Materials aterials used used are as per per the the appro approved ved delivery delivery inspect inspection ion (MIR) IR)
2
Check installation of air temination network which composed of but not limited to the following: Air Terminal, Copper Tape, Down Conductor, etc. is carried-out as per the approved shop drawing and methodology
3
Check air terminals and copper tapes are securely anchored and clamped at proper intervals
4
Check tightness of bonding between the roof & down conductors and test link
5
Check all exposed equipments and metal /steel works in the roof are securely bonded to the air termination network
6
Check installation of earth temination network which composed of but not limited to the following: Test Link, Earth Rod, Earth Pit, Main Earth Loop, etc. is carried-out as per the approved shop drawing and methodology
7
Check test link location is in accessible position for isolation/ disconnection of the air termination network and enable testing of the earth termination network
8
Check èarth èarth rods are driven in the t he approved location and are are provided with earth pit to allow access for bonding of main earth loop and LPS earth lead to the earth rod
9
Check tightness of bonding between the earth rod, main earth loop, LPS earth lead and test link
10
Check earth pit is provided with appropriate label, engraved "LPS Earth Below"
11
Lightning Protection System installation is complete as per project requirements and is ready for testing and commissioning
NO
Rem ar k s / Co m m en t s
N/A
The above above activiti es are found to be as per cont ract requirements and are ready for release.
The above above activiti es are correct and released released for the next activi ty.
Ch ec k ed b y :
Ver i f i ed b y (A EB El ec t r i c al En g i n eer ):
a. Site Electrical Engineer
b. Site QA/QC Engineer
Name/Signature
Name/Signature
Date
Date
Name / Signature Date
Checkin ingg and and appr approv oval al by AEB shall shall not not relie relieve ve the the Cont Contra ract ctor or from from his oblig obligat atio ionn to perf perfor orm m the the work work in accor accorda danc ncee with with othe otherr contr contract act docu docume ment ntss and and HSE HSE requ require ireme ment nts. s. This Note: Check inspection Checklist is a guide and shall be considered in the routine inspections BUT not limited to it.
Checklist for Installation of GI Conduit AccessoriesAEB - CSD Quality Forms