SC Nr. Nr. 7 from from cycl cyclon ones es Nr. Nr. 1
6.00
10.45
14°
0.70
10
0.30
0.25
60.00
2.50
0.72
1.50
60
4.00
1.50
6.00
G-11
SC Nr. 8 reciving stick water concentrate
25.20
25.20
11°
0.75
45
0.50
0.35
70.00
2.80
8.59
11.00
75
140 / 5
4.00
1.50
6.00
140 / 5
I T EM
DESCRIPTION
Length (m)
INCLINA TION
Specific Gravity
capacity (ton/h)
Spiral Screw Diameter(m)
Pitch (m)
RPM
k
Calculated requirement (kW)
Recommended requirement (kW)
Shaft diameter (mm)
Central Pipe (Dia/Thk) (mm)
U-Trough thickness (mm)
Cover Thickness (mm)
Helicoid Thickness (mm)
G-14
SC. Nr 9 to dryer Nr. 2
29.73
29.73
11°
0.75
45
0.50
0.35
70.00
2.80
10.14
15.00
75
4.00
1.50
6.00
G-15
SC Nr Nr 10 horizo horizonta ntall feed feed to to dryer dryer Nr. 2
6.00
10.50
0°
0.75
45
0.50
0.35
55.00
2.80
3.58
7.50
75
4.00
1.50
6.00
G-18
SC Nr. 11 discharge of dryer Nr. 2
6.96
10.60
0°
0.70
19
0.50
0.35
38.00
2.30
1.23
3.00 (5.50 *)
75
4.00
1.50
6.00
G-19
SC Nr. Nr. 12 12 disch discharg arge e of cyclon cyclones es Nr. Nr. 2
6.00
10.73
0°
0.70
8
0.30
0.25
40.00
2.30
0.53
1.50 (2.20 *)
60
4.00
1.50
6.00
G-20
SC Nr. 13 to SC Nr 11
7.03
7.03
4°
0.70
8
0.30
0.25
40.00
2.30
0.35
2.20
60
4.00
1.50
6.00
G-21
VERTICAL Screw conveyor Nr. 1
8.50
8.50
90°
0.70
26
G-22
SC Nr. 15 to cooling area
23.50
23.50
0°
0.70
26
0.50
0.35
38.00
2.30
3.89
5.50
75
140 / 5
4.00
1.50
6.00
K-01 K-01
FREE FREE (eli (elimi mina nate ted) d)
K-09 K-09
FREE FREE (eli (elimi mina nate ted) d)
K-11 K-11
FREE FREE (eli (elimi mina nate ted) d)
K-12 K-12
FREE FREE (eli (elimi mina nate ted) d)
K-13
SC Nr. 20 to feed air chiller
5.00
5.00
0°
0.70
26
0.50
0.35
40.00
2.30
0.83
2.20
75
4.00
1.50
6.00
K-34
SC Nr. 21 discharge of air chiller
4.25
4.25
0°
0.70
26
0.50
0.35
40.00
2.30
0.70
2.20
75
140 / 5
4.00
1.50
6.00
K-36
SC Nr. 22 to grinding system
26.35
26.35
18°
0.70
26
0.50
0.35
60.00
2.30
4.36
7.50
75
140 / 5
4.00
1.50
6.00
L-02
SC Nr. 23 to Antioxidant mixer
15.50
15.50
19°
0.70
26
0.50
0.35
60.00
2.30
2.57
5.50
75
140 / 5
4.00
1.50
6.00
L-04
SC Nr. 24 to bagging machines
18.90
18.90
22°
0.70
26
0.50
0.35
60.00
2.30
3.13
5.50
75
140 / 5
4.00
1.50
6.00
L-07
SC Nr. 25 ov er bagging machines
6.80
6.80
0°
0.70
26
0.50
0.35
40.00
2.30
1.13
2.20
75
4.00
1.50
6.00
NOTE: Gear motors for Screw conveyors highligth in yellow, yellow, are already at the factory Screw conveyors highlight in green, are already at the factory and will need only some modification and shall not be quoted. * : Because these motors are available in the factory Central pipe is the pipe which spiral screws are welded to it (outer diameter and thickness is given in the table) Shaft diameter is the diameter at end of shaft in connection to the electromotor (outer diameter is given in the table) The required screws are: G09-G11-G14-G22-K34-K36-L02-L04