard ikelihood of Risk 9e"erity Occurrence Rating to any other rele"ant assessment (112, $O9;;, &anual 9e"erity Occurrence Rating 6o. 6o. ;andling, O2R etc).
Prepare detailed test procedure
$oinate %ron! test pressure Over pressure syste
Daa!e to client syste
Mod
Mod
&
Procedure/job card %ill be prepared' c(ecked and approved by & separate BJ ) client personnel*
Mod
+o%
,
Prepare detailed test procedure
$oinate %ron! test liits Over pressure syste
Daa!e to client syste
Mod
Mod
&
Procedure/job card %ill be prepared' c(ecked and approved by & separate BJ ) client personnel*
Mod
+o%
,
Prepare detailed test procedure
ailure to identi.y $01s and valves Daa!e to to be ec(anically opened %it(in client syste t(e test liits 2rapped pressure in syste
Mod
Mod
&
Procedure/job card %ill be prepared' c(ecked and approved by & separate BJ ) client personnel*
Mod
+o%
,
Prepare syste .or .loodin!
ailure o. perit to %ork syste On!oin! con.lictin! %ork on t(e sae syste
Personal injury and BJ e3uipent daa!e
Mod
Mod
&
Perit to %ork syste is ad(ered to ri!idly and s(ortcoin!s/potential con.licts reported to P24 o..ice iediately*
Mod
+o%
,
Prepare syste .or .loodin!
i! up all .loodin! e3uipent Muscle / back strain .ro ovin! (eavy e3uipent
Personal injury
Mod
Mod
&
ollo% all !uidelines laid out durin! +o% sa.ety induction and BJ "#E anual* Personnel trained in anual (andlin! tec(ni3ues* 5tes over 67 8!s to be li.ted by , or ore people*
+o%
9
Prepare syste .or .loodin!
5nstall incorrectly rated teporary (ose / blinds / spades Overpressure o. teporary e3uipent
BJ e3uipent daa!e
Mod
Mod
&
Ad(ere at all ties to procedure' all teporary e3uipent to be certi.ied and pre-tested*
Mod
+o%
,
Prepare syste .or .loodin!
se o. (and 2ools 2rapped / cut injured body parts
Personnel injury Mod
Mod
&
ollo% all !uide lines laid out durin! sa.ety induction and BJ "#E anual
Mod
+o%
,
Prepare syste .or .loodin!
4orkin! at (ei!(t all .ro (i!( levels
Personnel injury "i!(
Mod
6
On ly use appro ved sca..o ldin!' %ear correct (arness above , .ro .loor*
Mod
+o%
,
Risk Assessment Form Base/Area/Dept/Project: Dubai/MEAP/Operations/Azeri Baku Pipelines Project Activity/Operation/Job: Pre-coissionin!/"ydrotestin!/MEPP# Task/Job Steps
Hazard ;a7ard 'escription and 2ffect for each *ask. 6ote8 dditional ha7ards may arise from interaction with other work.
Initial Risk 1ersonnel / 2%uipment / 2n"ironment at Risk
Assessed by: Date: Controls
Residual Risk
;a7ard ikelihood of Risk ist and describe fully all $ontrols Re%uired. $rossrefers ;a7ard ikelihood of Risk 9e"erity Occurrence Rating to any other rele"ant assessment (112, $O9;;, &anual 9e"erity Occurrence Rating 6o. 6o. ;andling, O2R etc).
Prepare detailed test procedure
$oinate %ron! test pressure Over pressure syste
Daa!e to client syste
Mod
Mod
&
Procedure/job card %ill be prepared' c(ecked and approved by & separate BJ ) client personnel*
Mod
+o%
,
Prepare detailed test procedure
$oinate %ron! test liits Over pressure syste
Daa!e to client syste
Mod
Mod
&
Procedure/job card %ill be prepared' c(ecked and approved by & separate BJ ) client personnel*
Mod
+o%
,
Prepare detailed test procedure
ailure to identi.y $01s and valves Daa!e to to be ec(anically opened %it(in client syste t(e test liits 2rapped pressure in syste
Mod
Mod
&
Procedure/job card %ill be prepared' c(ecked and approved by & separate BJ ) client personnel*
Mod
+o%
,
Prepare syste .or .loodin!
ailure o. perit to %ork syste On!oin! con.lictin! %ork on t(e sae syste
Personal injury and BJ e3uipent daa!e
Mod
Mod
&
Perit to %ork syste is ad(ered to ri!idly and s(ortcoin!s/potential con.licts reported to P24 o..ice iediately*
Mod
+o%
,
Prepare syste .or .loodin!
i! up all .loodin! e3uipent Muscle / back strain .ro ovin! (eavy e3uipent
Personal injury
Mod
Mod
&
ollo% all !uidelines laid out durin! +o% sa.ety induction and BJ "#E anual* Personnel trained in anual (andlin! tec(ni3ues* 5tes over 67 8!s to be li.ted by , or ore people*
+o%
9
Prepare syste .or .loodin!
5nstall incorrectly rated teporary (ose / blinds / spades Overpressure o. teporary e3uipent
BJ e3uipent daa!e
Mod
Mod
&
Ad(ere at all ties to procedure' all teporary e3uipent to be certi.ied and pre-tested*
Mod
+o%
,
Prepare syste .or .loodin!
se o. (and 2ools 2rapped / cut injured body parts
Personnel injury Mod
Mod
&
ollo% all !uide lines laid out durin! sa.ety induction and BJ "#E anual
Mod
+o%
,
Prepare syste .or .loodin!
4orkin! at (ei!(t all .ro (i!( levels
Personnel injury "i!(
Mod
6
On ly use appro ved sca..o ldin!' %ear correct (arness above , .ro .loor*
Approved by ;$ae<: #i!nature:
Task/Job Steps
Approved by ;2itle<: Date:
Hazard ;a7ard 'escription and 2ffect for each *ask. 6ote8 dditional ha7ards may arise from interaction with other work.
Initial Risk 1ersonnel / 2%uipment / 2n"ironment at Risk
;a7ard ikelihood of 9e"erity Occurrence
Mod
+o%
,
Pa!e , o. =
Controls
Risk ist and describe fully all $ontrols Re%uired. $rossrefers Rating to any other rele"ant assessment (112, $O9;;, &anual 6o. ;andling, O2R etc).
Residual Risk ;a7ard ikelihood of 9e"erity Occurrence
Risk Rating 6o.
lood syste
Drainin! %ater #oakin! adjacent %orkin! personnel
Personnel injury
+o%
Mod
,
4 (en drainin! %ater %arn as any people as possible and onitor t(e draina!e pat( o. t(e %ater* >over all electrical e3uipent*
+o%
+o%
9
lood syste
#plas(ed by (i!( velocity %ater Eye injury
Personnel injury "i!(
+o%
&
se o. correct PPE adv ised durin! induction and in "#E anual*
+o%
+o%
9
Prepare .or (ydrotest
4orkin! at (ei!(t all .ro (i!( levels
Personnel injury "i!(
Mod
6
On ly use appro ved sca..o ldin!' %ear correct (arness above , .ro .loor*
Mod
+o%
,
Prepare .or (ydrotest
ailure o. perit to %ork syste On!oin! con.lictin! %ork on t(e sae syste
E3uipent and plant daa!e
"i!(
Mod
6
Perit to %ork syste is ad(ered to ri!idly and s(ortcoin!s/potential con.licts reported to P24 o..ice iediately*
Mod
+o%
,
Prepare .or (ydrotest
i! up all "ydrotestin! e3uipent Muscle / back /strain .ro ovin! (eavy e3uipent
Personnel injury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
+o%
+o%
9
Prepare .or (ydrotest
5nstall incorrectly rated teporary pipe%ork / (oses / blinds / spades Overpressure o. teporary e3uipent se o. (and 2ools 2rapped injured body parts
BJ e3uipent and personnel injury
Mod
"i!(
6
Ad(ere at all ties to procedure* All Mod teporary e3uipent to be pre-tested prior to (ook up to clients syste*
+o%
,
Personnel injury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
Mod
+o%
,
Prepare .or (ydrotest
"ydrotest syste
Over pressurise syste >lient syste >ritical .ailure / rupture o. pipe%ork
"i!(
Mod
6
tilise syste over pressure protection device .itted upstrea o. test !au!e on (ydrotest injection ani.old*
Mod
+o%
,
"ydrotest syste
$on testin! personnel %orkin! on systes under pressure >ritical .ailure
"i!(
Mod
6
Mod
+o%
,
Depressurise / drain
2rapped Pressure in syste
Personnel injury Mod
Mod
&
ollo% all !uidelines on Perit to %ork* Ad(ere to barriers / si!ns recoended in procedure* $o unaut(orised personnel in test area* ollo% all !uidelines on Perit to
Mod
+o%
,
All personnel in test area
Task/Job Steps
Hazard ;a7ard 'escription and 2ffect for each *ask. 6ote8 dditional ha7ards may arise from interaction with other work.
Initial Risk 1ersonnel / 2%uipment / 2n"ironment at Risk
;a7ard ikelihood of 9e"erity Occurrence
Controls
Risk ist and describe fully all $ontrols Re%uired. $rossrefers Rating to any other rele"ant assessment (112, $O9;;, &anual 6o. ;andling, O2R etc).
Residual Risk ;a7ard ikelihood of 9e"erity Occurrence
Risk Rating 6o.
lood syste
Drainin! %ater #oakin! adjacent %orkin! personnel
Personnel injury
+o%
Mod
,
4 (en drainin! %ater %arn as any people as possible and onitor t(e draina!e pat( o. t(e %ater* >over all electrical e3uipent*
+o%
+o%
9
lood syste
#plas(ed by (i!( velocity %ater Eye injury
Personnel injury "i!(
+o%
&
se o. correct PPE adv ised durin! induction and in "#E anual*
+o%
+o%
9
Prepare .or (ydrotest
4orkin! at (ei!(t all .ro (i!( levels
Personnel injury "i!(
Mod
6
On ly use appro ved sca..o ldin!' %ear correct (arness above , .ro .loor*
Mod
+o%
,
Prepare .or (ydrotest
ailure o. perit to %ork syste On!oin! con.lictin! %ork on t(e sae syste
E3uipent and plant daa!e
"i!(
Mod
6
Perit to %ork syste is ad(ered to ri!idly and s(ortcoin!s/potential con.licts reported to P24 o..ice iediately*
Mod
+o%
,
Prepare .or (ydrotest
i! up all "ydrotestin! e3uipent Muscle / back /strain .ro ovin! (eavy e3uipent
Personnel injury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
+o%
+o%
9
Prepare .or (ydrotest
5nstall incorrectly rated teporary pipe%ork / (oses / blinds / spades Overpressure o. teporary e3uipent se o. (and 2ools 2rapped injured body parts
BJ e3uipent and personnel injury
Mod
"i!(
6
Ad(ere at all ties to procedure* All Mod teporary e3uipent to be pre-tested prior to (ook up to clients syste*
+o%
,
Personnel injury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
Mod
+o%
,
Prepare .or (ydrotest
"ydrotest syste
Over pressurise syste >lient syste >ritical .ailure / rupture o. pipe%ork
"i!(
Mod
6
tilise syste over pressure protection device .itted upstrea o. test !au!e on (ydrotest injection ani.old*
Mod
+o%
,
"ydrotest syste
$on testin! personnel %orkin! on systes under pressure >ritical .ailure
"i!(
Mod
6
Mod
+o%
,
Depressurise / drain
2rapped Pressure in syste
Personnel injury Mod
Mod
&
ollo% all !uidelines on Perit to %ork* Ad(ere to barriers / si!ns recoended in procedure* $o unaut(orised personnel in test area* ollo% all !uidelines on Perit to
Mod
+o%
,
All personnel in test area
Approved by ;$ae<: #i!nature:
Task/Job Steps
Approved by ;2itle<: Date:
Hazard ;a7ard 'escription and 2ffect for each *ask. 6ote8 dditional ha7ards may arise from interaction with other work.
Initial Risk 1ersonnel / 2%uipment / 2n"ironment at Risk
;a7ard ikelihood of 9e"erity Occurrence
Pa!e & o. =
Controls
Risk ist and describe fully all $ontrols Re%uired. $rossrefers Rating to any other rele"ant assessment (112, $O9;;, &anual 6o. ;andling, O2R etc).
Residual Risk ;a7ard ikelihood of 9e"erity Occurrence
Risk Rating 6o.
syste
uture release o. pressurised .luid critical .ailure
%ork* Ad(ere to barriers / si!ns recoended in procedure*
Depressurise / drain syste
Drainin! %ater #oakin! adjacent %orkin! personnel
Personnel injury
+o%
Mod
,
4 (en drainin! %ater %arn as any people as possible and onitor t(e draina!e pat( o. t(e %ater* >over all electrical e3uipent*
+o%
+o%
9
e-instate syste
De-ri! o. "ydrotestin! e3uipent Muscle / back / strain .ro ovin! (eavy e3uipent
Personnel injury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
+o%
+o%
9
e-instate syste
se o. (and 2ools 2rapped injured body parts
Personnel 5njury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
Mod
+o%
,
e-instate syste
4 ork in! at (ei!(t all .ro (i!( levels
Personnel 5njury "i!(
Mod
6
On ly use appro ved sca..o ldin!' %ear correct (arness above , .ro .loor*
Mod
+o%
,
e-instate syste
5nstall e3uipent incorrectly uture .ailure o. process syste
>lient syste
"i!(
Mod
6
>opletion o. einstateent >(eck s(eet by BJ and client*
Mod
+o%
,
e-instate syste
se o. (ydraulic bolt tensionin! and Personnel injury Mod tor3uin! e3uipent Muscle / back / strain .ro ovin! (eavy e3uipent
Mod
&
2rained and 3ua li. ie d personnel on Mod site to carry out bolt tensionin! %orks* Assistance !iven %(en (andlin! (eavy objects* 2%o an li.tin!*
+o%
,
e-instate syste
se o. (ydraulic bolt tensionin! and >lient syste e3uipent 5ncorrect tensionin!' loose bolts
Mod
6
Bolt tensionin! procedures .ollo%ed' Mod .ully trained personnel to carry out t(e bolt tensionin! operations*
+o%
,
"i!(
Task/Job Steps
Hazard ;a7ard 'escription and 2ffect for each *ask. 6ote8 dditional ha7ards may arise from interaction with other work.
Initial Risk 1ersonnel / 2%uipment / 2n"ironment at Risk
;a7ard ikelihood of 9e"erity Occurrence
Controls
Residual Risk
Risk ist and describe fully all $ontrols Re%uired. $rossrefers Rating to any other rele"ant assessment (112, $O9;;, &anual 6o. ;andling, O2R etc).
;a7ard ikelihood of 9e"erity Occurrence
Risk Rating 6o.
syste
uture release o. pressurised .luid critical .ailure
Depressurise / drain syste
Drainin! %ater #oakin! adjacent %orkin! personnel
Personnel injury
+o%
Mod
,
4 (en drainin! %ater %arn as any people as possible and onitor t(e draina!e pat( o. t(e %ater* >over all electrical e3uipent*
+o%
+o%
9
e-instate syste
De-ri! o. "ydrotestin! e3uipent Muscle / back / strain .ro ovin! (eavy e3uipent
Personnel injury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
+o%
+o%
9
e-instate syste
se o. (and 2ools 2rapped injured body parts
Personnel 5njury Mod
Mod
&
o llo% all !uidelines la id out durin! sa.ety induction and BJ "#E anual
Mod
+o%
,
e-instate syste
4 ork in! at (ei!(t all .ro (i!( levels
Personnel 5njury "i!(
Mod
6
On ly use appro ved sca..o ldin!' %ear correct (arness above , .ro .loor*
Mod
+o%
,
e-instate syste
5nstall e3uipent incorrectly uture .ailure o. process syste
>lient syste
"i!(
Mod
6
>opletion o. einstateent >(eck s(eet by BJ and client*
Mod
+o%
,
e-instate syste
se o. (ydraulic bolt tensionin! and Personnel injury Mod tor3uin! e3uipent Muscle / back / strain .ro ovin! (eavy e3uipent
Mod
&
2rained and 3ua li. ie d personnel on Mod site to carry out bolt tensionin! %orks* Assistance !iven %(en (andlin! (eavy objects* 2%o an li.tin!*
+o%
,
e-instate syste
se o. (ydraulic bolt tensionin! and >lient syste e3uipent 5ncorrect tensionin!' loose bolts
Mod
6
Bolt tensionin! procedures .ollo%ed' Mod .ully trained personnel to carry out t(e bolt tensionin! operations*
+o%
,
Approved by ;$ae<: #i!nature:
%ork* Ad(ere to barriers / si!ns recoended in procedure*
"i!(
Approved by ;2itle<: Date:
Pa!e 6 o. =
Risk Assessment 0 1ob $ite Re%ie" 2orm 1age 6o8 Assessment No-
4
1ob No/3ro'ect No-
4ork $copeLocationNote- !f 1rocedure $hange $ontrol pro"isions apply during the job this form shall be used for the re%uired assessment re"iew.
Ha5ards / Risks on 6eneral Risk Assessment "hich are not applicable for this 4ork $cope(!dentify by no. and description).
#se continuation sheet if out of space.
Ha5ards / Risks "hich ha%e not been identified in 6eneral Risk Assessments "hich are applicable for this 4ork $cope - (
Risk Assessment 0 1ob $ite Re%ie" 2orm 1age 6o8 Assessment No-
4
1ob No/3ro'ect No-
4ork $copeLocationNote- !f 1rocedure $hange $ontrol pro"isions apply during the job this form shall be used for the re%uired assessment re"iew.
Ha5ards / Risks on 6eneral Risk Assessment "hich are not applicable for this 4ork $cope(!dentify by no. and description).
#se continuation sheet if out of space.
Ha5ards / Risks "hich ha%e not been identified in 6eneral Risk Assessments "hich are applicable for this 4ork $cope - (
#se continuation sheet if out of space.
7ontrol Measures to be utilised to minimise these additional Ha5ards / Risks(ull 'escription of $ontrol &easures to be implemented).
#se continuation sheet if out of space.
! confirm that ! ha"e read the General Risk ssessment pro"ided for this ork 9cope and ha"e sur"eyed the work site, where the additional risks ha"e been identified. *hey are listed abo"e and control measures suggested.
1ob $ite Re%ie" 3erformed by-
8ate-
! confirm that ! ha"e read and understood both the General Risk ssessment and this =ob 9ite ssessment Re"iew, which are pro"ided for this ork 9cope. (*o be signed by all personnel in"ol"ed in this ork 9cope i.e. all <= and $lient/*hird 1arty as appropriate). (#se re"erse if not enough space below for signatures).
Name 3rinted(
$ignature
Name 3rinted(
$ignature
Risk Assessment 0 1ob $ite Re%ie" 2orm 7ontinuation $heet Assessment No-
1age 6o8
>
1ob No/3ro'ect No-
4ork $copeLocationNote- !f 1rocedure $hange $ontrol pro"isions apply during the job this form shall be used for the re%uired assessment re"iew.
Ha5ards / Risks on 6eneral Risk Assessment "hich are not applicable for this 4ork $cope(!dentify by no. and description).
#se continuation sheet if out of space.
Ha5ards / Risks "hich ha%e not been identified in 6eneral Risk Assessments "hich are applicable for this 4ork $cope - (
#se continuation sheet if out of space.
7ontrol Measures to be utilised to minimise these additional Ha5ards / Risks(ull 'escription of $ontrol &easures to be implemented).
#se continuation sheet if out of space.